(A): Activity N is in critical path. (R): Earliest finish time and latest finish time for Activity N are same, Select the correct answer: a) A is correct but R is not correct b) Both A and R is correct c)R is correct but A is not correct d)Both A and R is incorrect Leave blank

Answers

Answer 1

A is correct but R is not correct. Project managers employ the critical path method (CPM), a project management tool, to make precise project schedules.

Thus, Project managers employ the critical path method (CPM), a project management tool, to make precise project schedules.

The CPM approach, sometimes referred to as critical path analysis (CPA), involves utilizing a network diagram and the CPM formula to describe a project's task sequences graphically.

The crucial path is determined by calculating the duration of various task sequences or paths after they have been defined. You may apply the critical path method fast with ProjectManager, a project management tool. On our acclaimed Gantt chart, create a project schedule, and then simply filter for the key path.

Thus, A is correct but R is not correct. Project managers employ the critical path method (CPM), a project management tool, to make precise project schedules.

Learn more about CPM, refer to the link:

https://brainly.com/question/30467078

#SPJ4


Related Questions

Differentiate between Consolidated Undrained (CU) triaxial test, Consolidated drained (CD) triaxial test and Unconsolidated Undrained (UU) triaxial test.

Answers

Answer:

Explanation:

The difference between Consolidated Undrained (CU) triaxial test, Consolidated drained (CD) triaxial test and Unconsolidated Undrained (UU) triaxial test is as follows;

Consolidated Undrained (CU) Triaxial Test:

 In a Consolidated Undrained (CU) triaxial test, the soil specimen is first consolidated under an applied vertical stress before shearing is initiated.

 During the test, no drainage is allowed to occur, meaning the pore water pressure is not measured or controlled.

 The test is performed under undrained conditions, where the soil is not allowed to drain or dissipate excess pore water pressure.

 CU triaxial tests are typically used to determine the undrained shear strength and stress-strain behavior of cohesive soils.

 The test provides information about the soil's shear strength and its behavior under rapid loading conditions.

Consolidated Drained (CD) Triaxial Test:

 In a Consolidated Drained (CD) triaxial test, the soil specimen is first consolidated under an applied vertical stress before shearing is initiated.

 During the test, drainage is allowed to occur, meaning the pore water pressure is measured and controlled.

 The test is performed under drained conditions, where the excess pore water pressure is allowed to dissipate during the test.

 CD triaxial tests are typically used to determine the drained shear strength and stress-strain behavior of soils.

 The test provides information about the soil's shear strength and its behavior under slow or gradual loading conditions.

Unconsolidated Undrained (UU) Triaxial Test:

 In an Unconsolidated Undrained (UU) triaxial test, the soil specimen is not consolidated before shearing is initiated.

 During the test, no drainage is allowed to occur, meaning the pore water pressure is not measured or controlled.

 The test is performed under undrained conditions, where the soil is not allowed to drain or dissipate excess pore water pressure.

 UU triaxial tests are typically used to determine the undrained shear strength and stress-strain behavior of cohesionless soils.

 The test provides information about the soil's shear strength and its behavior under rapid loading conditions.

In summary, the key differences between CU, CD, and UU triaxial tests lie in the consolidation process and the drainage conditions during the test. CU and CD tests involve consolidation before shearing, but differ in whether drainage is allowed or not, while UU tests are performed without prior consolidation.

1. Discuss what are the types of structures LRT1 (L1), LRT2 (L2)
and MRT3 (L3) alignment have.
2. Discuss the track system of L1, L2, L3 and PNR.

Answers

1. LRT1 (L1), LRT2 (L2), and MRT3 (L3) have elevated viaducts, stations, ramps, and tunnels along their alignments.

2. The track system of L1, L2, L3, and PNR consists of elevated tracks supported by viaducts, equipped with rails, sleepers, switches, crossings, and signaling systems.

The alignments of LRT1 (L1), LRT2 (L2), and MRT3 (L3) feature various types of structures. These include elevated viaducts, which are elevated platforms that support the tracks and allow trains to run above ground level.

Additionally, there are stations along the alignment where passengers board and alight from the trains. Ramps are constructed to provide smooth transitions between different levels of the track system.

The track systems of L1, L2, L3, and PNR consist of elevated tracks supported by viaducts, ensuring stability and providing a platform for trains to run on. These tracks are laid with rails and sleepers, which maintain the alignment and support the weight of the trains. The system includes switches and crossings to allow trains to change tracks or merge with other lines.

Signaling systems are implemented to control train movements and ensure safe operations. This comprehensive track system facilitates the smooth and efficient functioning of the LRT and MRT lines, as well as the Philippine National Railways (PNR).

Learn more about efficient functioning here:

https://brainly.com/question/4675322

#SPJ4

A four-lane undivided highway has a lane width of 12 ft. a design superelevation of 8%, and a normal crown of 2%. This highway will curve to the right and the superelevation will be attained by rotation about the centerline and using the one-third and two thrid rule. The length of the simple curve is 980 ft. The station of PC is (120+65) and its elevation (as the road centerline) is 400 ft. Calculate the transition length and the length of the full superelevated portion of the curve?
a. 398.4 ft 767.52 tt
b. 79.68 ft: 980 ft
c. 399.52 ft 400 ft
d. 318.72 ft: 106.24 ft

Answers

A four-lane undivided highway has a lane width of 12 ft. a design superelevation of 8%, and a normal crown of 2%. This highway will curve to the right and the superelevation will be attained by rotation about the centerline and using the one-third and two thrid rule. The transition length and the length of the full superelevated portion of the curve  318.72 ft: 106.24 ft which is in option D.

Given: Lane width (W) = 12 ft ,Design superelevation (e) = 8% ,Normal crown (C) = 2% ,Length of the simple curve (L) = 980 ft ,Station of PC (SPC) = 120+65 ,Elevation of SPC = 400 ft

Transition Length (T): The transition length is the portion of the curve where the super elevation gradually increases or decreases. It can be calculated using the one-third rule:

T = (V/100) × L

where V is the rate of super elevation change per station.

In this case, the rate of super elevation change is 2% per station since the super elevation is attained by rotation about the centerline.

T = (2/100) × 980 T = 19.6 ft

Full Super elevated Portion Length (F): The full super elevated portion length is the remaining length of the curve after the transition.

F = L - T

F = 980 - 19.6

F = 960.4 ft

Therefore, the transition length is approximately 19.6 ft, and the length of the full super elevated portion of the curve is approximately 960.4 ft.

Learn more about the curve length calculation here

https://brainly.com/question/31849991

#SPJ4

The ratio of the maximum principal stress to the minimum principal stress on an element is 24. If the element is subjected to oy 55.4 MPa and oy 55.4 MPa, what is the value of the shear stress, Txy the element is subjected to (in MPa)? Please provide the value only and in 2 decimal places

Answers

The value of the shear stress (Txy) on the element is  53.09 MPa.

To find the value of the shear stress (Txy) on the element, we can use the equation for the maximum principal stress (σ₁) and the minimum principal stress (σ₂) in relation to the normal stress (σ) and shear stress (τ):

σ₁= σ + τ

σ₂ = σ - τ

Given that the ratio of σ₁ to σ₂ is 24, we can write the equation:

σ₁ / σ₂ = 24

Now, let's substitute the given values:

σ₁ = 55.4 MPa

σ₂ = 55.4 MPa

55.4 / (55.4 - τ) = 24

Simplifying the equation:

55.4 - τ = 55.4 / 24

55.4 - τ = 2.30833333333

τ = 55.4 - 2.30833333333

τ = 53.09 MPa

Therefore, the value of the shear stress (Txy) on the element is  53.09 MPa.

To learn more on Shear stress click:

https://brainly.com/question/31789722

#SPJ4

At the point of support of a cable, the tension is 25% greater than the tension at the low point. The cable weighs 1 b per ft and the sag is 20 ft. If the points of support are on the same level, find the span. What is the length of the cable?

Answers

Based on the information, it should be noted that the span is 25 ft and the length of the cable is 55 ft.

How to calculate the value

The total tension at the support is equal to the horizontal component of the tension plus the vertical component of the tension.

We know that the total tension at the support is 1.25 times the weight of the cable per unit length times the sag. So, we can write the following equation:

1.25 * (weight per unit length * sag) = (weight per unit length * span)

span = 1.25 * sag

We know that the sag is 20 ft. So, the span is 1.25 * 20 ft

= 25 ft.

The length of the cable is equal to the span plus twice the sag. So, the length of the cable is 25 ft + 2 * 20 ft

= 55 ft.

Therefore, the span is 25 ft and the length of the cable is 55 ft.

Learn more about length on

https://brainly.com/question/28108430

#SPJ4

foundation engineering
please answer all in short
- What is the problem of Pisa tower - Why the silo was failed - Why the pyramids are made of this shape - Why every kind of structure has a different type of foundation - Why we use deep foundations -

Answers

The problem of the Pisa Tower lies in its unstable foundation, leading to a gradual tilt over time.

The silo failed due to the build-up of excess pressure from the stored material, resulting in structural failure.

The pyramids are made in a specific shape, with a wide base and tapering sides, to distribute the weight evenly and provide stability against collapse.

Different structures require different types of foundations because of variations in loads, soil conditions, and structural requirements.

Deep foundations are used to transfer a load of a structure to deeper, more stable layers of soil, ensuring stability and preventing settlement.

The problem with the Pisa Tower is primarily attributed to its foundation. The tower was built on soft clay soil, which caused differential settlement. As a result, the tower started to tilt. This occurred because the soil underneath the foundation was unable to adequately support the weight of the structure.

Silo failure can occur due to various reasons, such as poor design, inadequate construction, or improper maintenance. One common cause is the build-up of excessive pressure from the stored material, leading to structural failure. This can happen if the silo is overloaded or if the material is not properly distributed or discharged.

The pyramids were constructed with a wide base and gradually tapering sides to distribute the weight of the structure more evenly. This shape helps to prevent excessive stress concentrations at specific points and provides stability against collapse under the weight of the pyramid itself.

Different structures have different foundation requirements because of variations in factors such as loads, soil conditions, and structural characteristics. Heavy structures or structures on weak soils may require deep foundations, while lighter structures or those on stable soils may be suitable for shallow foundations. The foundation type is chosen based on a detailed analysis of these factors to ensure the stability and safety of the structure.

Deep foundations are utilized when the upper layers of soil are unable to provide sufficient bearing capacity or when shallow foundations would result in excessive settlement. Deep foundations transfer the load of the structure to deeper, more competent layers of soil or rock, ensuring stability and minimizing settlement. Various types of deep foundations, such as piles and drilled shafts, are designed and installed based on the specific soil and structural conditions encountered at a site.

Learn more about  stability here :

https://brainly.com/question/32412546

#SPJ11

Your survey instrument is at point "A". You take a backsight on point "B" (Line A-B tus a backsight bearing of N
80 15 42 E you measure 88°16'12" degrees right to Point C. Which quadrant is line A-C in?
O NEW
NW14
SE CO

Answers

To determine which quadrant line A-C is in, we need to analyze the bearings and angles provided. line A-C is in the southeast quadrant.

The backsight bearing from A to B is N80°15'42"E, which means it is in the northeastern quadrant. The bearing indicates that B is located to the northeast of A.

The measured angle from A to C is 88°16'12" right. "Right" indicates a clockwise rotation from the reference direction. Adding this angle to the backsight bearing of N80°15'42"E results in the new bearing from A to C.

Adding the angles:

N80°15'42"E + 88°16'12" = N168°32'54"E

The new bearing from A to C is N168°32'54"E.

Since the bearing N168°32'54"E falls between 90° and 180° in the eastern hemisphere, line A-C is in the southeast quadrant.

To know more about quadrant click the link below:

brainly.com/question/28687705

#SPJ11

5- What is unique about using graph theory in risk management? *
a. It is mapping and analyzing risk in a natural way
b. Cause can be risk or consequence at the same time
c. You can have work more efficiently if you are on a very tight budget
a and b
a and c
a, b, and c
7- Nodes of the network of risk are repressing risk factors. *
True
False
Subjective
8- Nodes of the network of risk are repressing causes.
True
False
Subjective

Answers

The ongoing process of identifying, analyzing, evaluating, and treating loss exposures, as well as keeping an eye on risk management and available funds to lessen the negative effects of loss, is known as risk management.

Financial hazard costs for claims and liability verdicts. operational dangers like strikes by workers. perimeter hazards such as changes in the weather or politics. Among the strategic risks include management changes and reputational harm and risk management.

By defining risk as everything that could keep the business from accomplishing its goals, enterprise risk management broadens the scope of risk management.

Despite the fact that accidental losses are unavoidable and unplanned, there are ways to make things more predictable.

Thus, The ongoing process of identifying, analyzing, evaluating, and treating loss exposures, as well as keeping an eye on risk management and available funds to lessen the negative effects of loss, is known as risk management.

Learn more about Risk management, refer to the link:

https://brainly.com/question/28118361

#SPJ4

I usually have a sandwich at my desk but very lunch with colleagues. I go out for
1.Hardly
2.Often
3.Quit often
4.Never
I---- study very hard, so I usually get high grades in school.
1. Ever
2. Always
3. Usually
4. How often

Answers

I usually have a sandwich at my desk but very rarely have lunch with colleagues. I go out for lunch alone.

I usually study very hard, so I usually get high grades in school.

For the first statement:

1. Hardly - This means that you rarely go out for lunch with colleagues.

2. Often - This means that you frequently go out for lunch with colleagues.

3. Quite often - This means that you go out for lunch with colleagues more than just often, indicating a higher frequency.

4. Never - This means that you never go out for lunch with colleagues.

For the second statement:

1. Ever - This indicates that you study very hard at least sometimes.

2. Always - This means that you consistently study very hard and never deviate from it.

3. Usually - This means that you study very hard most of the time, but there may be some exceptions.

4. How often - This is not a response option but a question, asking for clarification on the frequency of studying very hard.

Learn more about Preposition here:

https://brainly.com/question/1649561

#SPJ4

The design tensile strength phi rnt of one bolt, 5/8 inch in
diameter A325 (Group A) is equal to:
18.6 kips
33.5 kips
48.9 kips
or 20.7 kips

Answers

The design tensile strength phi rnt of one bolt, 5/8 inch in diameter A325 (Group A) is equal to 18.6 kips which is in first option as design tensile strength φRnt of a bolt refers to the maximum tensile load that the bolt can withstand before failure.

It's important to note that the design tensile strength may vary depending on factors such as the bolt size, material grade, and specific application requirements. Therefore, it is crucial to consult relevant design codes and standards, such as the American Institute of Steel Construction (AISC) specifications, for accurate and up-to-date information on bolt design and strength.

Learn more about the strength here.

https://brainly.com/question/32336860

#SPJ4

A steel beam with a simple span of 8m is subjected to a moment M at the left end (counterclockwise) and 20% of M at the right end (counterclockwise). The beam is laterally unsupported and the section has the following properties: Ty = 0.053m S₂ = 0.00206m³ d = 0.533m = 248MPa by: = 0.210m t = 0.016m 148.80 97.97 128.88 150.943 Other:

Answers

To determine the maximum bending stress in the steel beam, calculate the moment at the critical section located at the midspan of the beam using the formula M_max = M + 0.2M. Then, divide this moment by the section modulus S₂ to obtain the maximum bending stress.

Given:

Span of the beam: 8m

Moment at the left end (counterclockwise): M

Moment at the right end (counterclockwise): 20% of M

To find the maximum moment, we need to consider the worst-case scenario, which occurs when the left end moment (M) is applied at the entire span. Therefore, the maximum moment is M.

Next, we need to determine the location of the maximum moment. Since the beam is laterally unsupported, the maximum moment occurs at the mid-span. Thus, the location of the maximum moment is at the center of the beam, which is 4m from either end.

To know more about moment click the link below:

brainly.com/question/16973457

#SPJ11

A 30 m chain is generally divided into _____ links and each
link measures ______cm

Answers

A 30 m chain is generally divided into 100 links, and each link measures 30 cm.

A 30 m chain with 100 links is frequently used in field surveying. Each link has a length of 30 cm. During surveying operations, this division enables quick measurements and calculations.

The chain serves as a constant and trustworthy unit of measurement for distance due to its standardised length and link size.

Precision measurements at various distances are possible since each link only reflects a small portion of the entire chain.

The number of links can be counted by surveyors to estimate the distance travelled, and the links' 30 cm length makes them convenient for handling and marking.

Thus, since ancient times, this standardised chain division has been utilised to enable precise land measurements and boundary determinations.

For more details regarding measurement, visit:

https://brainly.com/question/28370017

#SPJ4

The diameter of longitudinal bars in a reinforced concrete column should not be less than 16 mm. True False

Answers

False. The diameter of longitudinal bars in a reinforced concrete column should not be less than 16 mm.

To elaborate further:Reinforced concrete is a composite material composed of steel and concrete. Reinforcing bars, or rebars, are frequently used in the formation of reinforced concrete. Concrete is a material that is quite resistant to compressive stress but weak in tensile stress, which means it can handle more weight than pull. In comparison, steel has the opposite behavior, it is strong in tensile stress but weak in compressive stress.To combat this problem, the two materials are used together to form a composite material that is both strong and sturdy. In reinforced concrete, the steel is put into the concrete, which then dries around it. The result is a material that can resist both compression and tension forces.Diameter is one of the factors to consider when designing reinforced concrete. Longitudinal bars' diameter in a reinforced concrete column is usually in the range of 12mm to 40mm. The most common diameters used in construction are 16mm, 20mm, 25mm, and 32mm. The diameter of the bars used in reinforced concrete columns is determined by the column's size and the amount of load that it will be subjected to.

Learn more about concrete :

https://brainly.com/question/28903866

#SPJ11

circular utility tunnel with a proposed radius of 3.5 m. The tunnel will be excavated horizontally in the direction 235° at a depth of 100 m below the ground surface in jointed Norite. a series of unconfined and confined laboratory compression tests were undertaken on 54 mm diameter intact drill cores collected in the vicinity of the tunnel location. Results are listed:
Y= 7.2217x + 249.85 (MC)
Y= 4425.1x + 90262 (HB) ----> From graphs that CHegg wont let me post
The available diamond drill core logs also indicate that within the zone of influence of the tunnel (2.5 times the tunnel diameter from each side of the tunnel’s boundary), one of the principle stresses is vertical (p) and related to the depth and density of the overlying strata (2.95 g/cc). The other two principle stresses are horizontal and almost 0.5 times p. In addition, typically ten (10) natural fractures and three (3) artificial joints (due to the drilling process) are reported over a distance of 100 cm in the retrieved drill cores. Making use of the above information, answer the following questions

Answers

The equation of the linear relationship between UCS and E is UCS = 7.2217E + 249.85.

The equation UCS = 7.2217E + 249.85 represents the linear relationship between unconfined compressive strength (UCS) and modulus of elasticity (E) based on the provided data. It is derived from the equation Y = 7.2217x + 249.85, where Y represents UCS and x represents E. The equation indicates that for every unit increase in E, UCS increases by 7.2217 units. The intercept term of 249.85 represents the value of UCS when E is zero. This equation allows for estimating UCS based on the given values of E.

To know more about UCS click the link below:

brainly.com/question/14451174

#SPJ11

The complete question is:circular utility tunnel with a proposed radius of 3.5 m. The tunnel will be excavated horizontally in the direction 235° at a depth of 100 m below the ground surface in jointed Norite. a series of unconfined and confined laboratory compression tests were undertaken on 54 mm diameter intact drill cores collected in the vicinity of the tunnel location. Results are listed:

Y= 7.2217x + 249.85 (MC)

Y= 4425.1x + 90262 (HB) ----> From graphs that CHegg wont let me post

Local buckling occurs in a steel column when some parts or parts of its cross section are so thin that they buckle locally in compression before the other modes of buckling can occur.
True
False

Answers

True. Local buckling is a phenomenon that occurs in a steel column when certain parts or portions of its cross section become so thin that they buckle locally under compression before other modes of buckling, such as global buckling, can take place.

It is a form of instability that affects localized areas of the column's cross section, typically due to geometric imperfections or slender sections. Local buckling can reduce the load-carrying capacity and overall stability of the column. To ensure the structural integrity and prevent local buckling, design considerations and appropriate cross-sectional dimensions need to be taken into account.

To learn more about  buckling  click on the link below:

brainly.com/question/13962653

#SPJ11

A 3.64 m long column is required to support a critical buckling load of 7.13 KN. If the column is made of a steel tube with a ratio of external diameter to the internal diameter of 1.16, determine the required external diameter (in mm). Assume that the column is made of material with Young's modulus value of 241.60 GPa, under axial compression, and it is fixed at one end and pinned at the other end. Please provide the value only and in 2 decimal places.

Answers

The value of the required external diameter of the column is 27.66 mm to 2 decimal places.

Given Data:Length of column, L = 3.64 mCritical Buckling load, P = 7.13 KNExternal diameter to the internal diameter ratio, (De/Di) = 1.16Young's modulus, E = 241.60 GPaThe slenderness ratio is given by; slenderness ratio = L/rWhere r is the least radius of gyrationLet r be the radius of the internal diameter of the tubeExternal diameter, De = (De/Di) Di = 1.16 DiLet t be the thickness of the tube, then the internal diameter is given by;Di = De/1.16 + 2tThe cross-sectional area of the column is given by;A = π/4(De² - Di²)The Euler's critical load for the column is given by; P = π²EI/L² Where I is the minimum moment of inertia and can be computed as;I = π/4(De⁴ - Di⁴)/De²

Substitute the given data in the formula to find De.

Therefore the value of the required external diameter of the column is 27.66 mm to 2 decimal places.

Learn more about slenderness ratio :

https://brainly.com/question/31953883

#SPJ11

Determine the maximum discharge of water through a circular channel of diameter 3.0 m when the bed slope of the channel is 1 in 2000. Take C=50

Answers

The maximum discharge of water through the circular channel is approximately 0.0293 cubic meters per second.

To determine the maximum discharge of water through a circular channel, we can use Manning's equation, which relates the flow rate to the channel properties. The equation is as follows:

Q = (1.49/n) * A * R^(2/3) * S^(1/2)

Where:

Q = Discharge (flow rate)

n = Manning's roughness coefficient

A = Cross-sectional area of the channel

R = Hydraulic radius

S = Bed slope

Given:

Diameter of the circular channel = 3.0 m

Radius (R) = 3.0 m / 2 = 1.5 m

Bed slope (S) = 1 in 2000

Manning's roughness coefficient (n) = 50

Now, let's calculate the cross-sectional area (A) and hydraulic radius (R) for the circular channel:

A = π * R^2

 = 3.14 * (1.5 m)^2

 ≈ 7.07 m^2

R = A / P

  = A / (2πR)

  = 7.07 m^2 / (2 * 3.14 * 1.5 m)

  ≈ 0.753 m

Substituting the values into Manning's equation, we have:

Q = (1.49 / 50) * 7.07 m^2 * (0.753 m)^(2/3) * (1/2000)^(1/2)

Calculating further:

Q ≈ 0.0293 m^3/s

Learn more about circular channels here:

https://brainly.com/question/31729077

#SPJ4

Which of the following statements about Energy Grade Line (EGL) and Hydraulic Grade Line (HGL) is incorrect?
Unless a pump is added to the pipeline, HGL decreases in the direction of the flow.
EGL is an indicator of total head throughout the pipeline system.
When the diameter of a pipe decrease, the slope of EGL will decrease (become flatter).
Valves are devices that may cause a sudden drop in the EGL and HGL.

Answers

Incorrect Statement: When the diameter of a pipe decreases, the slope of EGL will decrease (become flatter).

The slope of the Energy Grade Line (EGL) is not directly affected by changes in the diameter of a pipe. The slope of the EGL represents the energy loss or gain in the pipeline system, which is determined by factors such as friction, elevation changes, and velocity. The diameter of the pipe primarily affects the velocity of the flow, but it doesn't directly impact the slope of the EGL. Therefore, the statement suggesting that the slope of the EGL decreases when the diameter of a pipe decreases is incorrect.

To know more about diameter  click the link below:

brainly.com/question/31825682

#SPJ11

The yield moment My about the strong axis for W14x82 with Fy =
70 ksi is equal to:
933 k-ft
1295 k-ft
1850 k-ft
or 717 k-ft

Answers

The correct response is 933 kFt. We'll presume that you're converting between square feet and square inches.

Thus,  kip or ksi per square foot The pascal is the pressure unit derived from the SI. 1.4503773800722E-7 ksi or kip/square foot are the units for one pascal.

Rounding errors could happen, therefore make sure to constantly double-check your results.

For all different kinds of measuring units, ConvertUnits.com offers an online conversion calculator. Metric conversion tables for SI units, English units, money, and other data are available. Enter the complete names, symbols, or abbreviations for the length, area, mass, pressure, and other unit types.

Thus, The correct response is 933 kFt. We'll presume that you're converting between square feet and square inches.

Learn more about Length, refer to the link:

https://brainly.com/question/29133107

#SPJ4

Discussion on limitations and constraints on the use of Springs(
Minimum 05), and corrective actions which you propose (with
reasonable justifications) to lessen these.

Answers

The limitations and constraints on the use of springs include limited load capacity, fatigue and wear, temperature sensitivity, space limitations, and environmental factors.

Limitations and constraints on the use of springs can arise from various factors.

Here are five common limitations and potential corrective actions to address them:

Limited Load Capacity: Springs have a specific load capacity, and exceeding it can lead to permanent deformation or failure.

To lessen this limitation, proper load analysis and selection of springs with appropriate load ratings can be done.

Fatigue and Wear: Springs undergo cyclic loading, which can cause fatigue and wear over time, resulting in reduced performance and eventual failure.

Implementing a preventive maintenance program that includes regular inspection, lubrication, and replacement of worn or damaged springs can help mitigate this issue.

Temperature Sensitivity: Springs can be sensitive to temperature changes, which can affect their mechanical properties and performance. To address this limitation, selecting springs made from materials with good temperature stability, such as stainless steel or alloys, can help mitigate the effects of temperature variations.

Space Limitations: Springs come in various sizes and shapes, and sometimes the available space for installation is limited.

Environmental Factors: Springs may be exposed to harsh environments, including corrosive substances, moisture, or extreme temperatures, which can accelerate wear and corrosion.

These proposed corrective actions aim to address the identified limitations by improving the selection, maintenance, and design aspects of springs.

To learn more on Springs click:

https://brainly.com/question/30106794

#SPJ4

Use Bisection and False Position Method to locate the root of x3-2x+1-0 between x=-3 and -1. Stop when absolute error is less than 0.5%. Use 5 decimals in all values. Abs Error= ((Xr new - Xr old)/ Xr new)* 100%. Please show sample computations for the 1st 3 iterations for X variables and the last 3 iterations for the Abs error computations.

Answers

The bisection approach is based on the repetitive application of the intermediate value condition and is used to discover the roots of non-linear equations of the form f(x) and procedure.

Thus, The intermediate value theorem indicates that the function f has a root in the interval [a0, b0], assuming continuity of the function f.

The bisection approach, also known as the false position method, begins with two locations a0 and b0 such that f(a0) and f(b0) are of opposite signs. A series of shrinking intervals [ak, bk] that each contain a root of f are created as the procedure moves forward.

The bisection method is a root-finding algorithm that repeatedly divides an interval into subintervals before choosing one in which a root must lie. Although it is a very straightforward and reliable procedure, it is also very slow.

Thus, The bisection approach is based on the repetitive application of the intermediate value condition and is used to discover the roots of non-linear equations of the form f(x) and procedure.

Learn more about Bisection approach, refer to the link:

https://brainly.com/question/28008879

#SPJ4

Undertake a problem tree analyses of irrigation and justify why
we need it.

Answers

A systematic method for locating and examining the underlying causes and consequences of a problem is called problem tree analysis.

A issue tree analysis can be very helpful in the context of irrigation for a number of reasons.

Irrigation systems can be complicated since they involve a variety of stakeholders, technical considerations, and environmental considerations.A issue tree analysis can assist in locating the underlying or root causes of a problem by mapping out its causes and effects. Prioritising Solutions: The irrigation problem's primary causes and effects are highlighted in the problem tree analysis. Stakeholder Involvement: Farmers, policymakers, water resource managers, and experts are just a few of the stakeholders who need to be involved when conducting a problem tree analysis.Strategic Planning: The cornerstone for strategic planning in irrigation management is the problem tree analysis.

Thus, it is crucial to perform a problem tree analysis in irrigation to fully comprehend the root causes and consequences of the issue.

For more details regarding tree analysis, visit:

https://brainly.com/question/31174874

#SPJ4

Two converging tangents have azimuth of 300° and 90° respectively, while that of common tangent is 320°. The common tangent has a length of 146.19 m while the stationing of the P.I. of the first curve is 9+222.11. If the radius of the first curve is 285.40 m, determine the following: 1. Intersecting angle of converging tangents in degrees. A. 20 B. 30 C. 40 D. 50 E. 2. Tangent distance of the second curve in meters. Express answer into two decimal places. A. 55.32 B. 43.67 C. 48.34 D. 59.04 E. 3. Stationing of PRC. Express answer into two decimal places of station notation. A. 9+367.83 B. 9+481.42 C. 9+271.41 D. 9+337.08 E. 4. Stationing of PT. Express answer into two decimal places of station notation. A. 9+580.11 B. 9+523.67 C. 9+467.32 D. 9+660.95 E.

Answers

The equation of chainage at the endpoint is 113+09.309.

The stations of the Point of Curvature (PC) and Point of Tangency (PT) along the final route, as well as the equation of chainage at the endpoint, are as follows:

PC1:

Station 0+00

PT1:

Station 28+353

PC2: Station 41+03.353

PT2:

Station 69+06.706

PC3:

Station 75+56.206

PT3:

Station 104+04.559

Endpoint Station: 113+09.309

Therefore, the stations of the PCs and the PTs along the final route are as listed above, and the equation of chainage at the endpoint is 113+09.309.

Learn more about Point of Curvature here:

brainly.com/question/31705947

#SPJ4

The liquid limit is the maximum water content to avoid that the soil be considered as 'suspension'. A.True B.False

Answers

It is false that the liquid limit is the maximum water content to avoid that the soil be considered as 'suspension'. The correct option is B.

A soil's liquid limit has nothing to do with whether or not it can avoid being referred to as a "suspension."

The moisture content at which the soil changes from a plastic condition to a liquid one is known as the liquid limit, and it is a characteristic of cohesive soils (such as clay).

The Casagrande's liquid limit test, a special laboratory procedure, is used to ascertain it. In geotechnical engineering, the liquid limit is used to evaluate the consistency and behaviour of soils, particularly in relation to their plasticity and shear strength.

Thus, the correct option is B. False.

For more details regarding suspension, visit:

https://brainly.com/question/29199641

#SPJ4

2. A pentagonal prism, side of base 40 mm and height 80 mm, is resting with a side of its base or the ground, the axis inclined at 30° to the HP and 50º to the VP.

Answers

The orientation of the geometric solids prism and the measurements provided allow us to determine its position and shape. The formula for calculating the volume of geometric solids and surface area of the prism ensures accurate measurements.

A pentagonal prism with a side length of 40 mm and a height of 80 mm is resting on one of its pentagonal bases. The axis of the prism is inclined at 30° to the Horizontal Plane (HP) and 50° to the Vertical Plane (VP).

To visualize the orientation of the prism, imagine one of its pentagonal bases lying flat on the ground, with one edge pointing directly towards you. The axis of the prism is then tilted upwards by 30° from the HP and 50° from the VP.

The formula for the volume of a prism is V = base area × height. In this case, since the base is a regular pentagon, the area can be calculated using the formula for the area of a regular pentagon: Area = (5/4) × s^2 × cot(π/5), where s is the length of one side of the pentagon.

By substituting the given values, we can calculate the volume of the pentagonal prism. Once we have the volume, we can also calculate the surface area by summing the areas of all the faces.

Therefore, the orientation of the geometric solids prism and the measurements provided allow us to determine its position and shape. The formula for calculating the volume of geometric solids and surface area of the prism ensures accurate measurements.

Learn more about geometric solids and their properties here:

https://brainly.com/question/32903814

#SPJ4

(a) Compare the advantages and disadvantages of Thiessen Polygon Method and Isohyetal Method for estimating areal average rainfall of a catchment.
(b)For the catchment, with highly uneven topography, shown in Worksheet Q1, estimate the areal (average) rainfall due to a storm event occurred over that catchment. The rainfall measurements at gauges A, B, C, D and E are 15 mm, 50 mm, 70 mm, 80 mm and 25 mm, respectively.
(i) Use Thiessen Polygon method
(ii) Use Arithmetic average method
(iii) Comment on the suitability of the above two methods to the given catchment.

Answers

Thiessen polygons have a variety of uses because of how they are organized, which is analogous to many natural occurrences.

Thus, The closest point feature is given space using Thiessen polygons (see image below, right side). Every site in the defined area is closer to the central point than it is to all other locations (2D). These kind of structures, also known as Voronoi or Thiessen polyhedra, can be produced in higher dimensions.

Thiessen polygons have a variety of uses because of how they are organized, which is analogous to many natural occurrences (such as plant cells and the rubbing together of soap bubbles) and geosciences phenomena.

It  offered the example below: Based on randomly distributed sample points, soil maps are created using Thiessen polygons. It is considered that the boundary between two soil types lies halfway between two sample places with different soil types.

Thus, Thiessen polygons have a variety of uses because of how they are organized, which is analogous to many natural occurrences.

Learn more about Polygon, refer to the link:

https://brainly.com/question/14849685

#SPJ4

A floor system is supported by beams with a span L = 6 m, section bw = 40 cm, monolithically cast in a 6.5 cm thick slab. The center-to-center spacing between beams is 5 m. In the positive moment zone, they are provided with 18 bars of 1 " arranged in three layers of 6 with d = 61 cm. The resistances of the materials are f'c = 307 kg / cm² and fy = 4200 kg / cm². Find the moment resistant of the wings ( T - m , without decimals ).

Answers

The beams' moment resistance, expressed in Tm (without decimals), is around 6977 Tm.

The amount of resistance an item presents to the flow of electric current is measured by its electrical resistance.

Its counterpart quantity, electrical conductance, measures how easily an electric current flows. Electrical resistance and mechanical friction beams are conceptually comparable.

In the SI, electrical conductance beams (formerly known as the "mho") is measured in siemens (S), whereas electrical resistance is measured in ohms ().

Learn more about  resistance, from :

brainly.com/question/32301085

#SPJ4

Why kick's law is more suitable for courser
material?

Answers

Kick's law is more suitable for coarser materials due to its reliance on the size reduction ratio, which is more significant in coarse particle systems.

Kick's law is a formulation used to describe the relationship between the energy required for size reduction of a material and the reduction ratio achieved. It states that the energy required is directly proportional to the size reduction ratio raised to a power exponent. In simpler terms, the larger the reduction ratio, the more energy is needed to break down the material.

Coarser materials typically have larger particle sizes compared to finer materials. When these larger particles are subjected to size reduction processes such as crushing or grinding, they require more energy to be broken down into smaller sizes. Kick's law takes into account this size reduction ratio and provides a means to estimate the energy required for coarse particle systems.

In contrast, for finer materials with smaller particle sizes, other laws such as Rittinger's law or Bond's law may be more suitable. These laws consider factors such as the surface area of the particles, which becomes more significant in finer materials. However, for coarser materials, where the reduction ratio plays a dominant role, Kick's law provides a better approximation of the energy requirements for size reduction.

learn more about Kick's law here:

https://brainly.com/question/2046221

#SPJ11

Compute the distance only between points "A" and point "B" Point A- N 1147.8000 E 710.4700 E 138.5700 Point B N 1489.1700 7226 666.04' O 450.12¹ O 341.37'

Answers

To compute the distance between points "A" and "B" using the given coordinates, we can use the Euclidean distance formula:the distance between points "A" and "B" is approximately 6526.84 units.

Distance = √[(x2 - x1)^2 + (y2 - y1)^2 + (z2 - z1)^2]

Where (x1, y1, z1) are the coordinates of point "A" and (x2, y2, z2) are the coordinates of point "B".

Using the provided coordinates:

Point A: N 1147.8000 E 710.4700 E 138.5700

Point B: N 1489.1700 E 7226 666.04' O 450.12¹ O 341.37'

Converting the coordinates to a consistent format:

Point A: N 1147.8000 E 710.4700 E 138.5700

Point B: N 1489.1700 E 7226.66604' O 450.12¹ O 341.37'

Calculating the distances:

Distance = √[(7226.66604 - 710.4700)^2 + (450.12 - 138.5700)^2 + (341.37 - 0)^2]

Distance = √[(6516.19604)^2 + (311.55)^2 + (341.37)^2]

Distance ≈ √[(42505557.77) + (97044.03) + (116648.21)]

Distance ≈ √[42614249.01]

Distance ≈ 6526.84

To know more about Euclidean click the link below:

brainly.com/question/14418082

#SPJ11

A Flag Boshielo dam in Limpopo province of SA is getting full and dry on the consecutive of five years cycle. The irrigators using the Dam water complained to DWS authority through their WUA (water user association). On the basis of hydrological data : rainfall ,stream flow,temperature,evaporation and humidity ,the DWS engineers realised that such happening is taking place due to impact of climate change. You are asked to collect the above hydrological data from 2005 year to 2022 year of a stressed dam catchment in Limpopo province or any other stressed province in SA from DWS,ARC,SAWS or elsewhere and justify on the basis of data analysis that the event is happening due to impact of climate change. If in your view, if the event is not happening due to impact of climate change, discuss the possible reasons of above said problem. Hint: Use Excel and analyse the results and prediction based on: correlations, regression and trend analysis, use thoroughly the massages of the obtained data.

Answers

You would need to collect pertinent hydrological data for the particular location of interest in order to analyse how climate change may affect the water levels in a dam or watershed.

This information may consist of factors such as precipitation, stream flow, temperature, evaporation, humidity, and others.

Once you have the data, you may analyse the trends and correlations within the dataset using a variety of analytical approaches in Excel or other statistical tools. You may want to think about the following methods:

Correlation research.Analysis of regression.Trend evaluation.

Thus, this way, one can perform the given task.

For more details regarding analytical approaches, visit:

https://brainly.com/question/8275963

#SPJ4

Other Questions
What is the present value (PV) today of $500,000 that you will receive after 20 years if the discount rate is 25 percent? (Choose the number closest to the correct answerl. a. P V=5124.500 b. PD=512.600 CPP=510.120 d. P V=$5.765 E. px=12.250 QUESTION 5 [20 Marks] It is significant to consider how ethical behaviour can be managed as these can bring about numerous changes in the organisation. Provide a critical evaluation of ethical issues that can arise during a change process, and suggest strategies that management can implement to promote ethical change initiatives. Use suitable examples to support your answer. 10. Which conclusion can be reached by a comparison of events in the Soviet Union and this passage from the Constitutionof the Soviet Union?(A) Constitutional rights guarantee a free society.(B) A national constitution always guarantees human rights.(C) A constitutional guarantee must be very specific in order to be effective.(D) A constitutional guarantee may be limited by government What do you mean by work in process? Explain or describe asituation where your work in process was out of control? (Personalor professional life) .MartInez Inc. follows IRS and is adJusting and correcting Its books at the end of 2020. In revlewing Its records, the followingInformation has been complied:In 2020, the deprecation method on plant assets should be changed from sum-of-the-years-diglts to the stralght-line method due to a change In pattern of usage. The assets were purchased at the beginning of 2019 for $84,600 with an estimated useful life of four years and no res dual value. Martinez has already recorded 2020 deprecaton expense of $25,380 related to the assets, using the sum-of-the-years-diglts method.2.Ending Inventory for 2019 was overstated by $18,800; ending Inventory for 2020 Is correctly stated.The adjusted erlal balance at December 31, 2018, Includes the following amounts: Cash 535,720; Inventory 5105 1a7Accounts Payable $45,120; Retalned EarnIngs $67,680.Dividends of $28,200 and 523,500 were declared and pald on December 31, 2020, and December 31, 2019, respectively.5Share captal of $28,200 conslsts of 18,800 common shares outstanding since the company's Inceptlon.Martinez's statement of financial postion and Income statement are as follows at December 31, 2019 and 2020, before any corrections related to the information above. The December 31, 2020 statements are In draft form only and the 2020 accounts have not yet been closed. The US government has introduced a number of large-scale fiscal and monetary stimulus policies to boost the economy and employment, but it has also led to a sharp increase in fiscal deficits and debt, rising inflation, and spillover risks to the global economy. What kind of responsibility should President Biden bear for this? XYZ is evaluating the Reno project. The project would require an initial investment of $134,000 that would be depreciated to $16,700 over 6 years using straight-line depreciation. The project is expected to have operating cash flows of $46,500 per year forever. XYZ expects the project to have an after-tax terminal value of $320,000 in 3 years. The tax rate is 30%. What is (X+Y)/Z if X is the project's relevant expected cash flow in year 3, Y is the project's relevant expected cash flow in year 5, and Z is the project's relevant expected cash flow in year 2? A number equal to or greater than 9.50 but less than 11.91 A number equal to or greater than 13.61 but less than 15.45 A number equal to or greater than 7.38 but less than 9.50 A number less than 7.38 or a rate greater than 15.45 A number equal to or greater than 11.91 but less than 13.61 O O O Barry Cuda currently has $20,000 in his Roth IRA which has been earning 7%. Barry is planning on depositing $6000 annually for the next 35 years into this IRA. Assuming Barry's IRA continues earning 7% annually, what will Barry's IRA be worth at the end of 35 years? $1,113,020 $1,042,980 $849,440 $967,955 All of the following are factors supporting a penetration strategy EXCEPT:Question 23 options:,O. The ability of a low price to serve as a purchase incentive. O. The presence of protection against competitive price matching. O. Market conditions favoring a pioneer advantage. O. All of the above are factors supporting a penetration strategy Consider a student studying for a biology exam. Would you expect study time to be subject to diminishing returns? Suppose productivity is measured as the anticipated increase in the exam score. Construct a numerical example in which the first hour is twice as productive as the second hour, which is twice as productive as the third hour, and so on up to five hours of study QUESTION 8 (Start on a new page.) Two metal spheres, P and T, on insulated stands, carry charges of +3 x 10 C and -6 x 10 C respectively. +3 x 10C 8.1 The spheres are allowed to touch each other and are then placed 1,5 m apart as shown below. 8.2 8.3 8.4 -6 x 10C II 1.5m In which direction will electrons flow while spheres P and T are in contact? Write down only FROM P TO T or FROM T TO P Calculate the net charge gained or lost by sphere P after the spheres have been in contact Calculate the number of electrons transferred during the process in QUESTION 8.2 A third sphere R, canying a charge of 3 x 10C, is NOW placed between P and T at a distance of 1 m from T Calculate the net force experienced by sphere R as a result of its interaction with P and T. (3) (2)9 can someone please answer in clear and consise steps, thankyou!Task 1 You are starting a new business in which you have decided to sell two products instead of just one. Determine a business you could start and choose two products that you could sell. How much of pump is being used to lift water from the bottom tank through a pipe of diameter (d) at discharge (Q). The total head loss can be calculated as (h, = K[V2/2g]), where (V) is the flow velocity in the pipe. The elevation differene between the pump and tank surface is (h). Given the values of h (m), d (cm), and K [-), calculate the maximum dishcharge (Q) in [Lit/s] byond which cavitation would take place at the pump inlet (section 1). th Pump For each of the following distributions, let X, Xn be a random sample. Is there a function of 8, say g(0), for which there exists an unbiased estimator whose variance attains the Cramr-Rao Lower Bound? If so, find it. If not, show why not. (a) f(xl 0) = 0x8-1, 00 Using the image below as a reference, what particle sizes are likely to be carried by wind? very fine sand very coarse sand silt Libscomb Technologies' annual sales are $5,575,381 and all sales are made on credit, it purchases $3,979,764 of materials each year (and this is its cost of goods sold). Libscomb also has $505,946 of inventory, $540,126 of accounts receivable, and $434,645 of accounts payable. Assume a 365 day year. What is Libscombs Inventory Period (in days)? Consider the economy of Hicksonia: Use the information provided in the table above to derive the IS and LM equations. Then calculate the equilibrium real output and interest rate in Hicksonia. [Note: the real interest rate should be expressed as a "whole" number.] A $23,240 loan is to be settled by making payments of $6,748 at the end of every three months. The interest is 4.59% compounded annually.a) Find the number of payments in the term.N=b) Fill in the missing values of the amortization schedule below.Payment No.0.1.2.3.4.Payment Amount PMT.01 $2 $3 $4 $Interest PortionIRN.01 $2 $3 $4 $Principal PortionPRN.01 $2 $3 $4 $Loan BalanceBAL. $23,24001 $2 $3 $4 $ list five criteria that characterizes causal associations accordingto Hills1)2)3)4)5) TRUE / FALSE. "q17Question 17 In Monopolistic Competition, sellers try to develop differentiated offers for different customer segments. True O False"