Design the RTL code and testbench in Verilog of the following system. Your report should include the block diagram and timing waveforms (both handwritten and from the simulation) of the design. 1. Garage system Max no of cars are 10 • Inputs: Cik Reset_n Car_entry_request Car_exit_request Open_entry_door Open_exit_door Garage_is_complete Hint: Show block diagram and timing waveforms Ouputs:

Answers

Answer 1

A block diagram of an AM signal detector is displayed. Recovery of the modulating signal from the modulated carrier wave is the process of detection.

Thus, The output is created by first passing the form's modulated signal via a rectifier. The message signal is contained in this signal envelope. The signal is routed via an envelop detector to produce the modulating signal, m(t).

Using a Ramp generator and a few circuit configurations, PWM pulse can be monitored. But how can a pulse width modulated signal be detected or demodulated. All of the decoding principles are explained in the block diagram itself.

In earlier articles, we spoke about the PWM generator circuit using 741 op-amps. A synchronous pulse can be used to quickly decode the PWM-based coded message.

Thus, A block diagram of an AM signal detector is displayed. Recovery of the modulating signal from the modulated carrier wave is the process of detection.

Learn more about Block diagram, refer to the link:

https://brainly.com/question/13441314

#SPJ4


Related Questions

Give regular expressions for the following languages.
a)The language of all strings over {a, b} with length 2.
b)The language of all strings over {a, b} with length greater
than 2.
c)The language of all strings over {a, b} with length less than
2.
d)The language of all strings over {a, b} with length divisible
by 3.
e)The language of all strings over {a, b} that contain at most 2
a’s
f)The language of all strings over {a, b} that does not contain
two consecutive a’s
g)The language of all strings over {a, b} except the empty
string.
h)The language of all strings over {0,1} that have neither the
sub-string 000 nor the sub-string 111. In other words, the language
contains all strings for which neither symbol ever appears more
than twice consecutively.
i)The language of all strings over {a, b} that have a b in every
odd position (first symbol is considered position 1; empty string
should be accepted).
j)The language of all strings over {a, b} that contain a number
of a’s that is divisible by 3.
k)The language of all strings over {a, b} that contain both bab
and aaa as sub-strings.

Answers

Regular expressions provide concise pattern matching for strings, enabling efficient manipulation based on specific conditions or patterns in the alphabet {a, b}. They are valuable tools for string-processing tasks

a) Regular expression for strings of length 2 over {a, b}: (a|b)(a|b)

b) Regular expression for strings of length greater than 2 over {a, b}: (a|b)(a|b)(a|b)+

c) Regular expression for strings of length less than 2 over {a, b}: (a|b)

d) Regular expression for strings of length divisible by 3 over {a, b}: ((a|b)(a|b)(a|b))*

e) Regular expression for strings with at most 2 a's over {a, b}: (babab*)|ε

f) Regular expression for strings without consecutive a's over {a, b}: (b|ε)(ba)*

g) Regular expression for all strings over {a, b} except the empty string: (a|b)+

h) Regular expression for strings without consecutive 000 or 111 over {0,1}: (0|1)[^000]+(0|1)[^111]+(0|1)*

i) Regular expression for strings with a b in every odd position over {a, b}: b(a|b)b(a|b)b*

j) Regular expression for strings with a number of a's divisible by 3 over {a, b}: (babab*)(a(aa)(a(aa)))*

k) Regular expression for strings containing both bab and aaa as substrings over {a, b}: (a|b)*bab(a|b)aaa(a|b)

In conclusion, regular expressions are powerful tools for defining patterns and matching strings in various languages. The provided regular expressions represent specific languages or criteria within the given alphabet {a, b}. By using these regular expressions, you can effectively describe and identify strings that meet the specified conditions or patterns. Regular expressions enable efficient and flexible handling of string manipulations and pattern-matching tasks.

To learn more about legal person, Visit:

#SPJ11

Briefly explain what stakeholders are in system development and
provide two examples.

Answers

Stakeholders in system development are individuals or groups with a vested interest in the system's success. Examples include users who interact with the system and management/executives.

Stakeholders in system development are individuals, groups, or organizations that have a vested interest in the success of a system being developed. They are the people who are affected by or can influence the system and its outcomes.

Stakeholders play a crucial role in providing input, feedback, and support throughout the system development lifecycle.

Examples of stakeholders in system development include:

1) Users: Users are stakeholders who directly interact with the system being developed. They are the individuals or groups who will utilize the system to perform their tasks or achieve their goals. For example, in the development of a customer relationship management (CRM) system, the sales team, customer support representatives, and marketing personnel would be the users.

Their feedback and requirements are essential for ensuring that the system meets their needs and enhances their productivity.

2) Management and Executives: Management and executives are stakeholders who have a strategic interest in the system development process. They provide guidance, allocate resources, and make decisions related to the system development project.

They are responsible for defining the overall goals and objectives of the system and ensuring that it aligns with the organization's strategic vision.

For instance, in the development of an enterprise resource planning (ERP) system, the Chief Information Officer (CIO) and other top-level executives would be stakeholders who are responsible for making decisions regarding the implementation and integration of the system across different departments.

Other examples of stakeholders in system development may include project managers, system developers, IT support staff, external vendors or consultants, regulatory bodies, and end customers or clients.

It is important to identify and engage stakeholders throughout the development process to ensure their needs are considered, and their perspectives are incorporated into the final system design and implementation.

Learn more about Stakeholders:

https://brainly.com/question/15532995

#SPJ11

int count; //constructor

Answers

The given code is not a complete code since it only provides a declaration of an integer variable named count and a comment that says constructor. This code would only be functional if it is part of a class or if it is placed within a function.

In programming, a constructor is a method that runs when a new object is created. The role of a constructor is to initialize the class variables and prepare the object for use. If a constructor is not defined, a default constructor is automatically provided by the compiler which initializes all the class variables to their default values. If a constructor is defined, then the default constructor will not be created, and it is the responsibility of the programmer to create a constructor to initialize the class variables.

A constructor is used to initialize the class variables and prepare the object for use. The constructor has the same name as the class and does not have any return type, not even void. When an object of the class is created, the constructor is called automatically.

For example, the following code declares a class named Example with a constructor that initializes the variable x with a value of 0:class Example {public:Example() {x = 0;}int x;};

When an object of Example is created, the constructor is called automatically, and the variable x is initialized to 0. For example:Example obj; // Creates an object of Examplecout << obj.x; // Prints 0

Learn more about default constructor: https://brainly.com/question/13267120

#SPJ11

Q: 4) Here is the project description according to that give answers:
There is A landscaping company currently has no software systems or experience using a software system, everything is achieved using paper methods currently. The landscaping company must track their customers, including each customers schedule for when their landscaping needs servicing, what services need to be performed each time and need to ensure the system takes care of sending invoices and tracking payments received. The landscaping company would also like to be as efficient as possible, making sure they schedule customers who live close to each other on the same day. This would save gas and time, to not have to drive far between customers. A daily map of their route would be an excellent benefit to help with efficiently as well.
The company has 5 employees. One employee does in office work (answering the phone, handling invoices, billing and payments). The other 4 employees perform the actual work in two teams (pairs) to complete the landscaping jobs for the day.
So give the answer .
1) Project Definition
2) Scope of the project (You need to mention clearly what has to be included and excluded from scope)
3)Project Deliverables

Answers

1) Project Definition: The project description talks about a landscaping company that presently does everything using paper methods and has no experience in using a software system.

2) Scope of the project: Develop a software system that will allow the company to keep track of their customers, schedules, services, sending invoices, and tracking payments received.

3) Project Deliverables: Software system for tracking customers, schedules, services, invoices, and payments received.

1) Project Definition: The landscaping company needs to keep track of their customers, schedules, services provided, sending invoices and tracking payments received. It also needs to schedule customers that live close to each other on the same day to save gas and time. A daily map of their route would help with efficiency. The company has 5 employees. One employee performs the in-office work, and the other four work in two teams to complete the landscaping jobs of the day. Develop a scheduling algorithm that schedules customers who live close to each other on the same day.

2) Scope of the project: The algorithm must optimize routes to save gas and time. Develop a dashboard that the in-office worker can use to handle invoices, billing, and payments. Excluded from the scope of the project: Designing a mobile application.

3) Project Deliverables: Scheduling algorithm that optimizes routes to save gas and time. Dashboard for the in-office worker to handle invoices, billing, and payments.

Learn more about Project at https://brainly.com/question/18279420

#SPJ11

C++ ONLY. I am trying to increment the value returned by a member function Function() of an object pointer pointer of type Object. In the implementation, Function returns a private int value called m_value. I have the following code written in the main module:
Object *pointer;
pointer = new Object(someUnimportantValue);
pointer->Function() = pointer->Function() + 1;
I get an error "lvalue required as left operand of assignment", but I already have an lvalue in the equation. How do I fix this?

Answers

The reason you're getting the error "lvalue required as left operand of assignment" is that you cannot assign a value to a returned value of a member function. It's a temporary value, and it can't be assigned a new value. The statement `pointer->Function() = pointer->Function() + 1;` won't work because `pointer->Function()` returns a temporary value.

Instead, you should use a temporary variable to store the returned value and then increment it. Here's the corrected code:

Object *pointer;
pointer = new Object(someUnimportantValue);
int temp = pointer->Function();
temp = temp + 1;
pointer->SetFunction(temp);

Here, I've created a temporary variable `temp` to store the value returned by `Function()`. Then, I've incremented `temp` by 1. Finally, I've used another member function called `SetFunction()` to set the new value of `m_value`. Here's what the implementation of `SetFunction()` should look like:void Object::SetFunction(int value)
{
   m_value = value;
}Note that `SetFunction()` is a member function of the `Object` class that takes an integer argument `value`. It sets the value of `m_value` to the value of the argument.

To know more about  temporary variable visit :

https://brainly.com/question/31538394

#SPJ11

A universal logic gate is one, which can be used to generate any logic function. Which of the following is a universal logic gate? O XOR AND OOR ONAND

Answers

The correct answer is the XOR (Exclusive OR) gate is a universal logic gate.

A universal logic gate is a gate that can be used to implement any logic function. By combining multiple XOR gates and properly connecting their inputs and outputs, it is possible to create circuits that can perform any logical operation. This property makes the XOR gate a universal building block for constructing complex digital systems.

On the other hand, the AND, OR, and NAND gates are not universal logic gates. While they are fundamental gates used in digital circuits, they cannot generate all possible logic functions on their own.

To know more about outputs visit-

brainly.com/question/32812117

#SPJ11

The autocorrelation function of the random process X(t) is given by Rx (T) = e-32/t 3 (a) Find the mean square value of X(t). (b) Find the power spectral density of X(t)

Answers

Given autocorrelation function of the random process X(t) is Rx (T) = e-32/t 3

(a)To find the mean square value of X(t) is given by:

[tex]$$\begin{aligned} E[X^2 (t)] &= \int_{-\infty}^{\infty} R_x (\tau) d\tau \\ &= \int_{-\infty}^{\infty} e^{-32|\tau|/3} d\tau \\ &= \int_{-\infty}^0 e^{-32(-\tau)/3} d\tau + \int_0^{\infty} e^{-32(\tau)/3} d\tau \end{aligned}$$Let, $\frac{32}{3} |\tau| = u$[/tex]

Thus,[tex]$d\tau = \frac{3}{32}du$$$\begin{aligned} E[X^2 (t)] &= \int_0^{\infty} e^{-u} \frac{3}{32}du + \int_0^{\infty} e^{-u} \frac{3}{32}du \\ &= \frac{3}{16} \int_0^{\infty} e^{-u}du \\ &= \frac{3}{16} \end{aligned}$$[/tex]

Therefore, the mean square value of X(t) is $\frac{3}{16}$.

(b) Power spectral density of X(t)The power spectral density of X(t) is given by:

[tex]$$\begin{aligned} S_x (\omega) &= \mathcal{F} [R_x (\tau)] \\ &= \int_{-\infty}^{\infty} R_x (\tau) e^{-j\omega \tau} d\tau \\ &= \int_{-\infty}^{\infty} e^{-32|\tau|/3} e^{-j\omega \tau} d\tau \end{aligned}$$[/tex]

Let, [tex]$\frac{32}{3} |\tau| = u$[/tex]

Thus, [tex]$d\tau = \frac{3}{32}du$$$\begin{aligned} S_x (\omega) &= \int_0^{\infty} e^{-u} e^{-j\omega(3u/32)} du + \int_0^{\infty} e^{-u} e^{j\omega(3u/32)} du \\ &= \frac{1}{1-(j\omega)(3/32)} + \frac{1}{1+(j\omega)(3/32)} \\ &= \frac{16}{9} \frac{1}{1+\frac{9}{16}\omega^2} \end{aligned}$$[/tex]

Therefore, the power spectral density of X(t) is [tex]$\frac{16}{9}\frac{1}{1+\frac{9}{16}\omega^2}$[/tex] which is the Lorentzian distribution.

To know more about autocorrelation function visit :

https://brainly.com/question/32310129

#SPJ11

stm32f407 discovery random number generator RNG library

Answers

The STM32Cube firmware libraries have an RNG library that enables developers to connect to the RNG hardware module.

The STM32Cube firmware libraries, which are a set of libraries and a software development kit (SDK) for the STM32 ARM Cortex-M microcontrollers, provide an RNG library that interfaces with the RNG hardware module. This library allows developers to create both TRNG and PRNG output.

The STM32F407 Discovery board has a built-in hardware random number generator that can be used to produce random numbers for various applications. This RNG is available on the STM32F407's High-speed General-Purpose Input/Output (GPIO) pins 4 and 5, and it's designed to be simple to connect to.

To know more about RNG  visit:-

https://brainly.com/question/30163870

#SPJ11

Complete the unsigned subtraction of 161-76 in binary.
Show calculation.

Answers

The answer is 111001 in binary.

To complete the unsigned subtraction of 161-76 in binary, follow the steps below:

Step 1: Convert 161 and 76 to binary 161 in binary: 10100001276 in binary: 1001100

Step 2: Create a minuend by padding the smaller number on the left with 0's to match the number of bits in the larger number.1001100 is smaller than 10100001,

so pad 1001100 with one 0 on the left to make 01001100

Step 3: Begin subtraction from right to left starting with the rightmost digit.1-0=1. Write 1 below.0-0=0. Write 0 below.0-1=1. Borrow 1 from the next column.2-1=1. Write 1 below.1-0=1. Write 1 below.1-1=0. Write 0 below.01001100 - 1001100 = 1110012

So, the answer is 111001 in binary.

To know more about binary visit:

https://brainly.com/question/31413821

#SPJ11

Obtain step response for the following transfer function and briefly describe step response obtained. (Hint - Type of response, V final, and T₁) 4 G(s) = s² + 4s + 4 Output response for the given transfer function

Answers

Step response of the given transfer function can be obtained by considering the input as a unit step function i.e. 1/s. Therefore, the output response for the given transfer function is given by:4 G(s) = s² + 4s + 4On substituting s with (1/s), we get4 G(1/s) = (1/s)² + 4(1/s) + 4G(1/s) = (1/s²) + (4/s) + 4

Therefore, the transfer function becomes G(1/s) = 1/s² + 4/s + 4It is clear from the obtained transfer function that the type of response will be overdamped. This is due to the fact that the poles of the transfer function are real and distinct with both poles in the left half of the S-plane. Final Value Theorem can be applied to find the final value of the step response of the given transfer function.

The Final Value Theorem states that the final value of a transfer function can be found by substituting s=0 in the transfer function. Hence, on substituting s=0 in the transfer function G(1/s), we get: G(1/0) = 1/0² + 4/0 + 4G(1/0) = ∞It is clear from the obtained value that the final value of the step response of the given transfer function will be infinite.

Time Constant can be obtained by finding the inverse of the real parts of the poles of the transfer function. The poles of the transfer function are (-2) and (-2).Hence, the time constant of the given transfer function is given byT₁ = 1/2*2 = 1SecondTherefore, the step response of the given transfer function can be written asY(t) = 1 - (1+4t)e⁻²ᵗ + 4e⁻²ᵗThe obtained step response is overdamped with a final value of infinity and a time constant of 1 second.

The response approaches to steady state value without any overshoot or oscillations. The obtained response indicates that the output becomes stable at a constant value of infinity. Therefore, it can be concluded that the given transfer function is not suitable for systems that require a stable output at a finite value.

To know more about function visit :

https://brainly.com/question/28303908

#SPJ11

Alice gets lazy and use the same RSA set of public and private keys for both RSA digital signatures and RSA encryption. Specifically, this means Alice has private key d and public key e for RSA encryp- tion/decryption, while having private signing key s = d and public verification key v = e for RSA digital signatures. Suppose that Alice occasionally signs messages for other people automatically (for exam- ple, Alice runs an online server where people give her messages and she signs them using RSA digital signatures). Show that Eve can do some "bad" things.

Answers

Alice uses the same RSA set of public and private keys for both RSA digital signatures and RSA encryption. Alice has a private key d and public key e for RSA encryption/decryption and private signing key s=d and public verification key v=e for RSA digital signatures.

If Alice signs messages for other people automatically, it would mean that Alice has access to their private keys. Since Alice uses the same set of keys for encryption and digital signature, Eve can easily obtain the private key d, which will allow her to decrypt messages meant for Alice.

This is possible because both encryption and digital signatures use the same private key d.The security of RSA relies on the fact that it is difficult to factor large numbers into primes.

To know more about Alice visit:

https://brainly.com/question/29187979

#SPJ11

display the following names in a Logisim circuit ?
-Car
you have to show all steps and screenshot

Answers

In Logisim circuit: Open Logisim Circuit, Create a New Circuit, Adding "String" to the circuit, Adding "Text" component to the circuit, Click on the "String" option on the "Text" component, Save the Circuit, Testing the Circuit.

To display the name "Car" in a Logisim circuit, follow these steps:

1: Open Logisim circuit by clicking on its icon or by going to the Start menu, searching for Logisim, and then selecting it.

2: Click on the "File" menu and then click on the "New" option. The "New Circuit" window will appear, where you can set the circuit's parameters. Click on the "OK" button to proceed to the next step.

3: Click on the "Text" button, which is located on the left-hand side of the screen, in the toolbar. Drag it to the work area and drop it.

4: In the field that appears, enter the word "Car" and then click "OK." You will see the word "Car" appear on the screen. If you want to adjust the size of the text, select the "Font Size" option from the "Text" component.

5: Click on the "File" menu and select "Save As" option to save the circuit. Choose the desired location, give it a name, and then click "Save."

6: To see the output of the circuit, click on the "Simulation" menu and then click on the "Run" option. You will see the "Car" name displayed on the screen in the Logisim circuit.

Learn more about toolbar here: https://brainly.com/question/7666374

#SPJ11

Removing a node from a BST is fairly straightforward, with four cases to con- sider: 1. the value to remove is a leaf node; or 2. the value to remove has a right subtree, but no left subtree; or 3. the value to remove has a left subtree, but no right subtree; or 4. the value to remove has both a left and right subtree in which case we promote the largest value in the left subtree. There is also an implicit fifth case whereby the node to be removed is the only node in the tree. This case is already covered by the first, but should be noted as a possibility nonetheless. Of course in a BST a value may occur more than once. In such a case the first occurrence of that value in the BST will be removed. 23 #4: Right subtree and left subtree # 3: Left subtree no right subtree 14 31 #1: Leaf Node 9 Figure 3.2: binary search tree deletion cases The Remove algorithm given below relies on two further helper algorithms named FindParent, and Find Node which are described in §3.4 and §3.5 re- spectively. #2: Right subtree 7 no left subtree

Answers

Binary Search Tree (BST) is a well-known data structure that is particularly useful in situations where fast searches, insertions, and deletions are required. Removing a node from a BST is fairly straight forward, with four cases to consider:1. The value to remove is a leaf node.2. The value to remove has a right subtree, but no left subtree.3.

The value to remove has a left subtree, but no right subtree.4. The value to remove has both a left and right subtree in which case we promote the largest value in the left subtree. In this case, we will be removing the node with the value 23 in the given tree. This node has both a left and right subtree, so we will promote the largest value in the left subtree, which is 14, to take its place.

To do this, we need to remove the 14 node from its current position and replace the 23 node with it. The node with the value 14 has a right subtree but no left subtree, so we will remove it using the second case. Since it is a leaf node, this is straightforward. The resulting tree after removing the 23 node is shown below:

14 #4: Right subtree and left subtree 31 #3: Left subtree no right subtree9Figure 3.2: binary search tree deletion casesNote that there is also an implicit fifth case whereby the node to be removed is the only node in the tree. This case is already covered by the first, but should be noted as a possibility nonetheless.

To know more about straight visit:

https://brainly.com/question/30732180

#SPJ11

switch (choice) //switch statment

Answers

A switch statement may be a control stream articulation utilized in programming dialects to perform diverse activities based on distinctive values of a variable or expression.

What is the switch statement

It gives an elective to utilizing numerous if-else statements. The expression is assessed, and its value is compared with the values within the case names.

In case a coordinate is found, the comparing square of code is executed. The break articulation is utilized to exit the switch square after the code for the coordinating case has been executed.

Learn more about switch statement

https://brainly.com/question/20228453

#SPJ4

The State Diagram Of Certain Control System Is Given Below 11:15 Based On The Above State Diagram, The Control System Is 2. Completely State Observable, Not Completely State Controllable And Can Be Converted To Completely State Controllable If We Redraw The State Diagram. B. Completely State Controllable, Not Completely State Observable And Can Be

Answers

We will define the terms completely state observable and completely state controllable before we proceed with the explanation of the options.

Completely state observable: A system is said to be completely state observable if all the initial states of the system can be determined through its output.

Completely state controllable: A system is said to be completely state controllable if all the initial states of the system can be controlled through its inputs.

Now, based on the above state diagram, the control system is not completely state controllable and can be converted to completely state controllable if we redraw the state diagram. Hence, option A is correct.

A system is said to be completely state controllable if all the initial states of the system can be controlled through its inputs. Since all the states of the system are not controllable through its inputs, the system is not completely state controllable.Hence, option B is incorrect.A system is said to be completely state observable if all the initial states of the system can be determined through its output. Since all the states of the system cannot be determined through its output, the system is not completely state observable.

To know more about state observable  visit:-

https://brainly.com/question/30560456

#SPJ11

why the duplicated codes in the subclasses can be moved to their super-class (5'):

Answers

Moving duplicated code reuse and inheritance from subclasses to their super class helps to promote code reusability and maintainability. By consolidating common code in the super class, we eliminate redundancy and reduce the risk of introducing bugs or inconsistencies when making changes.

When code is duplicated in subclasses, it can be more challenging to make updates or modifications. If a change needs to be applied to the duplicated code, it would require modifying each subclass separately. This approach can lead to code inconsistency and make maintenance more complex.

By moving the duplicated code to the super class, we can ensure that all subclasses inherit the common behavior. This centralizes the code logic in one place, making it easier to update or enhance in the future. Subclasses can focus on implementing their unique functionality while leveraging the shared code provided by the super class.

Additionally, moving duplicated code to the super class promotes the principles of object-oriented programming, such as inheritance and polymorphism. It allows for a more modular and extensible design, enabling new subclasses to be added without duplicating code.

Therefore, moving duplicated code reuse and inheritance to the super class improves code organization, reduces redundancy, and simplifies maintenance and future enhancements.

Learn more about code reuse here:

https://brainly.com/question/31678047

#SPJ4

Write a user defined function (roots_12nd) to solve the 1st and 2nd order polynomial equation. Hint: For 2nd order polynomial equation: ax² + bx + c = 0; the roots are xland x2 x1, x2 -b ± √b² - 4ac 2a 2. Check your function for the two equations below: 1. x² 12x + 20 = 0 2. x + 10 = 0 3. Compare your result with the build in function in MATLAB (roots)

Answers

A user-defined function can be used to solve both the 1st and 2nd order polynomial equations. Below is the user-defined function named roots_12nd that can be used to solve both 1st and 2nd order polynomial equations:>> function [xl, x2]= roots_12nd (a, b, c) % if it is a 1st order polynomial equation.

the root is easily found by x1 = -c/b if (a == 0) xl = -c/b; x2 = NaN; return; end % if it is a 2nd order polynomial equation, the root is found using the quadratic formula. disc = b^2 - 4*a*c; % the discriminant xl = (-b - sqrt(disc))/(2*a); x2 = (-b + sqrt(disc))/(2*a); end For the given equations, below are the solutions:

1. x² 12x + 20 = 0a = 1, b = 12, c = 20xl, x2 = roots_12nd(a,b,c) % the output of this command should be xl = -2.0000 and x2 = -10.0000root = roots([a b c]) % the output of this command should be root = -2.0000 -10.00002. x + 10 = 0a = 1, b = 0, c = 10xl, x2 = roots_12nd(a,b,c) % the output of this command should be xl = -10.0000 and x2 = NaNroot = roots([a b c]) % the output of this command should be root = -10.0000Comparing the outputs of the user-defined function and the built-in function in MATLAB shows that both results are the same.

To know more about polynomial visit:

https://brainly.com/question/11536910

#SPJ11

Online Activity 32 Digital Television Multiplexing 1. Perform an Internet search on the terms HDTV, digital television, or high definition TV 2. Locate documents that explain the operation, modulation, and multiplexing of the U.S. HDTV system. It is called the Advanced Television Standards Committee (ATSC) digital TV standard. 3. Answer the following questions. Questions: 1. How many individual signals are multiplexed in the ATSC HDTV system? 2. Does HDTV use FDM or TDM? 3. What is the bandwidth of an HDTV channel? 4. What is the net data rate through the channel? 5. What kind of modulation is used to transmit the HDTV signal?

Answers

The ATSC digital TV standard used by HDTV (High definition Television) multiplexes a variety of signals into one large carrier wave.

How many individual signals are multiplexed in the ATSC HDTV system ATSC HDTV system multiplexes six individual signals: four video signals and two audio signals The HDTV system used the FDM (Frequency Division Multiplexing) system to multiplex six signals, as opposed to TDM (Time Division Multiplexing)

The bandwidth of an HDTV channel varies from 6 to 19 Mb/s, and it is capable of accommodating several digital streams in the same channel bandwidth.

The net data rate through the channel for the HDTV system is around 19.39 Mb/s.5. What kind of modulation is used to transmit the HDTV signal The 8VSB (Vestigial Sideband Modulation) technique is used to transmit the HDTV signal in the ATSC digital TV standard used by HDTV.

To know more about  individual visit :

https://brainly.com/question/32647607

#SPJ11

Calculate the ES, EF, LS, and LF times and the slack for each activity in the figure below and identify the critical path for the project. Can the project be completed in 40 weeks? Assume that activity A actually finished at 3 weeks, activity B actually finished at 12 weeks, and activity C actually finished at 13 weeks. Recalculate the expected project completion time. Which activities would you focus on in order to get the project back on schedule?

Answers

The given project is shown in the figure below.
size(5cm);
label("A", (0,0));
label("B", (1,0));
label("C", (2,0));
draw((0,0)--(2,0));
label("2", (0.5,0.2));
label("3", (1.5,0.2));
draw((0,-0.2)--(0,-1)--(1,-1)--(1,-0.2), arrow=Arrows());
draw((1,-0.2)--(1,-1), arrow=Arrows());
draw((1,-1)--(2,-0.2), arrow=Arrows());
label("3", (0.5,-1.2));
label("2", (1.5,-1.2));

Given information;Activity A has finished at 3 weeks.Activity B has finished at 12 weeks.Activity C has finished at 13 weeks.The formula for the various types of time calculations:Early Start Earliest time an activity can finish.

The critical path is Activity to complete since the total duration of these activities is 8 weeks. This implies that the shortest time the project can be completed is in 8 weeks with no delays.If activity A actually finished at 3 weeks, activity  finished at 12 weeks, because it is taking longer than expected.  

To know more about project visit:

https://brainly.com/question/28476409

#SPJ11

Let F(u,v) denote the DFT of an image f(x,y). We know from our discussion in the class that multiplying F(u,v) by a filter fuction H(u,v) and taking the inverse Fourier transform will alter the appearance of image depending on the nature of the filter. Suppose that H(u,v)=A (where A is a positive constant) is applied to the image in frequency domain. What will happen to the image in Spatial Domain?

Answers

The image in the spatial domain will not be affected if we apply a filter H(u ,v) = A in the frequency domain to the image (x ,y).Explanation :Let's suppose that an image f(x ,y) is transformed using the DFT function and F(u ,v) is the result of the DFT of f(x ,y).

When we apply a filter function H(u, v) to the transformed image in the frequency domain, the appearance of the original image in the spatial domain is altered. In the inverse Fourier transform of F(u ,v), the filter function H(u, v) is multiplied with the transformed image and then the result is obtained in the spatial domain.

Thus, the image will be affected if a filter is applied to the image in the frequency domain .However, when a filter H(u ,v) = A (where A is a positive constant) is applied to the image in the frequency domain, it means that all the frequency components of the image are multiplied by a constant A.

As the constant is multiplied with the frequency components of the image, it will not alter the appearance of the original image in the spatial domain. Therefore, the image in the spatial domain will not be affected if we apply a filter H(u,v) = A in the frequency domain to the image

To know more about Explanation visit :

https://brainly.com/question/25516726

#SJP11

At which point in the creation of a Logical volume is the mkfs command is a file system?
a. As the individual disks or partitions are created prior to being used in a Physical Volume.
b. After one or Physical Volumes are created prior to the creation of a Volume Group.
c. After the Logical volume has been created from a Volume Group.
d. mkfs is not required, the creation of the logical volume causes automatic fs formatting.

Answers

Point in the creation of a Logical volume is the mkfs command is a file system at c. After the Logical volume has been created from a Volume Group.

The mkfs command is used to create a file system on a Logical Volume (LV) after it has been created from a Volume Group (VG). This option is represented by choice c. The process begins with the creation of individual disks or partitions, which are then used to form a Physical Volume (PV).

Once one or more PVs have been created, they are combined to create a Volume Group. The Volume Group serves as a pool of storage that can be allocated to Logical Volumes. After the Logical Volume has been created from the Volume Group, it is necessary to format the file system on it using the mkfs command.

This command initializes the LV with the appropriate file system structure, such as ext4 or XFS, allowing it to be used for storing files and directories. Therefore, the mkfs command is required after the creation of the Logical Volume from the Volume Group.

To learn more about “storing files” refer to the https://brainly.com/question/26972068

#SPJ11

Please show step by step solution. Handwritten only. Indicate the formula and given used. Box your final answer. Thanks!
Find the payment necessary to amortize a 4 % loan of Php 2600 compounded quarterly with 7
quarterly payments. Calculate the total payments and the total amount of interest paid.

Answers

The total payments amount to Php 27305.25 and the total amount of interest paid is Php 24705.25.

To find the payment necessary to amortize a loan, we can use the formula for the periodic payment amount of an amortizing loan:

P = (PV * r) / (1 - (1 + r)^(-n))

Where:

P = Payment amount

PV = Present value or loan amount

r = Interest rate per period

n = Total number of periods

In this case, we have:

PV = Php 2600

r = 4% per annum, compounded quarterly

n = 7 quarterly payments

First, we need to convert the annual interest rate to the quarterly interest rate. Since interest is compounded quarterly, we divide the annual rate by 4 to get the quarterly rate:

r = 4% / 4 = 1% = 0.01

Now, we can substitute the given values into the formula to calculate the payment amount:

P = (2600 * 0.01) / (1 - (1 + 0.01)^(-7))

Calculating the exponential term:

(1 + 0.01)^(-7) ≈ 0.9333

Substituting this value into the formula:

P = (2600 * 0.01) / (1 - 0.9333)

Calculating the denominator:

1 - 0.9333 ≈ 0.0667

Final calculation:

P ≈ 260.01 / 0.0667

P ≈ 3900.75

Therefore, the payment necessary to amortize the loan is approximately Php 3900.75.

To calculate the total payments, we multiply the payment amount by the total number of payments:

Total payments = P * n = 3900.75 * 7 = Php 27305.25

To calculate the total amount of interest paid, we subtract the loan amount from the total payments:

Total interest paid = Total payments - PV = 27305.25 - 2600 = Php 24705.25

Thus, the total payments amount to Php 27305.25 and the total amount of interest paid is Php 24705.25.

Learn more about interest here

https://brainly.com/question/28581279

#SPJ11

Assume a rod of elastic material fixed at both ends with a constant cross- sectional area and length of 6L. Formulate shape function matrix and stiffness matrix by using Hermitian polynomial displacement function. TI

Answers

The shape function matrix and stiffness matrix for a rod of elastic material fixed at both ends can be derived using Hermitian polynomial displacement functions. Let's denote the nodal displacements as u, and the length of the rod as 6L.

The shape function matrix for Hermitian polynomial displacement functions can be defined as:

N = [N1 N2 N3 N4] = [2ξ^3 - 3ξ^2 + 1, L(ξ^3 - 2ξ^2 + ξ), -2ξ^3 + 3ξ^2, L(ξ^3 - ξ^2)], where ξ represents the normalized coordinate varying from -1 to 1.

The stiffness matrix, K, can be formulated by integrating the product of the derivative of shape functions and the material stiffness:

K = ∫(B^T)(D)(B)dξ, where B is the strain-displacement matrix and D is the material stiffness matrix.

Considering the given assumptions, the shape function matrix and stiffness matrix can be determined using the Hermitian polynomial displacement functions. The detailed calculations involve the differentiation of the shape functions, substitution of values, and integration.

Know more about Hermitian polynomial displacement functions here:

https://brainly.com/question/31432979

#SPJ11

Evaluate: (a) (50 mN) (6 GN) (50 mN). (6 GN) = (50 x 10-³ N) x (6 x 10º N) 300 × 10 = 300 KN² * (116) × (1000 N) KN X 1000 N² x

Answers

The evaluation of the given expression yields the final answer of 3 x 10^17 N².

To evaluate the given expression, let's break it down step by step. We start with (50 mN) (6 GN) (50 mN) (6 GN).First, let's convert the units to the same base unit, which is Newton (N). 50 mN is equal to 50 x 10^(-3) N, and 6 GN is equal to 6 x 10^9 N.

Next, we multiply the values together:

(50 x 10^(-3) N) x (6 x 10^9 N) = 300 x 10^6 N²

To simplify the expression further, we convert the result to kilonewtons (KN). 1 kilonewton (KN) is equal to 1000 N.

Therefore, 300 x 10^6 N² is equal to 300 KN².

Finally, we multiply this result by (116) x (1000 N) to obtain the final answer. Multiplying 300 KN² by (116) x (1000 N) gives us 3 x 10^17 N².

In summary, the evaluation of the given expression yields the final answer of 3 x 10^17 N².

Learn more about expression here

https://brainly.com/question/1859113

#SPJ11

Add the binary number 110 to the negative binary number - 101. 4. Subtract 10112-1102. 5. Multiply the following unsigned binary numbers: 101.1 and 10.11. 6. Divide the following unsigned binary numbers: 1110 by 10. 7. State two instances that might call for the use of a floating-point numbering system. 8. What are the three basic components of a floating-point number?

Answers

Add the binary number 110 to the negative binary number - 101.The answer to the addition of binary number 110 to the negative binary number - 101 is 001 (1 in decimal).2. Subtract 10112 - 1102. The answer to the subtraction of binary numbers 10112 - 1102 is 11 (3 in decimal).

Multiply the following unsigned binary numbers: 101.1 and 10.11.Multiplying 101.1 and 10.11 using binary multiplication yields 1101.01000.4. Divide the following unsigned binary numbers: 1110 by 10.Dividing 1110 by 10 using binary division yields 110.5. State two instances that might call for the use of a floating-point numbering system.A floating-point numbering system can be useful for the following Scientific calculations involving very small or large numbers, such as in physics or astronomy.

Database queries requiring a high level of accuracy.6. What are the three basic components of a floating-point number A floating-point number has three components Mantissa (or significand): The number itself, which can be either positive or negative. Exponent: The power of two to which the mantissa is raised. Base: A constant value representing the number of digits available for representing the mantissa and exponent.

To know more about binary number visit :

https://brainly.com/question/32447290

#SPJ11

Quiz A.4 Consider a voltage step propagating in a transmission line with matched termination, driver output resistance is Ro-Z. and Voo-2V. Only one of these sentences is correct, select it. a) The power consumption at termination is Pd=Vco²/(4Z-) b) The voltage at termination can be higher than Voo c) The voltage at termination is null. d) The power consumption at termination is Pd=Voo²/(2Z)

Answers

The correct option for the given question is d) The power consumption at termination is Pd=Voo²/(2Z).The voltage step propagating in a transmission line with matched termination, driver output resistance Ro-Z and Voo-2V.

Voltage step propogating:-

A voltage step propagating in a transmission line can be represented as shown below:Where V₁ represents the voltage before the step and V₂ represents the voltage after the step.The wave's speed is given by v = √(L C).

Transmission Line:-

A transmission line is defined as a two-port network that can transmit electromagnetic signals from one end to the other.A voltage or current signal that flows in a transmission line is also reflected back by the impedance of the line. For example, if a signal is applied to the input of a 50 Ω coaxial cable, the signal will be reflected back when it encounters the 50 Ω impedance at the end of the line.The impedance of the line depends on its physical parameters, such as its geometry and the dielectric constant of the medium through which the signal passes.

Pd is the power consumed at termination. It is given by:Pd=Vco²/(2Z-)Where Vco is the voltage across the termination and Z- is the load impedance. In the present case, Z- is equal to the characteristic impedance of the transmission line, which is equal to Ro.

The voltage at the termination can be higher than Voo, and it is given by:Vco=2Voo This implies that:Pd=Voo²/(2Z-)

Therefore, the correct option for the given question is d) The power consumption at termination is Pd=Voo²/(2Z).

To learn more about "Power Consumption" visit: https://brainly.com/question/13976868

#SPJ11

X = f(a,b,c) = a-b b+c Which of the following is incorrect? A) Xa = 2√(b+c) (a−b) -√a-b C) Xc = 2√ (b+c)³ E) none are correct Question Six Z = f(x,y) = cosh-¹ Given the following: (i) Zx 2(x-y) √x √y (iii) Zx = 2(x-y) √x Which of the following is correct? A) (i) and (ii) D) Only (ii) B) X₂= D) Xc= = B) (ii) and (iii) E) Only (iii) -a-c 2√(a-b) (b+c)³ 2√(a-b) (b+c)³ (ii) Zy= 2(x-y) √y C) Only (i)

Answers

The correct option for the first question is **E) none are correct**. The correct option for the second question is **B) (ii) and (iii)**.

For the first question, the incorrect option is **E) none are correct**.

Let's examine the given options one by one to determine their correctness. The function X is defined as **X = f(a, b, c) = a - b + b + c = a + c**.

Option A) Xa = 2√(b+c) (a-b) -√a-b: This is incorrect because Xa should be equal to a + c, not 2√(b+c) (a-b) -√a-b.

Option C) Xc = 2√ (b+c)³: This is incorrect because Xc should be equal to a + c, not 2√ (b+c)³.

Therefore, the correct option for the first question is **E) none are correct**.

Moving on to the second question, we are given the function Z defined as **Z = f(x, y) = cosh⁻¹**. We need to determine which of the given statements is correct.

Statement (i) Zx = 2(x-y) √x √y: This statement is incorrect because Zx should be equal to √x, not 2(x-y) √x √y.

Statement (ii) Zx = 2(x-y) √x: This statement is correct as Zx is equal to 2(x-y) √x.

Statement (iii) Zy = 2(x-y) √y: This statement is also correct as Zy is equal to 2(x-y) √y.

Therefore, the correct option for the second question is **B) (ii) and (iii)**.

To summarize:

Question 1: The incorrect option is E) none are correct.

Question 2: The correct option is B) (ii) and (iii).

Learn more about question here

https://brainly.com/question/29987684

#SPJ11

Consider the following snapshot of a system: Allocation Max Available ABCD ABCD ABCD PO 0012 0012 1530 Pl 1000 1750 P2 1354 2356 P3 0131 0652 P4 0014 0656 Answer the following questions using the banker's algorithm: a) What is the content of the matrix Need? (2 marks) b) Is the system in a safe state? Demonstrate via safety algorithm. (4 marks) c) If a request from process PI arrives for (0.4,2,0), can the request be granted immediately? Why?

Answers

a) The content of the matrix Need is: Need = Max – Allocation

Need AB CD P0 1 1 0 1 P1 0 1 1 2 P2 1 1 0 1 P3 0 3 3 1 P4 0 0 1 2

b) Yes, the system is in a safe state because of the following reasons:

Initial state: Available = (1 5 3 0)

Max = (0 0 1 2 0 1 3 5 2 3 5 6 0 1 3 6 0 0 1 4)

Allocation = (0 0 1 2 0 1 0 0 1 2 1 0 0 3 3 1 0 0 0 2)

Need = (0 0 0 0 0 0 3 5 1 1 4 6 0 1 0 5 0 0 1 2)

Step 1: Find an i such that both: Finish[i] = falseNeed_i <= WorkIf no such i exists, go to step 4Else move to step 2

Step 2: Work = Work + Allocation_iFinish[i] = truegoto step 1

Step 3: If Finish[i] = false, for all i, then the system is not in a safe state.

If Finish[i] = true for all i, then the system is in a safe state. The sequence is < P0, P2, P3, P1, P4 >.

c) If a request from process P1 arrives for (0 4 2 0), the system will not be in a safe state as there is no way for P1 to complete with the current resource allocation. Therefore, the request cannot be granted immediately.

To know more about allocation visit:

https://brainly.com/question/28319277

#SPJ11

(20 gos]Whats the inpules of the syste

Answers

The reaction of a system to a momentary input or trigger, referred to as an impulse function, is meant  by the system's impulse.  it can be shown as:

Impulse = ∫ F(t) dt

What is the system impulse

When considering the fields of physics and engineering, an impulse is characterized as the accumulation of a force over a period of time.

Insight into the behavior and attributes of a system can be gained by examining its impulse. Signal processing involves understanding how systems respond to specific input signals. In the case of impulse signals, the impulse response of a system explains its reaction.

Learn more about system impulse  from

https://brainly.com/question/30395939

#SPJ4

See correct question below

What's the impulse of the system

Required skills I need to see all of the following skills demonstrated: . drawString o Font class and setFont method o Custom colors with the Color class and setColor method • drawline drawOval or filloval drawRect or fillRect • drawArc or fillArc drawPolygon or fillPolygon Anti-Aliasing o Graphics2D class o setRenderingHint method casting Graphics to Graphics2D . O Requirements: This project will force you to use your creativity! Requirements are as follows: You must draw at least 4 different types of flowers using the various draw methods listed in the required skills section of this document. • You may try to draw real flowers or come up with flowers from your imagination. • You must use all skills listed in the required skills section of this document. • You must use Font class and setFont method to set at least two different fonts. • You must use the drawstring method to label your flowers. The labels should give the name of each flower and a short description (about one sentence.) • You must use a photographic image in the background of your Applet • You must use Anti-Aliasing so that your renders smoothly • Your Application must be at most 1024x768px Your project must be named Your Name_Flowers and you will zip and submit the entire project folder to the D2L dropbox. You must have fun with this project! At least, I hope that you do. .

Answers

TO mentioned in the given project, you need to have a clear understanding of various skills and methods. Here are some required skills that you need to have a command of:drawString: It is a method of the Graphics class used to draw the string.

It takes several arguments such as x and y positions and a string message.Font class and setFont method: The Font class is used to represent fonts. setFont() method is used to set the font for the current graphics context.Custom colors with the Color class and setColor method:

The Color class is used to create custom colors. setColor() method is used to set the color of the graphics context.drawline: This method is used to draw a line.

To know more about project visit:

https://brainly.com/question/28476409

#SPJ11

Other Questions
On January 1,2021 . Concord Inc. granted stock options to officers and key employees for the purchase of 22,000 shares of the company's $10 par common stock at $23 per share. The options were exercisable within a 5 -year period beginning January 1,2023 , by grantees still in the employ of the company, and expiring December 31,2027 . The service period for this award is 2 years. Assume that the fair value option-pricing model determines total compensation expense to be $340,800. On April 1, 2022, 2,200 options were terminated when the employees resigned from the company. The market price of the common stock was $33 per share on this date. On March 31,2023,13,200 options were exercised when the market price of the common stock was $41 per share. Prepare journal entries to record issuance of the stock options, termination of the stock options, exercise of the stock options, and charges to compensation expense, for the years ended December 31, 2021,2022, and 2023. (Credit account titles are automatically indented when amount is entered. Do not indent manually. If no entry is required, select "No Entry" for the account titles and enter O for the amounts.) The ballistic pendulum is an apparatus used to measure the speed of a fast-moving projectiles, such as the bullet. A bullet of mass m1 = 12 gis fired into alarge block of wood of mass m2 = 6 kg suspended from some light wires. The bullet embeds in the block in the entire system swings to a maximum height of 3.50 m.a. Derive an expression for the velocity of the bullet. (Hint: Both concepts of conservation of energy and conservation of momentum will be employed in this problem.)b. What is the velocity of the bullet in m/s? It is estimated that the Sun produces around 3.846x1026J of energy per second. How much mass does the Sun convert to Energy every second? 1.28x1018 kg 3.41x1043kg 4.27x10 kg 1.28x10kg Next Previous 16 1 point What is the decay rate of a sample of Oxygen-22 if the sample has 6.22x1021 atoms and a decay constant of 0.308/s? 2.02x1022Bq 1.92x102Bq 0.308Bq 4.95x10-23Bq Next O Previous Solution is required 62. The coordinate axis are asymptotes of the equilateral hyperbola whose vertex in the first quadrant is 32 units from the origin. What is the equation of the hyperbola? 63. The coordinate axis are asymptotes of the equilateral hyperbola whose vertex in the first quadrant is 4/2 units from the origin. What is the equation of the hyperbola 64. The coordinate axis are asymptotes of the equilateral hyperbola whose vertex in the first quadrant is 52 units from the origin. What is the equation of the hyperbola? Balla Inc. leased equipment to Gaga Company on May 1, 2021. At that time the collectibility of the lease payments was not probable. The lease expires on May 1, 2022. Gaga could have bought the equipment from Balla for $5,600,000 instead of leasing it. Balla's accounting records showed a book value for the equipment on May 1, 2021, of $4,900,000. Balla's depreciation on the equipment in 2021 was $630,000. During 2021, Gaga paid $1,260,000 in rentals to Balla for the 8-month period. Balla incurred maintenance and other related costs under the terms of the lease of $112.000 in 2021. After the lease with Gaga expires, Balla will lease the equipment to another company for two years. Ignoring income taxes, the amount of expense incurred by Gaga from this lease for the year ended December 31, 2021, should be $1,260,000. $1,148,000. $518,000. $630,000. Design FPGA design in Xillinx Vivado 1. Describe the applications/functions of the functional block. Functional block diagram, ASM chart, specification of the circuit and etc could be included. 2. Design the functional block in Verilog using Vivado software. Please make sure that all the identifier names are the same as defined in the block diagram. 3. Develop a testbench for selective testing such that it shows all the possible/important output Five bits of "11101" sequence detector finite state machine. In December of 2006 the United Nations General Assembly adopted the Convention on the Rights of Persons with Disabilities (CRPD). In the U.S, this convention: Was added as an Amendment to the U.S. Constitution. Was signed into law by President Bush Was approved by Congress, but vetoed by President Bush Failed to be ratified by the U.S. Congress Rodney is the owner of a small company which produces electric knives to cut fabric. The annual demand is 8000 knives and Rodney produces the knives in batches (Production run). On average Rodney can produce 150 knives per day. During the production process, demand has been about 40 knives per day. The cost to set up the process is R100, and it cost Rodney A mass m hangs on a string that is connected to the ceiling. You pluck the string just above the mass, and a wave pulse travels up to the ceiling, reflects off the ceiling, and travels back to the mass. Calculate the fraction that the round-trip time will be decreased, if the mass m is increased by a factor of 4.33. (Assume that the string does not stretch in either case and the contribution of the mass of the string to the tension is negligible.) Suppose you have a restaurant of 350 seats. 3,217 is the amountof expected guests for next Saturday. If your restaurant used acook to guest ratio of 1:112 how many cooks would you schedule? What experiment(s) show light acting as a wave? Explain in no more than 2 sentences. What experiment(s) shows light acting like a particle? Explain in no more than 2 sentences. 6. (5 points) A wave can sometimes act like a massless particle, and a massive particle can sometimes act like a wave. Explain this in no more than 4 sentences, in terms of specific, relevant physics concepts. What is a business proposal? Select one.Question 5 options:A request for approval that has been solicited by an external partyDocuments designed to make a persuasive appeal to the audience to achieve a defined outcome, often proposing a solution to a problemA letter from a CEO discussing the organizations vacation policyA statement listing the organizations profits and losses for the year The following Java interface specifies the binary tree type interface BinaryTree { boolean isEmpty(); T rootValue(); BinaryTree leftChild(); BinaryTree rightChild(); } Write a method that takes an argument of type BinaryTree, uses an inorder traversal to count the number of integers in the range 1 to 9 in the tree, and returns the count. The monthly market for US. steel production (in millions of tons per month) is described in the table below. An increase in the price of iron ore, a critical input in the production of steel, shifts the supply curve to the left, decreasing supply by 200,000 tons at each price. (Hint: 200.000 tons =0.2 million tons) Instructions: Round your answers to 1 decimal place a. Fill in the new supply schedule in the table using the "New Quantity of Steel Supplied" column b. What are the initial equilibrium price and quantity in the steel market? P=$ per ton Q= million tons of steel C. What are the new equilibrium price and quantity in the market? P=$ per ton Q= million tons of steel You have started a company and are in luck-a venture capitalist has offered to invest. You own 100% of the company with 5.00 million shares. The VC offers $1.00 million for 800,000 new shares. a. What is the implied price per share? b. What is the post-money valuation? c. What fraction of the firm will you own after the investment? a. What is the implied price per share? The implied price per share will be $ 1.25 per share. (Round to the nearest cent.) b. What is the post-money valuation? The post-money valuation will be $7250.00 million. (Round to two decimal places.) Boeing, an airplane manufacturer, uses a job order cost system. When Boeing requisitions raw materials for the production of a new airplane, the journal entry will include: A debit to Raw Material Inventory A credit to Raw Material Inventory A credit to Work in Process Inventory A credit to Manufacturing Overhead None of the above are correct What is the difference between a constructor and a method?What are constructors used for? How are they defined?Think about representing an alarm clock as a software object. Then list some characteristics of this object in terms of states and behavior. Draw the class in UML diagram.Repeat the previous question for a Toaster Object. Afuer class, members will form groups of approximatety tive The managers of marketing and rescarch and developuent each. The groups will then consider the following scenario. seem more favorable as they know that work-life balance is One student will assume the role of the HR manager of a important. The managers of finance and production believe large manufacturing company who is leading a meeting that not being physicaliy preserst is detrimental to productivwith four senior managers workirg in the finance, market ity and the climate within their department. The graph of the function y(x) - Ayx' + Az x+Aix + Ao passes through the points (-1.6, -26.8), (0.8, 6.7), (1.9. 9.8), and (3.2, 48). Determine the constants As, A2, AI, and Ao, with accuracy of 2 decimal digits. Do NOT use any MATLAB built-in functions. B) Verify your solution by plotting the function and the 4 given data points each marked with a red 'O symbol) on the same figure The null space for the matrix 1367012111420034is span{A,B} where A=[]B=[]