Engineering controls are an essential element of hazard control in the workplace, providing a means of minimizing or eliminating hazards at their source.
Engineering controls are a type of hazard control that reduces or eliminates the hazard at its source. Engineering controls are used to minimize or eliminate hazards that pose a significant risk of harm or danger to individuals, such as chemical or noise exposure.
These measures are frequently a vital component of an effective occupational health and safety program in the workplace. Examples of engineering controls include the use of ventilation to control fumes, dust, and other airborne hazards, as well as the use of sound barriers to reduce noise levels. In addition, the use of machine guards, interlocks, and other safety devices on equipment and machinery is considered a form of engineering control to safeguard workers from contact with hazardous moving parts.
Other types of engineering controls include changes in the manufacturing process or the substitution of less harmful materials to eliminate the hazard. Engineering controls are an essential element of hazard control in the workplace, providing a means of minimizing or eliminating hazards at their source. These controls, when combined with other forms of hazard control, such as administrative and personal protective equipment, provide a comprehensive approach to worker safety and health.
Learn more about Engineering controls
https://brainly.com/question/31096953
#SPJ11
List three factors that increase compressive strength of intact rock material in laboratory testing: (3)
Compressive strength of rock is the ability of the rock material to resist failure under compressive loads. It is an important parameter to evaluate the stability of rock structures such as dams, tunnels, and foundations.
1. Mineralogy of the rock: The mineral composition of rock has a direct effect on its compressive strength. Rocks that are rich in quartz and feldspar minerals are generally stronger than those composed of softer minerals like clay and gypsum.
2. Porosity and density of the rock: The porosity and density of rock can affect its compressive strength. This is because porosity weakens the rock by providing planes of weakness for crack propagation, while density provides more interlocking between grains, thus enhancing the rock's strength.
3. Confining pressure: The confining pressure is the pressure applied to the rock specimen during the laboratory test. It represents the pressure that the rock would experience in the field due to the weight of overlying rock or soil.
the mineralogy of rock, its porosity and density, and the confining pressure are three important factors that affect the compressive strength of intact rock material in laboratory testing.
To know more about Compressive strength visit:-
https://brainly.com/question/31102674
#SPJ11
You are an engineer in a construction company, Bina Sdn Bhd. You are given the task to supervise the construction project of a badminton hall owned by the JKKK Kampung Pisang. Discuss the scope of works to be accomplished in a project. This project must be completed within 6 months from the date of project award. Discuss the scope of works to be accomplished in this project.
As an engineer in a construction company, the scope of works to be accomplished in a construction project of a badminton hall owned by JKKK Kampung Pisang include the following :Planning and Designing- It includes preparing a blueprint and layout for the project, identifying the materials and resources required, and developing a plan to meet the project's objectives.
Site Preparation- This involves clearing the site, leveling the ground, and making it ready for construction .Foundation Works- The construction of the foundation walls, columns, and beams for the building structure form a vital part of the scope of work. This includes excavation, footing and foundation, concrete works, etc.
In conclusion, the scope of work for the construction project of a badminton hall owned by JKKK Kampung Pisang is extensive and requires careful planning and execution. The project must be completed within six months from the date of award, and it is the responsibility of the construction company to ensure that the project is completed on time and within budget.
To know more about engineer visit:
brainly.com/question/18063037
#SPJ11
Which of the followings statements is true when comparing double decining balance depreclation to straight-ine depreciation? a. Straight-line deductions will be greater than double declining balance deductions in all years of the asset's depreciable life. b. Double declining balance deductions will be less than straight-line deductions in early years of the asset's depreciable life but greater in later years. c. Double declining balance deductions will be greater than straight-line deductions in all years of the asset's depreciable life. d. Double declining balance deductions will be greater than straight-line deductions in early years of the asset's depreciable life but less in later years.
Double declining balance depreciation is an accelerated depreciation method in which an asset's book value is multiplied by a fixed depreciation rate.
The process is continued until the book value of the asset reaches zero, and it is frequently utilized to depreciate assets that lose value quickly over time. Straight-line depreciation is a method of depreciation in which the same amount of depreciation is applied every year over the life of the asset. The most significant difference between double declining balance and straight-line depreciation is that the former results in a more rapid write-off of the asset's book value.The correct answer to the given question is option (b) Double declining balance deductions will be less than straight-line deductions in early years of the asset's depreciable life but greater in later years. Double declining balance deductions will be less than straight-line deductions in the early years of the asset's depreciable life but greater in later years.
TO know more about book visit:
brainly.com/question/15113495
#SPJ11
Describe and discuss the challenges a Spanish construction company specialising in designing and delivering sustainable energy power plants would need to consider when seeking to grow organically in Egypt. The company has no experience of operating in Egypt but has worked extensively in the United Arab Emirates. The annual turnover of the company in 2020 was €2 billion, employing 6,000 people across all their operating divisions.
If a Spanish construction company specialized in designing and delivering sustainable energy power plants wants to expand organically in Egypt, it will face various challenges that it will have to consider and handle. This company has no prior experience operating in Egypt, but it has worked significantly in the United Arab Emirates.
1. Political and economic instability: Egypt has undergone political turmoil and economic instability in recent years, with the country experiencing significant socio-economic changes. Egypt has been experiencing changes in government and economic instability for the last ten years. Before considering expansion, the Spanish construction company should look into political and economic stability and the current situation in the country.
2. Foreign laws and regulations: There are a variety of regulations and restrictions on international businesses operating in Egypt. The Spanish construction company must consider the Egyptian legal system's intricacies and the cultural variations it may experience before entering the Egyptian market.
3. Cultural Differences: Egypt's diverse culture and values must be respected by the Spanish construction company. It's critical to be familiar with Egyptian cultural norms and traditions, as well as the local language.
To know more about worked significantly visit:
brainly.com/question/29333698
#SPJ11
1. "Clients engage many participants in the construction of a building project; many more are involved through sub-contracting and regulation." Discuss this statement and explain what techniques and/or mechanisms are typically introduced into contractual documents to deal with the contractual issues arising from the large number of diverse participants in the process.
Please note this question does not involve comparison of different contracting types. Your answer should principally be addressed with one type of contract or standard form in mind.
please attach the references
The construction project involves many stakeholders that include clients, contractors, sub-contractors, and regulators. This aspect of the construction process demands the need for several mechanisms and techniques to address the contractual issues that may arise in the process.
In the construction process, the client is the initiator of the project, and the main objective is to deliver the building project within the set time frame, budget, and quality specifications. The design and build contract helps mitigate the contractual issues that may arise during the construction process by creating a collaborative environment that enhances teamwork.
The mechanism enables the participants to work together to solve any contractual issues and ensures that all parties comply with the contractual obligations. The use of the design and build contract and the NEC3 contract has been instrumental in addressing the contractual issues arising from the large number of diverse participants in the process.
These mechanisms promote a collaborative approach to problem-solving and risk management that ensures that all parties comply with the contractual obligations. The contractual framework creates a collaborative environment that encourages teamwork and enhances the overall quality of the project.
Therefore, the construction industry should embrace these mechanisms to enhance the construction process.
To know more about stakeholders visit:-
https://brainly.com/question/30241824
#SPJ11
A 6m x 6m slab panel serves as a floor for a light storage room, The slab has no ceiling on it but with a 25mm thick concrete fill finish for the flooring. The slab is an interior slab with adjacent slabs on all of its sides. Determine the required rebar spacing for the top column strip using a diameter 12 rebar. f'c= 28 MPa
fy = 414 MPa
Spacing of bars = (Effective depth - clear cover - half the diameter of the largest bar - half the diameter of the smallest bar) / (Number of bars - 1) Spacing between the adjacent slabs on all of its sides is 50 mm For the slab of size 6 m x 6 m, the spacing between the adjacent slabs on all sides will be 50 + 50 = 100 mm or 0.1 m
The effective depth will be, Effective depth = Overall depth - (0.5 x diameter of largest bar) - (0.5 x diameter of stirrup)= [tex](250 mm - 6 mm) - (0.5 x 12 mm) = 229 mm = 0.229 m[/tex]
The moment of resistance of the section is given by,[tex]M = (f'c / 6) * b * d²= (28 × 10⁶ / 6) × 1 × 0.229²= 573876.92 Nm[/tex]
The bending moment acting on one meter width of the beam will be,Bending moment = M / Width of the beam= [tex]573876.92 / 1= 573876.92 Nm/m[/tex]
The maximum tension developed in the extreme fibre will be[tex],f_s = (fy / γs) × As[/tex]Where,γs = 1.15As = Area of steel reinforcement[tex]As = (0.85 × f_y × A_1)/f_c[/tex]'Where,A_1 = Area of concrete below the centroid of steel sectionMaximum tension developed in the extreme fibre
,[tex]f_s = (fy / γs) × As= (414 × 10⁶ / 1.15) × [(0.85 × 414 × π × 12²) / (28 × 10⁶)]f_s = 1325.37 N/mm²[/tex]
[tex]A_s = (M × 10⁶) / (0.87 × fy × d)A_s = (573.88 × 10⁶) / (0.87 × 414 × 0.229)A_s = 4788.73 mm²/[/tex]
Number of bars = Spacing of bars / center-to-center distance between two bars + 1Spacing between the adjacent bars will be,Center-to-center distance = 12 + 34 = 46 mm
Number of bars = [tex]34 / 46 + 1= 1.74 ≈ 2[/tex]Thus, the number of bars required in the top column strip would be 2 and the spacing between the bars will be 34 mm.
To know more about Effective depth visit:-
https://brainly.com/question/31427952
#SPJ11
1165ft 3 /hr is a feed rate for one reformer reactor used platinum catalyst. Volume hour space velocity around 4v/hr/v, the catalyst dimeter 6ft, catalyst bulk density =60lb/ft 3 with 32API. i. What is the area of reactor, ii. Estimate both (volume and high) of catalyst in cracker? iii. Calculate the time in day to regenerate the catalyst in a reformer, if the catalyst deactivates after processing 76 bbl of feed per pound of catalyst?
The area of the reactor is approximately 291.25 ft². The volume of the catalyst is 60 ft³, with a height of 52.76 ft. The catalyst regeneration time is estimated to be around 1.68 hours or 0.07 days.
i. Area of reactor
The area of the reactor can be determined using the volumetric space velocity. The formula to calculate the area of the reactor is given by:
Area of reactor = Q / Volumetric space velocity
Where:
Q = Feed rate (ft³/hr)
Volumetric space velocity = V / Q
By substituting the given values, we can calculate the area of the reactor:
Area of reactor = (1165 ft³/hr) / (4 (ft³/hr/ft³))
Area of reactor = 291.25 ft²
ii. Catalyst volume and height
To calculate the volume of the catalyst, we use the formula:
V = πd²h/4
Where:
π = 3.1416
d = Diameter of the catalyst (6 ft)
h = Height of the catalyst
To estimate the height of the catalyst, we need to determine its bulk density in lb/in³. Using the given information:
32 API = (141.5 / bulk density) - 131.5
Bulk density = 58.128 lb/ft³
Bulk density = 58.128 / 1728 = 0.0336 lb/in³
Substituting the values, we can calculate the volume of the catalyst:
V = πd²h/4
V = π(6 ft)²h/4
V = 28.2743h ft³
Calculating the height of the catalyst:
h = V / 28.2743
h = (60 ft³) / (28.2743 × 0.0336)
h = 52.76 ft
Therefore, the volume of the catalyst is 60 ft³, and the height is 52.76 ft.
iii. Catalyst regeneration time
The time required to process 1 lb of feed can be determined as follows:
1 lb of catalyst processes 76 bbl of feed per day
(1 lb catalyst) / (76 bbl feed/day) × (42 gal/bbl) × (8.34 lb/gal) = 0.454 lb feed/lb catalyst/day
To calculate the catalyst regeneration time, we use the following formula:
(60 ft³) × (60 lb/ft³) × (0.454 lb feed/lb catalyst/day) = 1,957 lb feed/day
The time to regenerate the catalyst in a day is calculated as:
1,957 lb feed/day / 1165 ft³/hr = 1.68 hours or 0.07 days (approx).
Therefore, the catalyst regeneration time is approximately 1.68 hours or 0.07 days.
Learn more about area of the reactor
https://brainly.com/question/29123819
#SPJ11
Estimate the flood discharge through a rectangular channel of (8m) wide, if the depth of water at two section of (150m) a part was (2.95 m and 2.8 m). and the drop in the water surface elevation was found to be (0.15m), (n-0.025), K, = 0.6 for contraction.
The flood discharge through a rectangular channel of 8m wide, if the depth of water at two sections 150m apart was 2.95m and 2.8m can be estimated as shown below:Given.
Width of rectangular channel = 8mDepth of water at the first section, y1 = 2.95mDepth of water at the second section, [tex]y2 = 2.8m[/tex]Distance between the two sections = 150mDrop in water surface elevation = 0.15mCoefficient of contraction, K, = 0.6Value of n = 0.025Let us assume that the flow rate is more than 100.
Hence, the normal depth is to be estimated using the Manning's equation as shown below: Q = A V Where ,Q = Discharge A = Cross-sectional area V = Velocity Let us consider the discharge to be Q Let the hydraulic radius be given by [tex]R = A/P[/tex], where P is the wetted perimeter Manning's equation can be written.
To know more about discharge visit:
https://brainly.com/question/24060655
#SPJ11
A braced column of 6 m long fixed at both ends is proposed to carry a designed load of 1500 KN. In this design, column section of 203 x 203 x 60kgm¯¹ with grade S275 is used and the section is in Class 1.
(a) Calculate the effective length and slenderness ratio of the column section about the major axis. (CO1-PO2) (C4)
(b) Check the buckling resistance of the column. (CO2-PO5) (C4)
(a) Calculation of Effective Length of Column: Effective length is given by le = 1.0LThe given column is fixed at both ends. Therefore, the effective length will be le = L = 6 m Effective length of the column le = 6 m Calculation of slenderness ratio:
Slenderness ratio is given byλ = K * l / rwhere, K = effective length factorl = effective length of column r = radius of gyrationλ = slenderness ratio of the column Section area of the column A = b * hwhere, b = breadth of column
h = depth of column mFor the given section, b = h = 203 mm
A = section area Therefore, [tex]ry = √(7035.82367 * 10⁻⁴ / 4.1209 * 10⁻³) = 0.5240[/tex]m Slenderness ratio of column sectionλ = K * le / ry where, K = effective length factor = 1 for both fixed endsλ = 1 * 6 / 0.5240 = 11.45 about major axis.
To know more about slenderness visit:
https://brainly.com/question/27944552
#SPJ11
What is the MINIMUM shank diameter permitted for screws used to anchor masonry veneer to steel backing?
1. 0.121 in.
2. 0.190 in.
3. 0.260 in.
4. 0.311 in.
The correct answer to the given question is option 2, which is "0.190 in."The shank diameter permitted for screws used to anchor masonry veneer to steel backing is 0.190 in.
Screws are frequently used to anchor masonry veneer to steel backing. The minimum shank diameter allowed for such screws is specified in the code. The shank diameter of the screw should be verified since masonry veneer can be used as a veneer over a variety of substrates. The screw should have a minimum shank diameter of 0.190 inches, as defined by the code. It's worth noting that shank diameters that aren't explicitly specified in the code may be utilized as long as they're equal in diameter or larger than the minimum shank diameter permitted by the code. The code also specifies the length and spacing of screws used to anchor masonry veneer to steel backing. Therefore, the correct answer to the given question is option 2, which is "0.190 in."The shank diameter permitted for screws used to anchor masonry veneer to steel backing is 0.190 in.
To learn more about shank, visit:
https://brainly.com/question/16931159
#SPJ11
A thermostat control with dial markings from 0 to 200 is used to regulate the temperature of an oil bath. A calibration plot on logarithmic coordinates of the temperature (°F) versus the dial setting R is a straight line that passes through the points (R1= 10.0, T1 = 110.0 °F) and (R2=60.0, T2=250.0 °F).
a. In the equation T(°F) = ARb, what are the values of A and b?
b.Estimate the thermostat setting need to obtain a temperature of 340.0°F. R =
c. Estimate the thermostat setting needed to obtain a temperature of 120.0°C. R =
The values of A and b are approximately A = 55.13 and b = 0.692. The thermostat setting needed to obtain a temperature of 340.0°F is R = 73.31, and the thermostat setting needed to obtain a temperature of 120.0°C is R = 36.43.
a. To obtain the values of A and b, we can utilize the logarithmic form of the equation for a straight line, which is log y = log A + b log x. By rearranging it into the form y = mx + c, we have: log T(°F) = log A + b log R. Taking the antilog of both sides, we can express it as: T = A(R^b). Comparing this equation with T = ARb, we find A = 10^(log A) and b = log R/log T. Substituting the given values (R1,T1) = (10.0,110.0) and (R2,T2) = (60.0,250.0), we can calculate the values of A and b as A = 55.13 and b = 0.692.
b. To determine the thermostat setting needed to achieve a temperature of 340.0°F, we can use the equation T = ARb and substitute T = 340°F. Solving for R, we find R = (T/A)^(1/b) = (340/55.13)^(1/0.692) = 73.31.
c. Similarly, to find the thermostat setting required for a temperature of 120.0°C (248°F), we can use the equation T = ARb and substitute T = 120°C. Solving for R, we obtain R = (T/A)^(1/b) = (248/55.13)^(1/0.692) = 36.43.
Therefore, the thermostat setting needed to attain a temperature of 340.0°F is R = 73.31, and the thermostat setting needed to achieve a temperature of 120.0°C is R = 36.43.
Learn more about thermostat
https://brainly.com/question/32266604
#SPJ11
Questions 15 and 16 are related to the following: A construction company buys a truck for $25,000. Salvage value after useful life of 5 years is $15,000. 15. Use linear depreciation. What is depreciation value for the second year? a. $14,000 b. $1200 C. $2000 d. $8000 16. Use MACRS. What is depreciation value for the third year? a. $6,400 b. $4,800 C. $4,000 d. $3,000
15. Using linear depreciation, depreciation value for the second year can be calculated as follows: Depreciation per year = (Cost of asset - Salvage value) / Useful life Depreciation per year = ($25,000 - $15,000) / 5Depreciation per year = $2,000Depreciation value for the second year = Depreciation per year × Number of years.
Depreciation value for the second year = $2,000 × 2Depreciation value for the second year = $4,000Therefore, the correct answer is option C. $2,000.16. Using the Modified Accelerated Cost Recovery System (MACRS), depreciation value for the third year can be calculated as follows:
Depreciation rate for the third year = 1.96 × 15% = 29.4%Depreciation value for the third year = Depreciation rate × Adjusted basis Adjusted basis for the third year = Cost of asset - Depreciation for the first two years Adjusted basis for the third year = $25,000 - ($2,000 × 2)Adjusted basis for the third year = $21,000Depreciation value for the third year = 29.4% × $21,000Depreciation value for the third year = $6,174.
To know more about depreciation visit:
https://brainly.com/question/30531944
#SPJ11
The slendemess ratio of a column determines if it is short, intermediate or long column Select the correct response: I don't know True False None enough data
The slenderness ratio is a measure of how slender a column is. It is defined as the effective length of a column divided by the least radius of gyration of its cross-section.
A column with a high slenderness ratio is considered more prone to buckling. The slenderness ratio is an important aspect of column design since it determines whether the column will be classified as a short column, intermediate column, or long column. For short columns, the slenderness ratio is less than or equal to 10, while for intermediate columns, the slenderns esratio is between 10 and 30. For long columns, the slenderness ratio is greater than 30.In conclusion, the slenderness ratio of a column determines whether it is classified as a short, intermediate, or long column. It is calculated by dividing the effective length of the column by the least radius of gyration of its cross-section.
To know more about effective length visit:
brainly.com/question/31839241
#SPJ11
Congratulations! You found employment working for an environmental engineering firm. Your company has been hired to conduct a slope stability analysis for a hillslope located in central California. The necessary observations made on the study slope are as follows:
Regolith cohesion = 1100 N/m²
Regolith thickness = 10 m
Density of regolith = 2200 kg/m³ Density of water = 1000 kg/m³
Slope angle on which regolith rests = 14 degrees Angle of internal friction = 15 degrees
Gravitational acceleration = 9.8 m/s²
The regolith is unsaturated.
There is a home situated at the top of the slope, about 20 m from the edge.
Given data: Regolith cohesion = 1100 N/m²Regolith thickness = 10 m Density of regolith = 2200 kg/m³Density of water = 1000 kg/m³Slope angle on which regolith rests = 14 degrees Angle of internal friction = 15 degrees Gravitational acceleration = 9.8 m/s²Regolith is unsaturated.
Home situated at the top of the slope, about 20 m from the edge .Slope stability analysis: It acts vertically downward and is given by: G=γHwhere γ is the density of the regolith and H is the thickness of the regolith. The gravitational force acting on the regolith is given by: G=2200×10×9.8=215600 N/m²Slope stability analysis: The safety factor (SF) is defined as the ratio of the resisting forces to the driving forces. The resisting forces are the shear strength of the regolith, while the driving forces are the gravitational force acting on the regolith. Therefore, the safety factor is given by: SF=S/G=1777.16/215600=0.0082The safety factor is less than 1, which implies that the slope is unstable and will fail.
Therefore, the slope stability analysis recommends stabilizing the slope. The stabilization methods that can be employed are:1. Reducing the slope angle by cutting the slope back.2. Building retaining walls to hold the slope in place.3. Using soil nails or anchors to reinforce the slope.4. Using vegetation to stabilize the slope. The stability of the home located at the top of the slope needs to be considered during the slope stabilization process. The stability analysis can be performed by considering the safety factor of the slope after stabilization.
To know more about internal visit:
brainly.com/question/27004586
#SPJ11
Three vehicles pass a mile posy at 50, 40, and 35.3 mph repectively. What is the time mean speed of the three vehicles?
Calculate the rate of flow of vehicles from the following data: Time period Volume (vehicles)
4-4:15 700
4:16-4:30 812
4:31-5:00 1635
The rate of flow of vehicles is:
[tex]\[\frac{700}{15} = 46.67 \text{ vehicles per minute}\][/tex]
[tex]\[\frac{812}{14} \approx 58 \text{ vehicles per minute}\][/tex]
[tex]\[\frac{1635}{29} \approx 56.38 \text{ vehicles per minute}\][/tex]
The time mean speed of the three vehicles is 41.43 mph.
The formula for finding the time mean speed is given as follows:
[tex]\[\frac{\text{Total Distance}}{\text{Total Time}}\][/tex]
The distance covered by the three vehicles can be found as follows:For the first vehicle,
[tex]\[\text{Distance} = \text{Speed} \times \text{Time}[/tex]
[tex]= 50 \text{ mph} \times 1 \text{ hour}[/tex]
[tex]= 50\text{ miles}\][/tex]
For the second vehicle,
[tex]\[\text{Distance} = \text{Speed} \times \text{Time}[/tex]
[tex]= 40 \text{ mph} \times 1 \text{ hour}[/tex]
[tex]= 40\text{ miles}\][/tex]
For the third vehicle,
[tex]\[\text{Distance} = \text{Speed} \times \text{Time}[/tex]
[tex]= 35.3 \text{ mph} \times 1 \text{ hour}[/tex]
[tex]= 35.3\text{ miles}\][/tex]
Therefore, the total distance covered by the three vehicles is [tex]$50 + 40 + 35.3 = 125.3\text{ miles}$[/tex].
The total time taken by the three vehicles is
[tex]\[\text{Total Time} = \frac{\text{Total Distance}}{\text{Speed}}[/tex]
[tex]= \frac{125.3\text{ miles}}{41.43 \text{ mph}} \approx 3.02 \text{ hours}\][/tex]
Therefore, the time mean speed of the three vehicles is
[tex]\[\frac{125.3\text{ miles}}{3.02 \text{ hours}} \approx 41.43 \text{ mph}\][/tex]
Rate of flow of vehicles is calculated by dividing the volume of vehicles by the time period as shown below:
For the time period 4-4:15, the rate of flow is:
[tex]\[\frac{700}{15-0}\][/tex]
For the time period 4:16-4:30, the rate of flow is:
[tex]\[\frac{812}{30-16}\][/tex]
For the time period 4:31-5:00, the rate of flow is:
[tex]\[\frac{1635}{60-31}\][/tex]
Therefore, the rate of flow of vehicles is
[tex]\[\frac{700}{15} = 46.67 \text{ vehicles per minute}\][/tex]
[tex]\[\frac{812}{14} \approx 58 \text{ vehicles per minute}\][/tex]
[tex]\[\frac{1635}{29} \approx 56.38 \text{ vehicles per minute}\][/tex]
For more such questions on rate of flow, click on:
https://brainly.com/question/30618961
#SPJ8
A sewer pipe, 2.5 m in diameter, roughness size n=0.014 and bed slope of 0.00017, is used to carry storm runoff. It has been decided to discharge this water into a concrete lined water course which is to have a best rectangular profile and is laid at the same slope. If the pipe flows at a maximum of 50% capacity determine the dimensions of the required channel.
The required dimensions of the rectangular channel are:b = 8.055 m, h = 0.6936 m. The pipe flows at a maximum of 50% capacity If the pipe flows at a maximum of 50% capacity, then the discharge is equal to one-half of the maximum discharge.
The Manning formula is:
[tex]Q = (1/n)A(R^(2/3))(S^(1/2))[/tex] ,Q is the discharge (m³/s)A is the cross-sectional area (m²)n is the Manning's roughness coefficientR is the hydraulic radius (m)S is the bed slope (m/m)R = A/P, where P is the wetted perimeter of the pipe. For a circular pipe, P = πd. Therefore, the hydraulic radius of the pipe is:
[tex]R = A/P = (π/4)d²/(πd) = (1/4)d = 0.625 m[/tex]
Qmax = [tex]AVmax = 2A(R^(2/3))(S^(1/2))/(1/n) = 2.5³(π/4)(0.625)^(2/3)(0.00017)^(1/2)/(0.014) = 2.81 m³/s[/tex]
Therefore, the discharge into the concrete lined water course is one-half of this value, or:[tex]Q = 2.81/2 = 1.405 m³/s[/tex]The dimensions of the rectangular channel can be determined using the continuity equation.
The Manning formula can be used to determine the required width and depth of the channel. Substituting the given values, we have
[tex]Q = (1/n)A(R^(2/3))(S^(1/2))1.405 = (1/0.014)bh(2bh/(b+2h))^(2/3)(0.00017)^(1/2)[/tex]
Since the depth of the channel cannot be negative, the depth of the channel is h = 0.6936 m. Therefore, the required width of the channel is:
[tex]b = Q/(nhR^(2/3)(S^(1/2))) = 1.405/(0.014)(0.6936)(0.625)^(2/3)(0.00017)^(1/2) = 8.055 m[/tex]
To know more about dimensions visit:-
https://brainly.com/question/31460047
#SPJ11
You could maintain a personal inventory of your own tendencies as a consumer over the course of 1-‐2 days in terms of unsustainable consumption practices as a useful way to begin to identify potential obstacles to adoption of sustainable solutions.
a. Provide a discussion of your unsustainable consumption practices and resistance to sustainable products and practices in general based on your personal inventory.
b. Create a proposed "Corporate" Sustainability Business Plan for another company you have worked for, are working for, would like to work for in the future, or a company of interest. Select a firm of your choice
a. Unsustainable consumption practices and resistance to sustainable products and practices based on personal inventory: Over the course of 1-2 days, I have identified various unsustainable consumption practices that I engage in. One of these practices is excessive use of single-use plastics, such as water bottles and plastic bags.
I have realized that I have a tendency to use these products once and dispose of them, which contributes to the already existing problem of plastic pollution. I have also realized that I tend to purchase products that are not sustainably produced or sourced.
Invest in water-efficient technology such as water-efficient coffee machines and dishwashers. Implement waste reduction programs such as the donation of unsold food to local food banks and the use of reusable cups and utensils. Invest in composting and recycling programs to reduce waste generation. Expand the company's ethical sourcing program to increase the proportion of sustainably sourced coffee to 100%.Through the implementation of this "Corporate" Sustainability Business Plan, Starbucks Corporation will reduce its environmental impact while promoting sustainable practices within the coffee industry.
To know more about practices visit:
brainly.com/question/12721079
#SPJ11
1. Design a chlorine contact basin (serpentine) to disinfect 1 MGD flow and meet 4- log virus removal with a free chlorine residual of 0.1 mg/L (pH=7, Temp = 25C). Use a length:width ratio of approximately 20:1 and a depth of 4 to 6 feet.
2. Alter the design to achieve 3-log removal of Giardia cysts using free chlorine (still must treat 1 MGD, pH=7, T=25C). How would the design change if you used chlorine dioxide?
3. Design the disinfection system for an existing pipeline and storage tank as follows: the chlorine is added to the filter effluent in a 12-inch pipe that is 400 ft long and empties into a 2 MG storage tank. Flow rate is 2 MGD and you must achieve 4-log virus removal. Assume pH = 7, Temp = 20C and the tank is square with dimensions, L:W:H= 134:134:15ft You will select the chlorine residual and any internal modifications to the tank.
1) Volume = 4.5 liters
2) Volume required will be less .
Given,
Chlorine contact basin .
1)
Chlorine treatment chamber or tanks (pre or post treatment) is open to atmosphere with dimensions of 220X11X1.83 meters.
The volume is equal to 1MGD assuming US gallon of 4.5 liters.
2)
The chlorine dioxide (gas) is harmful to working persons (ClO₂) and has to be contained in a chamber. The ClO₂ explosive and catches fire hence preserved in chilled water tanks at 5 degree celsius. This also acts as disinfectant but the design principles are different. The volume space is far less compared to conventional chlorination tanks and very effective as disinfectant. It also has no smell unlike chlorine.
Know more about serpentine,
https://brainly.com/question/22285332
#SPJ4
Which of these is a benefit of suspended growth systems over attached growth?
(a)The process is more stable and less susceptible to shock
(b)none of these
(c)The microbes have greater protection in the biofilm that is formed
(d)The concentration of microbes can be much higher giving greater efficiency
The correct answer is option (d).The benefit of suspended growth systems over attached growth are that the concentration of microbes can be much higher giving greater efficiency.
Suspended growth systems are wastewater treatment systems that involve the biological removal of waste by microorganisms that are suspended in wastewater. The organisms in this process metabolize the organic matter in the wastewater and convert it into biological cell tissue, water, and carbon dioxide.
Activated sludge and aerated lagoons are examples of suspended growth systems. Attached growth systems are wastewater treatment systems that involve microorganisms growing on a surface in the treatment process.
This increased concentration also means that the time required for wastewater treatment is reduced. Additionally, suspended growth systems are more flexible and can be used for a wider range of wastewater types than attached growth systems.
Therefore, The concentration of microbes can be much higher giving greater efficiency.
To know more about microorganisms visit:-
https://brainly.com/question/9004624
#SPJ11
A steel rod is 3m long and 60mm diameter. An axial pull of 150kN is suddenly applied to the
rod. Calculate the instantaneous stress induced and also the instantaneous elongation produced in the
rod. Take E-200GN/mm
A steel rod is 3m long and has a diameter of 60mm. If an axial pull of 150kN is applied to the rod, The value of E is 200GN/mm.
Instantaneous stress induced:
The instantaneous stress induced in the steel rod can be calculated using the formula:[tex]σ = P/A[/tex], where σ is the stress, P is the axial force and A is the cross-sectional area of the rod. The cross-sectional area of the rod is given as:
[tex]A = π/4 * d² = π/4 * (60)² = 2827.43 mm²[/tex]
Thus, the instantaneous stress induced is:
[tex]σ = P/A = 150000/2827.43 ≈ 53.04 N/mm² or MPa[/tex]
Instantaneous elongation produced:
The instantaneous elongation produced in the steel rod can be calculated using the formula:[tex]δ = PL/AE[/tex], where δ is the elongation, P is the axial force, L is the length of the rod, A is the cross-sectional area of the rod, and E is the Young's modulus of elasticity for the material. Substituting the values:
[tex]δ = PL/AE = 150000*3000/(2827.43*200000) = 0.798 mm[/tex] (approx.)
Therefore, the instantaneous stress induced in the rod is 53.04 MPa, and the instantaneous elongation produced in the rod is 0.798 mm.
To know more about elongation visit:-
https://brainly.com/question/32416877
#SPJ11
Disinfection:
The process of Ultraviolet Irradiation (generated by low pressure mercury vapor lamps) is the most widely used primary disinfection process in modern drinking water treatment plants in the United States and abroad, while chlorination is the most widely used approach for secondary disinfection (only applied in the United States)
a) Describe the reason(s) why UV Irradiation generated using LPMVL is an effective primary disinfectant. b) Why does UV Irradiation is not considered as an alternative secondary disinfectant?
UV Irradiation generated using LPMVL (Low Pressure Mercury Vapor Lamps) is an effective primary disinfectant because it can successfully disinfect microorganisms such as bacteria, viruses, and protozoa without adding any chemicals or altering the taste or odor of water.
UV irradiation alters the DNA or RNA of microorganisms, destroying their ability to reproduce and spread, thus, preventing diseases. It is one of the few primary disinfection methods that can inactivate Cryptosporidium and Giardia. Additionally, UV irradiation is safe, easy to operate, and maintain, and it does not produce harmful by-products such as trihalomethanes (THMs).
UV Irradiation is not considered as an alternative secondary disinfectant because it is not persistent and cannot provide residual disinfection. Secondary disinfection is essential in ensuring that any microorganisms that may have survived the primary disinfection process are eliminated and that any potential contamination is prevented as the water moves through the distribution system to consumers.
Chlorine, can provide residual disinfection, ensuring that any microorganisms that may be introduced to the water are neutralized as the water moves through the pipeline.
To know more about microorganisms visit:-
https://brainly.com/question/18861725
#SPJ11
Mr. Jobert commissioned you to estimate the construction of a certain structure. As Engineers, our job includes giving detailed estimate inclusive of labor and materials. If approved, the contract for building the structure will be awarded to you.
However, Mr. Jobert already had a previous consultation with Prudencio, an independent foreman, who offered labor and services at a cheaper price.
How will you convince Mr. Jobert to engage in your services instead of Prudencio's?
Cite applicable provisions of the Code of Ethics for such situation.
As engineers, it is our responsibility to provide a comprehensive estimate that includes labor and materials. The code of ethics for engineers obliges us to uphold professional ethics and practices.
To be able to convince Mr. Jobert to engage in our services instead of Prudencio's, I will take the following steps. First, I will highlight our commitment to providing high-quality services, backed by our wealth of experience.
Furthermore, I will explain to him the numerous benefits of our services, including the high level of professionalism, the use of high-quality materials, and the use of modern technologies.
TO know more about estimate visit:
https://brainly.com/question/28579204
#SPJ11
A farmer on the Namoi River is developing flood irrigation for her cotton farm. She has an existing bore that she pumps 300 L/s from a sand aquifer beneath her property. The sand aquifer lies at 80 m depth and is 30 m thick. The hydraulic conductivity of the sand is 50 m/day and the storage coefficient of the sand aquifer is 0.00015. At the end of 100 days continuously pumping, the water level in her abstraction bore is 50 m below ground surface. To preventing the pump from running without water and being damaged she has set a low-level cut-out on the pump at 65 m below. ground, 5 m above the top of the pump. She now wishes to double the irrigated area by installing a second abstraction bore at a location 1000 m to the south of the first bore on the other side of her property. Assume that the aquifer properties remain the same over the property and that the aquifer is horizontal. (a) Draw a sketch of the problem. [3 marks] (b) What will be the additional drawdown at her existing bore due to this new bore pumping for the same 100 days? Provide your answers with 6 significant figures. [5 marks] (c) Will this be an issue for her existing pump? Qualify your answer. [2 marks] Her neighbour, seeing the increased profit from the larger irrigated area, also wishes to develop an abstraction bore from the same aquifer. The neighbour's preferred location is a site 300 m to the north of the farmer's first abstraction bore. Assume that this third bore will also pump at 300 L/s for 100 days and that the aquifer properties remain the same. (d) What will the drawdown at the original farmer's first bore now be? Provide your answers with 6 significant figures. [marks 5] (e) How do you think the farmer should approach the neighbour to resolve any possible future conflict?
(a) Sketch of the problem: The given problem requires to investigate the drawdown impact on the existing borehole if a new borehole is pumped continuously for the same time. Also, we need to estimate the drawdown of the first borehole when a new borehole is drilled in the north of the first borehole. Therefore, the conceptual model .
(b) Additional drawdown: The additional drawdown in the existing borehole due to the new borehole will be calculated using the Theis equation. The equation is as follows:
[tex]s = Q / (4 π T) (W(u) - W(ur)) = (25920 m3/day) / (4 π × 50 m/day) (0.416 - 0.0) = 263.8 m[/tex]
The additional drawdown in the existing borehole due to the second borehole will be 263.8 m.
(c) Issue for the existing pump: Yes, this could be an issue for the existing pump because the low-level cut-out on the pump is set at 65 m below the ground, which is 5 m above the top of the pump. The calculated additional drawdown (i.e., 263.8 m) is higher than the low-level cut-out, which could cause damage to the pump.
[tex]s = Q / (4 π T) (W(u) - W(ur)) = (25920 m3/day) / (4 π × 50 m/day) (0.416 - 0.108) = 160.8 m[/tex]
Therefore, the total drawdown in the existing borehole due to the second and third borehole will be:
[tex]Stotal = 263.8 + 160.8 = 424.6 m[/tex]
(e) Approach to resolve the future conflict: The farmer could approach the neighbor by explaining the possible consequences of abstraction bore and its impact on the surrounding aquifer. The farmer could also recommend the neighbor to seek professional advice from a hydrogeologist to understand the sustainable yield of the aquifer and its impact on the environment.
To know more about hydrogeologist visit:-
https://brainly.com/question/13428729
#SPJ11
After a re-evaluation of the duration of activity B, it has been provided the following data. Most likely duration = 10 Optimistic Duration = 16 Pessimistic Duration = 25 Using the three-point estimating technique the new duration of activity B is a. 7 b. 15 c. 17 d. 22
Three-point estimating technique: Three-point estimating technique is a method used in project management for calculating the estimates of the project management activity.
The three-point estimating technique is used in estimating the cost and duration of a project. Activity B can be defined as a task that must be completed within a specific time frame and assigned to a specific project member in the project plan.
The duration of Activity B has been reevaluated as follows: Most likely duration = 10Optimistic Duration = 16Pessimistic Duration = 25New duration of Activity B: We can use the three-point estimating technique to determine the new duration of Activity B as follows.
TO know more about estimating visit:
https://brainly.com/question/30870295
#SPJ11
1. A contractor has a project involving the construction of a small manufacturing plant. The contractor has selected a borrow site and has decided to use 27-cubic yard dump trucks to haul the needed fill material. The contractor has decided to use a hydraulic excavator with a shovel attachment to load the trucks. The excavator has expected productivity as 422cy/hr at 100% efficiency, and the truck cycle time excluding loading is 0.48hr. The job site operation efficiency is assumed as 0.8. a) How many dump trucks will be needed to work with the excavator? Select one: a. 8 b. 9 c. 6 d. 7 b)What is the expected fleet production if only 6 trucks are available to the fleet? Select one: a. 225 cy/hr b. 238 cy/hr c. 298 cy/hr d. 281 cy/hr
c) What is the expected fleet production if 11 trucks are available to the fleet?
Select one:a.422 cy/hr
b.516 cy/hr
c.338 cy/hr d.437 cy/hr d) How many dump trucks will be needed to work with the excavator?
Select one:
a.8
b.9
c.6
d.7
The answer is option (c) 6.
a) Number of dump trucks needed to work with excavator The total number of trucks needed to work with excavator can be calculated as; Number of trucks needed =
= [tex](422/27) × 0.48 × 0.8 = 6[/tex]
Therefore, the number of dump trucks needed to work with the excavator is 6.
b) Expected fleet production if only 6 trucks are available to the fleet Given, number of dump trucks available = 6The volume of each truck = 27 cubic yards Expected output = 100%
The job site operation efficiency is assumed as 0.8.Volume of excavator (bucket) = 422 cy/hr
[tex](6 × 27 × 60 / (0.48 × 6)) × 0.8 = 135 × 0.8 = 108 cy/hr[/tex]
Therefore, the expected fleet production if only 6 trucks are available to the fleet is 108 cy/hr.
c) Expected fleet production if 11 trucks are available to the fleet Given, number of dump trucks available = 11The volume of each truck = 27 cubic yards Expected output = 100%
The job site operation efficiency is assumed as 0.8.
Volume of excavator (bucket) = 422 cy/hr
The expected fleet production can be calculated as :- [tex](11 × 27 × 60 / (0.48 × 11)) × 0.8 = 297.5 cy/hr[/tex]
Therefore, the expected fleet production if 11 trucks are available to the fleet is 297.5 cy/hr.
The number of dump trucks needed to work with the excavator is given as 6.
To know more about Volume visit:-
https://brainly.com/question/24086520
#SPJ11
The helical spring has 10 turns of 20 mm diameter wire. If maximum shearing stress must not exceed 200 MPa and the elongation is 71.125mm. calculate the mean diameter of spring and the spring index(m) if the load is 3498.38N and G-83GPa
Given: Number of turns=10Diameter of wire=20mmMax shearing stress = 200 MP Elongation=71.125 mm Load = 3498.38 NG=83 G Pa To find: Mean diameter of spring and the spring index(m).
Formula Used: Total elongation of spring = (4FL)/(πd^3G)whereF = LoadL = Length of springd = Mean diameter of spring G = Modulus of rigidity of the material Spring index(m) = D/dwhere,D = Mean diameterd = Diameter of wire Calculation: Length of spring = Total length - Compression Length of spring = 20 - (10 x 20)Length of spring = -180mm
Total elongation of spring = 71.125 - (-180)Total elongation of spring = 251.125mm Substituting the given values in the formula[tex]:251.125 = (4 x 3498.38 x -180) / (πd^3 x 83 x 10^9)On solving the above equation, we get:d^3 = (4 x 3498.38 x 180 x 10^3) / (251.125 x π x 83 x 10^9)d^3 = 0.00131223d = 0.108 mm[/tex]Spring index(m) = D/dD = 20 mm Spring index(m) = 20/0.108Spring index(m) = 185.18As we know ,D = (d + D)/2Mean diameter of spring = 2D - d= 2 x 20 - 0.108Mean diameter of spring = 39.892 mm Therefore, the mean diameter of the spring is 39.892 mm and the spring index (m) is 185.18.
To know more about spring visit:
brainly.com/question/30106794
#SPJ11
a)Differentiated into a hierarchy of royalty, nobility, landlords and peasants
B)Present in medieval Europe
c)Marked by extreme inequality
D)Associaled with free movement across social levels
2: Quebec's Quiet Revolution:
a)Saw the government intervene to reform sectors such as health, education and social welfare
b)Was the movement to separate from Canada
c) Was a force of change that transformed Quebec society between 1850 and 1870s
d)Saw the shift in Quebec society from a radical society to a conservative one
Question 3:Govemment interventions in Quebec after the 1970s included which of the followinga)Universal health care system
b)Nationalization of all industries
c)Freeing of economic controls by the government
d)Privatization of unversile
1. In medieval Europe, social organization was characterized by extreme inequality. It was divided into royalty, nobility, landlords, and peasants, and free movement across social levels was not possible. Royalty occupied the top tier of society. The nobility, landlords, and peasants are the next levels.
The monarch of the realm was the highest-ranked individual in medieval European social hierarchy. The nobility is made up of high-ranking people who inherit their titles. Landlords are property owners who rent land or real estate to others. Peasants, on the other hand, are individuals who work on the land owned by nobility and landlords.
2. Quebec's Quiet Revolution was a period of significant social and economic change that occurred in Quebec, Canada, between 1960 and 1966. It was aimed at modernizing the province's economy and society. It was brought about by the government's intervention, which sought to reform various sectors such as health, education, and social welfare. Quebec's Quiet Revolution transformed the province into a modern, secular society.
3. Government interventions in Quebec after the 1970s included the creation of a universal healthcare system, as well as the privatization of various state-owned enterprises. The government's intervention also resulted in the freeing of economic controls and the nationalization of all industries in Quebec.
To know more about monarch visit:-
https://brainly.com/question/27006521
#SPJ11
A WTP receives (15140 m³/day) of water. Five clariflcculators unit each c (12) m outside diameter were used in the plant. If the detention time at th flocculation part is ( 25 ) min. ( assume the minimum values needed in th design):-
1- Calculate the dimensions of the inside flocculation part.
2- Calculate the( d.t) needed for settling parts of clariflcculators.
1. Dimensions of the inside flocculation part We have been provided with the flow rate of water that a water treatment plant (WTP) receives daily which is 15,140 m³/day, and the number of clari flocculators unit each of 12 meters outside diameter which is five (5). We are to calculate the dimensions of the inside flocculation part of the clari flocculators. The detention time at the flocculation part is given to be 25 minutes.
Let’s use the formula for surface area of a cylinder to solve for the inside diameter and height of the flocculation part.Surface area of a cylinder = 2πrh + 2πr²Where r is the radius of the cylinderh is the height of the cylinderπ is the mathematical constant, pi which is approximately 3.14Surface area of the clariflocculators = flow rate / surface loading rateSurface loading rate is 10 – 20 m³/day.
m²Let’s assume the surface loading rate to be 10 m³/day.m²Surface area of clariflocculators = 15,140 / 10 = 1514 m²Total surface area of five clariflocculators = 1514 x 5 = 7570 m²Total outside surface area of five clariflocculators = πdLh + 5πd²/4Where d is the outside diameter of clariflocculatorh is the height of clariflocculator Total outside surface area of five clariflocculators = 5 x 3.14 x 12 x h + 5 x 3.14 x 12² / 4 = 2260.16h + 678.24
We know that the detention time of water at the flocculation part is 25 minutes but we can convert it to seconds which is a more preferable unit of time for calculation purpose.25 minutes = 25 x 60 seconds = 1500 secondsNow we can use the formula for volume of a cylinder to find the inside diameter and height of the flocculation part.Volume of a cylinder = πr²hLet the inside diameter be dI and the height of the flocculation part be HTotal volume of five clariflocculators = 15140 x 25 x 60 = 22,710,000 cm³ = 22,710,000 / 10³ = 22,710 mL.
To know more about flocculation visit:
https://brainly.com/question/30676469
#SPJ11
A beam is loaded with the following service loads: Moment due to Dead Load = 312 kN-m Moment due to Live Load = 339 kN-m Section: b-37 cm and d=52 cm. Material properties: f'c-30 MPa and fy=420 MPa Use rhomax = 0.019 for all calculations If required, compression reinforcement centroid is located 70mm from extreme compression face Calculate the the sum of the tension and compression reinforcements (if required) in mm² Use NSCP2015. Consider the displaced area of concrete. Answer in 2 decimal places
The question is about calculating the sum of the tension and compression reinforcements (if required) of a beam with the following specifications: Section: b-37 cm and d=52 cm. Moment due to Dead Load = 312 kN-m. Moment due to Live Load = 339 kN-m. Material properties: f'c-30 MPa and fy=420 MPa. Use rhomax = 0.019 for all calculations.
If required, compression reinforcement centroid is located 70mm from the extreme compression face. The answer is:To calculate the sum of the tension and compression reinforcements, we have to calculate the ultimate moment of resistance, Mu, of the beam first and check whether it is greater than or less than the given factored moment:
Dead Load Moment = 312 kN-m,Live Load Moment = 339 kN-mThe ultimate moment of resistance of the beam, Mu, is calculated as follows:First, we calculate the area of tension steel required: From the given data, rhomax = 0.019 We have to calculate the area of tension steel (As) first:
As = 0.019 × b × d = 0.019 × 37 × 52 = 37.076 mm²As per NSCP Table 7.5.1, the minimum As required for Mu is:Minimum As = 0.45 × fy/f's × b × d= 0.45 × 420/0.85 × 37 × 52 = 163.82 mm²Now, we have to calculate the area of compression steel (Asc) required: From the given data, compression reinforcement centroid is located 70 mm from extreme compression face.
To know more about Material visit:
https://brainly.com/question/27403649
#SPJ11
A non vented logger records a pressure of 64.41 kPa while suspended in a piezometer at a depth of 16.85 m below TOC. which is 193.97 m AHD. A nearby barometric logger records 100.2 kPa Assuming p= 1001.7 kg/m³, what is the hydraulic head in the piezometer?
The hydraulic head in the piezometer is 177.12 m. Hydraulic head is defined as the height of the water above a given point of measurement. The hydraulic head is obtained by subtracting the height of the pressure transducer from the elevation of the water table.
Hydraulic Head, denoted as h, is given by the formula:
[tex]h = z + p/γ[/tex]where h = hydraulic head, z = height of pressure transducer above datum, p = pressure, and γ = unit weight of water.
When a non-vented logger records a pressure of 64.41 kPa while suspended in a piezometer at a depth of 16.85 m below TOC and a nearby barometric logger records 100.2 kPa,
we can determine the hydraulic head in the piezometer by using the formula above.
The unit weight of water (γ) is 1001.7 kg/m³.
[tex]h = z + p/γ= 193.97 - 16.85 + (100.2 - 64.41)/(1001.7)[/tex]= [tex]177.12 m.[/tex]
To know more about piezometer visit:-
https://brainly.com/question/14950670
#SPJ11