Find the slope of the line on the graph.
Write your answer as a fraction or a whole
number, not a mixed number or decimal.

Find The Slope Of The Line On The Graph.Write Your Answer As A Fraction Or A Wholenumber, Not A Mixed

Answers

Answer 1
I think the slope is -3

Related Questions

what the answer for this pls help me its way too complicated thank you very very much

Answers

The product of the given expressions 6 × x × y and 2 × x × 3 × y are both equivalent to 6xy.

How to find product?

Multiplication is another term for product and it is the process of finding the sum of a number with itself a specified number of times, or any other analogous binary operation that combines other mathematical objects.

6 × x × y

= 6xy

2 × x × 3 × y

= 6xy

Hence, 6 × x × y and 2 × x × 3 × y equals 6xy.

Read more on multiplication:

https://brainly.com/question/28768606

#SPJ1

halloween theme: enter the correct 4 digit code

Answers

Answer:

Explanation step-by-step

Zombie is 4

Bat is 1

Pumpkin is 2

Graves are 3

What observations do you notice about TB tests based on the tree diagram? (Hint: What do the numbers of the tree diagram represent?)

Answers

The answer to your question is they represent how to divide

Use a linear approximation (or differentials) to estimate the given number. (32.03)^94/5) (Round your answer to two decimal places.)

Answers

Using a linear approximation the estimated value of (32.03)^(94/5) is approximately 547.95.

To estimate the value of (32.03)^(94/5) using linear approximation, we can start by taking the natural logarithm (ln) of the expression and then use the linear approximation formula. The linear approximation formula is given as:

f(x) ≈ f(a) + f'(a)(x - a)

In this case, our function is f(x) = ln(x), and we want to approximate it at x = 32.03. We'll choose a as a value close to 32.03 to simplify the calculations. Let's choose a = 32.

Now, let's calculate the linear approximation step by step:

Calculate the derivative of the function:

f'(x) = 1/x

Evaluate the function and its derivative at a:

f(a) = ln(32) ≈ 3.4657

f'(a) = 1/32 ≈ 0.03125

Plug the values into the linear approximation formula:

f(x) ≈ f(a) + f'(a)(x - a)

ln(32.03) ≈ 3.4657 + 0.03125(x - 32)

Substitute x = 32.03 into the approximation equation:

ln(32.03) ≈ 3.4657 + 0.03125(32.03 - 32)

ln(32.03) ≈ 3.4657 + 0.03125(0.03)

Simplify the expression:

ln(32.03) ≈ 3.4657 + 0.0009375

Calculate the exponential function to obtain the estimated value:

(32.03)^(94/5) ≈ e^(ln(32.03)) ≈ e^(3.4657 + 0.0009375)

Using a calculator or a computer program, we can find that the estimated value of (32.03)^(94/5) is approximately 547.95 (rounded to two decimal places).

For more such questions on linear approximation , click on:

https://brainly.com/question/30403460

#SPJ8

Find the equation of the line with slope m=−3/4 that contains the point (8,−9).

Answers

Answer:

the answer is y=-3/4x-3

Answer:

The answer is

[tex]y = - \frac{3}{4} x - 3 \\ [/tex]

Step-by-step explanation:

To find an equation of a line when given the slope and a point we use the formula

[tex]y - y_1 = m(x - x_1)[/tex]

where

m is the slope

( x1 , y1) is the point

From the question the point is (8,−9) and slope -¾

The equation of the line is

[tex]y + 9 = - \frac{3}{4} (x - 8) \\ y + 9 = - \frac{3}{4} x + 6 \\ y = - \frac{3}{4} x + 6 - 9[/tex]

We have the final answer as

[tex]y = - \frac{3}{4} x - 3 \\ [/tex]

Hope this helps you

-5a - 8a + 2b - b

pleaseee helppp

Answers

answer: -13a + 1b

-5a - 8 = -13

2b - b = 1b

Answer:

Combine like terms

−5a -8a+2b-b

13a+2b-b

2

Combine like terms

again

3

Multiply by 1

Solution

-13a+b

Step-by-step explanation:

someone please help me

Answers

The Correct Answer is B .

2. The second term of an arithmetic sequence is -5, and the third term is 12. What is the first term?​

Answers

Answer: -12

Step-by-step explanation:

To get from -5 to 12, you'd add 7

So to get to the first, subtract 7 from -5

The first term of an arithmetic progression whose second term is -5  and third term is 12 is  -22.

What is an Arithmetic progression?

An arithmetic progression is a sequence of numbers such that the difference between the consecutive terms is constant. A sequence -

a₁ , a₂, a₃ , a₄ ...... aₙ

will be an arithmetic progression if -

a₂ - a₁ = a₃ - a₂ = a₄ -  a₃ = d (constant) is called common difference of A.P. and a₁ = 'a' as the first term.

Given is the second term of an arithmetic sequence which is -5 and the third term is 12.

We can calculate the nth term of an A.P. using the formula -

a[n] = a + (n - 1)d

Now -

a[2] = -5

a + (2 - 1)d = -5

a + d = - 5                ... [1]

and

a[3] = 12

a + (3 - 1)d = 12

a + 2d = 12                .... [2]

Expanding equation [2] further, we get -

(a + d) + d = 12

- 5 + d = 12

d = 17

Then -

a + d = -5

a = - 5 - d

a = -5 - 17

a = - 22

Therefore, the first term of an arithmetic progression whose second term is -5  and third term is 12 is  -22.

To solve more questions on Arithmetic progression , visit the link below-

https://brainly.com/question/26064016

#SPJ5

9. You have worked all summer long and saved $1240.
You want to buy a car that costs $5400. How much
money, m, do you need before you can buy the car?
10.
at y
you

Answers

Answer:

the answer is 4160

Step-by-step explanation:

because if you subtract 5400 by the money you worked for that is your sum yw xx.

Answer:

Step-by-step explanation:

We have to subtract the amount of money that you have earned by the amount of money that the car costs.

$5400-$1240 is $4160

So you need $4160 more money to buy the car

(Good luck getting that much money XD)

Hope this helps!

Burger Dome is a fast-food restaurant currently appraising its customer service. In its current operation, an employee takes a customer's order, tabulates the cost, receives payment from the customer, and then fills the order. Once the customer's order is filled, the employee takes the order of the next customer waiting for service. Assume that time between each customer's arrival s an exponential random variable with a mean of 1.35 minutes. Assume that the time for the employee to complete the customer's service an exponential random variable with mean of 1 minute. Use the Burgerdome file to complete a simulation model for the waiting line at Burger Dome for a 14-hour workday. Note that you will need to use native Excel functionality to solve this problem because the educational version of ASP has a limit of 100 random variables. Recall the formula 5LN(RANDO) (-m) generates a value for an exponential random variable with mean m Refer to the Burger Dome analysis in Problem 16. Burger Dome wants to consider the effect of hiring a second employee to serve customers (in parallel with the first employee). Use the Burgerdometwoservers file to complete a simulation model that accounts for the second employee. (hint: The time that a customer begins service will depend on the availability of employees.) What is the impact of this change on the output measures?

Answers

I apologize for the confusion, but as a text-based AI, I'm unable to access or interact with specific files or perform simulations using native Excel functionality. Additionally, I don't have access to the specific "Burgerdometwoservers" file mentioned in the question.

However, I can provide you with a general explanation of the impact of hiring a second employee in a waiting line system like Burger Dome based on common principles of queueing theory.

When a second employee is added to serve customers in parallel with the first employee, it can have several impacts on the output measures:

Waiting Time: The average waiting time for customers is expected to decrease because there are now two employees available to serve customers simultaneously. This allows for more efficient processing of customer orders and reduces the overall waiting time.

Service Time: With two employees, the average service time per customer may also decrease. Since there are two employees working, each customer can be served by one of the employees, resulting in a shorter time spent on each customer's service.

Queue Length: The presence of a second employee may also lead to a reduction in the length of the waiting line or queue. With two employees serving customers, the queue is expected to move faster, reducing the number of customers waiting in line.

System Utilization: The utilization of the system, which refers to the percentage of time that the employees are busy serving customers, may increase with the addition of a second employee. This is because the workload is distributed between two employees, reducing the idle time.

Overall, hiring a second employee in a waiting line system like Burger Dome can lead to improved customer service by reducing waiting times, decreasing queue lengths, and increasing system efficiency. However, the specific impact on output measures would depend on various factors such as the arrival rate of customers, the service times, and the coordination between the employees.

Denise is using a ladder to clean the outside of her second story windows. The ladder she is using is 24 feet long, and she puts the base of the ladder 13 feet away from the house in order to avoid her flower gardens. How high up the side of her house does the ladder reach?

Answers

in order to solve this you have to use the pythagorean’s theorem, which is a^2+b^2=c^2. from the problem you can find out you have a=13ft and c=24ft. c is your hypotenuse. you then solve and you get b=20.17ft. you can check to make sure the answer is right, but that is how you solve it. And the ladder would reach 20.17ft.

0.019 in scientific notation

Answers

Answer:

1.9x10^-2

hope this helps

Step-by-step explanation:

Answer:   1.9 • 10^-2

-----------------------------------------------------------------------------------------------------

can someone help? and explain

Answers

i think this is the answer and the little yellow boxes are the power of the x’s i hope this helps

I need help ASAP!!!


g(x) = x2 - 2x2 + x
g(3) =

Answers

Answer:

-6

Step-by-step explanation:

put the value of x=3 in the equation g(x)

find the error(s) and solve the problem correctly. solve by completing the square. 8x^2-x-1=0

Answers

Therefore, the solution of the equation 8x² - x - 1 = 0, obtained by completing the square is x = (1 ± √33)/16.

To solve the equation 8x² - x - 1 = 0, by completing the square, we should first bring the constant term to the right side of the equation:8x² - x = 1 ... equation (1)

Next, we should multiply the coefficient of x by ½ and square it to get the value of (b/2a)².

The result is 1/32.8x² - x + 1/32 = 1/32 + 1... equation (2)

The left side of equation (2) can be factored as:8(x - 1/16)² = 33/32

Dividing both sides of the above equation by 8 gives us(x - 1/16)² = 33/256

Taking square roots on both sides gives us x - 1/16 = ± √(33/256)x = 1/16 ± 1/16 √33

Know more about square here:

https://brainly.com/question/4248683

#SPJ11

Someone help pleaseeee

Answers

Step-by-step explanation:

come on, now, this is one of the (if not THE) most important formula you need to remember for the rest of your life :

a² + b² = c²

with c being the Hypotenuse (the side opposite of the 90° angle), a and b are the legs.

so, in our case, we have then

x² = 5² + 12² = 25 + 144 = 169

x = sqrt(169) = 13

An Apple store charges a fee of $25 to schedule an appointment, then $70
per hour to fix a laptop. A local tech shop charges $50 to schedule an
appointment, but only charges $65 per hour to fix a laptop. After how many
hours would the cost of fixing a laptop be the same at each store?

Answers

5 hrs

to work this out you need to do this:

Apple:

$70×2hrs+$25= $165

$70×3hrs+$25=$235

$70×4hrs+$25=$305

$70×5hrs+$25=$375

Local tech shop:

$65×2hr+$50=$180

$65×3hr+$50=$245

$65×4hr+$50=$310

$65×5hr+$50=$375

Now, if you go back and check both the costs you'll see that they are similar after 5 hours.

work out the perimeter of a semicircle with radius 3cm. give your answer in terms of pi

Answers

Answer:

[tex]\pi r + d \\ [/tex]

The circumference of a circle = 2πr

But here they asked half of the circumference = πr

By substituting this we get the answer 3π

Now add the diameter = 3π+6

La profesora de sexto grado coloca en la pizarra los siguientes números, y les pide a sus estudiantes determinar el MCD de dichas cifras:

180 - 225

¿Cuál será la respuesta correcta que darán los estudiantes?

A. 90

B. 60

C. 45

D. 15 La profesora de sexto grado coloca en la pizarra los siguientes números, y les pide a sus estudiantes determinar el MCD de dichas cifras:

180 - 225

¿Cuál será la respuesta correcta que darán los estudiantes?

A. 90

B. 60

C. 45

D. 15

Answers

15 is the GCD of 45 and 15.

The teacher of the sixth grade places the following numbers on the board and asks her students to determine the GCD of these digits:C. 45D. 15GCD (45, 15) or the Greatest Common Divisor of 45 and 15 is the largest number that divides both 45 and 15 without leaving a remainder.The prime factorization of 45 is as follows:45 = 3 x 3 x 5To get the prime factorization of a number, divide it by its smallest prime factor (which is 3 in this case) and then divide the resulting quotient by its smallest prime factor, if possible. This operation is repeated until a prime number is reached.The prime factorization of 15 is as follows:15 = 3 x 5Thus, the common factors between 45 and 15 are 3 and 5, and the highest common factor is 3 x 5 = 15, which is the Greatest Common Divisor.GCD (45, 15) = 15

for more search question GCD

https://brainly.com/question/219464

#SPJ8

viola drives 170 meters up a hill that makes an angle of 6° with the horizontal. to the nearest tenth of a meter, what horizontal distance has she covered?
a). 171.5 m
b). 169.1 m
c). 1617.4 m
d). 17.8

Answers

Viola drove 170 meters up the hill that makes an angle of 6° with the horizontal. We are to find what horizontal distance she has covered.

Let us say the horizontal distance she has covered is x meters. From the given information, we know the length of the inclined plane, which is 170 meters. Also, the angle of inclination is 6°. Hence, we know the value of opposite side and the hypotenuse.The horizontal distance she has covered is the adjacent side.Using the trigonometric formula of the tangent function, we get:

tan 6° = opposite/adjacent

tan 6° = x/170 x = 170

tan 6° Using a scientific calculator, we get

:x = 17.8 meters (nearest tenth of a meter).

Hence, the correct answer is option (d) 17.8 meters.

Viola has covered 17.8 meters horizontally.

To know more about circle visit:

brainly.com/question/15008542

#SPJ11

a. How many integers from 1 through 1,000 are multiples of 2 or multiples of 9?
b. Suppose an integer from 1 through 1,000 is chosen at random. Use the result of part (a) to find the probability that the integer is a multiple of 2 or a multiple of 9.
c. How many integers from 1 through 1,000 are neither multiples of 2 nor multiples of 9?

Answers

a) Number of integers from 1 through 1,000 are multiples of 2 or  9 are 556 ; b) probability that integer is multiple of 2 or a multiple of 9. is 0.556; c) number of integers from 1 through 1,000 that are neither multiples of 2 nor 9 is 444.

a) We can use the inclusion-exclusion principle to count the total number of integers from 1 through 1,000 that are multiples of 2 or multiples of 9.To begin, we count the number of integers between 1 and 1,000 that are multiples of 2. There are 500 integers between 1 and 1,000 that are multiples of

Next, we count the number of integers between 1 and 1,000 that are multiples of 9. There are 111 integers between 1 and 1,000 that are multiples of 9. However, note that every multiple of 18 (which is a multiple of both 2 and 9) is counted twice: once as a multiple of 2 and once as a multiple of 9.

There are 55 such multiples of 18 between 1 and 1,000. Thus, the total number of integers between 1 and 1,000 that are multiples of 2 or multiples of 9 is

500 + 111 - 55

= 556.

b) Let us suppose that an integer from 1 through 1,000 is chosen at random.

Use the result of part (a) to find the probability that the integer is a multiple of 2 or a multiple of 9.The probability that the integer is a multiple of 2 or a multiple of 9 is the ratio of the number of integers that are multiples of 2 or multiples of 9 to the total number of integers between 1 and 1,000.

Thus, the probability is:

556/1000

= 0.556

c) The number of integers from 1 through 1,000 that are neither multiples of 2 nor multiples of 9 is the complement of the number of integers that are multiples of 2 or multiples of 9. Thus, the number of integers that are neither multiples of 2 nor multiples of 9 is:

1000 - 556

= 444

Therefore, the number of integers from 1 through 1,000 that are neither multiples of 2 nor multiples of 9 is 444.

To know more about integers, refer

https://brainly.com/question/929808

#SPJ11

is 8 1/2 rational or irrational

Answers

I believe it’s rational
rational


Hopes this helps!!

An attorney charges a fixed fee on $250 for an initial meeting and $150 per hour for all hours worked after that. Which function can be used to find how much he will charge after working x hours? If f(x) is that function, enter your answer in the form of f(x)=mx+b here:

Answers

Answer:

f(x)=250+150x

Step-by-step explanation:

step one:

Given that the fixed fee is  $250

and the hourly fee is $150

let the number of hours be x

step two:

Also, let the   function to represent the total cost be f(x)

we can represent the total cost in the form of f(x)=mx+b as

f(x)=250+150x

describe the error in graphing the function .
and correct the error

Answers

what are the answer choices ?

does anyone know the answer to this?​

Answers

Answer:

18 is the answer of your question

Answer:

Your answer is D, 18.

Step-by-step explanation:

EP is half of EC so all we would have to do is multiply EP by 2 (9*2)

given allowable stresses in steel and concrete of 150mpa and 12mpa, respectively, calculate the maximum bending moment the section can carry

Answers

Given allowable stresses in steel and concrete of 150MPa and 12MPa, respectively, the maximum bending moment that the section can carry can be determined as follows:

Assuming the section is made up of steel and concrete, it is essential to consider the stresses on both materials. By considering the material properties of the section, the overall strength of the section can be obtained.

Therefore, the bending moment that a section can carry can be given by the formula:

M = σ_s * Z_s + σ_c * Z_c

Where: M = Maximum bending moment that the section can carry

           σ_s = Maximum allowable stress in steel

          Z_s = Section modulus of steel

          σ_c = Maximum allowable stress in concrete

           Z_c = Section modulus of concrete

Therefore, the maximum bending moment that the section can carry = 150*Z_s + 12*Z_c

To determine the section modulus of the steel and concrete, we can use the formula:

Z = I/y

whereZ = section modulus

          I = Moment of Inertia of the section

         y = distance of the neutral axis to the extreme fibre

By determining the section modulus of the steel and concrete, the maximum bending moment that the section can carry can be calculated.

To know more about section modulus visit :

https://brainly.com/question/30756002

#SPJ11

5. A statue that cast a shadow that is 7 feet long. A 5 ſt person looking at it cast a shadow that 2.5 feet long. How tall is that person?​

Answers

I think it is 14 I’m not sure though

Please help me with this geometry problem!!!

Answers

There are infinitely many ways to answer this, but one way could be this.

There is a 30 foot tree that casts a 25 foot shadow. A sign post nearby casts a 15 foot shadow. How tall is the sign post? Both the tree and the sign post are standing completely vertical. The ground is completely flat and horizontal.

Note: Since the sun is very far away, the light rays are effectively parallel which allows for the two bottom acute angles to be nearly the same value.

---------------------

If you're curious on how to solve such a question, then we can make a proportion like shown below. Cross multiply to isolate for x

30/25 = x/15

30*15 = 25*x

450 = 25x

25x = 450

x = 450/25

x = 18

The sign post is therefore 18 feet tall.

An alternative equation is 30/x = 25/15, which leads to the same solution.

The length of a side of a square is given by the expression 2x+1, and its perimeter is 56. Calculate the length of a side of the square.

Answers

Answer:

8x+4

Step-by-step explanation:

8x+4=56

56-4=52      52 divided 8 = 6.5

The formula c = 5p + 215 relates c, the total cost in dollars of hosting a birthday party at a skating rink, to p, the number of people attending the party.
a. solve for p
b. If Allies parents are are willing to spend $300 for her party, how many people can attend. Show your work.​

Answers

Answer: a. p = c/5 - 43        b. 17 people

Step-by-step explanation:

c= 5p + 215  

A)  a said solve for p so we will solve for p in the equation.

c= 5p + 215  First   Subtract 215 from both sides

-215     -215  

c - 215 = 5p Now divide both sides by 5.

p = c/5 - 43  

B)  If c is the total cost  of hosting a birthday party then we will input 300 into the equation for c and solve for p.

300 = 5p + 215    First subtract 215 from both sides

-215             -215

 85 = 5p      Divide both sides by 5

 p = 17  

This means  17 people can attend the meeting if Allies parents are willing to spend $300.

The number of people that can attend the party will be 17

Since the formula given is represented by c = 5p + 215, to solve for p, we've to use subject of the formula and this will be:

c = 5p + 215

c - 215 = 5p

p = (c - 215)/5

p = c/5 - 43

Based on the equation given, the number of people that can attend the party will be:

c = 5p + 215

300 = 5p + 215

Collect like terms

5p = 300 - 215

5p = 85

p = 85/5

p = 17

Therefore, 17 people can attend the party.

Read related link on:

https://brainly.com/question/17504350

Other Questions
Vista Vacuum Company has the following production information for the month of March. All materials are added at the beginning of the manufacturing process.Unitsa. Beginning inventory of 4,800 units that are 100 percent complete for materials and 28 percent complete for conversion.b. 14,100 units started during the period.c. Ending inventory of 4,000 units that are 19 percent complete for conversion.Manufacturing Costsa. Beginning inventory was $21,700 ($10,500 materials and $11,200 conversion costs).b. Costs added during the month were $29,300 for materials and $47,600 for conversion ($27,300 labor and $20,300 applied overhead).Required:1. Calculate the number of equivalent units of production for materials and conversion for March.2. Calculate the cost per equivalent unit for materials and conversion for March. (Round your answers to 5 decimal places.)3. Determine the costs to be assigned to the units transferred out and the units in process. (Use Cost per Equivalent Unit rounded to 5 decimal places.) is this correct? and how do u solve it? A patient is given a glass of pure water to drink.The patient's cells are now in a hypotonic solution.What will happen to the patient's cells?Water will move into the cells.Water will move out of the cells.Water will not move in either direction. How does farming up the food web reduce total amount of fish toeat? Two forces, vector F 1 = (5.90 5.60) N and vector F 2 = (4.65 5.55) N, act on a particle of mass 2.10 kg that is initially at rest at coordinates (1.75 m, +4.15 m).(a) What are the components of the particle's velocity at t=10.4s ?(b) In what direction is the particle moving at t = 10.4 s? (+counterclockwise from the x axis)(c) What displacement does the particle undergo during the first 10.4 s?(d) What are the coordinates of the particle at t = 10.4 s? (in x and y meters) what zodiac are u ?Capricorn: Jan 20 Feb 16Aquarius: Feb 16 March 11Pisces: March 11 April 18Aries: April 18 May 13Taurus: May 13 June 21Gemini: June 21 July 20Leo: August 10 September 16Virgo: September 16 October 14Libra: October 14 November 23Scorpio: November 23 November 29Ophiuchus: November 29 December 17Sagittarius: December 17 January 20 following trial balance relates to Cavern as at 30Equity shares of $1 eachOther components of equity (share premium)45,0006,00030,6008% loan note (note (i))Retained earnings-30 September 20X66,6007,000Revaluation surplusLand and buildings at valuation-30 September 20X6:43,000Land ($7 million) and building ($36 million) (note (ii)) Plant and equipment at cost (note (ii))67,400Accumulated depreciation plant and equipment-30 September 20X6 Equity investments (note (iii))13,400Current assets15,80048,800Bank4,600Deferred tax (note (iv)) Current tax (note (iv))4,00021,700Trade payables Draft profit for the year90037,000175,900175,900The following notes are relevant:(0 The 8% loan note was issued on 1 October 20X5 at its nominal value of $30 million. The loan note will be redeemed on 30 September 20X9 at a premium which gives the loan note an effective finance cost of 10% per annum.(1)Cavern revalues its land and building at the end of each accounting year. At 30 September 20X7 the relevant value to be incorporated into the financial statements is $41.8 million. The building's remaining life at the beginning of the current year (1 October 20X6) was 18 years. Cavern does not make an annual transfer from the revaluation surplus to retained earnings in respect of the realisation of the revaluation surplus. Ignore deferred tax on the revaluation surplus.Plant and equipment includes an item of plant bought for $10 million on 1 October 20X6 that will have a 10-year life (using straight-line depreciation with no residual value). Production using this plant involves toxic chemicals which will cause decontamination costs to be incurred at the end of its life. The present value of these costs using a discount rate of 10% at 1 October 20X6 was $4 million. Cavern has not provided any amount for this future decontamination cost. All other plant and equipment is depreciated at 12.5% per annum using the reducing balance method.No depreciation has yet been charged on any non-current asset for the year ended 30 September 20X7. All depreciation is charged to cost of sales. How do PCBs enter remote Alaskan lakes? Be very specific. Are you in LD debate? If so can I share you my case and can you share me your case? .A 9.0-V battery is connected to a bulb whose resistance is 3.0 .Part AHow many electrons leave the battery per minute?Express your answer using two significant figures. the basal ganglia's ability to evoke one specific movement pattern out of an almost endless variety of possible movement patterns is best ascribed to which neural coding strategy? Consider a sector consisting of three companies. The supply functions are S(P)=P, S2(p)=p - 5, S3(p)=2p. a) Draw the individual supply curves and the industry supply. b) What is the market price if the demand curve is given by D(p) = 15? What is the equilibrium quantity? Also give the individual supply of each firm. The successful account manager will take a(n) _____ role in meeting facilitation.a. Activeb. Passivec. Cursoryd. ThoughtfulInternal meeting facilitation is a critical skill for advancement in _____.a. Any marketing positionb. A creative positionc. An account management positiond. A strategy position Who rediscovered America 1)Given expected project completion time of 10 months (1.5months std. dev.), when should we start the project to be 80%confident of on-time completion? Hiring staff members is one of the most important and expensive decisions that managers can make. What are the components that make an effective hiring strategy? Hiring staff members is one of the most important and expensive decisions that managers can make. What are the components that make an effective hiring strategy?Describe an effective process for performance appraisals. Explain why it is the best process to use. Kelly is knitting a scarf for her brother. It took her 13 hour to knit 34 foot of the scarf. How fast is Kelly knitting, in feet per hour? Discuss your intent or goal(s) for beginning a doctoral program. Discuss how your intent fits the ScholarPractitioner-Leader^SM model. Identify a problem in your organization or industry that can be solved or better managed through leadership skills. Please I need some answers just a few are fine The pension manager at Bloom Town Gardens estimates that retiree benefits of $750,000 per year will be paid starting a year from today. Payments are estimated to be made for 20 years. Assuming an 8% interest rate, what is the closest value of the pension obligation as of today? Select one: A. $7,363,610 B. $2,703,256 C. $2,924,191 D. $3,158,106