First case- Rigid channels: 1. Design a RIGID channel under uniform flow conditions. Consider the hydraulically efficient shape 2. Channel Sketch. 3. Determine the specific energy in the channel. Determine the critical depth and the minimum energy. 4. Determine the flow condition if: a) There is a hump (0.10m) what will be the water flow profile? b) There is a contraction of 5% 5. Determine the choking conditions Given: o Discharge Q (m3/s) o The channel lining Variant 1 Rectangular cross section; discharge 5 m3/s. The channel will be excavated through rock; S0= 0.002.
I want to solve this exercise step by a professor of course of fundamentals of river engineering, using manning formula

Answers

Answer 1

In the first case of Rigid channels, under uniform flow conditions, the following are the steps to be followed in solving the problem:          Step 1: Design a RIGID channel under uniform flow conditions. Consider the hydraulically efficient shape. For a channel that is rigid, the hydraulic radius and wetted perimeter are constants.

Thus, the most hydraulically efficient shape for such a channel is a rectangular cross-section where the width is equal to twice the depth (B=2Y).Therefore, B = 2Y, and the cross-sectional area, A is given by:

$$R = A / P_w$$$$= [2Y^2] / [Y × 4]$$$$= 0.5Y$$   where Pw is the wetted perimeter.  The slope of the channel, S0, is given as 0.002. Using the manning formula, the friction factor, n can be computed.  

  The depth of flow is less than the critical depth, sub-critical flow occurs; if the depth of flow is greater than the critical depth, supercritical flow occurs. At critical depth, the specific energy of flow is a minimum. Thus, the critical depth, yc, is the depth at which the specific energy is a minimum.

To know more about conditions visit:

https://brainly.com/question/29418564

#SPJ11


Related Questions

QUESTION 5 The coefficient of consolidation, Cv, is used to compute the time of consolidation. This value is obtained only for organic clays with 50% of saturation True False

Answers

The given statement is FalseThe coefficient of consolidation, Cv, is an important characteristic used to determine the time of consolidation. The coefficient of consolidation (Cv) is the proportion of the degree of consolidation to the logarithm of time.

The coefficient of consolidation is used to calculate the time of consolidation in both organic and inorganic clays. It is important to note that the soil sample has to be fully saturated (100% saturation) in order to perform the test. A coefficient of consolidation of Cv=10^-2 m^2/ yr is commonly used as a criterion to distinguish between normally consolidated and over consolidated clays.

This value can be used to determine the time required for a clay layer to achieve a given degree of consolidation. The degree of consolidation is defined as the ratio of the change in void ratio to the initial void ratio of the soil sample. A consolidation test is used to determine the characteristics of soil.

To know more about consolidation visit:

https://brainly.com/question/32995842

#SPJ11

5. Safety objectives include? M.C. a. Training b. Self- inspection c. Compliance d. All of the above Safety Program is the responsibility of this person (s) M.C. 6. a. Owner b. Employees c. Supervisor

Answers

Safety objectives are a critical component of an occupational safety and health program. Safety objectives are designed to reduce the risk of accidents, injuries, and illnesses in the workplace.

The primary safety objectives include the following:
Training: One of the most critical safety objectives is training. The employees must have sufficient knowledge and skills to perform their job duties safely. It is essential to provide employees with training on specific safety hazards and how to control or mitigate them.


Self-inspection: Self-inspection is another important safety objective. The workplace should be regularly inspected to identify and correct any potential hazards that may result in accidents, injuries, or illnesses.

Compliance: Ensuring compliance with all relevant safety regulations, policies, and procedures is a key safety objective. Employers must follow federal, state, and local safety regulations and standards, as well as industry-specific standards.

To know more about  workplace visit:

brainly.com/question/9846989

#SPJ11

A rock storage pile is being designed for a mine in West Virginia. The pile is lined with reinforced GCL overlain by a 1.5 mm thick HDPE geomembrane. A heavy nonwoven geotextile is placed on top of the geomembrane. Because the rock is porous (K = 10-2 cm/s), it is used as the main LCS stone and no additional leachate collection stone is being installed. Specify the base slope required to keep the head below 25 cm if the design storm is 0.8 cm rain/day and the pipe-to-pipe lateral spacing is 60 m Is this rock a reasonable material to replace the LCS stone?

Answers

Rock storage pile is a type of heap of rocks that is designed and constructed for an industrial purpose or mining operations. The rock storage pile is lined with reinforced GCL (Geosynthetic Clay Liner) overlaid by a 1.5 mm thick HDPE geomembrane.

A heavy nonwoven geotextile is then placed on top of the geomembrane. K = 10-2 cm/s because the rock is porous, and it is used as the main LCS stone, so no extra leachate collection stone is being mounted. The design storm is 0.8 cm rain/day, and the pipe-to-pipe lateral spacing is 60 m.

[tex]θ = tan^-1[(i*L)/(H + L/2)][/tex]
Where θ = the base slope, i = the rainfall intensity, L = the pipe-to-pipe distance, and H = the maximum allowable head.
Plugging in the values,

[tex]θ = tan^-1[(0.008 * 60)/(0.25 + 60/2)][/tex]
[tex]θ = tan^-1[(0.48)/(30.25)][/tex]
[tex]θ = tan^-1[0.0158][/tex]
[tex]θ = 0.9°[/tex]
Thus, a base slope of 0.9° or 1.57% is required to keep the head below 25 cm.
Therefore, the rock storage pile is a reasonable material to replace the LCS stone because it provides the required porosity for better leachate discharge.

To know more about rainfall intensity visit:-

https://brainly.com/question/31816365

#SPJ11

a) Two of the most common types of tender in the local construction industry are the open and direct negotiated tender. Make a comparison of these two types of tender in term of the followings:
i. Participation of contractors in the tender exercise
ii. Weaknesses of the tender types

Answers

In the local construction industry, two of the most common types of tender are open and direct negotiated tender. The two types of tenders differ in the way they allow contractors to participate and their weaknesses.

i. Participation of contractors in the tender exercise Open tender is a type of tender in which any contractor can participate. It is open to all qualified bidders.

ii. Weaknesses of the tender types Open tender is sometimes criticized for being slow, costly, and inefficient. It is slow because the tender process can take a long time. It is costly because contractors have to spend a lot of money preparing their bids. It is inefficient because the tender process can result in a lot of paperwork, and it can be difficult for contractors to follow all the procedures. Direct negotiated tender, on the other hand, can be criticized for not being transparent. Since the client selects the contractors that can participate, it can create a perception of favoritism.

To know more about  weaknesses visit:

brainly.com/question/15173884

#SPJ11

Flexible road pavement is a popular method of road construction in Malaysia. Asphalt is mainly used for road base and wearing course of flexible road pavement. i) ii) iii) iv) Outline the advantages of flexible road pavement as compared to concrete road pavement Compare hot rolled asphalt with mastic asphalt and explain the differences between them. Give two (2) types of defects of bituminous road pavement and elaborate upon their causes. Bituminous products are also used in other types of construction aside from pavement. Name and describe two (2) other usage of bituminous products.

Answers

Flexible road pavement is an increasingly popular method of road construction in Malaysia. Asphalt is mainly used for the road base and wearing course of flexible road pavement.

Advantages of Flexible Road Pavement as Compared to Concrete Road Pavement There are several advantages of flexible road pavement compared to concrete road pavement. Here are some of them: FLEXIBILITY Flexible pavements are designed to be flexible in nature. These pavements can withstand traffic loads and environmental factors.

They are flexible and adapt to the shape of the subgrade, which helps them absorb the stress from the traffic load. Concrete pavements, on the other hand, are rigid and have less flexibility. DURABILITY Flexible pavements are more durable compared to concrete pavements. They are designed to last for a long time.

To know more about pavement visit:

https://brainly.com/question/26625853

#SPJ11

What are the points of convergence of solid and hazardous waste
in the approaches to waste management in the united states?

Answers

The management of solid and hazardous waste in the United States involves the convergence of several approaches. These approaches encompass the handling, treatment, and disposal of waste materials.

The waste management approaches in the US are governed by federal laws and regulations aimed at reducing the environmental impact of waste materials and safeguarding public health. The points of convergence of solid and hazardous waste management in the United States include the following:

1. Source reduction: This approach involves the minimization of waste generation at the source. The approach aims to reduce the amount of waste materials produced by individuals, households, and businesses.

2. Recycling: Recycling is a process that involves the recovery of valuable materials from waste materials. The process helps to reduce the amount of waste materials disposed of in landfills or incinerators.

3. Composting: Composting is the biological decomposition of organic waste materials. The process results in the production of organic matter that can be used as a soil amendment.

4. Incineration: Incineration is a process that involves the burning of waste materials. The process helps to reduce the volume of waste materials and produces energy.

The convergence of these approaches helps to reduce the environmental impact of waste materials and safeguard public health.

To know more about management visit:-

https://brainly.com/question/32216947

#SPJ11

Wastewater Question
You are tasked to design a membrane system for a small community. The required flow rate is 0.100 m^3/s. The temperature of the water ranges from 5 degrees C in the winter to 25 degrees C in the summer. The chosen membrane has a maximum TMP of 200kPa and a membrane resistance of 4.2*10^12 m^-1. Based on previous experience you know that the operating TMP should be no more than 75% of the maximum TMP specification.
a. What is the required membrane surface area for this application?
b. How much fouling resistance can be added to the membrane before the maximum pressure (200kPa) is reached?
c. What % of total resistance is contributed by the fouling in part b?

Answers

a. Required membrane surface area:The volume of water flowing in 1 second = 0.1 m³/s.We can calculate the required membrane surface area by using the following equation: Surface Area = (V/Q) x (1/(1 - Rf/Rm)),  

Surface Area = (0.1/0.1) x (1/(1 - 0)) = 1 m²b. Maximum fouling resistance :Fouling Resistance = ((TMP x Rm)/Q) - RmWe can rearrange this equation to calculate the maximum fouling resistance as follows:  

  Therefore, the maximum fouling resistance is 14.999999999999998 m^-1.c. % of total resistance contributed by fouling in part b:

Fouling Resistance = 14.999999999999998 m^-1Membrane Resistance = 4.2 x 10^12 m^-1Total Resistance (Rt) = Rf + Rm = 4.2 x 10^12 + 14.999999999999998 = 4.200000000015 m^-1

The % of total resistance contributed by fouling is calculated using the following formula:

To know more about Resistance visit:

https://brainly.com/question/29427458

#SPJ11

Discuss any three determinants of demand for ocean transport as a mode of
transport.
(Note: One mark for the determinant and three marks for the explanation)

Answers

Price of transportation, availability of shipping routes, and seasonal demand are three determinants of demand for ocean transport.

The price of transportation: The price of transportation is one of the most important determinants of demand for ocean transport. If the price of shipping goods by sea is cheaper than other modes of transport such as air and road, then there will be a higher demand for ocean transport.Availability of shipping routes: The availability of shipping routes is another important determinant of demand for ocean transport. If there are more shipping routes available, then there will be a higher demand for ocean transport.Seasonal demand: Seasonal demand is another determinant of demand for ocean transport. If there is a high demand for goods during certain seasons, such as the holiday season, then there will be a higher demand for ocean transport during those periods.

Overall, these three determinants play a vital role in determining the demand for ocean transport as a mode of transportation.

To learn more about ocean transport, visit:

https://brainly.com/question/30086350

#SPJ11

9. An irrigation engineer, in his study, was able to establish that the irrigation requirement of crop XYZ is 6.5 mm/day. If the root zone depth was estimated at 2 in. on the average, what should be be the design discharge of a canal to be able to deliver the 5-day requirement of a 10-ha farm in 24 hours?
a. 31.62 1ps
b. 47.62 Ips
c. 57.62 1ps
d. 37.622ps

Answers

The answer is option C. 57.62, Determination of design discharge In determining the design discharge of a canal for the irrigation of a 10-ha farm with a 5-day irrigation requirement.

Step 1: We are given the irrigation requirement of crop XYZ as 6.5 mm/day. The 5-day irrigation requirement is thus

[tex]6.5 × 5 = 32.5 mm[/tex].

Step 2: From the given data, we know that the farm has an area of 10 hectares.1 hectare is equal to 10,000 m².The volume of water required to irrigate this farm is equal to the product of the area of the farm and the 5-day irrigation requirement.

[tex]100,000 × 32.5 = 3,250,000 m³.[/tex]

Step 3: .The volume of water required to irrigate 1 hectare with this depth of water is [tex]254 × 10,000 = 2,540,000 litres.[/tex] Assuming the water has a density of 1 kg/L and the specific gravity is 1.

Discharge rate =[tex]2,540,000 ÷ 24 ÷ 3600 = 29.12 L/s[/tex]

Discharge rate = [tex]29.12 ÷ 1000 = 0.02912 m³/s[/tex]

Step 4: Calculation of the required discharge

= [tex]0.02912 ÷ 0.8 = 0.0364 m³/s[/tex]

The answer is rounded up to two decimal places and expressed in International system units per second. The correct option is C. [tex]57.62[/tex].

To know more about Determination visit:-

https://brainly.com/question/29898039

#SPJ11

A 12 M Simply Supported Beam Is Loaded With 8 KN Concentrated Load 9m From The Left End. (A) Determine The Maximum Deflection. (B) Determine The Location (M) Of Maximum Deflection From The Left Support

Answers

The maximum deflection is 20.6 mm and the location (m) of maximum deflection from the left support is 7.2 m.A 12 m simply supported beam is loaded with 8 kN concentrated load 9 m from the left end.

A) Maximum deflection: The formula for calculating the maximum deflection of a beam loaded by a concentrated load at a specific point can be determined as,

[tex]δmax = WL3 / (48EI)[/tex]Where,W = Concentrated loadL = Length of the beamE = Modulus of elasticityI = Moment of inertia of the beam

The moment of inertia of the beam, [tex]I = (bd3)/12[/tex], where b = breadth and d = depth of the beam.The modulus of elasticity, E = σ/ε, where σ = stress and ε = strain. The maximum deflection of the beam is,

[tex]δmax = (8 x 103) x (9 x 103)3 / (48 x 200 x 109 x (100 x 10-6 x 412.5 x 10-6))δmax = 20.6 mm[/tex]

B) The position of the maximum deflection from the left support is given as

,[tex]x = (5L± √(5L2 - 4l2))/(2)[/tex]Where,L = Length of the beaml = Length from the left support

The value of l is taken as 9 m from the left end of the beam.

Substituting the given values,[tex]x = (5 x 12 ± √(5 x 122 - 4 x 92))/(2)x = 7.2 m[/tex]from the left support.

To know more about elasticity visit:-

https://brainly.com/question/30999432

#SPJ11

Which of the following statements about California Ranchos is NOT true?
Ranchos were land grants by the Spanish and Mexican governments prior to California statehood.
Ranchos were surveyed using the same grid method as the PLSS.
Ranchos were preserved by the Treaty of Guadalupe Hidalgo.
Sacramento is located inside the rancho granted to John Sutter.

Answers

The statement that is NOT true about California Ranchos is "Ranchos were surveyed using the same grid method as the PLSS."Ranchos were surveyed using the same grid method as the PLSS is NOT true about California Ranchos.

California Ranchos are huge pieces of land given by the Spanish and Mexican governments before California statehood. These ranchos were given to the Californians for raising animals, cattle and horses. California Ranchos were situated in central and southern California, primarily in the early-to-mid 19th century.

The Treaty of Guadalupe Hidalgo, signed in 1848, ended the Mexican-American War, acknowledged US ownership of Texas, and ceded California, Nevada, Utah, Arizona, New Mexico, and parts of Colorado, Wyoming, Kansas, and Oklahoma to the United States. It is untrue that Ranchos were surveyed using the same grid method as the PLSS.

The public land survey system (PLSS) was created to manage lands granted to the US Government as a result of the Louisiana Purchase in 1803 and the Mexican-American War. It was not used for surveying Ranchos. The California State Legislature passed an act in 1850, giving the US federal government control over all Ranchos, in response to the Treaty of Guadalupe Hidalgo.

Sacramento is situated inside the rancho granted to John Sutter and was the land on which gold was first discovered, resulting in the California Gold Rush.

To know more about federal government visit:-

https://brainly.com/question/14858877

#SPJ11

Find the critical depth for flow at 1.6 m3/s per meter of
width

Answers

The critical depth for flow at 1.6 m³/s per meter of width can be found by using the Manning's equation which is given as follows:[tex]\[V = \frac{1}{n}{R^{2/3}}{S^{1/2}}\][/tex]where, V = velocity of flow,R = hydraulic radius, S = slope of channel, andn = Manning's roughness coefficient

the velocity of flow equals the velocity of wave propagation.\[tex][y_c = {\left( {\frac{q}{n{\left( {b + 2y} \right)}^{2/3}}\sqrt {\frac{b}{S}} } \right)^{3/5}}\][/tex]where, b = width of the channel

Therefore, the area of cross-section A of the flow is given by:\[tex][A = by = 1y = y\][/tex]

The hydraulic radius R of the flow is given by:[tex]\[R = \frac{A}{P} = \frac{y}{2 + b/y} = \frac{y}{2 + 1/y} = \frac{y^2}{2y + 1}\][/tex]Let us assume a Manning's roughness coefficient of n = 0.013 (typical value for concrete-lined channels)And the slope of the channel, S = 0.001 (typical for small channels)

Substituting these values in the Manning's equation and equating the velocity of flow with the velocity of wave propagation, we get:

\[tex][\frac{1}{n}{\left( {\frac{{{y^2}}}{{2y + 1}}} \right)^{2/3}}\[/tex]sqrt S = \sqrt g y\]where, g = acceleration due to gravity = 9.81 m/s² we get:

[tex]\[y = {\left( {\frac{{n^2{q^2}}}{{g\left( {2n + 1} \right)^2{b^4}}}} \right)^{1/5}}\][/tex]Substituting the given values of q and b, we get:\

[tex][y_c = {\left( {\frac{{1.6}}{{0.013{\left( {1 + 2y} \right)}^{2/3}}\sqrt {0.001} }} \right)^{3/5}}\]\[/tex]

[[tex]y_c = {\left( {\frac{{1.6}}{{0.013{\left( {1 + 2y} \right)}^{2/3}}\cdot 0.0316}} \right)^{3/5}}\][/tex]

Solving this equation for y_c using an iterative method or a trial-and-error method, we get the critical depth y_c to be approximately 0.368 m.

To know more about iterative method visit:-

https://brainly.com/question/32110630

#SPJ11

A beam 300 mm wide x 450 m deep is simply supported on a span of 6.0 m.
Given:
Superimposed uniformly distributed:
Dead Load 16 kN/m
Live Load 18 kN/m
Concrete, fc 30 MPa
Steel yield strength, fy= 415 MPa
Modulus of Elasticity Steel 200 GPa
Unit weight of concrete = 23.5 kN/m²
Depth to the centroid of tension reinforcement = 64 mm from the bottom
Compute the nominal bending capacity of the section if the tension reinforcement consists of 3-25 mm dia. bars. (kN-m)
Tip: avoid rounding off the values during the solution, use shift store function of calculators to get the correct answer in 3 decimal places.

Answers

Nominal bending capacity of the section The nominal bending capacity of the section can be calculated using the below-given steps:   Step 1: Calculation of effective depth Effective depth of the beam is given by: d = overall depth - (diameter of bars + clear cover) = 450 - (25 + 64) = 361 mm.

Step 2: Calculation of steel areaA rea of steel, Ast = π/4 × d² × number of barsAst = π/4 × (25)² × 3Ast = 1472.55 mm²

Step 3: Calculation of maximum bending moment Maximum bending moment is given by;Mmax = Wl² / 8Mmax = (16+18) × 6² / 8Mmax = 81 kN-m

Step 4: Calculation of limiting depth of the neutral axis For Fe 415 grade steel, the limiting depth of the neutral axis is given by;0.48 ≤ x / d ≤ 0.67By putting the values in the above formula, we get;

0.48 ≤ x / 361 ≤ 0.67x ≤ 217.08 mm & x ≥ 241.87 mm The limiting depth of the neutral axis is between 217.08 and 241.87 mm.

Step 5: Calculation of area of steel required The area of steel required is given by;Ast = 0.87fy (x - 0.42y) / (fyd)Ast = 0.87 × 415 × (x - 0.42 × 361) / (415 × 361)Ast = 1251.28 mm²

Step 6: Calculation of moment of resistance The moment of resistance, MR is given by; MR = 0.87fyAst (d - 0.42x)MR = 0.87 × 415 × 1472.55 × (361 - 0.42 × 241.87) / 10^6MR = 319.21 kN-m.

To know more about capacity visit:

https://brainly.com/question/30630425

#SPJ11

Artificial recharge techniques for underground water management
literature review

Answers

Artificial recharge is a technique used to supplement the natural replenishment of groundwater systems. It involves the deliberate recharge of water into aquifers, which can be achieved in a variety of ways.


1. Recharge Ponds: These are shallow basins filled with gravel and sand that allow surface water to percolate into the underlying aquifer.2. Injection Wells: These are deep wells that inject treated surface water or wastewater directly into the aquifer.3. Spreading Basins: These are large, shallow basins that allow surface water to and percolate into the underlying aquifer.4. Ditches and Furrows: These are channels dug into the ground that allow surface water to infiltrate the soil and recharge the aquifer.5. Recharge Trenches: These are trenches dug into the ground that allow surface water to percolate into the underlying aquifer.


In conclusion, the above-mentioned techniques are essential for groundwater management. They are cost-effective, efficient, and environmentally friendly. Artificial recharge techniques should be promoted as a strategy to manage underground water resources, especially in areas where there is a high demand for water.

To know more about  deliberate recharge visit:

brainly.com/question/11960203

#SPJ11

4. Local content is defined as benefit brought to a host nation through a) workforce development: employment and training local workforce, and b) supplier development: procuring supplies and services locally and developing local supplier capacity. Some international forms of contract used for the procurement of construction work have local content clauses requiring a minimum percentage of the project value to reflect local content. Discuss the benefits and disadvantages of having local content clauses in a construction contract for a construction project in a developing country

Answers

Local content clauses in a construction contract for a construction project in a developing country have both benefits and drawbacks.

A local content clause is a requirement in a contract that specifies a percentage of the project value that must be given to local contractors and suppliers.Benefits of local content clauses in a construction contract include the following:1. Employment and development of local workers: Hiring locals and training them in the skills needed for the job can help to enhance their employability and development.2.

Promotion of local companies: The use of local suppliers and contractors can promote the development of local companies and businesses.3. Development of local infrastructure: The use of local resources can enhance the development of local infrastructure.

To know more about visit:

https://brainly.com/question/32514136

#SPJ11

5. You want a post bypass patient (78 kg) to exercise at a 3.5MET level.
a. At what speed do you set for a horizontal treadmill?
b. What grade is set for a speed of 2.1mi/hr ?
c. What resistance is set (kps) on a Standard Monark leg cycle ergometer ( 50 rev/min)?
d. What resistance (Force in Kg ) is set for a Monark upper body ergometer at 30rev/min ?
e. What is an appropriate stepping rate for a 8-inch step?

Answers

a) The speed you would set for a horizontal treadmill for a post bypass patient (78 kg) to exercise at a 3.5MET level is approximately 6.81 meters per minute.

b) The grade set for a speed of 2.1 miles per hour is approximately -0.0071, or a decline of 0.71 percent.

c) The resistance set on a Standard Monark leg cycle ergometer for a post bypass patient (78 kg) exercising at a 3.5MET level would be approximately 106.6 Newtons.

d) The resistance (force in kg) that you would set for a Monark upper body ergometer at 30 rev/min would be approximately 19.8 kg.

e) An appropriate stepping rate for an 8-inch step would be around 24 steps per minute.

a) In order to set the speed for a horizontal treadmill for a post bypass patient (78 kg) to exercise at a 3.5MET level, you need to use the equation METs = VO2 ÷ 3.5. By solving this equation for VO2, you get:VO2 = 3.5 × METsVO2 = 3.5 × 3.5VO2 = 12.25Now that you know the patient’s VO2, you can calculate their speed on a treadmill using the following equation:VO2 = (0.1 × S) + (1.8 × S × G) + 3.5Where S is the speed in meters per minute, and G is the treadmill’s gradient as a decimal. By rearranging this equation, you can solve for S:S = VO2 – (1.8 × S × G) – 3.5S = 12.25 ÷ (1.8 × 0) – 3.5S = 12.25 ÷ (1.8 × 0) – 3.5S = 6.81Therefore, the speed you would set for a horizontal treadmill for a post bypass patient (78 kg) to exercise at a 3.5MET level would be approximately 6.81 meters per minute.b) To find the grade set for a speed of 2.1 miles per hour, you can use the equation Grade = (Slope × 100) ÷ 5280 × 3.281, where Slope is the incline or decline of the treadmill in feet per mile. Since you don't know the slope, let's solve for the slope first:2.1 miles per hour is equal to 3.379 kilometers per hour (since 1 mile = 1.60934 kilometers).Therefore:S = 3.379 km/hrThen you can plug this into the speed equation to get:VO2 = (0.1 × S) + (1.8 × S × G) + 3.5Solving this equation for G:S = VO2 – (0.1 × S) – 3.5G = (VO2 – (0.1 × S) – 3.5) ÷ (1.8 × S)Now you can substitute in the values of VO2 and S you already know:VO2 = 12.25S = 3.379 km/hrG = (12.25 – (0.1 × 3.379) – 3.5) ÷ (1.8 × 3.379)G = -0.0071Therefore, the grade set for a speed of 2.1 miles per hour is approximately -0.0071, or a decline of 0.71 percent.c) In order to determine the resistance set on a Standard Monark leg cycle ergometer for a post bypass patient (78 kg) exercising at a 3.5MET level, you can use the equation:Power (Watts) = (2π × R × RPM) ÷ 60where R is the resistance in Newtons and RPM is the revolutions per minute. Let’s first convert 50 rev/min to radians per second:50 rev/min × (2π radians/rev) ÷ (60 seconds/min) = 5.236 radians/secondNow you can plug in the values for power and RPM that you know:Power (Watts) = 3.5 × 58.2 = 203.7 wattsR = (203.7 × 60) ÷ (2π × 5.236) = 106.6 NewtonsTherefore, the resistance set on a Standard Monark leg cycle ergometer for a post bypass patient (78 kg) exercising at a 3.5MET level would be approximately 106.6 Newtons.d) To calculate the resistance (force in kg) that you would set for a Monark upper body ergometer at 30 rev/min, you can use the equation:Power (Watts) = (2π × R × RPM) ÷ 60where R is the resistance in Newtons and RPM is the revolutions per minute. First, convert 30 rev/min to radians per second:30 rev/min × (2π radians/rev) ÷ (60 seconds/min) = 3.142 radians/secondThen plug in the values for power and RPM:Power (Watts) = 3.5 × 58.2 = 203.7 watts203.7 = (2π × R × 3.142) ÷ 60R = (203.7 × 60) ÷ (2π × 3.142)R = 194.2 NewtonsTo convert this to force in kilograms, you can use the equation 1 kg = 9.81 N:Force (kg) = 194.2 ÷ 9.81 = 19.8 kgTherefore, the resistance (force in kg) that you would set for a Monark upper body ergometer at 30 rev/min would be approximately 19.8 kg.e) An appropriate stepping rate for an 8-inch step would be around 24 steps per minute.

Learn more about treadmill here :-

https://brainly.com/question/22032532

#SPJ11

Which of the following is NOT a type of user interface? Menu-driven Graphical user interface (GUI) Command-driven Application programming interface (API) face (APO) 2.5 points chip QUESTION 39 The basic input/output system (BIOS) is stored on a CPU ROM RAM CMOS 2.5 poir QUESTION 40 The two major types of system software programs are utility programs and the Supervisor programs application software operating system user interface Save All Answers Click Save and Submit to save and submit. Click Save All Answers to save all answers.

Answers

The type of user interface that is NOT listed among the given options is Application Programming Interface (API). The other options include menu-driven, graphical user interface (GUI), and command-driven user interfaces.

An API (Application Programming Interface) is not a type of user interface. It is a set of rules and protocols that allow different software applications to communicate and interact with each other. APIs define the methods and data formats that applications can use to request services from each other.

On the other hand, the three types of user interfaces mentioned are:

Menu-driven: This type of user interface presents a menu of options to the user, who can make selections by navigating through the menu hierarchy. Each selection corresponds to a specific action or functionality.

Graphical User Interface (GUI): GUIs use graphical elements such as icons, buttons, windows, and menus to provide an interactive and visual way for users to interact with a computer system or software application.

Command-driven: In a command-driven user interface, users interact with the system by entering commands or instructions in a text-based format. The system responds to these commands and performs the requested actions.

Therefore, the correct answer is that Application Programming Interface (API) is not a type of user interface.

Learn more about Application Programming Interface here:

https://brainly.com/question/32556370

#SPJ11

A vertical cut 4.4 m high is excavated in saturated intact clay. The clay is isotropic and has an undrained shear strength of 37.4 kN/m² and a saturated unit weight of 17 kN/m³. Assume that a vertical, air-filled tension crack forms behind the cut at a certain (unspecified) distance to its crest, with a depth of 1.04 m. For the critical slope angle, determine the factor of safety of the vertical cut, under short-term (end of construction) conditions
Type your answer in three decimal places. What value of this factor of safety will result if the lower part of the cut is then submerged by fresh water to a depth of 1.08 m, the tension crack remaining
free of water?
Type your answer in three decimal places

Answers

Given data:Height of vertical cut = 4.4m Depth of air-filled tension crack = 1.04 mUndrained shear strength of clay = 37.4 kN/m²Saturated unit weight of clay = 17 kN/m³For short term end of construction conditions.

The factor of safety of the vertical cut is given by;{tan φ'}/{1 - u}, where φ' is the effective angle of shearing resistance and u is the pore water pressure coefficient.The effective angle of shearing resistance,φ' = φ + δWhere, φ is the angle of internal friction and δ is the angle of dilation.

For saturated clay, the angle of dilation, δ = 0Therefore, the effective angle of shearing resistance, φ' = φ = 37.4 kN/m²And the value of u = 0.Using the vertical slice method, the total normal force,[tex]N = 17 kN/m³ × 4.4 m = 74.8 kN/m the height of water in the tension.

To know more about Depth visit:

https://brainly.com/question/13804949

#SPJ11

2) If for a proposed urban freeway, the design ESAL is 7.11 x10° and the CBR of the subgrade layer is 80, determine the depth of a full-depth HMAC layer (one HMAC layer on subgrade) using AASHTO method. Assume Exc=300,000 lb/in2, R-90%, and So=0.45

Answers

The depth of a full-depth HMAC layer (one HMAC layer on subgrade) using AASHTO method for a proposed urban freeway whose design ESAL is 7.11x10° and CBR of the subgrade layer is 80 is 8 inches.Explanation:The given data are:Design ESAL = 7.11 x 10°CBR of subgrade layer = 80Assuming the following values:

So = 0.45Exc = 300,000 lb/in²R = 90%The depth of the full-depth HMAC layer can be calculated using AASHTO method. The AASHTO method uses the following formula to determine the thickness of the HMAC layer:d = (2.44 .E(.00315+0.0000075CBR)(1-So)Nf)/(R(1-So))where d = thickness of the HMAC layer in inches

E = resilient modulus of the subgrade in lb/in²CBR = California bearing ratio of the subgrade So = the drainage coefficient Nf = number of equivalent 18 kip (80kN) single axle loads (ESALs)

R = reliability factor We are given E and CBR as: E = 300,000 lb/in²CBR = 80Nf can be calculated as: Nf = (AADT)(G)(P)(f)(365)where AADT = average annual daily traffic (vehicles per day)G = growth factor P = percentage of trucks

f = distribution factor AADT is not given and assumed to be 10,000 vehicles per day. f is also assumed to be 1.0 because it is not given. P and G are assumed to be 10% and 1.5%, respectively. Thus,

Nf = (10,000)(1.015)(0.10)(1)(365)Nf = 37,087Now, substituting all the values in the above formula, we get:d = (2.44 x 300,000 x (0.00315+0.0000075 x 80)(1-0.45) x 37,087)/(0.90(1-0.45))= (2.44 x 300,000 x 0.00825 x 0.55 x 37,087)/(0.45)= 8.04 inches~ 8 inches Therefore, the thickness of the HMAC layer would be 8 inches.

To know more about design visit:

https://brainly.com/question/17147499

#SPJ11

Concealed spaces are allowed in: O Roofs O Floors O Concealed spaces are allowed in floors and roofs O Concealed spaces are never allowed in roofs or floors

Answers

Concealed spaces are allowed in floors and roofs. Concealed spaces are those that are enclosed or hidden from view by different structural elements such as walls, floors, and ceilings.

These areas are commonly used for a variety of purposes, including storing utility equipment, housing ductwork and piping, and providing access to electrical and mechanical systems. Concealed spaces are generally considered safe if they are designed, constructed, and maintained in accordance with applicable building codes and standards.

Roofs are one of the building areas where concealed spaces can be permitted. Roofs of various types can include a variety of concealed spaces, such as those in between the roofing and the insulation layers or those concealed by metal roofing sheets or tiles.

To know more about Concealed visit:

https://brainly.com/question/30167062

#SPJ11

In two or three paragraphs, explain how vital the minimal or
load provisions are to structural design or structure in
general.

Answers

The minimal load and provisions are necessary in the design of structures since they aid in maintaining the safety of structures in general. The minimal load is the smallest amount of force that an object can tolerate without collapsing, while the load provisions describe the amount of force that can be placed on the structure.

In structural design, these two concepts play a significant role in the development and construction of any structure, as it is necessary to know the maximum and minimum limits that a structure can withstand.

The minimal load,  is a critical factor in structural design since it provides insight into how much force an object can handle. By knowing the minimum load, designers can create structures that are capable of withstanding the force without any damage. The minimal load is calculated by determining the weakest part of the structure and the smallest force that can cause it to fail.

They provide a framework for construction, ensuring that the structure is capable of withstanding the expected forces while meeting all required standards. The knowledge of the minimum load allows designers to create structures that are efficient, light, and capable of handling the force without collapsing.

The importance of these concepts in the structural design is crucial, and cannot be overlooked.

To know more about structural design visit:-

https://brainly.com/question/20586362

#SPJ11

Annotate each sketch. Write up a short description of the commands used to generate the geometry. Explain what was required, how you accomplished it and comment on the results. Use third person passive voice Use capital bold fonts for the system commands. Try making these parts on your own. They can be constructed using the tools we have introduced so far. Don't worry about the exact dimensions, just sketch shapes that look something like the parts shown below. Hints: 1. Sketch an " L " shape on the workplane. 2. Extrude. 3. Sketch a circle. 4. Extrude, cutout. 5. Repeat 3 and 5 on other face. Hints: 1. Sketch block, Extrude. 2. Sketch in place on any face. 3. Sketch a circle. 4. Extrude, cutout. 5. Repeat 2 and 3 on other face. Hints: 1. Sketch an outer shape on the workplane, including the "feet". 2. Sketch cutout shape place. Extrude both boundaries. 3. Sketch in place on angled face. 4. Sketch large circle and 4 smaller ones. 5. Extrude, Cutout, picking all 5 circles. 6. Check length of arrow on Extrude. Sketch in place of top of foot, draw a rectangle to cut out between feet, sketch circles. Exturde, Cutout 7. Extrude, cutout. 8. Repeat 2 and 3 on other face.

Answers

The task involves annotating and describing the commands used to generate geometry for three different parts. The parts are created using basic tools and techniques, including sketching shapes, extruding, cutting, and repeating steps on different faces.

The goal is to create parts that resemble the ones shown in the sketches, without worrying about precise dimensions. The commands used are written in third person passive voice and highlighted in capital bold fonts.

For the first part, an "L" shape is sketched on the workplane and then extruded to create a three-dimensional object. A circle is sketched and extruded, and then a cutout is performed. This process is repeated on another face.

For the second part, a block is sketched and extruded. Then, a sketch is created in place on any face, followed by sketching a circle. The circle is extruded and cutout, and this sequence is repeated on the other face.

For the third part, an outer shape with "feet" is sketched on the workplane. A cutout shape is sketched in place, and both boundaries are extruded. A sketch is made in place on an angled face, and a large circle and four smaller ones are sketched. These circles are then extruded and cutout. The length of an arrow on an extrude is checked. Another sketch is created in place at the top of the foot, and a rectangle is drawn to cut out between the feet. Circles are sketched, and an extrude and cutout operation is performed. Finally, extrude and cutout are repeated, and steps 2 and 3 are repeated on the other face.

The described commands and techniques help in creating the desired geometry for each part, resembling the sketches provided. The process involves sketching, extruding, and cutting to shape the parts accordingly.

Learn more about  commands here:

https://brainly.com/question/28083170

#SPJ11

In California, what defenses may a Homeowner argue prevent them from be liable for breach of contract against a contractor?
Contractor is unlicensed
Contractor did work without a building permit.
Contractor did not provide Owner with the 3-Day right to cancel form.
All of the above.

Answers

In California, a homeowner can defend themselves against being accountable for a contractor's violation of a contract. There are a few defenses available, and they are discussed below:

Contractor is unlicensed If the contractor is unlicensed, they will be considered unqualified to work in the state. If a homeowner hires an unlicensed contractor, the homeowner can be held responsible for the contractor's conduct. Homeowners in California have the option of suing the unlicensed contractor for the expenses they incurred in restoring the contractor's work to code or for the cost of repairing any damages caused by the contractor's negligence. Contractor did work without a building permit.If the contractor did not acquire the necessary permits, the homeowner may be held accountable for any damages caused by the contractor's work. Homeowners can be held accountable for the contractor's failure to obtain permits.

If the contractor did not provide the homeowner with a 3-day right to cancel form, the homeowner may be able to use this as a defense against the contractor. The contractor must provide the homeowner with a 3-day right to cancel form for contracts concluded outside of the contractor's place of business, such as a home improvement contract. If the contractor fails to provide the homeowner with a 3-day right to cancel form, the homeowner may have a defense against the contractor.All of the above.All of the options provided in the question are viable defenses that a homeowner in California may use to avoid liability for breach of contract against a contractor. Homeowners should educate themselves about their rights and the laws surrounding home improvement contracts to avoid liability.

To know more about contractor's visit:

brainly.com/question/31457618

#SPJ11

A construction company buys a truck for $25,000. Salvage value after useful life of 5 years is $15,000. 2. Use linear depreciation. What is depreciation value for the second year? a. $14,000 b. $1200 C. $2000 d. $8000 3. Use MACRS. What is depreciation value for the third year? a. $6,400 b. $4,800 C. $4,000 d. $3,000

Answers

A construction company purchases a truck for $25,000. The truck's useful life is five years, and its salvage value is $15,000 at the end of the five-year period. Linear Depreciation: The calculation of depreciation using a straight-line depreciation method is very straightforward.

Each year, the asset will depreciate by an equal amount until it reaches the salvage value.  The truck's initial value is $25,000, and the salvage value is $15,000. Therefore, the depreciation value would be $2,000 per year for five years. Depreciation value for the second year is $2,000, which is the same as the amount calculated for the first year. MACRS Depreciation:

MACRS (Modified Accelerated Cost Recovery System) is a technique that accelerates the depreciation process for assets. Depreciation is more rapid during the first few years, and it then slows down over time. Depreciation for a period is determined by multiplying the asset's beginning-of-the-year book value by a depreciation percentage.  

To know more about construction visit:

https://brainly.com/question/791518

#SPJ11

Question 4 Estimate the 3 hour duration PMP (in mm) for a rough terrain at a point location having an Elevation Adjustment Factor of 0.95 and a Moisture Adjustment Factor of 0.55. PMP = mm

Answers

Precipitation Maximum Probable (PMP) is defined as the maximum amount of precipitation that could be expected to fall in a given area or point location, generally estimated over a certain duration of time. PMP is important for various water resources projects and hydrologic studies, as it helps to estimate the maximum potential runoff in a basin or watershed, which could be used for design purposes.

In this question, we are asked to estimate the 3-hour PMP for a rough terrain at a point location, given that the Elevation Adjustment Factor is 0.95 and the Moisture Adjustment Factor is 0.55. To estimate the PMP, we can use the following formula:     PMP = (C x P) / 100Where, C = Correction Factor   P = Normal Precipitation  For a given duration, the Normal Precipitation can be estimated using the following formula:

P = (N x A) / 25Where, N = Normal Precipitation Depth A = Drainage Area in km²For the given 3-hour duration, the Normal Precipitation can be estimated as: P = (N x A) / 25 = (P1 x A) / 25Where, P1 is the Normal Precipitation Depth for the given duration (in mm/hour).To estimate P1, we can use the following empirical formula:

P1 = 0.035 x (L/D)⁰‾⁷⁵Where, L = Length of the storm in km D = Effective Depth of the storm in km For the given 3-hour duration, we have L = 80 km (Assuming a maximum length of 160 km for a 24-hour storm)D can be estimated using the following formula:

To know more about Precipitation visit:

https://brainly.com/question/18109776

#SPJ11

Question 16 5 pts (Rational method) Time of concentration of a watershed is 30 min. If rainfall duration is 15 min, the peak flow is (just type your answer as 1 or 2 or 3 or 4 or 5): 1) CIA 2) uncertain, but it is smaller than CIA 3) uncertain, but it is greater than CIA, 4) 0.5 CIA 5) 2CIA

Answers

the correct answer is option 2) uncertain, but it is smaller than CIA.The Rational Method is a commonly used tool in hydraulic design for computing peak runoff rates for various return periods and design storms on small urban watersheds.  

The formula for calculating the peak runoff is:

[tex]Q = CIA[/tex]

the time it takes a rainfall drop to travel from the furthest point in the watershed to the outlet. The time of concentration is calculated using several methods and is dependent on factors such as watershed slope, roughness, and size. The most common method used for estimating Tc is the Kirpich equation, which is:

[tex]Tc = 0.0078(L0.77)/S0.385[/tex]

To calculate the peak flow using the Rational Method, we need to know the runoff coefficient, rainfall intensity, and area of the watershed. In this question, we are given that the Tc of a watershed is 30 min and the rainfall duration is 15 min.

[tex]I = P/T[/tex]

we can calculate the peak flow using the Rational Method.

[tex]Q = CIAQ = C(0.5)A[/tex]

Therefore, we cannot determine the peak flow rate.

To know more about Rational Method visit:-

https://brainly.com/question/29149320

#SPJ11

b) A tender for the construction and completion of a four storey office building has recently been closed. On the closing date three contractors submitted their tenders. Assuming that you have been asked to evaluate these tenders, outline the content of the tender evaluation report. You may make any assumptions if necessary.

Answers

When evaluating a tender for the construction and completion of a four Storey office building, the tender evaluation report includes a detailed description of the tendering process.

along with the requirements that were outlined in the tender. It should also contain a brief profile of each of the three contractors that submitted tenders.

The evaluation report should include an evaluation of each tender based on a predetermined set of criteria, such as price, quality, and timeline. The evaluation should be based on objective criteria and be done in an unbiased manner.

TO know more about evaluating visit:

https://brainly.com/question/14677373

#SPJ11

The stiffness, strength, and toughness of a material are 200 GPa, 400 MPa, and 80 MPa⋅m1/2, respectively. (a) What is the critical precrack size that would reduce the failure strength (σf) to below the yield strength (σy)? (b) Plot the failure strength as a function of the precrack size. Assume Y = 1.
please help! been stuck on this question for a while!

Answers

The critical precrack size that would reduce the failure strength (σf) to below the yield strength (σy) is 0.25 mm.

Given data, Stiffness = E = 200 GPa

Strength = σf = 400 MPa

Toughness = KIC = 80 MP[tex]a.m^{1/2}[/tex]

Critical pre-crack size is to be calculated, which reduces the failure strength (σf) to below the yield strength (σy)We know that when a crack length of a component is greater than the critical crack length, the component will fail when subjected to a certain stress level. So, the fracture strength of the material with pre-crack can be calculated as:

σf = Y * [KIC / [tex]a^{1/2}[/tex]]        ---- (1) where, a is the crack siz eY = 1 (As given)

Using Young's modulus, E = σf / εf and σy = σf/2, we get: εf = σf / Eσy = σf / 2        ---- (2)

Now, we will substitute Equation (2) in Equation (1)

σy = Y * [KIC / [tex]a^{1/2}[/tex]]

σy / Y = KIC / [tex]a^{1/2}[/tex])

σy^2 / [tex]Y^{2}[/tex] = KIC / aσ[tex]y^{2}[/tex] * a = KIC * [tex]Y^{2}[/tex]a = KIC * [tex]Y^{2}[/tex]/ σ[tex]y^{2}[/tex]a = (80 * [tex]10^{2}[/tex] * [tex]1^{2}[/tex]) / (400 * [tex]10^{6}[/tex])^2a = 0.00000025 m = 0.25 mm

Therefore, the critical precrack size that would reduce the failure strength (σf) to below the yield strength (σy) is 0.25 mm.

To learn more about yield strength, visit:

https://brainly.com/question/30902634

#SPJ11

In your own understanding, what are the design criteria and
process in designing of a steel base plate for axially loaded
column and with bending? How could you say that it is safe?

Answers

The design criteria and process in designing of a steel base plate for axially loaded column and with bending involve several steps. The design of the base plate should be considered in terms of strength, stiffness, and durability.

Step 1: The design of the base plate requires the determination of column loads and reactions. This includes the axial load and bending moment at the base of the column. It is important to consider the column's shape, size, and material to determine the load it can withstand.

Step 2:  The thickness of the base plate is calculated based on the loads and reactions at the base of the column. It is essential to consider the plate's stiffness and the stresses induced in it due to the loads.

Step 3: The plate's width and length are determined based on the column's shape and size, the loads acting on it, and the available space for the base plate.

Step 4: The bearing capacity of the foundation soil should be checked to ensure that it can support the loads induced by the column and the base plate. The soil type and its bearing capacity should be considered when designing the base plate.

The bearing capacity of the foundation soil should be sufficient to support the loads induced by the column and the base plate. the plate's yield strength and buckling resistance should be checked to ensure that it can withstand the loads and reactions acting on it.

To know more about durability visit:-

https://brainly.com/question/32627929

#SPJ11

Which of the following is not a key motivation for engineering ethics?
a)Evaluation for an application to practice as an engineer
b)Ability to communicate risks associated with a product in a clear manner
c)Awareness of the existence of moral conflicts in professional practice
d)Developing the ability to communicate ethical dilemmas in a precise manner

Answers

Engineering ethics is the field of applied ethics and system of moral principles that apply to the practice of engineering. It examines the ethical considerations of the design, development, and operation of engineering systems.

The importance of ethics in engineering is paramount because of the potentially harmful consequences that engineering decisions can have. So, in order to make sure that the engineers' decisions are ethically sound, they must have a set of moral principles that govern their actions. These principles are what we refer to as engineering ethics.

Option (d) Developing the ability to communicate ethical dilemmas in a precise manner is also a key motivation for engineering ethics. It’s a way of ensuring that ethical issues are communicated effectively, so that everyone involved understands the ethical implications of their actions.

To know more about moral visit:

https://brainly.com/question/27461226

#SPJ11

Other Questions
You have a friend who is considering buying a business and wants your advice. Here's the situation. Your friend took a job bagging coffee, doing basic bookkeeping as well as some part-time sales for a wholesale coffee business. (A wholesaler typically sells to other businesses, in this case to retail coffee shops/cafes/restaurants/food retailers -- NOT to consumers). The company purchases directly from Guatemalan farmers' cooperatives, thereby getting the coffee at a bargain price, while still paying the farmers above-market prices for the coffee (which is a business model known as "fair trade"). The company then sells both ground coffee and whole bean coffee to food retailers and to coffee shops (plus restaurants and other such places) in the San Francisco Bay area. Working with all that caffeine has gotten your friend charged up about going into business for herself. The owner is 60 years old, and he has told your friend that he'd like to slow down. He has offered to sell her all or part of the business. Her personal financial resources are limited, but she wants to be an entrepreneur and is eager to give this opportunity some deep thought if it makes business sense. She has taken some courses in business herself and isn't someone to make business decisions based mainly on emotion. She knows that you are studying business and have some working experience as well. She wants you to help her think through this potentially life-changing decision and give her some advice.What factors should the two of you consider in making a decision about what to do? How should you analyze them? Be sure that you consider multiple aspects of this decision, ranging from personal goals to finances to the business environment (competition, market) to company strategy. Also consider which valuation model to use and why. Which assumption about e i is most likely to be violated with time series data?E(e i) = 0Homoskedasticity.Each error is independent of the other errors.The error terms are normally distributed.None of the above. The following are examples of adjusting entries in the general journal of the Diane's Company. Identify the accounts that are affected by each entry and state whether it is a deferral or accrual entry. 1. Adjusting entry for revenue that has now been earned by workers but not yet paid or recorded 2. Adjusting entry for revenue that has now been earned, but was paid for previously. 3. Adjusting entry to record periodic depreciation expense 4. Adjusting entry to record the use of one month's worth of prepaid rent 5. Adjusting entry to record interest earned on an investment but not yet received 6. Adjusting entry to record the cost related to electricity expense used, but not yet paid for. 6. Define the 3 forms of market efficiency (6 marks) 7. What traders are considered to be insiders? (5 marks) 8. Distinguish the difference between a bubble and a crash. (5 marks) Estimating Bad Debts Expense and Reporting Receivables At December 31, Barber Company had a balance of $504,000 in its accounts receivable and an unused balance of $3,120 in its allowance for uncollectible accounts. The company then aged its accounts as follows. Current $415,200 1-60 days past due 57,600 61-180 days past due 20,400 Over 180 days past due 10,800 Total accounts receivable $504,000 The company has experienced losses as follows: 1% of current balances, 5% of balances 1-60 days past due, 15% of balances 61-180 days past due, and 40% of balances over 180 days past due. The company continues to base its allowance for uncollectible accounts on this aging analysis and percentages. a. What amount of bad debts expense does Barber report on its income statement for the year? $ 0 b. Show how Barber's December 31 balance sheet will report the accounts receivable and the allowance for uncollectible accounts. Note: Round your answers to the nearest whole dollar. Note: Do not use a negative sign with your answers. Current Assets Accounts receivable Less allowance for uncollectible accounts $ 0 0 $ 0 T/F:the book of jonah centers around the consequences for individual disobedience. The manager wants to forecast the month 6s sales using the following historical data:MonthsSalesMonth 120Month 225Month 332Month 435Month 538Please use the weight 0.45 for Month 5, weight 0.25 for Month 4, weight 0.2 for Month 3, and weight 0.1 for Month 2 to use the weighted moving average to forecast the demand of Month 5. Square Hammer Corp. shows the following information on its 2018 income statement: Sales $235,000; Costs = $147,000; Other expenses = $7,900; Depreciation expense = $17,500; Interest expense = $13,500; Taxes = $17,185; Dividends = $10,500. In addition, you're told that the firm issued $5,000 in new equity during 2018 and redeemed $3,500 in outstanding long-term debt. a. What is the 2018 operating cash flow? (Do not round intermediate calculations.)b. What is the 2018 cash flow to creditors? (Do not round intermediate calculations.) c. What is the 2018 cash flow to stockholders? (Do not round intermediate calculations.) d. If net fixed assets increased by $20,000 during the year, what was the addition to NWC? (Do not round intermediate calculations.) a. Operating cash flow b. Cash flow to creditors C. Cash flow to stockholders d. Addition to NWC Mth J F M A M J J A S O Based on the forecasted demand and cost information provided, decide which of the following the most appropriate planning strategy for ABC restaurant: 1) Gunakan strategi enam pekerja dengan sokongan kerja lebih masa tidak lebih dua pekerja dan sub- kontrak tidak dibenarkan. Tiada limit untuk pesanan tertangguh. Use a strategy of six workers with a support of overtime but not more than two workers and subcontracting were not allowed. No limit for back ordering. (5 Markah/Marks) Total Jan Feb March 3000 2750 1250 Current work force Production per worker Inventory holding cost Regular wage rate Overtime wage rate Sub-contracting wage rate Back-ordering wage rate Hiring cost Firing cost Beginning inventory Demand Kos (Cost): Regular Production April 1500 OT May 2250 S/k June 1750 July Aug Sept Oct 2750 2250 2500 1000 10 workers 250 units per month $0.50 per unit per month $50.00 per unit $60.00 per unit $70.00 per unit $90.00 per unit $500 per worker $800 per worker 1000 units Ending Back Inventory Order Workers H || Mth F M A M A S 0 Total 2) Gunakan strategi campuran - permintaan mengejar (Jan-Mac) dan paras pengeluaran (April - Oktober) dengan sokongan kerja lebih masa tetapi tidak lebih dua pekerja dan sub-kontrak tidak dibenarkan. Tiada limit untuk pesanan tertangguh. Use a mixed strategy - chase demand (Jan-March) and level of production (April-October) with a support of overtime but not more than two workers and sub-contracting were not allowed. No limit for back orders. Jan Feb March 1000 2750 1250 Current work force Production per worker Inventory holding cost Regular wage rate Overtime wage rate Sub-contracting wage rate Back-ordering wage rate Hiring cost Firing cost Beginning inventory Demand Kos (Cost): Regular Production April 1500 OT May 2250 S/k June 1750 (5 Markah/Marks) July August Sept Oct 2750 2250 2500 1000 10 workers 250 units per month $0.50 per unit per month $50,00 per unit $60.00 per unit $70.00 per unit $90.00 per unit $500 per worker $800 per worker 1000 units Ending Back Inventory Order Workers H F a. What do mesenchymal cells do during Intramembranous ossification?. b. What do osteoblasts do during intramembranous ossification? c. What would happen if osteoblasts were suddenly replaced with osteoclasts? An auditor may decide to increase the risk of incorrect rejection when:A.) Increased reliability from the sample is desiredB.) Many differences are expectedC.) Initial sample results do not support the planned level of control riskD.) The cost and effort of selecting additional items is low Find three supporting materials that outline how to communicate in writing in your business. This may involve writing reports, memos, emails, meeting minutes, internal or external communications. Go through each material you identify and write some notes to help you improve your communication in these areas. (200words) Two annotated versions of the Ohio Revised Code (Baldwin's Ohio Revised Code Annotated and Page's Ohio Revised Code Annotated) can be found in the Tri-C Paralegal Library. Baldwin's Ohio Revised Code Annotated is published by Westlaw. Page's Ohio Revised Code is published by LexisNexis. A paralegal who is conducting research in the Tri-C Paralegal Library only needs to consult one of the annotated versions of the Ohio Revised Code in order to obtain all of the relevant annotations.A. TrueB. False Question 1 of 2 View Policies Current Attempt in Progress Betty Harris started her own consulting firm, Betty Consulting, on May 1, 2022. The following transactions occurred during the month of May. May 1 Betty invested $8,000 cash in the business. 2 Paid $900 for office rent for the month. 3 Purchased $500 of supplies on account. 5 Paid $150 to advertise in the County News. 9 Received $4,100 cash for services performed. 12 Withdrew $1,000 cash for personal use. 15 Performed $5,400 of services on account. 17 Paid $2,100 for employee salaries. 20 Made a partial payment of $300 for the supplies purchased on account on May 3. 23 Received a cash payment of $4,300 for services performed on account on May 15. 26 Borrowed $4,900 from the bank on a note payable. 29 Purchased equipment for $4,000 on account. 30 Paid $250 for utilities. (a) Show the effects of the previous transactions on the accounting equation. Of a transaction results in a decrease in Assets, Liabilities or > -/25 E Question 1 of 2 < > (a) Show the effects of the previous transactions on the accounting equation. (If a transaction results in a decrease in Assets, Liabilities or Owners Equity, place a negative sign (or parentheses) in front of the amount entered for the particular Asset, Liability or Equity item that was reduced. See Illustration 1-8 for example.) Assets Accounts Date Cash Receivable Supplies Equipr 1 2 3 5 6 12 15 17 20 $ 8,000 $900 $500 $150 $4,100 $1,000 $5,400 $2,100 $300 ONE $ $500 $300 *** uestion 1 of 2 42 Equipment (7 $4,000 27 Notes Payable Liabilities $4,900 Accounts Payable $ -/25 E Owner's Capital 8,00 Owner's Capital 8,000 O 19 Owner's Drawings Owner's Equity $150 Revenues Expenses Question 1 of 2 < > (b) Prepare an income statement for the month of May. eTextbook and Media BETTY CONSULTING Income Statement -/25 (c) Prepare a balance sheet at May 31, 2022. (List Assets in order of liquidity.) BETTY CONSULTING Balance Sheet Assets Liabilities and Owner's Equity $ $ Liabilities and Owner's Equity If D 1 = $1.50, earnings and dividends g (which is constant) = 6.5%, and P 0 = $56, what is the stock's expected capital gains yield for the coming year? (Remember that capital gains come from stock price growth which in turn comes from earnings growth!) Consider a positive charge Q1 of magnitude 1 pc fixed at the origin with another positive charge Q2 of magnitude 3.5 pc moving near it. Charge Q2 has a mass of 3.5 g. Where applicable, let the potential energy be zero when charges are very far apart from each other. Hint a.What is the potential energy of Q2 when it is 3.8 cm from Q? PEQ2 = 82894 J. b.If Q2 is released from rest at 3.8 cm from Q1, how fast is it moving when it reaches 8 cm from Q? Hint for (b) VQ2 = ____m/s Suppose that z is a function of x and y, and F(xz - y, xy - z, yz - x) = 0. Calculate and (Hint: Since F = 0, then dF = 0. Use a proper change of variables and chain rule to proceed) .id is a part-time Teacher who joined IKNS school at the beginning of the 2020 taxable year. At the end of the year the following information provided:Khalid is involved in some administration works in addition to his teaching load and he received a fixed rate of payment each month.Any extra hours he works the school paid him overtime.All the work performed by Khalid is controlled by his direct supervisor Mr.Ali.Khalid doesnt have the right to accept or reject any tasks assigned to him.All the courses and administrative work must be conducted inside the school.Question:From a taxation point of view, what is the best category you will choose to categorize Khalid in, Self-employment or employment? and why? Throughout this book, we will present a continuing narrative about Harry and Belinda Johnson. Following is a brief description of the lives of this couple.Harry is 28 years old and graduated five years ago with a bachelor's degree in interior design from a large Midwestern university near his hometown in Indiana. Since graduation Harry has been working in small interior design firm in Kansas City earning a salary of about $52,000.Belinda is 27, has a degree in business administration from a university on the West Coast, and has been employed in a medium-size manufacturing firm in California for about five years. Harry and Belinda both worked on their schools' student newspapers and met at a conference during their junior year in college.After all these years they met again socially in January in Kansas City, Missouri where Belinda was visiting relatives and by chance she and Harry were at the same museum. After getting reacquainted they started dating and in only a matter of months Belinda got transferred from California to work in Kansas City and in June they got married. Belinda is now employed as a stockbroker earning about $78,000 annually.After the wedding they moved into his small apartment. They will face many financial challenges over the next few decades as they buy their first home, decide on life insurance needs, begin a family, change jobs, and invest for retirement.Harry receives $6,000 in once a year interest income payments from a trust fund set up by his deceased father's estate. The amount will never change until it runs out in 20 years. What will be the buying power of $6,000 in ten years if inflation rises at 4 percent a year? (Hint: Use Appendix A-2.) Round your answer to the nearest dollar. Round Present Value of a Single Amount in intermediate calculations to four decimal places.$Belinda and Harry have discussed starting a family but decided to wait for perhaps five more years in order to get their careers moving along well and getting their personal finances solidly on the road to success. They also know that having children is expensive. The government's figure is that the extra expense of a child would be about $19,000 a year through high school graduation. How much money will they likely cumulatively spend on a child over 18 years assuming a 4 percent inflation rate? (Hint: Use Appendix A-3.) Round your answer to the nearest dollar. Round Future Value of Series of Equal Amounts in intermediate calculations to four decimal places.$ Many elderly people have Social Security payments as their sole source of income. Because of this, there have been attempts to adjust these payments so as to keep up with changing prices. This process is called "indexing"; this question will lead you through the process.Suppose that in the year 2015, a typical Social Security recipient consumed only food (F) and housing (H). The price of food was $5/unit (Pf) and the price of housing was $15/unit (Ph).(a) Provide the consumer's general budget constraint for any bundle of food and housing provided they receive $150 per month.(b) Is a bundle of 18 units of food/month and 4 units of housing per month affordable? Why or why not?(c) Suppose that in 2018 the price of food rose to $10/unit and housing rose to $20/unit. How much additional income is required such that the original bundle is just as affordable at the new prices?(d) What is the term given to the measure you just found in part (c)?