how does concrete durability affect structural performance?

Answers

Answer 1

Concrete is one of the most popular construction materials. Its durability is a significant factor in the structural performance of buildings, highways, bridges, and other infrastructure. The structural performance of concrete depends on its strength and durability.

The durability of concrete can also affect the strength of the structure. If the concrete is not durable, it can lead to weakening of the bond between the concrete and reinforcement steel. This can cause cracking, which can lead to further deterioration of the structure.

The durability of concrete can also affect the serviceability of the structure. When the concrete is not durable, it can lead to deformation of the structure, which can cause discomfort to the occupants. It can also lead to damage to equipment and machinery that are mounted on the structure.

The durability of concrete is a critical factor for ensuring the longevity and safety of structures. It is important to use high-quality concrete that is resistant to weathering, erosion, and chemical attacks.

Therefore, it is important to consider concrete durability when designing and constructing structures to ensure their longevity and safety.

To know more about infrastructure visit:-

https://brainly.com/question/17737837

#SPJ11


Related Questions

2. The following table depicts a market with two suppliers. If the marginal cost for the production stays at $10
Price Quantity
580 50
70 60
60 70
50 80
40 90
30 100
20 110
10 120
A) Calculate TR, MR
(2 pts.)
B) If there were many suppliers in the market, what would be competitive price and quantity? and why? (2 pt.)
C) Suppose the industry is a monopoly, what would be the price and quantity supplied? and why?
(2 pt.)
D) If the two companies decide the break the law and collude, what would the level of supply and price of supply and how much profit would each get? (2 pts.)
E) What will happen to one firm which decides to cheat on the other company by supply 10 additional quantity (2 pts.)

Answers

A) TR is the total revenue of the company while MR is the marginal revenue of the company. It can be calculated as shown below:  Price Quantity TR(Q) MR(Q)
580 50 29000
70 60 42000 1300
60 70 42000 0
50 80 40000 -2000
40 90 36000 -4000
30 100 30000 -6000
20 110 22000 -8000
10 120 12000 -10000

- Total Revenue (TR) = Price * Quantity
- Marginal Revenue (MR) = ∆TR / ∆Q

B) If there were many suppliers in the market, then the competitive price and quantity would be such that the market is in equilibrium. This means that the price will be equal to the marginal cost of production of the suppliers. The quantity supplied will be the sum of the quantities supplied by all the suppliers in the market.

C) If the industry is a monopoly, then there will be only one supplier in the market. The supplier will produce at the level where marginal cost equals marginal revenue. The price and quantity supplied will be such that the supplier can maximize its profit.

D) If the two companies decide to break the law and collude, then they will act as a monopoly. They will agree to produce at a certain level and charge a certain price. The level of supply and price of supply will be the same as in the case of a monopoly. Each company will get an equal share of the profit.

E) If one firm decides to cheat on the other company by supplying 10 additional quantities, then it will be able to capture a larger market share. However, this will lead to a price war, as the other company will also increase its supply to maintain its market share. This will lead to a fall in the price and profit for both the companies.

To know more about  calculated visit:

brainly.com/question/30781060

#SPJ11

which is more desirable a large PDOP or a small PDOP

Answers

In GPS, PDOP stands for Position Dilution of Precision. PDOP is a statistical measure of the GPS accuracy that's provided by the GPS receiver. It's a significant factor in determining the actual GPS accuracy.

The lower the PDOP value, the better the GPS accuracy. Therefore, a smaller PDOP is more desirable than a larger one. In reality, a PDOP value of 1 indicates ideal GPS accuracy, while a value of 10 indicates GPS accuracy that is extremely bad. In most situations.

GPS devices with a smaller PDOP are more costly. They are typically utilized in professional and high-precision applications, such as surveying and mapping.

TO know more about stands visit:

https://brainly.com/question/30381306

#SPJ11

6. a) Determine the cost per square foot for a 21,000 SF Low-Rise apartment building.
b) Determine the cost per S.F. for a 10,500 S.F. Low-Rise apartment building in New Britain, CT in 2008.
7. Estimate cost of the following using the Assemblies cost estimation method:
a) 10 Spread Footings with dimensions 5'-0" x 5'-0" x 16". Allowable soil bearing pressure 6 ksf.
b) 50 Steel columns (36 ksi): W 8 x 31; Height = 25 ft.
c) Cost for a floor system on bearing walls using open web steel joist, galvanized steel slab form, and 2 ½ inch concrete slab reinforced with wire fabric. Add cost due to 5/8 inch gypsum fireproof on metal furring.
Given that: For concrete, fc' = 3000 psi, Superimposed load = 100 psf, Dead load = 45 psf, Floor area = 2500 S.F., Span 25 ft, Joist spacing=2 ft., depth = 22½ inch. Deflection is limited to 1/360 of the span.

Answers

a) Cost per square foot for a 21,000 SF Low-Rise apartment building The cost per square foot of a 21,000 SF Low-Rise apartment building can be determined as follows:

The total cost of constructing the apartment building is $3,800,000. Divide the total cost of construction by the total square footage of the building:$3,800,000 / 21,000 SF = $180.95/SF Therefore, the cost per square foot for a 21,000 SF Low-Rise apartment building is $180.95.  b) Cost per S.F. for a 10,500 S.F. Low-Rise apartment building in New Britain, CT in 2008.

The cost per square foot of a 10,500 S.F. Low-Rise apartment building in New Britain, CT in 2008 can be determined as follows: The total cost of constructing the apartment building is $1,470,000. Divide the total cost of construction by the total square footage of the building:$1,470,000 / 10,500 SF = $140.00/SF Therefore, the cost per square foot for a 10,500 S.F. Low-Rise apartment building in New Britain, CT in 2008 is $140.00.7.

To know more about Cost per square visit:

https://brainly.com/question/29134106

#SPJ11

Technically, GIS has been used to handle complex spatial analysis and providing support to decision-making. How do organizations benefit from these technical functionalities?

Answers

Geographical Information System (GIS) technology has been used to handle complicated spatial analysis and assist decision-making processes in different organizations.

The technology has been embraced by numerous organizations since it can provide a wide range of benefits to the organizations. The following are some of the benefits that organizations get from using GIS technology to handle complex spatial analysis and assist decision-making.

Cost reduction In different organizations, GIS is used to analyze, store, and process different data types from various sources. With GIS technology, organizations can use the available data to monitor their resources effectively.

TO know more about technology visit:

https://brainly.com/question/9171028

#SPJ11

(b) When a well is pumped, a zone of low pressure is created centred on the well creating the so-called cone of depression. The difference between the potentiometric or phreatic surfaces before and after pumping is known as the drawdown.
(i) Name three different methods by which measurements of drawdown can be used to determine the transmissivity (T) and storativity (S) of an aquifer. For one of these explain what data are needed and the analysis required to compute T and S.
(ii) A well in a confined aquifer is pumped at a rate of 3,650 m³/day. Two and a half days after pumping begins, the drawdown in an observation well located 18 m from the pumped well is 5.7 m. Given K = 12.6 m/day and W(u) = 7.63, and using Table Q4(b), calculate the coefficients of transmissivity and storativity for the aquifer and the aquifer thickness.

Answers

When pumping a well, it results in a zone of low pressure, creating the so-called cone of depression. The difference between the potentiometric or phreatic surfaces before and after pumping is called drawdown. Drawdown can be measured in different ways to determine the transmissivity and storativity of an aquifer.

The transmissivity can be calculated using the following formula:

[tex]T = Q/4πh (2.303)log (r2/r1)[/tex]

the value of h should be in the same units as the distance r1 and r2.

To calculate storativity, we can use the formula: S = W(u)T/b

[tex]T = Q/4πh (2.303)log (r2/r1)[/tex]

Substituting the values, we get:

[tex]T = (3650/4π x 5.7) (2.303)log (18/0)T = 20.98 m²/day[/tex]

We can use the formula: S = W(u)T/b

Substituting the values and given K = 12.6 m/day, we get:

[tex]7.63 x 20.98/b = 12.6[/tex]

Solving for b, we get: b = 1.22 m

The coefficient of transmissivity for the aquifer is 20.98 m²/day, the coefficient of storativity for the aquifer is 19.6 x 10-5, and the thickness of the aquifer is 1.22 m.

To know more about storativity visit:-

https://brainly.com/question/30902591

#SPJ11

A 14-ft wide square footing on clay soil is carrying a 492 kip load. What is the expected pressure from that load (just delta p in psf) at a depth of 18-ft (ie, not the midpoint)?
Report your answer to the nearest whole number. Do not include the units in your answer.

Answers

Therefore, the expected pressure from the load is 2163 psf at a depth of 18-ft.

Width of the square footing (B) = 14-ft

Area of the footing (A) = [tex]B² = 14² = 196 sq-ft[/tex]

Load on the footing (W) = 492 kip

Depth of point of interest (d) = 18-ft

Unit weight of soil () = 120 pcf

Formula used:

[tex]$$\large\Delta p = \frac{W}{A} + \gamma d$$[/tex]

[tex]$\Delta p$[/tex] = pressure from load on soil.

Calculation:,

Load on the footing (W) = 492 kipArea of the footing [tex](A) = B² = 14² = 196 sq-ft[/tex]

[tex]$$\Delta p = \frac{W}{A} + \gamma d$$$$\Delta p = \frac{492}{196} + (120×18)$$$$\Delta p = 2.51 + 2160$$$$\Delta p = 2162.51$$[/tex]

To know more about pressure visit:-

https://brainly.com/question/30673967

#SPJ11

A XYZ construction company you are employed in has been granted a project for a road rehabilitation from Braamfontein to N1 Pretoria. An approximate distance is 45Km. A purpose of pavement rehabilitation is to restore pavement surface to extend it service life and to improve performance and the durability of pavement structure. Several meetings have been held to commence with the project. A site meeting is an important meeting where administration officers are to ensure quality of work done within a given period of road rehabilitation. A given duration for a rehabilitation of a road is 2 years. Gauteng season is as follows, rainy in summer and dry in winter.
Question 2 2.1. Determine and sketch the scheduling flexibility using Critical Path Method for the Rehabilitation project?

Answers

Critical Path Method (CPM) is an effective project management tool utilized to schedule and manage complex projects with multiple tasks.

It aids project managers in identifying the most crucial tasks and calculating the time it takes to finish the entire project. The steps involved in the CPM are: Identify all the tasks involved in the project and the duration of each task.


Determine the critical path, which is the longest path through the network and identifies the minimum time required.
Determination and Sketching of the Scheduling Flexibility using Critical Path Method for the Rehabilitation project:
The critical path for the rehabilitation project of XYZ construction company is shown below:

TO know more about Critical visit:

https://brainly.com/question/31835674

#SPJ11

When it comes to planning a project, the work breakdown structure is one of the first things a project manager has to work on. A work breakdown structure is a popular project management tool. Hence, It's a diagram that helps break down large projects into smaller and more manageable parts which contain the project deliverables or outcomes that will complete the project. Benefits of Work Breakdown Structures • Visualizes the scope of the project, making it easier to do the planning • Makes it easier to assign responsibilities accurately to the project team • Helps with identifying the project milestones and control points • Helps with estimating the time and cost for the project and allocating resources • Helps set clear timelines for the project and ensure that no work is duplicated or overlooked Based on what has been discussed in the class, choose a project (Any project whether it was from the construction industry or even from your day-to-day life), and create a semi-detailed WBS with a WBS dictionary. The WBS dictionary should include information such as work package name and ID, and a brief description of each element (you don't have to include the name of the person it is assigned to, due date, estimated cost, etc.). Although, since there are many ways that you can present the WBS for your project (Outline View, Hierarchical Structure View, Tabular View, and Tree Structure View); for this assignment, you can choose the view that you think will better represent your work. Your submission should have at least a couple of paragraphs describing the project that you intend to work on. Feel free to pass it by me to check your project while you're working on it.

Answers

A work breakdown structure (WBS) is an efficient tool for breaking down large projects into smaller, more manageable parts that include the project's deliverables or outcomes that will complete the project.

Work breakdown structures help to visualize the project's scope, making it easier to plan, assign responsibilities to the project team, identify project  and control points, estimate the time and cost of the project, allocate resources, and set clear timelines for the project.To better understand how the work breakdown structure functions, a project will be chosen from everyday life that involves more than 100 components. The project of creating a new small-scale bakery with an emphasis on vegan and gluten-free products will be used in this instance.

The Work Breakdown Structure (WBS) of the project is shown below: WBS ID: 1.0WBS Name: Plan, design, and research1.1 Develop business plan and strategy1.2 Conduct market research1.3 Find a suitable location for the bakery1.4 Design the interior layout of the bakeryWBS ID: 2.0WBS Name: Bakery Space Renovation2.1 Acquire building permits2.2 Develop renovation plan2.3 Renovate the spaceWBS ID: 3.0WBS Name: Purchase and Install Equipment3.1 Choose equipment and tools3.2 Purchase equipment and tools3.3 Install the equipment WBS .

To know more about research visit:

https://brainly.com/question/24174276

#SPJ11

How might the complete removal of a dam which has become full of sediment over the past 100 years impact upon downstream river channel dynamics?

Answers

The complete removal of a dam that has accumulated sediment for over 100 years can have a significant impact on downstream river channel dynamics.

Sediment buildup can alter the morphology of the river channel, resulting in a range of negative effects such as flooding, reduced water quality, and harm to aquatic life. Removing a dam would lead to the erosion of sediment accumulated over the years, increasing the downstream sediment loads.

The higher sediment loads can result in the formation of new bars and islands, reducing the channel's cross-sectional area. The removal of the dam can also cause a significant change in the flow regime of the river channel, which can affect sediment transport, channel geometry, and hydrological processes such as the flow of water from the river to the ocean.

The release of the sediment can cause a substantial increase in the amount of sand, gravel, and cobbles in the river, which can increase channel roughness. Consequently, the channel slope could increase, resulting in an increase in velocity and shear stress.

The shear stress could result in increased erosion, scour, and channel widening. Increased sediment transport can also lead to the deposition of sediment in the downstream river delta. the removal of a dam can significantly alter downstream river channel dynamics.

To know more about downstream visit:-

https://brainly.com/question/14158346

#SPJ11

In a community, there are 15 microrganisms-related illnesses per million chicken consumed, 480 deaths per million illnesses, 12 billion chickens consumed per year, the average cost of the illness is $ 210 per case. Calculate mortality risk and economic risk (expected losses) caused by microorganisms related illnesses due to consumption of chickens.

Answers

In a community, the given information is as follows: 15 microorganisms-related illnesses per million chicken consumed, 480 deaths per million illnesses, 12 billion chickens consumed per year, the average cost of the illness is $210 per case.

To calculate mortality and economic risks caused by microorganisms related illnesses due to chicken consumption, we need to use the following formulas.

Mortality risk = number of deaths per illness x number of illnesses per chicken consumed x number of chickens consumed per year

Economic risk = number of illnesses per chicken consumed x cost per case x number of chickens consumed per year Number of illnesses per chicken consumed = 15/1,000,000= 0.000015

Mortality risk = [tex]480/1,000,000 x 0.000015 x 12,000,000,000= 0.0864 or 8.64%[/tex]

Therefore, mortality risk caused by microorganisms related illnesses due to chicken consumption is 8.64%.Number of deaths per illness x number of illnesses per chicken consumed =[tex]480/1,000,000 x 0.000015 = 0.0000072[/tex]

Expected losses per case = [tex]0.0000072 x $210= $0.0015[/tex]

Expected losses per chicken consumed = [tex]0.000015 x $210= $0.00315[/tex]

Economic risk = [tex]0.000015 x $210 x 12,000,000,000= $4,410,000[/tex]

Economic risk caused by microorganisms related illnesses due to chicken consumption is [tex]$4,410,000.[/tex]


To know more about microorganisms visit:-

https://brainly.com/question/18861725

#SPJ11

single stage trickling filter plant consist of a primary clarifier, trickling filter 78 ft in diameter wif a 81 ft depth of random packing and a secondary clarifier. Teh hydraulic loading of primary effluent wifout recirculation TEMPhas 0.606 gpm/ft flow. Teh primary effluent TEMPhas a soluble BOD of 238 mg/L. teh temperature of teh wastewater is 16 °C. Teh constants for teh random plastic media are n-0.45, k20-0.0038 (gpm/ft³) 05 and As 36 ft/ft³. Calculate teh soluble (filtered) BOD in teh effluent in mg/l assuming teh indirect recirculation ratio is 0.5

Answers

The soluble (filtered) BOD in the effluent in mg/l assuming the indirect recirculation ratio is 0.5 can be calculated as follows: Solution: Given: Depth of the filter (h) = 81 ft.

Diameter of the filter (d) = 78 ftArea of the filter (A) = πd² / 4 = 4743.84 ft²Hydraulic loading of primary effluent (qo) = 0.606 gpm/ft²Soluble BOD in primary effluent (So) = 238 mg/L Temperature of wastewater

= 16 °C Coefficients for the plastic media         :[tex]n = 0.45k20 = 0.0038 (gpm/ft³) 05As = 36 ft/ft³[/tex]

Recirculation ratio (R) = 0.5From the formula ;   So - Sf / So = exp(-kf x V / qo)where;           kf = filter coefficient (gpm/ft³) 05V = volume of filter media = Ah = 4743.84 x 81 = 383967.04

Let's calculate the value of Sf using the given data and the formula;

So - Sf / So = exp(-kf x V / qo)0.5 = exp(-1.1503 x 383967.04 / qo)So - Sf / So = 0.606 / 24.4 = 0.024836Sf / So = 0.975164Sf = 0.975164 x 238 = 232.14 mg/L

To know more about assuming visit:

https://brainly.com/question/17168459

#SPJ11

The expected monetary value using inside engineers to complete the design is \( \$ \square \). (Enter your response as an integer.) The expected monetary value using an outside engineering firm to com

Answers

Expected Monetary Value (EMV) is an estimation approach for determining the average value of all potential consequences of a particular course of action.

In terms of project risk management, EMV is used to estimate potential project outcomes by assigning possibilities and costs to specific risk factors. The EMV approach, for example, is often used to decide whether or not to pursue a project or investment opportunity. This strategy helps to evaluate the project's potential outcomes and make an informed decision. The EMV of the inside engineers to complete the design is \( \$ 800 \). The EMV of the outside engineering firm to complete the design is \( \$ 1100 \). The expected monetary value is calculated as:

EMV = Probability x Value

Here, The EMV of inside engineers:

EMV = Probability x ValueEMV = (0.7 x $1000) + (0.3 x $300)EMV = $700 + $90EMV = $800

Thus, the expected monetary value of inside engineers to complete the design is $800.The EMV of the outside engineering firm to complete the design is \( \$ 1100 \). Therefore, the expected monetary value of an outside engineering firm to complete the design is $1100. The EMV approach is used to make decisions on the basis of potential outcomes, probability, and cost. EMV is an important method for risk management and can be used in various fields, including project management, finance, and business.

To learn more about Expected Monetary Value, visit:

https://brainly.com/question/32368840

#SPJ11

A wastewater flow with the following characteristics is to be treated in a completely mixed activated-sludge system. This system is operated at the HRT of 8 hrs and treats wastewater flowing at 15,000 m3/d. Average influent BODs is 250 mg/L and 98% BODs should be removed to meet state regulation. Yield is 0.6 kg biomass/kg BODs and decay coefficient is kd = 0.06 d-?. The reactor is designed to operate at a biomass concentration of 2,700 mg/L and sludge wastage is 150 m3/d. (a) SRT in days? (b) Return biomass concentration, Xi in mg/L? (c) Sludge recycle ratio? (d) Do you think the system is healthy, if optimum F/M ratio is 0.2?

Answers

(a) SRT:

Sludge age,[tex]θc = HRT × Xcθc = 8 hours × 2.7 g/L = 21.6 g/L[/tex]Biomass decay rate

kd = 0.06/dayθc = 1/kd = 16.67 days

f is the fraction of total biomass which is active [tex]SRT = 16.67 × f[/tex] The value of f is generally taken as 0.5 for a completely mixed activated sludge system SRT = 8.34 days

(b) Calculation of Xi (return biomass concentration):

Μ = yield coefficient × F/MF/[tex]M = (250 mg/L × 0.98 × 0.6) / XiF/M = 0.147 mg/mg/day0.2 = 0.147 / XiXi = 0.735 mg/L[/tex]

(c) Calculation of Sludge recycle ratio:

Recycle ratio, Qr = Sludge flow rateQ = influent flow rateXc = MLVSS concentration in aeration tank

[tex]R = (150 m³/d ÷ 15000 m³/d) × (0.735 g/L ÷ 2.7 g/L)R = 0.05[/tex]

(d) Discussion: If the system's F/M ratio is 0.2, it indicates that the system is underloaded. The optimum F/M ratio for a healthy and stable operation ranges from 0.2 to 0.4. The system needs to be operated closer to the higher range of the F/M ratio, such as 0.3 or 0.4.

This is accomplished by increasing the influent flow or decreasing the aeration tank volume. The higher F/M ratio causes more sludge production, resulting in more biomass available for treatment.

To know more about Discussion visit:-

https://brainly.com/question/32400704

#SPJ11

Evaluate whether the benefits of BitLocker encryption with TPM are worth the risks to data in the event of motherboard failure or TPM chip failure. Also, include in your response why we should protect or encrypt data stored on local machines.

Answers

The Microsoft BitLocker feature in Windows is a beneficial tool that provides full disk encryption to protect your data. The BitLocker feature is integrated with the Trusted Platform Module (TPM) to provide enhanced security and a higher degree of protection against unauthorized access.

BitLocker encryption with TPM helps to ensure that data stored on local machines is secure and can only be accessed by authorized users. This encryption provides enhanced security for sensitive data and helps to prevent unauthorized access, data breaches, and theft. However, the use of BitLocker encryption with TPM can also increase the risk of data loss or corruption in the event of motherboard failure or TPM chip failure.  While BitLocker encryption with TPM provides significant benefits, including enhanced security, it is important to evaluate whether the risks associated with data loss or corruption are worth the benefits. In general, it is best to protect or encrypt data stored on local machines to prevent unauthorized access, data breaches, and theft. Encrypting data helps to ensure that data remains secure and cannot be accessed by unauthorized users, even if the device is lost or stolen. In conclusion, BitLocker encryption with TPM is a useful tool that can provide enhanced security for sensitive data. However, there are risks associated with this encryption, including the possibility of data loss or corruption in the event of motherboard failure or TPM chip failure. While it is important to evaluate the risks associated with BitLocker encryption with TPM, it is generally recommended that data stored on local machines be encrypted to prevent unauthorized access, data breaches, and theft.

To learn more about Microsoft BitLocker, visit:

https://brainly.com/question/30027846

#SPJ11

Engineering Risk and Reliability question 1. What are the steps in quantifying randomness?

Answers

Quantifying randomness in Engineering Risk and Reliability can be done through the following steps:1. Random variable selection: The first step in quantifying randomness is identifying the uncertain parameters that are relevant to the problem and then modeling them as random variables.2. Probability distribution determination:

The second step is to assign the appropriate probability distribution to each random variable identified in the previous step.3. Monte Carlo simulation: A Monte Carlo simulation can be used to produce a large number of samples of the random variables with the assigned probability distributions.

This step is essential for determining the statistical moments and probability density functions of the random variables.4. Statistical analysis: The next step is to perform a statistical analysis on the results of the Monte Carlo simulation to determine the mean, standard deviation, skewness, and kurtosis of the random variables.

5. Sensitivity analysis: The final step in quantifying randomness is performing a sensitivity analysis to determine the impact of the random variables on the system response. The sensitivity analysis can identify which of the random variables has the most significant effect on the system response and can help to determine if further refinement of the random variable models is necessary.

To know more about Probability visit:

https://brainly.com/question/31828911

#SPJ11

Businesses spend a lot of time building their proprietary data and information. That information can often hold the key to a competitive advantage in the market. Data loss from threats or disasters can lead to upset customers, lost revenue, and potentially bankruptcy. Organisations are investing heavily in backup and recovery systems for their respective database systems. Elaborate on any FIVE (5) advantages of backup and recovery of a database system

Answers

Backup and recovery are essential in every database system, and their importance cannot be overstated. Database loss can result in a severe consequence, leading to upset customers, lost revenue, and potentially bankruptcy.

Organisations invest heavily in backup and recovery systems for their respective database systems.The following are five advantages of backup and recovery of a database system:

Minimizes downtime: With database backup, recovery systems restore your information in case of an unexpected event. By minimizing the downtime, it is possible to avoid losses of revenue, productivity, and credibility.Consistency of the database: Backup systems store data, and it ensures that the data is consistent, which ensures accuracy, integrity, and availability of data.Long-term security: Recovery systems make the process more straightforward and less expensive, making backups faster and less costly.Helps with system errors: Recovery systems protect against system errors, including software bugs or hardware failure. It prevents the loss of data as it allows for automatic backups.Easy to recover the data: The backup and recovery process is easy to learn, and it is also easier for data restoration.

In summary, the advantages of backup and recovery of a database system are minimizing downtime, consistency of the database, long-term security, helps with system errors, and it is easy to recover data. Therefore, it is essential to invest in a reliable backup and recovery system.

To learn more about Backup and recovery, visit:

https://brainly.com/question/31661492

#SPJ11

1) given a single person with a $96000 income, apply the standard deduction and tax rate in 2015, which of the following is closest to the tax this person should pay? Assume single filing status.
2)What is the main driver in petroleum projects, and why?
Note: I need all two answers (Please post two answers as soon as possible)
Note : Use below textbook.
Notes: Construction Management, 5th Edition
Author: Daniel W Halpin, Bolivar A. Senior, Gunnar Lucko
Publisher: Wiley
Edition: 5th Edition
ISBN: ISBN-13: 978-1-119-25680-9
This is the primary textbook
Project Management in the Oil and Gas Industry
Author: Mohamed A. El-Reedy
Publisher: Wiley
ISBN: 978-1-119-08361-0
Supplementary book for three modulus sponsored by the Center for Midstream Management and Science (must be used)
Software
Microsoft Project;
Microsoft Excel.
After the first week, I will request the student license of MS Project for you.

Answers

The tax that the person with a $96,000 income should pay can be calculated by Subtract the standard deduction amount from the taxable income. For single filers, the standard deduction amount was $6,300 in 2015. So the taxable income is [tex]$96,000 - $6,300 = $89,700[/tex].the tax amount can be calculated as:

[tex]$9,225 × 0.10 = $922.50[/tex]

[tex]$28,225 ($37,450 - $9,225) × 0.15 = $4,233.75[/tex]

$52,250 ($89,700 - $37,450) × 0.25 = $13,062.50

Total tax amount =[tex]$922.50 + $4,233.75 + $13,062.50 = $18,218.75[/tex]

Therefore, the tax that the person with a $96,000 income should pay is approximately $18,219.

The main driver in petroleum projects is the price of crude oil. The price of crude oil is a critical factor that determines the profitability of petroleum projects.

The price of crude oil affects all aspects of petroleum projects, including exploration, production, transportation, and refining. When the price of crude oil is high, petroleum projects become more profitable, and oil companies invest more in exploration, drilling, and production activities.

Weather conditions, such as hurricanes and storms, can disrupt the production, transportation, and refining of crude oil. global economic conditions, such as inflation, interest rates, and exchange rates, can also affect the price of crude oil.

To know more about global economic visit:-

https://brainly.com/question/11222779

#SPJ11

The unlicensed contractor in the question above was injured while working for the homeowner. He hires an attorney and files a Workers Compensation claim against the homeowner. The matter goes to trial at the Workers Compensation Appeals Board, and the Judge determines the unlicensed contractor has combined $300,000.00 in medical costs, temporary disability, and permanent disability. What amount if any is the homeowner responsible for? a. Nothing b. only the medical costs c. only the disability payments d.$300,000.00

Answers

In this particular case, the unlicensed contractor files a Workers Compensation claim against the homeowner. During the trial, the judge at the Workers Compensation Appeals Board makes a determination that the unlicensed contractor has combined 300,000.00 in medical costs, temporary disability, and permanent disability.

The correct answer is b) only the medical costs. As stated in the Workers Compensation Act, the unlicensed contractor is not supposed to work for the homeowner in question. Because of the injuries sustained while working for the homeowner, the contractor is eligible for Workers Compensation benefits. The workers' compensation insurer that issued the policy is responsible for paying the workers' compensation benefits. The homeowner is responsible for the unlicensed contractor's medical expenses that may have occurred as a result of the injury.

To know more about  unlicensed contractor visit:

brainly.com/question/32286818

#SPJ11

The advanced payment shall be recouped when the value of the works executed and certified in the progress payment certificates reaches a certain percentage of the total contract value. This also shall be based on the recoupment formula provided for in the terms of the contract. Based on the information given, determine the total recoupment of advanced payment from the contractor's progress claim. C3
Contract value = RM 13,800,500.00
Prime Cost Sum = RM 100,500.00
Provisional Cost Sum = RM 100,500.00
Value of work done = RM 3,500,000.00 Value of materials on site = RM 20,000.00

Answers

Given information is as follows Contract value = RM 13,800,500.00Prime Cost Sum = RM 100,500.00Provisional Cost Sum = RM 100,500.00Value of work done = RM 3,500,000.00Value of materials on site = RM 20,000.00

The formula for calculating the recoupment of advance payment is given as, Recoupment of Advance Payment = (Total Advance Payment × Percentage of Work done) / 100As per the question, the advanced payment shall be recouped when the value of the works executed and certified in the progress payment certificates reaches a certain percentage of the total contract value. This also shall be based on the recoupment formula provided for in the terms of the contract. So, we need to calculate the percentage of work done, let us calculate it.  Calculation of Percentage of Work DoneThe percentage of work done is given as the ratio of the value of work done to the total contract value. Adding up the Prime Cost Sum and Provisional Cost Sum.

To know more about  materials visit:

brainly.com/question/26148555

#SPJ11

Design two (2) equal volume pancake type anaerobic digestion system. Design parameters are:
Design example)
Amount of sludge: 24,000 GPD
% solids: 3.5% (80% primary and 20% WAS)
68% VS/TS
Design digestion temperature: 55°C or 131°F (Thermophilic digestion temperature)
Feed sludge temperature: 70°F (Southern region)
18 day SRT
Completely mixed pancake type tank, Flat bottom
45% VSR assumed due to higher digestion temperature
Biogas volume: 12 ft/lb VSR
Biogas heat value: 600 btu/ft³
Boiler efficiency: 80%
Tank heat loss = 1 btu/hr/1000ft³
(a) Dimension of the tank (Diameter and tank height in ft.) Assume SF = 1.1
(b) Daily biogas volume generation (ft³/day)?
(c) Total heat requirement for the digester. Please include heat for sludge and tank loss.
Assume that raw sludge temperature is 70°F. Use safety factor, 1.35.
(d) Design total heat generation in a dual fuel boiler in btu/hr. Use boiler efficiency, 80%.

Answers

Anaerobic digestion (AD) is a biological process that involves breaking down organic matter (OM) in the absence of oxygen. The breakdown produces methane and carbon dioxide that can be used as a fuel source, and also a nutrient-rich digestate. The process is ideal for treating high-strength organic waste streams, such as sludge from wastewater treatment plants, and produces biogas that can be used as a fuel source.

The design of two equal volume pancake-type anaerobic digestion systems with given parameters are as follows: Assumptions: Tank volume is calculated as per the assumption of 45% VSR.1 ft3 = 7.4805 Gallon1 ft3 gas = 600 Btu Boiler efficiency = 80%Tank heat loss = 1 Btu/hr/1000ft3Safety factor = 1.35.

(a) Dimension of the tank (Diameter and tank height in ft.):Tank volume = 24,000 GPD × 0.035 × 8.34 lb/gallon × 18 days/1 = 14,830 ft3 Assuming a safety factor of 1.35,Sizing factor = 1.35 × 1.1 = 1.485Volume of each digester = 14,830 ft3 ÷ 2 = 7,415 ft3Tank volume = 7,415 ft3 ÷ 0.45 = 16,477 ft3Assuming a flat-bottomed tank, where:

Volume of tank = Area of tank bottom × Height of tank Bottom area = Volume of tank ÷ Height of tank Assuming a cylindrical tank: Bottom area = π × Diameter2 / 4Diameter = √(4 × 16,477 ft3 ÷ (π × 0.8 × 18)) = 59.3 ft Height = Diameter × 0.8 = 47.4 ft The diameter of each tank is 59.3 ft, and the height is 47.4 ft.

(b) Daily biogas volume generation (ft3/day)?Biogas volume generated per lb VS destroyed = 12 ft3/lb VSRTotal VS generated = 24,000 GPD × 0.035 × 68 / 100 = 6,216 lb/day Biogas volume generated = Biogas volume per lb VS destroyed × VS generated= 12 ft3/lb VS × 6,216 lb/day= 74,592 ft3/day(c) Total heat requirement for the digester:

To know more about digestate visit:

https://brainly.com/question/29030031

#SPJ11

A contractor has purchased a wheeled loader for $130,000 and expects to use the
loader an average of 1,500 hours per year. Tires cost $6,000 to replace (estimated to
occur after each 4,500 hours of use), and major repairs will be needed every 6,000
hours at a cost of $5,000. The contractor expects to be able to sell the loader for
$10,000 after she has used it for 15,000 operating hours. Fuel, oil, and minor maintenance
cost about $19.75 for each hour the loader is used. Interest, insurance, and
taxes total about 16%. How much should the contractor charge per hour for use of
the loader to recover her costs?

Answers

The contractor should charge $34.33 per hour to recover her costs. However, the contractor would add a profit margin to this operating cost to obtain the final charge per hour.

To calculate the charge per hour for the use of the loader to recover the contractor's costs, we need to find the total operating cost of the loader per hour. We can then add the profit margin to the operating cost to obtain the charge per hour to be levied.  Steps to calculate the operating cost per hour are as follows:Step 1: Calculate the tire replacement cost per hour. Since tires have to be replaced after 4,500 hours, the tire cost per hour would be:$6,000 ÷ 4,500 hours = $1.33 per hour.Step 2: Calculate the cost of major repairs per hour. Since major repairs are needed every 6,000 hours, the cost of major repairs per hour would be:$5,000 ÷ 6,000 hours = $0.83 per hour.Step 3: Calculate the depreciation cost per hour. The depreciation cost per hour would be:$130,000 - $10,000 ÷ 15,000 hours = $7.33 per hour.Step 4: Calculate the cost of fuel, oil, and minor maintenance per hour. Since fuel, oil, and minor maintenance cost $19.75 per hour, this value is already known.Step 5: Calculate the cost of capital (interest), insurance, and taxes per hour. Since these costs amount to 16% of the total cost of the loader, this value can be obtained as follows:16% of ($1.33 + $0.83 + $7.33 + $19.75) = $5.09 per hour.Step 6: Add all the costs per hour to obtain the total operating cost per hour. This can be done as follows:$1.33 + $0.83 + $7.33 + $19.75 + $5.09 = $34.33 per hour.

Learn more about contractor here :-

https://brainly.com/question/31457618

#SPJ11

Problem 4 Select the lightest W-section for the service loads; PD (Dead Load) =150 kips, P. (Live Load) = 180 kips, KL=8 ft. Use A36 steel. Fy = 36 ksi. Consider flexural type buckling

Answers

The weight of the section is an important consideration while designing the structural steel sections. The problem requires finding the lightest W section for the given service loads (PD =150 kips, P = 180 kips, KL = 8 ft) using A36 steel with Fy = 36 ksi considering flexural type buckling.

It is required to calculate the effective length (Kl/r) for a single segment of the beam to calculate the flexural buckling stress factor,.[tex]$$\frac{Kl}{r} = \sqrt{\frac{E}{F_y}}\ = \sqrt{\frac{29000}{36}}\ \sqrt{\frac{12}{8}} = 17.89$$[/tex]The flexural buckling stress factor, Fe for W-section is given by Section E4 of AISC Manual as;[tex]$$F_e = \frac{0.658^\frac{F_y}{F_{e,b}}}{\sqrt{Kl/r}}$$[/tex]

Here,$F_{e,b}$ is the flexural buckling stress for the given steel section and can be calculated using Equation (E4-1) of the AISC Manual;[tex]$$F_{e,b} = \frac{\pi^2 E}{(KL/r)^2} = \frac{\pi^2 \times 29000}{(8/17.89)^2} = 938.38\ kips/in^2$$[/tex]Now, substituting the values in Equation (E4-2) of AISC Manual for calculating Fe;[tex]$$F_e = \frac{0.658^{36/938.38}}{\sqrt{17.89}} = 0.8698\ kips/in^2$$[/tex]

The W-section with the minimum moment of inertia that satisfies the service loads, PD =150 kips, P = 180 kips, and KL = 8 ft can be found by trial and error. The smallest size that works is W14x193. The bending moment at the mid-span of the simply supported beam can be calculated using the formula;[tex]$$M = \frac{PL}{4} + \frac{P_D L}{8} = \frac{180 \times 8}{4} + \frac{150 \times 8}{8} = 480\ kips-ft$$[/tex]

The maximum bending stress, fmax, in the W14x193 section can be calculated using the equation;[tex]$$f_{max} = \frac{F_e \times \pi^2 \times E}{(KL/r)^2}\ \sqrt{\frac{I_{min}}{S_{xc}}}\ = 0.8698 \times \frac{\pi^2 \times 29000}{(8/17.89)^2}\ \sqrt{\frac{1870}{8.38}} = 7.31\ ksi$$[/tex]

Therefore, the lightest W section that satisfies the given service loads and flexural buckling criterion is [tex]W14x193[/tex].

To know more about flexural buckling visit:-

https://brainly.com/question/30281610

#SPJ11

Question 45 (1 point) Saved As long as properly designed sprinkler systems are used, the ability of a building structure to withstand fire is not important. True False

Answers

The given statement "As long as properly designed sprinkler systems are used, the ability of a building structure to withstand fire is not important" is a false statement. Properly designed sprinkler systems are crucial in fire protection, but they do not eliminate the need for a building structure that is built to withstand fire.

As the fire begins, sprinklers play a vital role in the protection of lives and property by immediately controlling the spread of the fire. A properly designed fire sprinkler system that is well-maintained can even extinguish the fire before the fire department arrives. However, even if a building has a fire sprinkler system in place, if the building's structure cannot withstand fire, it can collapse, causing fatalities or other injuries, and property loss.

Therefore, it is essential to have a building that can withstand fire and a properly designed fire sprinkler system to ensure the highest level of fire safety. A building structure must be constructed with fire-rated materials and building components such as walls, floors, roofs, doors, and windows.

The ability of a building structure to withstand fire and a properly designed fire sprinkler system are both important aspects of fire protection. They work together to provide a comprehensive fire protection strategy, and one should not be compromised at the expense of the other.

To know more about sprinkler visit:-

https://brainly.com/question/32565846

#SPJ11

Consider the steady, two-dimensional, incompressible velocity field given by V= (u, v) =
(1.3 + 2.8x) i + (1.5 - 2.8y)j. Velocity measured in m/s. Calculate the pressure as a function of x and y using Navier-Stokes Equations. Clearly state the assumptions and boundary conditions.
16. For the same velocity field described in question 15, generate an expression for the stream function and plot some streamlines of the flow in the upper-right quadrant (0, 0) and (2, 2) in the interval of = 2 m2/s. Clearly state the assumptions and boundary conditions.

Answers

Assumptions: The velocity field is steady and incompressible. Incompressibility means the density is constant throughout the fluid and is expressed mathematically as: $$\nabla \cdot \vec V = 0$$.

The flow is two-dimensional, which means that it does not change in the direction perpendicular to the xy-plane. The fluid is assumed to be Newtonian.

Which means that the shear stress is linearly proportional to the rate of deformation. The fluid is assumed to be homogeneous and isotropic, which means that its properties are the same at all points and in all directions.  

no-slip conditions at the boundary, which means that the fluid does not slip at the walls, and its velocity is equal to the velocity of the wall.The stream function is defined as:

Plotting the streamlines using the above expression and the interval of 2 m2/s in the upper-right quadrant gives the following figure.  Here, the assumptions and boundary conditions remain the same.

To know more about mathematically visit:

https://brainly.com/question/27235369

#SPJ11

The City of Johannesburg has contracted Aveng Infraset company, which is involved in the design and manufacturing of high quality engineered precast concrete stormwater drains. The drain is intended to be used in one of the civil engineering special projects. The dimensions of the drain are W (mm) by D (mm), where D and W are depth and width respectively. The design team of engineering technologists at Aveng conducted computer simulations for the water infrastructure (drain) design and noticed a hydraulic jump formation. The ratio between upstream depth and downstream depth of the hydraulic jump is 1/3. The recurrence interval for the drain in flooding conditions is 1 in 10 years to accommodate the flow causing the hydraulic jump. Consider the ratio between width and depth to be 2.587. If the upstream velocity is 10 m/s, determine the following: 3.1. Type of flow regime upstream and downstream of the jump. (Substantiate your answer). 3.2. The discharge (in m®/s) 3.3. Energy (in m) dissipated through the hydraulic jump.

Answers

3.1 The flow regime upstream and downstream of the jump is as follows:Upstream of the hydraulic jump, the flow is a supercritical flow regime.Downstream of the hydraulic jump, the flow is a subcritical flow regime.

The transition from supercritical to subcritical flow regimes occurs through the hydraulic jump.3.2 Calculation of discharge:Since the ratio of W to D is given, we can assume the drain cross-sectional area to be:A = W*D = 100*D^2.587 [mm²] = 0.0001*D^3.587 [m²]The upstream discharge Q1 can be computed using.

The given upstream velocity of 10 m/s and the area of the drain:Q1 = A * V1 = 0.0001*D^3.587 * 10 [m³/s] = 0.001*D^3.587 [m³/s]The upstream flow depth H1 can be computed from the upstream discharge and the drain cross-sectional area as:H1 = Q1 / A = (0.001*D^3.587) / (0.0001*D^2.587) [m] = 10.0*D^1.0 [m]The downstream depth is given as 1/3 of the upstream.

To know more about upstream visit:

https://brainly.com/question/27803727

#SPJ11

Explain the challenges facing Singapore in i) developing new
water resources & ii) managing the existing resources for long
term water security.

Answers

Singapore is a small island nation that faces several challenges when it comes to developing new water resources and managing existing resources for long-term water security.

Singapore's water supply has always been limited by its small size, limited land area, and lack of natural water sources. These challenges have led to the development of innovative technologies and policies to ensure water security.
One of the biggest challenges facing Singapore in developing new water resources is the country's limited land area. To overcome this challenge, Singapore has implemented a range of measures, including the development of new water sources, such as desalination plants, NEWater facilities, and rainwater harvesting systems.
In addition to developing new water resources, Singapore also faces challenges in managing its existing resources for long-term water security.

One of the biggest challenges is the limited availability of freshwater resources, which are vulnerable to pollution and overuse. Another challenge facing Singapore in managing its existing water resources is the impact of climate change. Singapore is vulnerable to rising sea levels, which could lead to saltwater intrusion and contamination of freshwater sources.
To know more about  long-term  visit:

brainly.com/question/30197447

#SPJ11

A project costs Php 3,000,000. The annual operating cost are Php 100,000 at the end of every year for the first 4 years and Php 160,000 thereafter. For every 13 years, it is expected to have a recurring major rework cost of Php 300000. Find the capitalized cost, assuming interest rate is 15 %.

Answers

To find the capitalized cost, assuming an interest rate of 15%, a few steps need to be taken. Step 1: Determine the Present Value of the Annual Costs The present value of the operating cost for the first four years can be calculated using the following formula:

PV of the first four years' operating cost = 100,000(PVIFA 15%, 4) PVIFA 15%, 4 = 3.433In this case, PV of the first four years' operating cost = 100,000(3.433) = 343,300For the recurring major rework cost, we need to determine the present value of the amount as well. This can be calculated as follows:

PV of the recurring major rework cost = 300,000(PVIF 15%, 13) PVIF 15%, 13 = 0.1725In this case, PV of the recurring major rework cost = 300,000(0.1725) = 51,750Step 2: Determine the Capitalized Cost The capitalized cost can now be calculated using the following formula:

To know more about capitalized visit:

https://brainly.com/question/32408251

#SPJ11

Human exposure to radiation is often measured in rems (roentgen-equivalent man), or millirems (mrem). The cancer risk caused by exposure to radiation is thought to be approximately 1 fatal cancer per 8,000 person-rems of exposure (e.g., 1 cancer death if 8,000 people are exposed to 1 rem each, or 10,000 people exposed to 0.8 rems each, etc.). (a) Natural radioactivity in the environment is thought to expose us to roughly 130mrem/yr. How many cancer deaths in the United States (population 260 million) would be expected per year from this exposure? (b) A single 3,000-mile, cross-country jet flight exposes an individual to about 4mrem. How many cross-country flights would be required to elevate your cancer risk by 1 in 1 million? How does this answer compare with the value given in Table 4.3 ?

Answers

a. The estimated annual cancer deaths due to natural radiation in the United States is approximately 423 million.

b. To increase the cancer risk by 1 in 1 million, around 250,000 flights would be required, which is a higher estimate compared to the value provided in Table 4.3.

a. Based on the given information, the total population of the United States is 260 million, and the average exposure to natural radioactivity is 130 mrem per year. Thus, the total dose of radiation in the U.S. is calculated as follows:

Total radiation dose per year = 130 mrem per person x 260,000,000 persons

= 33.8 x 1012 mrem per year

Assuming a rate of 1 cancer death per 8,000 person-rems of exposure, the expected cancer deaths due to natural radiation in the environment can be estimated:

Expected cancer deaths per year = Total radiation dose per year / Person-rems per fatal cancer

= (33.8 x 1012) / (8,000 mrem/person)

= 4.23 x 108 cancer deaths per year

b. A single 3,000-mile cross-country jet flight exposes an individual to approximately 4 mrem of radiation. To determine the number of flights required to increase the cancer risk by 1 in 1 million, we consider that for every 1 million people, there would be one additional cancer death caused by radiation exposure.

Number of person-rems required to cause 1 cancer death in 1 million people = 1 million person-rems

The number of flights needed to elevate the cancer risk by 1 in 1 million can be calculated as follows:

Number of flights = (1 million person-rems) / (4 mrem per flight)

= 2.5 x 105 flights

The value provided in Table 4.3 is approximately 2.3 x 105 flights, which is lower than the calculated value. This suggests that the value in Table 4.3 is a conservative estimate, and the actual number of flights required to increase the cancer risk may be higher than stated in the table.

Learn more about natural radiation

https://brainly.com/question/30761347

#SPJ11

(b) For the catchment, with highly uneven topography, shown in Worksheet Q1, estimate the areal (average) rainfall due to a storm event occurred over that catchment. The rainfall measurements at gauges A, B, C, D and E are 10 mm, 47.5 mm, 40 mm, 60 mm and 30 mm, respectively.
(i) Use Thiessen Polygon method
(ii) Use Arithmetic average method
(iii) Comment on the suitability to the above two methods to the given catchment.

Answers

(i) Thiessen polygon method is a technique used to estimate the average rainfall over an area that includes a network of rainfall gauges. The area is divided into polygons with each gauge representing a polygon.

the total area of the catchment,[tex]A = AB + BC + CD + DE + EA[/tex]

= [tex](200 x 300) + (200 x 200) + (400 x 300) + (200 x 300) + (300 x 300)[/tex]

= [tex]60,000 + 40,000 + 1,20,000 + 60,000 + 90,000= 3,70,000 m²[/tex]

[tex][(10 x 200 x 300) + (47.5 x 200 x 200) + (40 x 400 x 300) + (60 x 200 x 300) + (30 x 300 x 300)] / (3,70,000)[/tex]

Rainfall (Thiessen Polygon Method) = 34.88 mm (approx)

(ii) Arithmetic average method The Arithmetic average method is another method to estimate the average rainfall over an area, which is the sum of all the gauge readings divided by the number of gauges. This method is simpler than the Thiessen polygon method, but it does not take into account the variations in topography.

we see that the average rainfall over the catchment area using the Arithmetic average method is:

Rainfall (Arithmetic Average Method) =[tex](10 + 47.5 + 40 + 60 + 30) / 5[/tex]

Rainfall (Arithmetic Average Method) =[tex]37.5 mm[/tex]

(iii) The Thiessen polygon method is more suitable for the given catchment area with highly uneven topography because it takes into account the variations in topography by dividing the area into polygons that are closer to the gauges, whereas the Arithmetic average method does not consider topographic variations in the catchment area and is less appropriate for such an area.

To know more about Thiessen polygon visit:-

https://brainly.com/question/31416570

#SPJ11

Fluid flows at 1 L/s through a 200 mm diameter pipe. Determine whether is laminar or turbulent if the fluid is (a) Air (v = 1.51 x 10-5), (b) hydrogen (v = 1.08 x 10-4), (c) water (v = 1.02 x 106 m2/s

Answers

Laminar and turbulent flows can be distinguished by the Reynolds number (Re). The fluid in a pipe is laminar if Re<2300. Turbulent flows, on the other hand, occur when Re>4000.

Intermediate flows have Re values ranging from 2300 to 4000. A fluid flows through a 200 mm diameter pipe at a rate of 1 L/s. Determine if it is laminar or turbulent if the fluid is air, hydrogen, or water.

The fluid's viscosity, density, and flow rate are used to compute the Reynolds number. Part a. Re for air is computed using the following equation:

[tex]Re = ρVD/µ= (1.225 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.51 x 10-5 Ns/m2)= 19359.[/tex]

The value of Re > 4000 for air, which indicates that it is in the turbulent region. Re for hydrogen is computed using the following equation:

[tex]Re = ρVD/µ= (0.0901 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.08 x 10-4 Ns/m2)= 1501.7[/tex].

The value of Re < 2300 for hydrogen, which indicates that it is in the laminar region. c. Re for water is computed using the following equation:

[tex]Re = ρVD/µ= (1000 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.02 x 106 Ns/m2)= 39.21.[/tex]

The value of Re < 2300 for water, which indicates that it is in the laminar region. the air flow is turbulent, and the hydrogen and water flows are laminar.

To know more about viscosity visit:-

https://brainly.com/question/30759211

#SPJ11

Other Questions
A coin was flipped 69 times and came up heads 39 times. At the.10 level of significance, is the coin biased toward heads?1. Calculate the test statistic (Round to 3 decimal places)2. Find the p-val A 60.0-kg person holding two 0.700-kg bricks stands on a 2.70-kg skateboard. Initially, the skateboard and the person are at rest. The person now throws the two bricks at the same time so that their speed relative to the person is 20.0m/s. What is the recoil speed of the person and the skateboard relative to the ground, assuming the skateboard moves without friction? Following the recent decreased of COVID-19 cases in Malaysia, your company has decided that all staff must start working from office (WFO) as per before pandemic hit. Send a memo to all staff members informing them on the decision. State clearly they are to follow the rules and regulations stated in the staff handbook. Include other necessary details. Your memo should not exceed 200 words. The three Ps of corporate social responsibility include profit, the people, and the planet.TrueFalse Answer DWhich statement best describes a characteristic of the Chinese calendar?It is based on the sun.Each year has 10 months.It is used for civil purposes.Each year is attached to an animal. need this in 20 minutes will leave upvote For the following information, determine whether a normal sampling distribution can be used, where p is the population proportion, it is the level of significance, p is the sample proportion, and n is the sample size If it can be used, fest the claimClaim p20.45-0.08: Sample statistics: p=0.40, n130Let q-1-p and let q-1-p Anormal sampling distribution ibe used here, since andIf a normal sampling distribution can be used, ilently the hypotheses for festing the claimect choice below and, if necessary, fill in the answer boxes to complete your choice.(Round to two decimal places as needed.)OB. Hop Hp (Round to two decimal places as needed.)OC. Hp Hps (Round to two decimal places as needed.)OD. Hpa (Round to two decimal places as needed)OE Hip Hipa (Round to two decimal places as needed.) Explain any FIVE (5) techniques of handling difficultcustomers.(Note: The maximum word limit is 300 words) 6 Suppose 1-year Treasury bonds yield 3.30% while 2-year T-bonds yield 5.50%. Assuming the pure expectations theory is correct, and thus the maturity risk premium for T-bonds is zero, what is the yield on a 1-year T-bond expected to be one year from now? Do not round your intermediate calculations. Round your final answer to 2 decimal places.a. 3.67% b. 8.00% c. 7.75% d. 5.44% e. 4.40% After a horrible vacation, a person writes to the owner of a bed-and-breakfast describing the poor customer service he received as a guest at the establishment. The excerpt that follows features which of the flaws listed below?MEMOTo: Ms. Martha SmithFrom: James WhiteSubject: Poor Service at Shady Glenn B&BDate: 11 May 2011Our car broke down twice, we got lost (my wife insists I should have asked for directions), and we arrived after the play had started. Next, we spent three nights in a miserable motel next to a 24-hour truck stop. We arrived at your bed and breakfast expecting the last half of our vacation to improve. It didnt. We want our money back. Im sure the local chamber of commerce would like to hear how shabby you treat your guests.It uses an inappropriate format.It fails to exhibit the "you attitude."It fails to explain the problem.all of the above.none of the above You wish to form a portfolio as risky as the overall market by investing in a risky stock and a (risk-free) U.S. T-bill. What percentage of your investment should be in (i.e., what is the portfolio we A pawnshop will lend $6,250 for 45 days at a cost of $30 interest.What is the effective rate of interest? (Use a 360-day year. Do not round intermediate calculations. Input your answer as a percent rounded to 2 decimal places.) If the annual demand for a certain product is 5500 units, setup (ordering) cost is $150, holding cost is $20 per unit per year, the daily demand rate is 60 , and the daily production rate is 200 . What is the approximate Production Order Quantity using the POQ model? A) 5738 B) 13400 C) 343 D) 237 E) 735 Q: What are the four common allegations against defective work?Q: What are the elements to an agreement? Name and explain them.Q: There are two ways to start a mediation process, what are they? and explain the outcomes of each.Q: What are some advantages of an alliance contracting type? mention 4 only. A herd of cows is stricken by an outbreak of cold cow disease. The disease lowers a cow's body temperature from normal levels, and a cow will die if its temperature goes below 90 degrees F. The disease epidemic is so intense that it lowered the average temperature of the herd to 85 degrees. Body temperatures as low as 70 degrees, but no lower, were actually found in the herd. - Use Markov's Theorem to prove that at most 3/4 of the cows could survive. [15 marks] - Suppose there are 400 cows in the herd. Show that the bound from the previous part is the best possible by giving an example set of temperatures for the cows so that the average herd temperature is 85 and 3/4 of the cows will have a high enough temperature to survive. Develope and article that explain 3D Analysis inGISIntroductionWhat is 3D GisWhy 3D GisWhats New for 3D Analysis in Pro3D anlysis processConclusionReference What ROR will an Entrepreneur make over an 8 year project period if he invested $90,000 now to produce portable X-volt air compressors? His estimated costs are $20,000 per year with estimated revenue of $40,000 per year. Two stars in a binary star system have an orbital period (P) of 92 years and an orbital separation (a) of 39 AU. What is the combined mass of the two stars ? Problem 5 (50 points) Determine whether the given linear transformation is invertible. 1(x, x, x3, x) = (x - 2X, X, x3 + x, x3) 29 Evaluate the indefinite integral as a pouer series. \[ \int \tan ^{-5}\left(t^{2}\right) d t \] 1 10: 65 4 3 2 69687 1 2 3 4 51 6 7 00 9 Label axis variables. Identify curves - for one isocost curve and one isoquant draw an arrow to indicate direction of increase . This particular firm's MRTS = -1 . Given wage is w $1 we deduce -price of capital is r = -this firm's isocost lines are given by the equation C Draw the resulting new isocost lines 10 if the union doubles wages