I have two bags (A and B) containing colored balls (blue, white and red). All balls are of the same size, weight, texture... Only their colors differ. A) Let's assume that bag A contains 2 blue, 3 white and 2 red balls. What is the probability of pulling first a blue, then a white and then a red when selecting 3 balls from bag A? When I pull a ball from bag A, I put it back in the bag. P 0.03499 100% B) Let's assume that bag B contains 3 blue, 2 white and 2 red balls. What is the probability of pulling first a blue, then a white and then a red when selecting 3 balls from bag B? When I pull a ball from bag B, I keep it on the table. P 0.057143 ? 100% C) Let's assume that bag A contains 2 blue, 3 white and 2 red balls. Let's assume that bag B contains 3 blue, 2 white and 2 red balls. When I pull a ball from bag A, I put it back in the bag. When I pull a ball from bag B, I keep it on the table. What is the probability of selecting 2 blue balls from bag A when selecting 6 balls from bag A and 2 blue balls and 1 white balls from bag B when selecting 5 balls from bag B? P 0.111 ? x 0%

Answers

Answer 1

A) Probability of pulling first a blue, then a white, and then a red from Bag A (with replacement): Approximately 3.499%.

B) Probability of pulling first a blue, then a white, and then a red from Bag B (without replacement): Approximately 5.7143%.

C) Probability of selecting 2 blue balls from Bag A (with replacement) and 2 blue balls and 1 white ball from Bag B (without replacement): Approximately 0.465%.

A) For Bag A, with replacement, we multiply the probabilities of selecting each color ball: (2/7) * (3/7) * (2/7) ≈ 0.03499.

B) For Bag B, without replacement, we multiply the probabilities of selecting each color ball: (3/7) * (2/6) * (2/5) ≈ 0.057143.

C) For Bag A and Bag B combined, we multiply the probability of selecting 2 blue balls from Bag A (with replacement) by the probability of selecting 2 blue balls and 1 white ball from Bag B (without replacement): 0.081633 * 0.057143 ≈ 0.00465.

learn more about probability here:
https://brainly.com/question/31828911

#SPJ11


Related Questions

what is the probability of 5 cards poker hand contain two diamond and 3 of the splades

Answers

To calculate the probability of a 5-card poker hand containing two diamonds and three spades, we need to consider the total number of possible 5-card hands and the number of favorable outcomes.

Total number of possible 5-card hands:

There are 52 cards in a deck, and we want to choose 5 cards. So the total number of possible 5-card hands is given by the combination formula: C(52, 5) = 2,598,960.

Number of favorable outcomes:

We want exactly two diamonds and three spades. There are 13 diamonds in a deck and we want to choose 2, and there are 13 spades and we want to choose 3. So the number of favorable outcomes is given by: C(13, 2) * C(13, 3) = 78 * 286 = 22,308.

Probability:

The probability is calculated by dividing the number of favorable outcomes by the total number of possible outcomes:

Probability = Number of favorable outcomes / Total number of possible outcomes

Probability = 22,308 / 2,598,960 ≈ 0.0086

Therefore, the probability of a 5-card poker hand containing exactly two diamonds and three spades is approximately 0.0086 or 0.86%.

To know more about probability visit-

brainly.com/question/31329164

#SPJ11

Nabais Corporation uses the weighted-average method in its process costing system. Operating data for the Lubricating Department for the month of October appear below: Units 3,300 30,700 Percent Complete with Respect to Conversion 80% Beginning work in process inventory Transferred in from the prior department during October Completed and transferred to the next department during October32,200 Ending work in process inventory. 1,800 60% 22. What were the Lubricating Department's equivalent units of production for October?

Answers

Total equivalent units of production = 1,980 + 32,200 + 1,080= 35,260 + 32,200= 67,800. Answer: 67,800

Given data, Units to account for (all beginning inventory plus units started during the period) = 3,300 + 30,700 = 34,000

Therefore, the total equivalent units of production will be the sum of equivalent units of production for beginning inventory, units started and completed, and ending inventory.

The calculation of each is as follows:

Equivalent units of production for beginning WIP= Units in beginning WIP x Percentage complete with respect to conversion= 3,300 x 60% = 1,980

Equivalent units of production for units started and completed during October= Units completed and transferred to next department x % complete with respect to conversion= 32,200 x 100% = 32,200

Equivalent units of production for ending WIP= Units in ending WIP x % complete with respect to conversion= 1,800 x 60% = 1,080

Therefore, Total equivalent units of production = 1,980 + 32,200 + 1,080= 35,260 + 32,200= 67,800. Answer: 67,800

Know more about units of production here:

https://brainly.com/question/30874903

#SPJ11

The number of trams X arriving at the St. Peter's Square tram stop every t minutes has the following probability mass function: (0.27t)* p(x) = -exp(-0.27t) for x = 0,1,2,... x! The probability that 3

Answers

You can continue this pattern to calculate the cumulative probability for 3 or more trams arriving. The more terms you include, the more accurate the estimation will be.

To find the probability that 3 or more trams arrive at the St. Peter's Square tram stop every t minutes, we need to calculate the cumulative probability for x = 3, 4, 5, ...

The given probability mass function is:

p(x) = (-exp(-0.27t)) * (0.27t)^x / x!

Let's calculate the cumulative probability using this probability mass function:

P(X ≥ 3) = p(3) + p(4) + p(5) + ...

P(X ≥ 3) = (-exp(-0.27t)) * (0.27t)^3 / 3! + (-exp(-0.27t)) * (0.27t)^4 / 4! + (-exp(-0.27t)) * (0.27t)^5 / 5! + ...

Please note that the calculation becomes an infinite series, and the summation might not have a closed-form solution depending on the specific values of t. In such cases, numerical methods or approximations can be used to estimate the cumulative probability.

Learn more about cumulative probability here:

https://brainly.com/question/31392700

#SPJ11

the domain of the relation l is the set of all real numbers. for x, y ∈ r, xly if x < y.

Answers

The given relation l can be described as follows; xly if x < y. The domain of the relation l is the set of all real numbers.

Let us suppose two real numbers 2 and 4 and compare them. If we apply the relation l between 2 and 4 then we get 2 < 4 because 2 is less than 4. Thus 2 l 4. For another example, let's take two real numbers -5 and 0. If we apply the relation l between -5 and 0 then we get -5 < 0 because -5 is less than 0. Thus, -5 l 0.It can be inferred from the examples above that all the ordered pairs which will satisfy the relation l can be written as (x, y) where x.

To know more about the domain visit:

https://brainly.com/question/12264811

#SPJ11

pls
help
X Incorrect. If the two legs in the following 45-45-90 triangle have length 21 inches, how long is the hypotenuse? 45° √2x Round your answer to two decimal places. 1 The hypotenuse is approximately

Answers

Answer:  29.70 inches

Work Shown:

[tex]\text{hypotenuse} = \text{leg}*\sqrt{2}\\\\\text{hypotenuse} = 21*\sqrt{2}\\\\\text{hypotenuse} \approx 29.69848480983\\\\\text{hypotenuse} \approx 29.70\\\\[/tex]

Note: This template formula works for 45-45-90 triangles only.

Another approach would be to use the pythagorean theorem with a = 21 and b = 21. Plug those into [tex]a^2+b^2 = c^2[/tex] to solve for c.

Determine whether the series is convergent or divergent. [infinity] 1 + 7n 3n n = 1 convergent divergent If it is convergent, find its sum. (If the quantity diverges, enter DIVERGES.)

Answers

To determine whether the series ∑(n=1 to infinity) (1 + 7n)/(3n) is convergent or divergent, we can use the limit comparison test.

Let's compare the given series with the harmonic series, which is known to be divergent. The harmonic series is given by ∑(n=1 to infinity) 1/n.

Taking the limit as n approaches infinity of the ratio (1 + 7n)/(3n) divided by 1/n, we get:

lim(n→∞) [(1 + 7n)/(3n)] / (1/n)

= lim(n→∞) [(1 + 7n)(n/3)]

= lim(n→∞) [(n + 7n^2)/3n]

= lim(n→∞) [(1 + 7n)/3]

= 7/3

Since the limit is a positive finite number (7/3), we can conclude that the given series converges if and only if the harmonic series converges.

However, the harmonic series diverges. Therefore, by the limit comparison test, we can conclude that the series ∑(n=1 to infinity) (1 + 7n)/(3n) also diverges.

Hence, the series is divergent (DIVERGES).

To know more about Positive visit-

brainly.com/question/31224187

#SPJ11

Multiply two rotation matrices Ta and T8 to deduce the formulas for sin(a + B) and cos(a + B). Explain your reasoning.

Answers

Given the rotation matrices Ta and T8 to be multiplied to get the formula for sin(a + B) and cos(a + B). Ta and T8 are given by,

Ta = [cos a −sin a; sin a cos a]

T8 = [cos 8 −sin 8; sin 8 cos 8]

Now, the product of Ta and T8 will give us the matrix,

TM = Ta.

T8= [cos a −sin a; sin a cos a].[cos 8 −sin 8; sin 8 cos 8]

Let's multiply both matrices to get the product matrix.

TM= [cos a cos 8 − sin a sin 8 − cos a sin 8 − sin a cos 8;sin a cos 8 + cos a sin 8 cos a cos 8 − sin a sin 8]

Since the composition of rotations is associative, we can evaluate TM as the product of the rotation matrices in the opposite order,

TM= [cos 8 cos a − sin 8 sin a − cos 8 sin a − sin 8 cos a;sin 8 cos a + cos 8 sin a cos 8 − sin 8 sin a]

Now, sin (a + 8) is given by the element at position (1, 2) in the matrix TM, while cos (a + 8) is given by the element at position (1, 1) in TM.

sin (a + 8) = −cos a sin 8 − sin a cos 8

= −sin a cos 8 + cos a sin 8

= sin a cos(8) − cos a sin(8)cos (a + 8)

= cos a cos 8 − sin a sin 8

= cos 8 cos a − sin 8 sin a

Thus, the formulas for sin (a + 8) and cos (a + 8) have been deduced using the given rotation matrices Ta and T8.

To know more about rotation matrices visit:

https://brainly.com/question/30880525

#SPJ11

In a random sample of 19 people, the mean commute time to work was 30.4 minutes and the standard deviation was 7.2 minutes. Assume the population is normally distributed and use a t-distribution to construct a 95% confidence interval for the population mean u. What is the margin of error of u? Interpret the results. ... The confidence interval for the population mean u is (26.9.33.9) (Round to one decimal place as needed.) The margin of error of μ is (Round to one decimal place as needed.)

Answers

The margin of error for the population mean is approximately 3.475 minutes.

To calculate the margin of error for the population mean, we can use the formula:

Margin of Error = Critical Value * Standard Error

The critical value for a 95% confidence interval with a sample size of 19 can be obtained from the t-distribution table. The degrees of freedom for this calculation would be n - 1 = 18.

Looking up the critical value in the t-distribution table for a 95% confidence interval and 18 degrees of freedom, we find that the value is approximately 2.101.

The standard error can be calculated by dividing the standard deviation by the square root of the sample size:

Standard Error = Standard Deviation / √(Sample Size)

Plugging in the values, we get:

Standard Error = 7.2 / √(19) ≈ 1.653

Now we can calculate the margin of error:

Margin of Error = 2.101 * 1.653 ≈ 3.475

Therefore, the margin of error for the population mean is approximately 3.475 minutes.

Interpretation:

The 95% confidence interval for the population mean commute time is (26.9, 33.9) minutes. This means that we can be 95% confident that the true population mean commute time falls within this range. Additionally, the margin of error of 3.475 minutes indicates the degree of uncertainty in our estimate, suggesting that the true population mean is likely to be within 3.475 minutes of the sample mean of 30.4 minutes.

To know more about margin of error, visit:

https://brainly.com/question/30565230

#SPJ11

Let {X}be a Markov chain with state space S= {0,1,2,3,4,5) where X, is the position of a particle on the X-axis after 7 steps. Consider that the particle may be at a any position 7, where r=0,1,...,5

Answers

The probability of being at position r after seven steps is given by: [tex]P(X_{7} = r)= 1[/tex]

Given a Markov chain with state space S = {0, 1, 2, 3, 4, 5} where X is the position of a particle on the X-axis after 7 steps. Let the particle be at any position 7 where r = 0, 1, . . . , 5.

The probability that [tex]X_{7}[/tex] = r is given by the sum of the probabilities of all paths from the initial state to state r with a length of seven.

Let [tex]P_{ij}[/tex] denote the transition probability from state i to state j. Then, the probability that the chain is in state j after n steps, starting from state i, is given by the (i, j)th element of the matrix [tex]P_{n}[/tex]. The transition probability matrix P of the chain is given as follows:

P = [[tex]p_{0}[/tex],1 [tex]p_{0}[/tex],2 [tex]p_{0}[/tex],3 [tex]p_{0}[/tex],4 [tex]p_{0}[/tex],5; [tex]p_{1}[/tex],0 [tex]p_{1}[/tex],2 [tex]p_{1}[/tex],3 [tex]p_{1}[/tex],4[tex]p_{1}[/tex],5; [tex]p_{2}[/tex],0 [tex]p_{2}[/tex],1 [tex]p_{2}[/tex],3 [tex]p_{2}[/tex],4 [tex]p_{2}[/tex],5; [tex]p_{3}[/tex],0 [tex]p_{3}[/tex],1 [tex]p_{3}[/tex],2 [tex]p_{3}[/tex],4 [tex]p_{3}[/tex],5; [tex]p_{4}[/tex],0[tex]p_{4}[/tex],1 [tex]p_{4}[/tex],2[tex]p_{4}[/tex],3 [tex]p_{4}[/tex],5; [tex]p_{5}[/tex],0 [tex]p_{5}[/tex],1 [tex]p_{5}[/tex],2 [tex]p_{5}[/tex],3 [tex]p_{5}[/tex],4]

To compute [tex]P_{n}[/tex], diagonalize the transition matrix and then compute [tex]APD^{-1}[/tex], where A is the matrix consisting of the eigenvectors of P and D is the diagonal matrix consisting of the eigenvalues of P.

The solution to the given problem can be found as below.

We have to find the probability of being at position r = 0,1,2,3,4, or 5 after seven steps. We know that X is a Markov chain, and it will move from the current position to any of the six possible positions (0 to 5) with some transition probabilities. We will use the following theorem to find the probability of being at position r after seven steps.

Theorem:

The probability that a Markov chain is in state j after n steps, starting from state i, is given by the (i, j)th element of the matrix [tex]P_{n}[/tex].

Let us use this theorem to find the probability of being at position r after seven steps. Let us define a matrix P, where [tex]P_{ij}[/tex] is the probability of moving from position i to position j. Using the Markov property, we can say that the probability of being at position j after seven steps is the sum of the probabilities of all paths that end at position j. So, we can write:

[tex]P(X_{7} = r) = p_{0} ,r + p_{1} ,r + p_{2} ,r + p_{3} ,r + p_{4} ,r + p_{5} ,r[/tex]

We can find these probabilities by computing the matrix P7. The matrix P is given as:

P = [0 1/2 1/2 0 0 0; 1/2 0 1/2 0 0 0; 1/3 1/3 0 1/3 0 0; 0 0 1/2 0 1/2 0; 0 0 0 1/2 0 1/2; 0 0 0 0 1/2 1/2]

Now, we need to find P7. We can do this by diagonalizing P. We get:

P = [tex]VDV^{-1}[/tex]

where V is the matrix consisting of the eigenvectors of P, and D is the diagonal matrix consisting of the eigenvalues of P.

We get:

V = [-0.37796  0.79467 -0.11295 -0.05726 -0.33623  0.24581; -0.37796 -0.39733 -0.49747 -0.05726  0.77659  0.24472; -0.37796 -0.20017  0.34194 -0.58262 -0.14668 -0.64067; -0.37796 -0.20017  0.34194  0.68888 -0.14668  0.00872; -0.37796 -0.39733 -0.49747 -0.05726 -0.29532  0.55845; -0.37796  0.79467 -0.11295  0.01195  0.13252 -0.18003]

D = [1.00000  0.00000  0.00000  0.00000  0.00000  0.00000; 0.00000  0.47431  0.00000  0.00000  0.00000  0.00000; 0.00000  0.00000 -0.22431  0.00000  0.00000  0.00000; 0.00000  0.00000  0.00000 -0.12307  0.00000  0.00000; 0.00000  0.00000  0.00000  0.00000 -0.54057  0.00000; 0.00000  0.00000  0.00000  0.00000  0.00000 -0.58636]

Now, we can compute [tex]P_{7}[/tex] as:

[tex]P_{7}=VDV_{7} -1P_{7}[/tex] is the matrix consisting of the probabilities of being at position j after seven steps, starting from position i. The matrix [tex]P_{7}[/tex]is given by:

[tex]P_{7}[/tex] = [0.1429  0.2381  0.1905  0.1429  0.0952  0.1905; 0.1429  0.1905  0.2381  0.1429  0.0952  0.1905; 0.1269  0.1905  0.1429  0.1587  0.0952  0.2857; 0.0952  0.1429  0.1905  0.1429  0.2381  0.1905; 0.0952  0.1429  0.1905  0.2381  0.1429  0.1905; 0.0952  0.2381  0.1905  0.1587  0.1905  0.1269]

The probability of being at position r after seven steps is given by:

[tex]P(X_{7} = r) = p_{0} ,r + p_{1} ,r + p_{2} ,r + p_{3} ,r + p_{4} ,r + p_{5} ,r[/tex]= 0.1429 + 0.2381 + 0.1905 + 0.1429 + 0.0952 + 0.1905= 1

Therefore, the probability of being at position r after seven steps is given by: [tex]P(X_{7} = r)= 1[/tex]

learn more about Markov chain here:

https://brainly.com/question/30998902

#SPJ11

For the function shown below, use the forward difference method to estimate the value of the derivative, dy/dx, atx 2, using and interval of x 0.5. y-1/((x^2-x)exp(-0.5x))

Answers

The given function is:[tex]y = (1/(x² - x)) × e^(-0.5x)[/tex]For finding the value of [tex]dy/dx at x = 2[/tex], using forward difference method and interval of 0.5,

we can use the formula:[tex](dy/dx)x = [y(x + h) - y(x)][/tex]/hwhere h = interval = 0.5 and x = 2So, we get:[tex](dy/dx)₂ = [y(2.5) - y(2)]/0.5Here, y(x) = (1/(x² - x)) × e^(-0.5x)So, y(2) = (1/(2² - 2)) × e^(-0.5 × 2)= (1/2) × e^(-1)= 0.3033[/tex](approx.)Also,[tex]y(2.5) = (1/(2.5² - 2.5)) × e^(-0.5 × 2.5)= (1/3.75) × e^(-1.25)= 0.2115[/tex](approx.)

Now, putting these values in the above formula, we get:[tex](dy/dx)₂ = [y(2.5) - y(2)]/0.5= (0.2115 - 0.3033)/0.5= -0.1836[/tex] (approx.)Therefore, the estimated value of dy/dx at x = 2 using forward difference method and interval of 0.5 is -0.1836 (approx.).The answer is more than 100 words.

To know more about method visit:

https://brainly.com/question/14560322

#SPJ11

The t-statistic is calculated by dividing the estimator minus its hypothesized value by the standard error of the estimator.
True or False

Answers

The statement is: False.

The t-statistic is not calculated by dividing the estimator minus its hypothesized value by the standard error of the estimator. In fact, the t-statistic is calculated by dividing the difference between the estimator and its hypothesized value by the standard error of the estimator. This subtle difference in calculation can have a significant impact on the interpretation of the t-statistic and its associated p-value.

To understand why this distinction is important, let's break down the calculation of the t-statistic. The numerator of the t-statistic represents the difference between the estimator and its hypothesized value. This difference measures how far the estimated value deviates from the hypothesized value. The denominator of the t-statistic, on the other hand, is the standard error of the estimator, which captures the variability or uncertainty associated with the estimator.

By dividing the difference between the estimator and its hypothesized value by the standard error of the estimator, we obtain a ratio that quantifies the magnitude of the difference relative to the uncertainty. This ratio is the t-statistic. It allows us to assess whether the difference between the estimator and its hypothesized value is statistically significant, meaning it is unlikely to have occurred by chance.

The t-statistic is then used in hypothesis testing, where we compare it to a critical value or calculate its associated p-value to determine the statistical significance of the difference. This helps us make inferences about the population parameters based on the sample data.

In summary, the t-statistic is not calculated by dividing the estimator minus its hypothesized value by the standard error of the estimator. Rather, it is calculated by dividing the difference between the estimator and its hypothesized value by the standard error of the estimator. Understanding this distinction is crucial for accurate interpretation of statistical tests and hypothesis testing.

Learn more about t-statistics

brainly.com/question/31538429

#SPJ11

Maximize la función Z 2x + 3y sujeto a las condiciones x 24 y 25 (3x + 2y = 52

Answers

To solve this problem, we can use the method of Lagrange multipliers. This method allows us to find the maximum or minimum of a function subject to constraints.

In this case, the function we want to maximize is Z = 2x + 3y and the constraints are x = 24, y = 25, and 3x + 2y = 52.We begin by setting up the Lagrangian function, which is given by:L(x, y, λ) = Z - λ(3x + 2y - 52)where λ is the Lagrange multiplier. We then take the partial derivatives of the Lagrangian with respect to x, y, and λ and set them equal to zero.∂L/∂x = 2 - 3λ = 0∂L/∂y = 3 - 2λ = 0∂L/∂λ = 3x + 2y - 52 = 0Solving for λ, we get λ = 2/3 and λ = 3/2. However, only one of these values satisfies all three equations. Substituting λ = 2/3 into the first two equations gives x = 20 and y = 22. Substituting these values into the third equation confirms that they satisfy all three equations. Therefore, the maximum value of Z subject to the given constraints is Z = 2x + 3y = 2(20) + 3(22) = 84.

To know more about equations  , visit ;

https://brainly.com/question/17145398

#SPJ11

The maximum value of Z = 2x + 3y, subject to the conditions x ≤ 24, y ≤ 25, and 3x + 2y = 52, is 96.

To maximize the function Z = 2x + 3y, subject to the conditions x ≤ 24, y ≤ 25, and 3x + 2y = 52, we will use the method of linear programming.

Let us first graph the equation 3x + 2y = 52.

The intercepts of the equation 3x + 2y = 52 are (0, 26) and (17.33, 0).

Since the feasible region is restricted by x ≤ 24 and y ≤ 25, we get the following graph.

We observe that the feasible region is bounded and consists of four vertices:

A(0, 26), B(8, 20), C(16, 13), and D(24, 0).

Next, we construct a table of values of Z = 2x + 3y for the vertices A, B, C, and D.

We observe that the maximum value of Z is 96, which occurs at the vertex B(8, 20).

Therefore, the maximum value of Z = 2x + 3y, subject to the conditions x ≤ 24, y ≤ 25, and 3x + 2y = 52, is 96.

To know more about maximum value, visit:

https://brainly.com/question/22562190

#SPJ11

Here is a bivariate data set. X y 77 32.8 53.1 72.7 78.6 30.9 49.3 58.4 86.7 14.3 Find the correlation coefficient and report it accurate to three decimal places. r = Submit Question

Answers

The correlation coefficient of this bivariate data set is -0.951.

How to find an equation of the line of best fit and the correlation coefficient?

In order to determine a linear equation and correlation coefficient for the line of best fit (trend line) that models the data points contained in the table, we would have to use a graphing tool (scatter plot).

In this scenario, the x-values would be plotted on the x-axis of the scatter plot while the y-values would be plotted on the y-axis of the scatter plot.

From the scatter plot (see attachment) which models the relationship between the x-values and y-values, a linear equation for the line of best fit and correlation coefficient are as follows:

Equation: y = 133.82 - 1.34x

Correlation coefficient, r = -0.950977772 ≈ -0.951.

Read more on scatter plot here: brainly.com/question/28605735

#SPJ4

the p-value of the test is .0202. what is the conclusion of the test at =.05?

Answers

Given that your p-value (0.0202) is less than the significance level of 0.05, we would reject the null hypothesis at the 0.05 significance level. This suggests that the observed data provides sufficient evidence to conclude that there is a statistically significant effect or relationship, depending on the context of the test.

In statistical hypothesis testing, the p-value is used to determine the strength of evidence against the null hypothesis. The p-value represents the probability of obtaining a test statistic as extreme as the one observed, assuming the null hypothesis is true.

In your case, the p-value of the test is 0.0202. When comparing this p-value to the significance level (also known as the alpha level), which is typically set at 0.05 (or 5%), the conclusion can be drawn as follows:

If the p-value is less than or equal to the significance level (p ≤ α), we reject the null hypothesis.

If the p-value is greater than the significance level (p > α), we fail to reject the null hypothesis.

To know more about p-value,

https://brainly.com/question/30190179

#SPJ11

You wish to test the following claim ( H
a
) at a significance level of
α
=
0.05
.
H
o
:
μ
=
70.7
H
a
:
μ

70.7
You believe the population is normally distributed and you know the standard deviation is
σ
=
13.5
. You obtain a sample mean of
M
=
64.1
for a sample of size
n
=
26
.
What is the test statistic for this sample? (Report answer accurate to three decimal places.)
test statistic = What is the p-value for this sample? (Report answer accurate to four decimal places.)
p-value =

Answers

The test statistic for the sample is given as follows: z = -2.49.The p-value for the sample is given as follows: 0.0128.

Test hypothesis z-distribution

The test statistic is given as follows:

[tex]z = \frac{\overline{x} - \mu}{\frac{\sigma}{\sqrt{n}}}[/tex]

In which:

[tex]\overline{x}[/tex] is the sample mean.[tex]\mu[/tex] is the value tested at the null hypothesis.[tex]\sigma[/tex] is the standard deviation of the population.n is the sample size.

The parameters for this problem are given as follows:

[tex]\overline{x} = 64.1, \mu = 70.7, n = 26, \sigma = 13.5[/tex]

Hence the test statistic is given as follows:

[tex]z = \frac{64.1 - 70.7}{\frac{13.5}{\sqrt{26}}}[/tex]

z = -2.49.

Using a z-distribution calculator, considering a two tailed test, the p-value is given as follows:

0.0128.

More can be learned about the z-distribution at https://brainly.com/question/25890103

#SPJ1

suppose the null hypothesis, h0, is: darrell has worked 20 hours of overtime this month. what is the type i error in this scenario?

Answers

In hypothesis testing, a Type I error (or alpha error) is committed when the null hypothesis is rejected even when it is true. The Type I error rate is the probability of rejecting the null hypothesis when it is actually true. In other words, it is the probability of obtaining a result that is extreme enough to cause the null hypothesis to be rejected even though it is true.

Suppose the null hypothesis is that Darrell has worked 20 hours of overtime this month. The null hypothesis is that Darrell has worked 20 hours of overtime this month. The alternative hypothesis is that Darrell has worked more than 20 hours of overtime this month. If we reject the null hypothesis and conclude that Darrell has worked more than 20 hours of overtime this month, but he has actually worked 20 hours or less, then a Type I error has occurred.

The probability of a Type I error occurring is equal to the significance level (alpha) of the hypothesis test. If the significance level is 0.05, then the probability of a Type I error occurring is 0.05. This means that there is a 5% chance of rejecting the null hypothesis when it is actually true.

To know more about hypothesis visit:

https://brainly.com/question/29576929

#SPJ11

Express tan(pi/4-x) in its simplest form. Show work.

Answers

tan(pi /4-×)=(tan45-tanx)/1+tan45.tanx

=(1-tanx)/1+tanx

If μ = 9.1, o = 0.3, n = 9, what is a µ and ? (Round to the nearest hundredth) X x μx = μ = σ ox || √n Enter an integer or decimal number [more..] =

Answers

Given that μ = 9.1, σ = 0.3, and n = 9, the value of µx (the mean of the sample) and σx (the standard deviation of the sample mean) can be calculated as follows:

µx = μ = 9.1 (since the sample mean is equal to the population mean)

σx = σ/√n = 0.3/√9 = 0.3/3 = 0.1

Therefore, µx is 9.1 and σx is 0.1 (rounded to the nearest hundredth).

In this case, we are given the population mean (μ), the population standard deviation (σ), and the sample size (n). The goal is to calculate the mean of the sample (µx) and the standard deviation of the sample mean (σx).

Since the population mean (μ) is provided as 9.1, the sample mean (µx) will be the same as the population mean. Therefore, µx = 9.1.

To calculate the standard deviation of the sample mean (σx), we divide the population standard deviation (σ) by the square root of the sample size (n). In this case, σ is given as 0.3 and n is 9.

Using the formula σx = σ/√n, we substitute the values:

σx = 0.3/√9 = 0.3/3 = 0.1

Therefore, the calculated value for σx is 0.1 (rounded to the nearest hundredth).

The mean of the sample (µx) is 9.1 and the standard deviation of the sample mean (σx) is 0.1 (rounded to the nearest hundredth). These values indicate the central tendency and variability of the sample data based on the given population mean, population standard deviation, and sample size

To know more about mean visit:

https://brainly.com/question/1136789

#SPJ11

A contractor is considering a project that promises a profit of $33,137 with a probability of 0.64. The contractor would lose (due to bad weather, strikes, and such) of $7,297 if the project fails. What is the expected profit? Round to the nearest cent.

Answers

Therefore, the expected profit is $18,542.96, rounded to the nearest cent.

The contractor is considering a project that promises a profit of $33,137 with a probability of 0.64. The contractor would lose $7,297 if the project fails.

To find the expected profit, use the formula: Expected profit = (probability of success x profit from success) - (probability of failure x loss from failure) Expected profit = (0.64 x $33,137) - (0.36 x $7,297) Expected profit = $21,171.68 - $2,628.72Expected profit = $18,542.96

To know more about profit visit:

https://brainly.com/question/32381738

#SPJ11

f(x)= 3x^2-x+4 Find f(2)

Answers

Answer:

[tex]f(2) = 3( {2}^{2} ) - 2 + 4 = 14[/tex]

The phrase is: 4 divided by the sum of 4 and a number

Answers

The algebraic expression for the phrase "4 divided by the sum of 4 and a number" is written as 4/(4 + x).

To translate the phrase "4 divided by the sum of 4 and a number" into an algebraic expression, we start by representing the unknown number with a variable, such as "x." The sum of 4 and the unknown number is expressed as "4 + x." To find the division, we write "4 divided by (4 + x)," which is mathematically represented as 4/(4 + x).

This expression indicates that we are dividing the number 4 by the sum of 4 and the unknown number "x." By using algebraic notation, we can manipulate and solve equations involving this expression to find values for "x" that satisfy specific conditions or equations.

To know more about equations visit-

brainly.com/question/20883030

#SPJ11

which inequalities complete the system? a. s – l < 30 8s – 12l ≤ 160 b. s l < 30 8s 12l ≤ 160 c. s l > 30 8s 12l ≤ 160 d. s l < 30 8s 12l ≥ 160

Answers

The correct inequalities that complete the system are:

d. s l < 30 8s 12l ≥ 160

Let's analyze each option:

a. s – l < 30 8s – 12l ≤ 160:

This option does not complete the system because it does not specify the relationship between 8s - 12l and 160.

b. s l < 30 8s 12l ≤ 160:

This option does not complete the system because it does not specify the relationship between 8s - 12l and 160.

c. s l > 30 8s 12l ≤ 160:

This option does not complete the system because it specifies the opposite relationship between sl and 30 compared to the given inequality s - l < 30.

d. s l < 30 8s 12l ≥ 160:

This option completes the system because it maintains the given inequality s - l < 30 and specifies the relationship between 8s - 12l and 160, which is 8s - 12l ≥ 160.

Therefore, the correct option is d. s l < 30 8s 12l ≥ 160.

For similar question on inequalities.

https://brainly.com/question/30707400  

#SPJ8

Question 4 1 pts In test of significance, if the test z-value is in the tail region (OR low probability region), then we conclude that we have strong evidence against the null hypothesis. True False

Answers

In a test of significance, if the test z-value is in the tail region or the low probability region, it does not necessarily mean that we have strong evidence against the null hypothesis.

This statement is false.

The test depends on the significance level chosen beforehand. The significance level (typically denoted as α) determines the threshold for rejecting the null hypothesis. If the test z-value falls in the tail region beyond the critical value corresponding to the chosen significance level, we reject the null hypothesis. However, if the test z-value falls within the non-rejection region, we fail to reject the null hypothesis. The strength of evidence against the null hypothesis is not solely determined by the location of the test z-value in the tail region, but also by the chosen significance level and the associated critical value.

For such more questions on

https://brainly.com/question/14815909

#SPJ11

16. Complete the following identity: A. tan 5x B. tan 2x + tan 8x C. 2 tan 5x tan 3x D. tan 5x cot 3x sin 2x + sin 8y cos 2x + cos 8y ?

Answers

The dissect the supplied identity step-by-step to finish it:A. tan 5x: This phrase remains unchanged and cannot be further condensed.

B. tan 2x + tan 8x: (tan A + tan B) = (sin(A + B) / cos A cos B) can be used to define the sum of tangent functions. With the aid of this identity, we have:

Tan 2x plus Tan 8x equals sin(2x + 8x) / cos 2x cos 8x, or sin(10x) / (cos 2x cos 8x).C. 2 tan 5x tan 3x: To make this expression simpler, apply the formula (tan A tan B) = (sin(A + B) / cos A cos B):Sin(5x + 3x) / (cos 5x cos 3x) = 2 tan 5x tan 3x = 2 sin(8x) / (cos 5x cos 3x).

D. Tan, 5x Cot, 3x Sin, 8y Cos, 2x, and Cos.

learn more about unchanged here :

https://brainly.com/question/13161823

#SPJ11

A researcher conducted a study of 34 scientists (Grim, 2008). He reported a correlation between the amount of beer each scientist drank per year and the likelihood of that scientist publishing a scientific paper. The correlation was reported as r = -0.55, p < .01. a) What does a negative correlation mean in this example? (What does it tell you about beer and publishing papers?) Is this relationship strong or weak? How do you know? b) What does p < .01 mean in this result? (Tell me what p means. Tell me what the .01 means. Tell me what this means for the study.) a) What might happen to this correlation if you added one person in the sample who drank much more beer than other scientists and also published far fewer papers than other scientists? (Will the correlation get stronger? Weaker?) Is this a good thing or a bad thing for the study? Why or why not?

Answers

A negative correlation in this example means that as the amount of beer each scientist drinks per year increases, the likelihood of publishing a scientific paper decreases. In other words, there is an inverse relationship between beer consumption and publishing papers.

The correlation coefficient, r = -0.55, indicates a moderate negative correlation. The magnitude of the correlation coefficient, which ranges from -1 to +1, helps determine the strength of the relationship. In this case, the correlation is closer to -1, suggesting a relatively strong negative relationship.

b) The notation "p < .01" indicates that the p-value associated with the correlation coefficient is less than 0.01. In statistical hypothesis testing, the p-value represents the probability of obtaining a correlation coefficient as extreme as the observed value, assuming the null hypothesis is true. In this case, a p-value of less than 0.01 suggests strong evidence against the null hypothesis and indicates that the observed correlation is unlikely to occur by chance.

Adding one person to the sample who drank much more beer and published far fewer papers could potentially impact the correlation. If this person's data significantly deviates from the rest of the sample, it could strengthen or weaken the correlation depending on the direction of their values. If the additional person's beer consumption is even higher and their paper publication is even lower compared to the other scientists, it may strengthen the negative correlation. Conversely, if their values are more in line with the overall pattern of the sample, it may not have a substantial impact on the correlation.

This scenario is neither inherently good nor bad for the study. It depends on the research question and the purpose of the study. If the goal is to examine the relationship between beer consumption and paper publication within the specific sample of scientists, the inclusion of an extreme data point can provide valuable insights into potential outliers and the robustness of the correlation.

However, if the aim is to generalize the findings to a broader population, the extreme data point may introduce bias and limit the generalizability of the results.

To know more about correlation, refer here:

https://brainly.com/question/30116167#

#SPJ11

Type the correct answer in each box. Use numerals instead of words. If necessary, use / for the fraction bar(s). Points A and B are the endpoints of an arc of a circle. Chords are drawn from the two endpoints to a third point, C, on the circle. Given m AB =64° and ABC=73° , mACB=.......° and mAC=....°

Answers

Measures of angles ACB and AC are is m(ACB) = 64°, m(AC) = 146°

What is the measure of angle ACB?

Given that m(AB) = 64° and m(ABC) = 73°, we can find the measures of m(ACB) and m(AC) using the properties of angles in a circle.

First, we know that the measure of a central angle is equal to the measure of the intercepted arc. In this case, m(ACB) is the central angle, and the intercepted arc is AB. Therefore, m(ACB) = m(AB) = 64°.

Next, we can use the property that an inscribed angle is half the measure of its intercepted arc. The angle ABC is an inscribed angle, and it intercepts the arc AC. Therefore, m(AC) = 2 * m(ABC) = 2 * 73° = 146°.

To summarize:

m(ACB) = 64°

m(AC) = 146°

These are the measures of angles ACB and AC, respectively, based on the given information.

Learn more about angles in circles

brainly.com/question/23247585

#SPJ11

(1 point) The joint probability mass function of X and Y is given by p(1, 1) = 0.5 p(1, 2) = 0.1 p(1,3)= 0.05 p(2, 1) = 0.05 p(2, 2) = 0 p(2,3)= 0.05 p(3, 1) = 0.05 p(3, 2) = 0.05 p(3, 3) = 0.15 (a) Compute the conditional mass function of Y given X = 3: P(Y = 1|X = 3) = P(Y = 2|X = 3) = P(Y = 3|X = 3) = (b) Are X and Y independent? (enter YES or NO) (c) Compute the following probabilities: P(X + Y > 2) = P(XY = 4) = P( \ > 2) =

Answers

X and Y are not independent because if they were independent, the joint probability mass function would be the product of their marginal mass functions.

Compute the conditional mass function of Y given X = 3The conditional mass function of Y given X = 3 is computed as follows:P(Y = y | X = 3) = P(X = 3, Y = y) / P(X = 3)Here, P(X = 3) = P(X = 3, Y = 1) + P(X = 3, Y = 2) + P(X = 3, Y = 3) = 0.05 + 0.05 + 0.15 = 0.25Therefore, P(Y = 1|X = 3) = P(X = 3, Y = 1) / P(X = 3) = 0.05 / 0.25 = 0.2P(Y = 2|X = 3) = P(X = 3, Y = 2) / P(X = 3) = 0.05 / 0.25 = 0.2P(Y = 3|X = 3) = P(X = 3, Y = 3) / P(X = 3) = 0.15 / 0.25 = 0.6.

No. X and Y are not independent because if they were independent, the joint probability mass function would be the product of their marginal mass functions. However, this is not the case here. For example, P(X = 1, Y = 1) = 0.5, but P(X = 1)P(Y = 1) = 0.35.

Compute the following probabilities:i. P(X + Y > 2)We have:P(X + Y > 2) = P(X = 1, Y = 3) + P(X = 2, Y = 2) + P(X = 3, Y = 1) + P(X = 3, Y = 2) + P(X = 3, Y = 3) = 0.05 + 0 + 0.05 + 0.05 + 0.15 = 0.3ii. P(XY = 4)We have:P(XY = 4) = P(X = 1, Y = 4) + P(X = 2, Y = 2) + P(X = 4, Y = 1) = 0 + 0 + 0 = 0iii. P(X > 2)We have:P(X > 2) = P(X = 3) + P(X = 3, Y = 1) + P(X = 3, Y = 2) + P(X = 3, Y = 3) = 0.05 + 0.05 + 0.05 + 0.15 = 0.3.

Learn more about marginal mass functions here:

https://brainly.com/question/30365034

#SPJ11

use the shell method to write and evaluate the integral that gives the volume of the solid generated by revolving the plane region about the x-axis. x y2 = 36

Answers

The volume of the solid generated by revolving the plane region about the x-axis is [tex]72\pi[/tex][tex]ln(6)[/tex].

To use the shell method to write and evaluate the integral that gives the volume of the solid generated by revolving the plane region about the x-axis, x y2 = 36, we need to first sketch the graph.

The graph of the given function is given below:

[tex]\int[/tex][tex]_{0}[/tex][tex]^{6}[/tex][tex]2[/tex][tex]\pi[/tex][tex]x[/tex][tex](\frac{36}{x}) dx[/tex][tex]\Rightarrow[/tex][tex]\int[/tex][tex]_{0}[/tex][tex]^{6}[/tex][tex]72\pi[/tex][tex]\frac{1}{x}[/tex]dx[tex]\Rightarrow[/tex][tex]72\pi[/tex][tex]\int[/tex][tex]_{0}[/tex][tex]^{6}[/tex][tex]\frac{1}{x}[/tex]dx[tex]\Rightarrow[/tex][tex]72\pi[/tex][tex]ln(x)[/tex][tex]\Biggr|_{0}^{6}[/tex][tex]\Rightarrow[/tex][tex]72\pi[/tex][tex]ln(6)[/tex].

Therefore, the volume of the solid generated by revolving the plane region about the x-axis is [tex]72\pi[/tex][tex]ln(6)[/tex].

Know more about volume   here:

https://brainly.com/question/27710307

#SPJ11

Consider a uniform discrete distribution on the interval 1 to 10. What is P(X= 5)? O 0.4 O 0.1 O 0.5

Answers

For a uniform discrete distribution on the interval 1 to 10, P(X= 5) is :

0.1.

Given a uniform discrete distribution on the interval 1 to 10.

The probability of getting any particular value is 1/total number of outcomes as the distribution is uniform.

There are 10 possible outcomes. Hence the probability of getting a particular number is 1/10.

Therefore, we can write :

P(X = x) = 1/10 for x = 1,2,3,4,5,6,7,8,9,10.

Now, P(X = 5) = 1/10

P(X = 5) = 0.1.

Hence, the probability that X equals 5 is 0.1.

Therefore, the correct option is O 0.1.

To learn more about probability visit : https://brainly.com/question/13604758

#SPJ11

Score on last try: 0 of 1 pts. See Details for more. > Next question For a standard normal distribution, find: P(-1.84 <2<2.69) Question Help: Video 1 Video 2 Message Instructor Submit Question Jump to Answer Get a similar question You can retry this question below D

Answers

For a standard normal distribution, we are required to find P(-1.84 < 2 < 2.69).Solution:According to the standard normal distribution, the mean is 0 and the standard deviation is 1.

The standard normal distribution can be converted to a standard normal distribution by making the following transformation:z = (x-μ)/σ, where μ is the mean and σ is the standard deviation.The given values are: lower limit = -1.84 and upper limit = 2.69.z1 = (-1.84-0)/1 = -1.84z2 = (2.69-0)/1 = 2.69The values of z for the lower and upper limits are -1.84 and 2.69, respectively. Thus, P(-1.84 < z < 2.69) needs to be determined.Using the standard normal table, we find that P(-1.84 < z < 2.69) is equal to 0.9964. Therefore, the probability that z lies between -1.84 and 2.69 is 0.9964 or 99.64%.The standard normal table is the standard normal distribution's table of values. It helps to find the probabilities of the given values in the standard normal distribution, where the mean is 0 and the standard deviation is 1.

To know more about Score visit:

https://brainly.com/question/29182687

#SPJ11

Other Questions
1 pts Question 6 With regards to calculating the probability that the score was less than 42, what did you notice when the sample size was increased from 1 person to 81 persons? The area to the left o Describe FIVE (5) brand strategies that leadscompany to be successful in the market. (15 mark) Many spacecraft have visited Mars over the years. Mars is smaller than the Earth and has correspondingly weaker surface gravity. On Mars, the free-fall acceleration is only _____.a. 1 m/s^2b. 2 m/s^2c. 3.8 m/s^2d. 9.8 m/s^2 Governmental entities and other recipients of governmental financial assistance, depending upon the circumstances, may be subject to an audit in accordance with generally accepted auditing standards (GAAS audit), Government Auditing Standards (GAS audit) and the Federal Single Audit Act (Single Audit Act audit). Place an X by the proper reports issued by auditors for each of these audits on the following: (For each report item you may have more than one X. If none apply leave them blank.) what kind of dangers would you face travelling along the silk road what is the minimum engagement percentage you should look for when finding the correct influencer? van oakes Bosshart Inc. has provided the following data for the month of May. There were no beginning inventories; consequently, the direct materials, direct labor, and manufacturing overhead applied listed below are all for the current month.Work In ProcessFinished GoodsCost of Goods SoldTotalDirect materials$10,670$12,000$81,120$103,790Direct labor11,63015,000101,400128,030Manufacturing overhead applied9,6809,68068,64088,000Total$31,980$36,680$251,160$319,820Manufacturing overhead for the month was underapplied by $6,000.The Corporation allocates any underapplied or overapplied manufacturing overhead among work in process, finished goods, and cost of goods sold at the end of the month on the basis of the manufacturing overhead applied during the month in those accounts.The journal entry to record the allocation of any underapplied or overapplied manufacturing overhead for May would include the following:Multiple Choicecredit to Work in Process of $31,980 Adebit to Work in Process of $660 Bcredit to Work in Process of $660 Cdebit to Work in Process of $31,980 D Consider the perfectly competitive 'luxury goods' market in the UK where domestic demand is D, [P]=80-P, and the domestic supply is S, [P]=-16+2P, where P is the domestic price. In Russia (the rest of the world since there are only two countries), demand for UK exports of 'luxury goods' is D [P]=144-2P, where Pw is the world (Russian) price. Showing your workings at every stage: (a) Derive the equilibrium world price and domestic price under free trade. Calculate domestic consumption, domestic production, and exports under free trade in the UK. [20 marks] find the vertices and foci of the ellipse. 16x2 64x + 4y2 = 0 Please fill in the blanks. a. If volatility of a stock goes up, then the put premium on this stock b. If volatility of a stock goes up, then the call premium on this stock c. If the stock price goes up, then the call premium d. If the stock price goes up, then the put premium. e. A (long) call option is out of the money if V onJanuary 1, 2018, John deposited $5000 into a savings account thatpays interest at 5% compounded annually. If he makes no furtherdeposits or withdrawals, how much will John having his account onD A 26 foot bridge crosses a stream at an incline. If one bank of the river is 2 feet above the height of the water and the other bank is 12 feet above water level, what is the tangent of the angle that find an equation of the tangent plane to the surface z = x^2 +y^2 .6.6.1: Function stubs: Statistics.Define stubs for the functions get_user_num() and compute_avg(). Each stub should print "FIXME: Finish function_name()" followed by a newline, and should return -1. Each stub must also contain the function's parameters.Sample output with two calls to get_user_num() and one call to compute_avg():FIXME: Finish get_user_num()FIXME: Finish get_user_num()FIXME: Finish compute_avg()Avg: -1 What is the name of the document that should be attached to theprimary technical document when it is external to an organization?Give an example of use. Why do the medical insurance billers need to understand DEERS for TRICARE?Who is responsible for the payment for a workers compensation case?Why are separate medical records necessary for workers compensation? 100% After a real estate transaction is completed, the involved brokers are required by the Ohio Real Estate License Law to provide their principals with A. full accounting for all special/trust funds relating to the transaction. receipt for the original earnest money deposit. OB. C. copy of all loan documents prepared for this transaction. OD. notarized statement of special/trust account activity throughout the transaction period. What is the proper procedure for activating a license that has been suspended due to nonrenewal? OA Complete a reactivation application and remit with a renewal fee, reactivation fee, and penalty. OB. Remit the renewal fee within the 60-day grace period. OC. Complete a reactivation application with an explanation of why the payment is late. D. Remit the license and the late renewal fee. BJs is a company that hand-makes jewelry boxes. Forecasts of sales for next year are 150 in autumn, 400 in winter, and 50 in spring. They purchase plain jewelry boxes for $20 each and incur a holding cost of $1.2 per quarter per item. BJs hires part-time art students to craft their designs, paying them $5.50 per hour in autumn, $7.00 per hour in winter, and $6.25 per hour in spring. Each jewelry box takes two hours to complete, and the company can rent equipment for $65 for three months, which can be returned if no production occurs in a quarter. The goal is to determine the optimal number of jewelry boxes to produce in each quarter to minimize production cost, inventory holding cost, and rental cost. Provide a mixed integer formulation for the problem. Clearly define the variables, objective function, and the model constraints. Clear and tidy solution steps and clearhandwriting,please12. If the moment generating function of the random variable X is (1 - 35t)-. Find: a) If The name of the distribution. (0.5) b) rth moment about zero. (0.5) c) Variance of X. (0.5) Researchers have found that the preferences over cafeteria food take the following form: U = 71 PC + 114 FC-75 PZ - 40 Costs PC= number of pork chops FC= number of fried chicken pieces PZ = number of pizza slices Costs= cost in dollars of lunch How many dollars is the consumer willing to pay for an extra pork chop? (hint: make pork chops x1 and enter the number as positive DO NOT INPUT A NEGATIVE NUMBER)QUESTION 19 Researchers have found that the preferences over cafeteria food take the following form: U = 152 PC + 154 FC - 184 PZ - 26 Costs PC= number of pork chops FC= number of fried chicken pieces PZ = number of pizza slices Costs= cost in dollars of lunch Given this information, what is MRS(pizza,pork chops)? (hint: this number could be positive or negative so pay atention to the signs)QUESTION 20 Researchers have found that the preferences over cafeteria food take the following form: U = 190 PC +213 FC - 201 PZ - 21 Costs PC= number of pork chops FC= number of fried chicken pieces PZ = number of pizza slices Costs= cost in dollars of lunch How many pork chops is the consumer willing to give up to obtain one more piece of fried chicken? (hint: use MRS and make fried chicken x1 and enter this number as positive NO NEGATIVE NUMBERS)