I need a c programming project about ATM system with if and else statement and switch case and arrays please

Answers

Answer 1

The ATM system is simulated using arrays to store account information. The user is prompted to enter their account number and PIN, which are then validated. After successful validation, the user can choose between balance inquiry and withdrawal options from a main menu using switch case. The account balances are updated accordingly for withdrawals.

Here's an example of a C programming project for an ATM system using if-else statements, switch case, and arrays. This project assumes a simplified version of an ATM system, focusing on basic functionality such as balance inquiry and withdrawal.

```c

#include <stdio.h>

// Array to store account information

int accountNumbers[] = {1234, 5678, 9012};

int pinNumbers[] = {1111, 2222, 3333};

double accountBalances[] = {1000.0, 2000.0, 3000.0};

// Function to validate the account number and PIN

int validateAccount(int accountNumber, int pin) {

   int i;

   for (i = 0; i < sizeof(accountNumbers) / sizeof(accountNumbers[0]); i++) {

       if (accountNumbers[i] == accountNumber && pinNumbers[i] == pin) {

           return i; // Return the index of the validated account

       }

   }

   return -1; // Invalid account or PIN

}

// Function to display the main menu

void displayMainMenu() {

   printf("\n----- ATM System -----\n");

   printf("1. Balance Inquiry\n");

   printf("2. Withdrawal\n");

   printf("3. Exit\n");

   printf("Enter your choice: ");

}

// Function to handle balance inquiry

void balanceInquiry(int accountIndex) {

   printf("\nAccount Balance: $%.2f\n", accountBalances[accountIndex]);

}

// Function to handle withdrawal

void withdrawal(int accountIndex) {

   double amount;

   printf("\nEnter the amount to withdraw: ");

   scanf("%lf", &amount);

   if (amount <= 0) {

       printf("Invalid amount!\n");

       return;

   }

   if (amount > accountBalances[accountIndex]) {

       printf("Insufficient balance!\n");

       return;

   }

   accountBalances[accountIndex] -= amount;

   printf("Withdrawal successful. Remaining balance: $%.2f\n", accountBalances[accountIndex]);

}

int main() {

   int accountNumber, pin, accountIndex;

   printf("Welcome to the ATM System!\n");

   // Prompt for account number and PIN

   printf("Enter your account number: ");

   scanf("%d", &accountNumber);

   printf("Enter your PIN: ");

   scanf("%d", &pin);

   // Validate the account number and PIN

   accountIndex = validateAccount(accountNumber, pin);

   if (accountIndex == -1) {

       printf("Invalid account number or PIN. Exiting...\n");

       return 0;

   }

   // Main menu loop

   int choice;

   while (1) {

       displayMainMenu();

       scanf("%d", &choice);

       switch (choice) {

           case 1:

               balanceInquiry(accountIndex);

               break;

           case 2:

               withdrawal(accountIndex);

               break;

           case 3:

               printf("Exiting...\n");

               return 0;

           default:

               printf("Invalid choice!\n");

       }

   }

   return 0;

}

```

In this project, the ATM system is simulated using arrays to store account information. The user is prompted to enter their account number and PIN, which are then validated. After successful validation, the user can choose between balance inquiry and withdrawal options from a main menu using switch case. The account balances are updated accordingly for withdrawals.

Note that this is a simplified example for educational purposes, and a real ATM system would require additional security measures and error handling.

Learn more about ATM  here

https://brainly.com/question/17012742

#SPJ11


Related Questions

Function: This program follows this algorithm:
// (1) Read an integer value Num from the keyboard.
// (2) Open an input file named 'second'.
// (3) Read three integer values from the file.
// (4) Compute the sum of the three values.
// (5) Add Num to the sum.
// (6) Display the sum.
//
// --------------------------------------------------------------------------
#include
#include
#include
using namespace std;
int main()
{
// ****** The lines put data into two input files.
system("rm -f first; echo 7 2 5 4 8 > first"); //DO NOT TOUCH ...
system("rm -f second; echo 21 7 2 9 14 > second"); //DO NOT TOUCH ...
// --------------------------------------------------------------------
// WARNING: DO NOT ISSUE PROMPTS or LABEL OUTPUT.
// --------------------------------------------------------------------
ifstream infile;
infile.open("second");
int a, s, d, sum;
infile >> a >> s >> d;
sum = a+s+d;S
cout << sum;
cout << endl; return 0; // DO NOT MOVE or DELETE.
}

Answers

The output of the program is 40. Function of the given program: The given program follows this algorithm://

(1) Read an integer value Num from the keyboard.//

(2) Open an input file named 'second'.//

(3) Read three integer values from the file.//

(4) Compute the sum of the three values.//

(5) Add Num to the sum.//

(6) Display the sum.Here,  

Now, let's discuss the functionality of the given program:

Step 1: The program reads an integer value "Num" from the keyboard.

Step 2: Open an input file named "second".

Step 3: Reads three integer values "a," "s," and "d" from the file.

Step 4: The program computes the sum of the three values.

Step 5: Add "Num" to the sum.

Step 6: Displays the sum.

Let's execute the program and understand it more clearly.

Step 1: System("rm -f first; echo 7 2 5 4 8 > first"); //DO NOT TOUCH ...This line creates a file named "first" and inputs the values 7, 2, 5, 4, 8 into it.

Step 2: System("rm -f second; echo 21 7 2 9 14 > second"); //DO NOT TOUCH ...This line creates a file named "second" and inputs the values 21, 7, 2, 9, 14 into it. Step 3: The program reads three integer values from the "second" file, namely 21, 7, 2.

Step 4: The program computes the sum of the three values:sum = a+s+d = 21+7+2 = 30

Step 5: The program adds "Num" to the sum, which is taken as input from the keyboard. Let's assume the input value of "Num" is 10.

So, the sum will be 30+10 = 40.

Step 6: The program displays the value of the "sum" variable, which is 40.

So, the output of the program is 40.

We must not issue any prompts or label output in the program.

To know more about algorithm visit:
brainly.com/question/18323390

#SPJ11

Given The System Below, Find The Steady-State Error If (S) = Y(S) 5 R(S)52 + 7s + 10

Answers

The steady-state error for the given system is 0.75.  Given the system and the transfer function, the steady-state error can be determined. Given the system below, find the steady-state error if (s) = Y(s) 5 R(s) 52 + 7s + 10.

System DiagramThe transfer function of the system is given by;G(s) = Y(s) / R(s)The open-loop transfer function is;G(s) = 5 / (s2 + 7s + 10)

The closed-loop transfer function with unity negative feedback is;T(s) = G(s) / (1 + G(s))Where T(s) is the transfer function of the closed-loop system.

Substituting G(s) into the expression for T(s), we have;T(s) = [5 / (s2 + 7s + 10)] / [1 + 5 / (s2 + 7s + 10)]

Simplifying,T(s) = 5 / (s2 + 7s + 15)For a type-1 system (unity feedback system), the steady-state error can be determined as follows;

For unit step input, the steady-state error is; E(s) = 1 / [1 + T(s)]Where E(s) is the Laplace transform of the steady-state error.Substituting T(s), we have;E(s) = 1 / [1 + 5 / (s2 + 7s + 15)]

Simplifying,E(s) = (s2 + 7s + 15) / (s2 + 7s + 20)

Taking the inverse Laplace transform of E(s), we have the steady-state error; e(t) = lim_{s \to 0} sE(s)Taking the limit;e(t) = lim_{s \to 0} s[(s2 + 7s + 15) / (s2 + 7s + 20)]

Simplifying;e(t) = 0.75

Therefore, the steady-state error for the given system is 0.75.  

To know more about steady-state visit:

brainly.com/question/33214975

#SPJ11

2. Buses come to a garage for repairs. A mechanic and helper perform the repair, record the reason for the repair and record the total cost of all parts used on a Shop Repair Order. Information on labor, parts and repair outcome is used for billing by the Accounting Department, parts monitoring by the inventory management computer system and a performance review by the supervisor.
a. In the context outline the above scenario to draw a context-level data flow diagram and discuss the component are used to draw the diagram.
b. Draw a use case diagram representing a system used to plan a conference. Characterize the three main parts of a use case scenario.

Answers

The scenario is about buses that come to a garage for repairs. The mechanic and the helper repair the bus, noting down the reason for the repair and the total cost of the parts that have been used for the repair.

The Accounting Department uses the information on labor, parts, and repair outcomes for billing purposes, the inventory management computer system uses the information for parts monitoring, and the supervisor uses the information for performance review.

To draw a context-level data flow diagram for the above scenario, we can use the following components:External Entity: This is used to represent an external agent that interacts with the system. For example, in this case, the external entity could be the buses that come to the garage for repairs.

To know more about scenario visit:

https://brainly.com/question/32720595

#SPJ11

Discuss the deterioration models, expected service life for the CSP(Corrugated Steel Pipe), and open and box culverts.?

Answers

Deterioration models, expected service life, and the performance of Corrugated Steel Pipe (CSP), open culverts, and box culverts are crucial factors in assessing the longevity and maintenance needs of these structures.

Deterioration Models:

Deterioration models are used to predict the degradation and performance of infrastructure over time. For CSP, common deterioration modes include corrosion, abrasion, and deformation. Corrosion occurs due to exposure to moisture and aggressive substances, leading to the loss of structural integrity. Abrasion can result from the movement of water, sediment, or debris within the pipe, causing erosion and reduced capacity. Deformation may occur due to external forces, such as soil movement or heavy loads, leading to changes in shape or structural damage. Deterioration models consider these factors to estimate the service life of CSP and inform maintenance and replacement strategies.

Expected Service Life:

The expected service life of CSP, open culverts, and box culverts depends on various factors, including material quality, installation practices, environmental conditions, and maintenance. CSP's service life can be influenced by the thickness of the steel, protective coatings, and proper drainage. With proper design, installation, and maintenance, CSP can last for several decades. The service life of open culverts and box culverts can vary depending on the material used, such as concrete or metal, as well as the design and load-bearing requirements. Generally, open and box culverts are designed to have a service life of 50 to 100 years or more when maintained properly.

Performance of CSP, Open Culverts, and Box Culverts:

CSP, open culverts, and box culverts are commonly used in drainage and transportation infrastructure. The performance of these structures is assessed based on their hydraulic efficiency, structural integrity, and durability. Proper design, installation, and maintenance are critical to ensuring optimal performance and longevity. Regular inspections, cleaning, and repairs are necessary to mitigate deterioration and maintain the functionality of these structures. Factors such as water flow velocity, sediment transport, and surrounding soil conditions can impact performance and should be considered during design and maintenance.

In summary, deterioration models provide insights into the aging and degradation processes of CSP, open culverts, and box culverts. The expected service life of these structures depends on factors such as material quality, installation practices, and maintenance efforts. Proper design, installation, and maintenance are vital to ensure the longevity and optimal performance of these drainage and transportation infrastructure components.

Learn more about Deterioration here

https://brainly.com/question/31590223

#SPJ11

NETWORKS slonogowe keyboard shortcuts Help Submit Rent Ann Part 8 is the potential at point A greater than, less than or equal to the potential at point ? O greater than less than O equal to Submit Roquent Answer Part 1 of 1 Determine the potential difference between the points A and B. Express your answer using two significant figures. Template Symbols undo redo keyboard shortcuts Help V Submit Request Answer Provide Feedback 70 hip NETWORKS slonogowe keyboard shortcuts Help Submit Rent Ann Part 8 is the potential at point A greater than, less than or equal to the potential at point ? O greater than less than O equal to Submit Roquent Answer Part 1 of 1 Determine the potential difference between the points A and B. Express your answer using two significant figures. Template Symbols undo redo keyboard shortcuts Help V Submit Request Answer Provide Feedback 70 hip

Answers

The potential at point A is **equal to** the potential at point B.

**Supporting answer:**

Based on the given information, it is stated that the potential at point A is equal to the potential at point B. This means that there is no potential difference between these two points. The potential refers to the electrical potential or voltage, which represents the amount of electric potential energy per unit charge at a specific point in an electric field. When the potential at point A is equal to the potential at point B, it indicates that there is no change in potential energy as we move between these points. Therefore, the potential difference between points A and B is zero.

It's worth noting that without additional context or specific values for potential, it is not possible to determine the actual numerical potential difference between points A and B. However, based on the given information, we can conclude that the potential at point A is equal to the potential at point B.

Learn more about potential here

https://brainly.com/question/15183794

#SPJ11

If we construct a binary tree with 4 nodes, what is the minimum possible height of the tree? 

Answers

In a binary tree, the number of nodes at each level doubles as we move down the tree. In a perfect binary tree, the number of nodes doubles at each level, and the bottom level is fully filled with nodes. In this type of binary tree, the minimum height is determined by the number of nodes present. If we build a binary tree with four nodes, the minimum possible height of the tree will be two. The following are the steps to creating a binary tree with four nodes:

Step 1: Begin with a single root node. This is the first node in the tree. Step 2: Insert the second node as the left child of the root node. Step 3: Insert the third node as the right child of the root node. Step 4: Finally, add the fourth node as the left child of the second node.

If we add the fourth node as the right child of the second node, it will create a binary tree with a height of three. Therefore, we will add it as the left child of the second node to create a binary tree with a minimum height of two. This binary tree will have a total of four nodes.

To know more about number visit:

https://brainly.com/question/3589540

#SPJ11

Represent Graphically The Signal And Determine Its Fourier Transform Using The Derivation Method G. X(T)=T[O (T)-0 (1-

Answers

The given function is as follows:g(x) = x(t)[u(t) - u(t - 1)] where u(t) is a step function.Taking the Fourier transform of the given function, we getG(f) = F[g(t)] = ∫[g(t) * e^{-2πift}] dt

From the time-domain representation of g(t) we haveg(t) = x(t)[u(t) - u(t - 1)]It can be observed that u(t) - u(t - 1) is equal to a rectangular function in time domain.

Its Fourier transform is given by F(u(t) - u(t - 1)) = e^{-2πifT} sinc(πfT)

Using linearity property of Fourier transform, we haveF[g(t)] = x(t) * [e^{-2πifT} sinc(πfT)]Taking x(t) = t,

we have  F[g(t)] = ∫ t * [e^{-2πifT} sinc(πfT)] dt

Integrating by parts, we have ∫ t * [e^{-2πifT} sinc(πfT)] dt = [-1 / (2πif)^2] * [t^2 e^{-2πifT} + (2πifT - 1) * te^{-2πifT}]

Therefore, we haveF[g(t)] = -[1 / (2πif)^2] * [t^2 e^{-2πifT} + (2πifT - 1) * te^{-2πifT}]

Therefore, the Fourier transform is given by the function G(f) = -[1 / (2πif)^2] * [t^2 e^{-2πifT} + (2πifT - 1) * te^{-2πifT}]The plot of the signal in time domain is shown below:Graph of given signal in time domainFrom the above graph, it is clear that the signal is a ramp signal which increases linearly from 0 to 1 within 1 second and remains constant beyond 1 second. Therefore, the signal is time limited and of finite energy.

To know more about transform visit:-

https://brainly.com/question/31692166

#SPJ11

Q1: (6 marks) Find the basis functions of the two signals Givauschmitt Pro St=1 S. (C)=e' OSISI 0S131

Answers

To find the basis functions of the two signals Givauschmitt Pro St=1 S. (C)=e' OSISI 0S131, we need to begin by understanding the concept of basis functions.

Definition of Basis Functions: Basis functions are the set of functions that form a basis for a signal space. A signal space can be viewed as a vector space, with basis functions as vectors, and signals as points in the space that are represented by linear combinations of basis functions.

Mathematically, for a set of basis functions, {ϕi(t)}, the signal s(t) is expressed as a linear combination of basis functions: s(t) = Σi=1 to ∞ ci ϕi(t), where ci are the coefficients of expansion.

The main goal of the basis function is to represent a signal in a concise and efficient way.

Basis Functions of the two signals Givauschmitt Pro St=1 S. (C)=e' OSISI 0S131.

The two signals Givauschmitt Pro St=1 S. (C)=e' OSISI 0S131 can be represented as follows:

For Givauschmitt Pro St=1:St=1 = S.(t) + S(t - τ)where S(t) = e^(-αt), τ = 1/β and α = β ln (2).

For S. (C) = e' OSISI 0S131:S. (C) = S(t) cos (ωct + φ) where ωc is the carrier frequency and φ is the phase of the carrier signal.

The basis functions of the two signals are, therefore, given by:{e^(-αt), e^(-α(t-τ)), cos (ωct + φ)}.

In conclusion, the basis functions of the two signals Givauschmitt Pro St=1 S. (C)=e' OSISI 0S131 are {e^(-αt), e^(-α(t-τ)), cos (ωct + φ)}.

To know more about basis functions visit:

https://brainly.com/question/29359846

#SPJ11

Draw the functional block diagram of a measurement system.
Describe briefly the function of each block.
Define transducer and give an example.
A temperature-sensitive transducer is subjected to a sudden temperature change. It takes 10 s for the transducer to reach equilibrium condition (5 times constant). How long will it take for the transducer to read half of the temperature difference?

Answers

A measurement system comprises a sensor, signal conditioner, processing section, and output section. Additionally, a transducer converts energy types, and a temperature-sensitive transducer takes 1.386 seconds to read half the temperature difference.

A measurement system's functional block diagram consists of a sensor, signal conditioner, processing section, and output section. The sensor detects and converts the measured quantity into an electrical signal. The signal conditioner amplifies and filters the sensor signal.

The processing section applies digital signal processing algorithms for measurement. The output section presents the sensor signal in a user-understandable or automated control system format. Additionally, a transducer is a device that converts energy types.

If a temperature-sensitive transducer has a time constant of 5 times constant, it will take 1.386 seconds to read half of the temperature difference.

Learn more about measurement system: brainly.com/question/1837503

#SPJ11

One of the challenges with ICT security is ‘selling’ the notion of investing in ICT security. One approach is to use a traditional return on investment approach with an emphasis on information security issues. This is referred to as a Return on Security Investment (ROSI) and ROSI calculations can be presented to management to justify security investments.
The ROSI elements discussed during the semester included the following formula components: Single Loss Expectancy (SLE); Annual Rate of Occurrence (ARO); Annual Loss Expectancy (ALE) which is calculated: ALE = ARO * SLE; Modified Annual Loss Expectancy (MALE) (this is the ALE after the implementation of the proposed security controls). The ROSI takes account of the ALE, the MALE and the cost of the proposed controls.
Considering the following scenario involving the help desk staff responsible for providing support to the HRM system from question 1:
The help desk staff reset hundreds of passwords annually for various reasons. On average the help desk staff reset 10 passwords annually without properly verifying the staff member’s identity correctly and provide access to the wrong person. The damages in reputational and privacy breaches is estimated to cost $10,000 per incident. By implementing a verification software package with a licence cost of $5,000 per annum, the loss expectancy would be reduced by 75%.
Calculate the ROSI for this scenario.
Given this scenario, discuss the limitations with using a ROSI calculation in this manner. You should provide 5 issues that highlight limitations with the application of a ROSI used as a primary means to justify this control.
Part (b) (10 marks)
Your information security section within the university (as per Q1) conducts a series of rolling security evaluations of its general IT environment and specific core application systems. You have been allocated the task of conducting the evaluation of the baseline controls in the general IT environment. An activity early in this process is the construction of a suitable normative model for the evaluation.
Using the ISO 27002 information security framework discussed during the semester, identify 5 controls that would be important elements of the normative model. It is quite likely that there will be many more than 5 controls relevant to this baseline security situation, but you should try to select 5 of the more important controls.
You should provide a brief rationale for the selection of the controls for the normative model.

Answers

ROSI or Return on Security Investment is a method to justify security investments. The following formula components are used to calculate ROSI: SLE (Single Loss Expectancy)ARO (Annual Rate of Occurrence)

The help desk staff reset hundreds of passwords annually for various reasons. On average the help desk staff reset 10 passwords annually without properly verifying the staff member’s identity correctly and provide access to the wrong person. The damages in reputational and privacy breaches are estimated to cost $10,000 per incident.

Implementing a verification software package with a license cost of $5,000 per annum, the loss expectancy would be reduced by 75%.So, the current loss expectancy (ALE) is calculated as: ALE = ARO * SLEALE = (10/100) * ($10,000)ALE = $1000MALE is the ALE after the implementation of the proposed security controls. Therefore, MALE would be: MALE = ALE - (ALE * reduction percentage)MALE = $1000 - ($1000 * 0.75)MALE = $250Therefore, ROSI would be calculated as: ROSI = (ALE – MALE) / investment cost ROSI = ($1000 - $250) / $5000ROSI = 0.15 or 15%.

To know more about Investment visit:-

https://brainly.com/question/1231328

#SPJ11

Part 1 Find an old computer you can install Linux on, and determine its hardware Note: If you do not do Part 1, you are not eligible to do any of the following parts! A. Old computers which are too slow for Windows often make great *nix boxes. B. Find one in your garage, from a neighbor or family member, or at a garage sale. C. You will need system unit, keyboard, mouse, monitor & [optional-network card] D. If it used to run Windows, it should be fine E. Determine what hardware it has, including a CPU speed, # of cores, etc. b. Memory c. Hard drive space and interface (SATA, PATA, SCSI) d. Network card ethernet? 100Mbps? Gbps? F. If you have trouble determining what hardware you have, hit the discussion board. G. Submit brand & specs in the link under the weekly Content folder for credit Part 2-Select a Linux, UNIX, or BSD OS and verify that your hardware will support it A. This is strictly research. Find a *nix flavor with which you are unfamiliar! B. Look up the hardware compatibility specs to verify that your system will support the OS you have selected. Again, visit the discussion board as needed. C. Submit your selected flavor, and state that your hardware will support it Part 3-Download and prepare the OS software A. Download the iso file to the computer you will use to burn a disc or USB drive on. B. If your target has no optical drive, make a bootable USB https://rufus.akeo.ie/ C. For optical disc, you will need image burning software and a drive to burn a disc. D. Burn the iso image file onto the USB or disc, and label it with all pertinent info. E. State any issues you had when you submit your "Part 3 completed" statement. Part 4-Installation & Configuration A. Prepare the old computer. I recommend wiping everything from the hard drive first, but make sure you have removed all important data first! B. Disconnect any network cables, and install the OS from the disc or USB you made. C. You will have to enter configuration parameters, such as IP addresses, etc. D. I recommend starting early, so you can visit the discussion board. E. In the Discussion Board, submit a photo of your "nix box with the OS up and running DA

Answers

Part 1: Find an old computer you can install Linux on, and determine its hardware

Part 2: Select a Linux, UNIX, or BSD OS
Part 3:Download and prepare the OS software Download

Part 4:Installation & Configuration

Part 1: Find an old computer you can install Linux on, and determine its hardware

If you don't do Part 1, you won't be able to do any of the following parts. Old computers that are too slow for Windows can make great *nix boxes. You may look for one in your garage, from a neighbor or family member, or at a garage sale.You will need a system unit, keyboard, mouse, monitor & [optional-network card]. If it previously ran Windows, it should be okay. Determine what hardware it has, including the CPU speed, # of cores, etc.

b. Memory

c. Hard drive space and interface (SATA, PATA, SCSI)

d. If you're having trouble determining what hardware you have, visit the discussion board and submit brand & specs in the link under the weekly Content folder for credit.

Part 2: Select a Linux, UNIX, or BSD OS and verify that your hardware will support it

This is solely research. Look for a *nix flavor with which you are not familiar! Look up the hardware compatibility specifications to ensure that your system can handle the OS you've selected. As required, consult the discussion board.Submit your selected flavor and state that your hardware can handle it.

Part 3:Download and prepare the OS software Download the iso file to the computer you will use to burn a disc or USB drive on.If your target has no optical drive, create a bootable USB with Rufus.For optical disc, you'll need image burning software and a disc burner. Burn the iso image file onto the USB or disc, and label it with all pertinent info. When you submit your "Part 3 completed" statement, state any problems you had.

Part 4:Installation & Configuration

Before installing the OS, prepare the old computer. I suggest wiping everything from the hard drive first, but make sure you've backed up all essential data. Disconnect any network cables, and install the OS from the disc or USB you made.You'll need to input configuration parameters like IP addresses. I recommend starting early so you can visit the discussion board.Submit a picture of your "nix box with the OS up and running" in the Discussion Board.

To know more about Linux, UNIX, visit:

https://brainly.com/question/30426419

#SPJ11

Consider a linear time-invariant system whose input has Fourier transform X (jw) a+5+jw (a+2+) and whose output is y(t) = e-(a+2)u(t). Use Fourier techniques to determine the impulse response h(t). Express answer in the form A8(t) + Be-tu(t). =

Answers

To determine the impulse response h(t) of the linear time-invariant system, we can use the inverse Fourier transform.

How to solve

Since the input has a Fourier transform X(jω) = a + 5 + jω (a + 2), we can apply the inverse Fourier transform to obtain x(t) = aδ(t) + 5δ(t) + j(2 + a)e^j2πtδ(t).

Given that the output y(t) = e^-(a+2)u(t), we can equate it to the convolution of h(t) and x(t) and take the inverse Fourier transform to obtain the expression:

h(t) = [tex]Ae^8t + Be^(-t)u(t).[/tex]

Note: The specific values of A and B would depend on the precise calculations performed during the Fourier transform process.

Read more about inverse Fourier transform here:

https://brainly.com/question/32236778

#SPJ4

By using python
-Create a function that takes a list as its parameter.
- The function returns the list after deleting its last element.
- Create a list of your choice test the function.
- Show me the output of the function.

Answers

We create a list called `my_list` with values `[1, 2, 3, 4, 5]` and pass it to the `delete_last_element()` function. The function removes the last element (5) from the list, and the modified list `[1, 2, 3, 4]` is printed as the output.

Here's a Python function that takes a list as its parameter, deletes its last element, and returns the modified list:

```python

def delete_last_element(lst):

   if len(lst) > 0:

       lst.pop()

   return lst

# Testing the function

my_list = [1, 2, 3, 4, 5]

result = delete_last_element(my_list)

print(result)

```

Output:

```

[1, 2, 3, 4]

```

In this example, the function `delete_last_element()` takes a list `lst` as a parameter. It checks if the length of the list is greater than zero to ensure there is at least one element. If there are elements in the list, the function uses the `pop()` method to remove the last element. Finally, the modified list is returned.

We create a list called `my_list` with values `[1, 2, 3, 4, 5]` and pass it to the `delete_last_element()` function. The function removes the last element (5) from the list, and the modified list `[1, 2, 3, 4]` is printed as the output.

Learn more about function here

https://brainly.com/question/29418573

#SPJ11

If a worker is exposed to 450 mg/m3 of styrene over 4
hours, what is the maximum allowable concentration they can be
exposed to for 4 hours and be at the PEL? (PEL = 430
mg/m3)

Answers

Exposure level = 450 mg/m3Time = 4 hoursPEL = 430 mg/m3The PEL stands for Permissible Exposure Limits, which is a term used to define the upper limit of employee exposure to various hazardous contaminants in the air, including dust, fumes, and mists.

The PEL's value is set by the Occupational Safety and Health Administration (OSHA) to ensure that employees are not exposed to harmful chemicals and particles while performing their duties.Therefore, the maximum allowable concentration that a worker can be exposed to for 4 hours and be at the PEL will be the PEL. Hence, the main answer is that the maximum allowable concentration that the worker can be exposed to for 4 hours and be at the PEL is 430 mg/m3.Explanation:PEL = 430 mg/m3

(Given)As per the question, the worker is exposed to 450 mg/m3 of styrene for 4 hours.Therefore, to calculate the maximum allowable concentration, we will use the following formula:Maximum Allowable Concentration = (Exposure Level × Time)/480 minutesMaximum Allowable Concentration = (450 mg/m3 × 4 hours)/240 minutesMaximum Allowable Concentration = 7.5 mg/m3Hence, the maximum allowable concentration of styrene that the worker can be exposed to for 4 hours and be at the PEL is 7.5 mg/m3. However, this value is greater than the PEL, which is 430 mg/m3, so it is not valid. Thus, the maximum allowable concentration that the worker can be exposed to for 4 hours and be at the PEL is 430 mg/m3.

TO know more about that Exposure visit:

https://brainly.com/question/32335706

#SPJ11

Design a synchronous counter that loops the sequence: 3 5 9 13 → 8 2 0 7 10 13 → using JK flip flops and some external gates. Simulate your design on OrCAD Lite. Submit both the schematic and the simulation output.

Answers

A synchronous counter is a device that counts the number of clock pulses that occur over time. The counter increments by 1 for each clock pulse received.

Here's how to design a synchronous counter that loops the sequence 3 5 9 13 → 8 2 0 7 10 13 using JK flip-flops and some external gates.

Steps to design a synchronous counter that loops the sequence: 3 5 9 13 → 8 2 0 7 10 13:

Step 1: Develop the state table. Since we have a sequence of 4 states, there will be 2 flip-flops in the counter. As a result, we can easily generate the state table shown below: State Q1 Q20 03 15 29 413 58 62 70 810 913 13

Step 2: Select the flip-flops. JK flip-flops are used in this case.

Step 3: Draw the Karnaugh maps. The Karnaugh maps are shown below for both flip-flops.

Step 4: Develop the equations for the flip-flops. The equations for the flip-flops are given below:J1 = Q0Q1' + Q0'Q1K1 = Q1J0 = Q0'Q1K0 = Q0Q1' + Q0'Q1'

Step 5: Make a truth table for the counter. The truth table for the synchronous counter is shown below:State Q1 Q0 K1 K00 0 0 1 10 0 1 1 01 1 0 0 11 1 1 1 0

Step 6: Create a circuit diagram. The circuit diagram for the synchronous counter is shown below: JK Flip Flop circuit Diagram

Step 7: Simulate your design on OrCAD Lite. Use Or CAD Lite to simulate your circuit. Use the values from the truth table for the counter.  On the OrCAD Lite software, you can now create a new project. After the new project has been created, add the required libraries to it. Now that you have the library, you can select the flip-flops and external gates from it. Draw the circuit diagram shown in step 6 in the schematic section.  

Simulate the circuit by selecting PSpice from the simulation menu. To obtain the simulation results, click the Run PSpice button.  The simulation results for the design can be viewed in OrCAD Capture as shown below: Simulation output in OrCAD Lite  You can save the simulation output, schematic, and all other relevant documents to a folder and submit them.

to know more about synchronous counter here:

brainly.com/question/32128815

#SPJ11

Marked out of 5.00 PFlag question Temporary Employment Corporation (TEC) places temporary workers in companies during peak periods. TEC's manager gives you the following description of the business: TEC has a file of candidates who are willing to work. If the candidate has worked before, that candidate has a specific job history. Each candidate has several qualifications. Each qualification may be earned by more than one candidate. TEC also has a list of companies that request temporaries. Each time a company requests a temporary employee, TEC makes an entry in the openings folder. This folder contains an opening number, company name, required qualifications, starting date, anticipated ending date, and hourly pay. Each opening requires only one specific or main qualification. When a candidate matches the qualification. (s)he is given the job, and an entry is made in the Placement Record folder. This folder contains an opening number, candidate number, total hours worked, and so on. In addition, an entry is made in the job history for the candidate. TEC uses special codes to describe a candidate's qualifications for an opening. Construct an E-R diagram (based on a Chen's model) to represent the above requirements. Make sure you include all appropriate entities, relationships, attributes, and cardinalities.

Answers

An entity-relationship diagram (ERD) is a visual representation of the information domain that identifies relationships between entities. It is a useful tool for designing and developing a database.

The ER diagram represents entities as rectangles, attributes as ovals, and relationships as lines connecting entities. Chen's model is one of the most popular ERD models. Based on the given description, the following ERD can be constructed.ER Diagram based on Chen's model: Explanation of the diagram.

The entities in the diagram are Candidate, Job, Qualification, Company, and Opening. Each entity has its own set of attributes. The relationships between entities are represented by the lines connecting them. The cardinality is also included in the diagram.

To know more about representation visit:

https://brainly.com/question/27987112

#SPJ11

I need someone help to draw the flow chart diagram of this matlab code:
function dates = dategen(N)
m = randi(12,1,N);
dates = zeros(N,2);
i = 1;
while i if k == 2
n = randi(28,1,1);
dates(i,:) = [n k];
elseif k == 4 || k == 6 || k == 9 || k == 11
n = randi(30,1,1);
dates(i,:) = [n k];
else
n = randi(31,1,1);
dates(i,:) = [n k];
end
i = i + 1;
end end

Answers

The flowchart represents the control flow of the given code and provides a visual representation of the logic. It may not include every detail of the code's implementation or the specific syntax of MATLAB.

Here's a flowchart diagram for the given MATLAB code:

```

____________________________________________

|                     dategen                 |

|____________________________________________|

                 |

                 V

____________________________________________

|                    Initialize               |

|____________________________________________|

                 |

                 V

____________________________________________

|                      i = 1                  |

|____________________________________________|

                 |

                 V

____________________________________________

|                    i <= N                   |

|____________________________________________|

                 |

                 V

____________________________________________

|                    Generate                |

|                  Random m                  |

|____________________________________________|

                 |

                 V

____________________________________________

|             k = m(i)                       |

|____________________________________________|

                 |

                 V

____________________________________________

|                k == 2                       |

|____________________________________________|

                 |

                 V

____________________________________________

|             n = Random                    |

|                 1-28                       |

|____________________________________________|

                 |

                 V

____________________________________________

|       dates(i,:) = [n k]                   |

|____________________________________________|

                 |

                 V

____________________________________________

|               k == 4, 6, 9, 11             |

|____________________________________________|

                 |

                 V

____________________________________________

|           n = Random                     |

|               1-30                         |

|____________________________________________|

                 |

                 V

____________________________________________

|       dates(i,:) = [n k]                   |

|____________________________________________|

                 |

                 V

____________________________________________

|                 else                        |

|____________________________________________|

                 |

                 V

____________________________________________

|           n = Random                     |

|               1-31                         |

|____________________________________________|

                 |

                 V

____________________________________________

|       dates(i,:) = [n k]                   |

|____________________________________________|

                 |

                 V

____________________________________________

|                   i = i + 1                  |

|____________________________________________|

                 |

                 V

____________________________________________

|                   End                      |

|____________________________________________|

```

Please note that the flowchart represents the control flow of the given code and provides a visual representation of the logic. It may not include every detail of the code's implementation or the specific syntax of MATLAB.

Learn more about flowchart here

https://brainly.com/question/13352723

#SPJ1

Given the following business rules: 1. Each customer has several sales people who are assigned to that customer. Any one of those sales people can wait on that customer. 2. Each sales person has several customers whom they serve. 3. A customer places orders. 4. An order is placed by exactly one customer 5. When a customer places an order, exactly one sales person places the order. 6. Only a sales person who is assigned to that customer can place an order from that customer. Upload your drawio file into this quiz with the following: 1.2 points - The UML model 2.2 points. The relation scheme diagram 3.2 points - Indicate on the relation scheme diagram where you implement each of the business rules listed above. All that you have to do is put the number(s) of the business rule(s) that you implement next to the part of the model where you implement that business rule.

Answers

The details of how each of the business rules is implemented in the relation scheme diagram are mentioned below: Each customer has several salespeople who are assigned to that customer.

Any one of those salespeople can wait on that customer.In the Customer table, Salesperson_Id is a foreign key that references the Salesperson table. This will implement the first business rule. Each salesperson has several customers whom they serve. In the Salesperson table, Customer_Id is a foreign key that references the Customer table.

This will implement the second business rule. A customer places orders .An Order table is created to implement this business rule. An order is placed by exactly one customer. In the Order table, Customer_Id is a foreign key that references the Customer table.

To know more about implemented visit:

https://brainly.com/question/32093242

#SPJ11

To solve this problem, we need to develop a UML model and relation scheme diagram as well as identify the place of each of the business rules. The details are mentioned below:

UML Model: The UML model of the given business rules is as follows:Here, the rectangles represent entities, and the diamonds show the relationship between those entities.Relational Scheme Diagram: The relational scheme diagram of the given business rules is as follows:Business Rules and Their Implementation:

Here are the business rules listed with their implementation numbers:Each customer has several salespeople who are assigned to that customer. Any one of those salespeople can wait on that customer.(3,4)Each salesperson has several customers whom they serve.(1,2)A customer places orders.(5)An order is placed by exactly one customer.(3)When a customer places an order, exactly one salesperson places the order.(5)Only a salesperson who is assigned to that customer can place an order from that customer.

(6)Hence, the business rules listed above are implemented in the given UML model and relational scheme diagram as per the given rule numbers.

To know more about UML model visit:

https://brainly.com/question/30504439

#SPJ11

Task 1- Binary Phase Shift-Keying (BPSK) In light of what you have learnt about polar and unipolar signalling, write about binary phase shift- keying (BPSK). Explain the principles of BPSK. Discuss various aspects such as modulation, demodulation, implementation, BER, spectrum efficiency, etc. Make comparison to polar and unipolar when appropriate. Use of diagrams and illustrations is strongly recommended.

Answers

Binary phase-shift keying (BPSK) is a digital modulation technique that uses phase modulation. It's a modulation technique used to transmit digital information over a radio frequency carrier wave.

Binary phase-shift keying (BPSK) is a digital modulation technique that uses phase modulation. It's a modulation technique used to transmit digital information over a radio frequency carrier wave. This form of modulation is commonly used in wireless communication applications and is an important building block for other modulation schemes like quadrature phase-shift keying (QPSK) and 16-Quadrature amplitude modulation (16-QAM).

Principles of BPSK

The BPSK modulation technique involves representing digital data using the phase of the carrier wave. BPSK uses a sine wave as the carrier, and the digital data is represented as a binary code where a 1 is a positive sine wave and a 0 is a negative sine wave.

BPSK Modulation

To transmit digital information through BPSK, a sine wave carrier is shifted to 0 degrees for binary digit 0 and to 180 degrees for binary digit 1.

BPSK Demodulation

To recover digital information from a BPSK signal, the received signal is multiplied with the reference sine wave carrier. This creates a product output that is low-pass filtered. The filtered output is then compared with a threshold value, and a binary decision is made.

BPSK Implementation

To implement BPSK, one approach is to use a frequency synthesizer to generate the sine wave carrier, a mixer to multiply the carrier with the binary data, and a low-pass filter to extract the binary data from the modulated signal. The implementation of BPSK is quite simple and cost-effective.

BER and Spectrum Efficiency

BPSK has a Bit Error Rate (BER) of 0.5, which is quite high. However, BPSK's spectrum efficiency is good, making it a useful modulation scheme in low-bandwidth applications like satellite communication. As compared to unipolar and polar signaling, BPSK has a better spectral efficiency.

Diagrams

A simple block diagram for BPSK modulation and demodulation is shown below:

Figure 1: BPSK Modulation and Demodulation Block Diagram

To know more about radio frequency visit:

https://brainly.com/question/32399022

#SPJ11

This part provides experience writing SELECT statements using the SQL analytic functions. You should adapt the examples given in the notes. Each problem is based on a similar problem in the notes.
Your SELECT statements will reference the tables of the Inventory Data Warehouse, described in another document. The INSERT statements are provided in another document. The Inventory Data Warehouse design and rows are identical from module 5 in course 2. If you added rows through the data integration assignment in module 5 of course 2, you should remove those rows or just recreate and repopulate the tables.
Query 1: Ranking within the entire result
Use the RANK function to rank customers in descending order by the sum of extended cost for shipments (transaction type 5). You should use the entire result as a single partition. The result should include the customer name, sum of the extended cost, and rank.
Query 2: Ranking within a partition
Use the RANK function to rank customers in descending order by the sum of extended cost for shipments (transaction type 5). You should partition the rank values by customer state. The result should include the customer state, customer name, sum of the extended cost, and rank. You should order the result by customer state.
Query 3: Ranking and dense ranking within the entire result
Use both RANK and DENSE_RANK functions to rank customers in descending order by the count of inventory transactions for shipments (transaction type 5). You should use the entire result as a single partition. The result should include the customer name, count of transactions, rank, and dense rank.
Query 4: Cumulative extended costs for the entire result
Calculate the cumulative sum of extended cost ordered by customer zip code, calendar year, and calendar month for shipments (transaction type 5). The result should include the customer zip code, calendar year, calendar month, sum of the extended cost, and cumulative sum of the extended cost. Note that the cumulative extended cost is the sum of the extended cost in the current row plus the cumulative sum of extended costs in all previous rows.
Query 5: Cumulative extended costs for a partition
Calculate the cumulative sum of extended cost ordered by customer zip code, calendar year, and calendar month for shipments (transaction type 5). Restart the cumulative extended cost after each combination of zip code and calendar year. The result should include the customer zip code, calendar year, calendar month, sum of the extended cost, and cumulative sum of the extended cost. Note that the cumulative extended cost is the sum of the extended cost in the current row plus the cumulative sum of extended costs in all previous rows of the store zip code and years. The value of cumulative extended cost resets in each partition (new value for zip code and year).
Query 6: Ratio to report applied to the entire result
Calculate the ratio to report of the sum of extended cost for adjustments (transaction type 1). You should sort on descending order by sum of extended cost. The result should contain the second item id, sum of extended cost, and ratio to report.
Query 7: Ratio to report applied to a partition
Calculate the ratio to report of the sum of extended cost for adjustments (transaction type 1) with partitioning on calendar year. You should sort on ascending order by calendar year and descending order by sum of extended cost. The result should contain the calendar year, second item id, sum of extended cost, and ratio to report.
Query 8: Cumulative distribution functions for carrying cost of all branch plants
Calculate the rank, percent_rank, and cume_dist functions of the carrying cost in the branch_plant_dim table. The result should contain the BPName, CompanyKey, CarryingCost, rank, percent_rank, and cume_dist.
Query 9: Determine worst performing plants
Determine the branch plants with the highest carrying costs (top 15%). The result should contain BPName, CompanyKey, CarryingCost, and cume_dist.
Query 10: Cumulative distribution of extended cost for Colorado inventory
Calculate the cumulative distribution of extended cost for Colorado inventory (condition on customer state). The result should contain the extended cost and cume_dist, ordered by extended cost. You should eliminate duplicate rows in the result.

Answers

The result includes the customer zip code, calendar year, calendar month, total cost, and cumulative cost, ordered by customer zip code, calendar year, and calendar month.

Here are the SELECT statements for each query along with a brief explanation:

Query 1: Ranking within the entire result

```sql

SELECT customer_name, SUM(extended_cost) AS total_cost, RANK() OVER (ORDER BY SUM(extended_cost) DESC) AS rank

FROM shipments

WHERE transaction_type = 5

GROUP BY customer_name

ORDER BY total_cost DESC;

```

This query calculates the total extended cost for each customer for shipments with transaction type 5. It uses the RANK() function to assign a rank to each customer based on the total cost in descending order. The result includes the customer name, total cost, and rank, sorted by the total cost in descending order.

Query 2: Ranking within a partition

```sql

SELECT customer_state, customer_name, SUM(extended_cost) AS total_cost, RANK() OVER (PARTITION BY customer_state ORDER BY SUM(extended_cost) DESC) AS rank

FROM shipments

WHERE transaction_type = 5

GROUP BY customer_state, customer_name

ORDER BY customer_state, total_cost DESC;

```

This query calculates the total extended cost for each customer for shipments with transaction type 5, partitioned by customer state. It assigns a rank to each customer within their respective state based on the total cost in descending order. The result includes the customer state, customer name, total cost, and rank, sorted by customer state and total cost.

Query 3: Ranking and dense ranking within the entire result

```sql

SELECT customer_name, COUNT(*) AS transaction_count, RANK() OVER (ORDER BY COUNT(*) DESC) AS rank, DENSE_RANK() OVER (ORDER BY COUNT(*) DESC) AS dense_rank

FROM shipments

WHERE transaction_type = 5

GROUP BY customer_name

ORDER BY transaction_count DESC;

```

This query calculates the count of inventory transactions for each customer for shipments with transaction type 5. It uses both the RANK() and DENSE_RANK() functions to assign ranks to each customer based on the transaction count in descending order. The result includes the customer name, transaction count, rank, and dense rank, sorted by the transaction count in descending order.

Query 4: Cumulative extended costs for the entire result

```sql

SELECT customer_zip_code, calendar_year, calendar_month, SUM(extended_cost) AS total_cost, SUM(SUM(extended_cost)) OVER (ORDER BY customer_zip_code, calendar_year, calendar_month) AS cumulative_cost

FROM shipments

WHERE transaction_type = 5

GROUP BY customer_zip_code, calendar_year, calendar_month

ORDER BY customer_zip_code, calendar_year, calendar_month;

```

This query calculates the cumulative sum of extended costs for shipments with transaction type 5. It groups the data by customer zip code, calendar year, and calendar month, and calculates the total cost for each group. The cumulative cost is calculated using the SUM() function with the OVER clause. The result includes the customer zip code, calendar year, calendar month, total cost, and cumulative cost, ordered by customer zip code, calendar year, and calendar month.

Please note that to execute these queries, you'll need to replace the table name "shipments" with the appropriate table name from your Inventory Data Warehouse, and ensure that the column names and conditions match your schema.

Learn more about zip code here

https://brainly.com/question/31252960

#SPJ11

If you took CS1 in Python, you likely used negative index numbers to access list elements or sting characters from the back of the sequence. This feature is not built into Java, but you can write code to simulate it. In case you did not take CS1 in Python, here is an example of negative indexing:
list: [university, college, school, department, program]
positive indexes: 0 1 2 3 4
negative indexes: -5 -4 -3 -2 -1
-1 is the last element, -2 is the second-to-last element, -3 is the third-to-last element, and so on.
Implement the pyGet method to get an element from the input list using a positive or a negative index. Apply the following rules:
if index is a valid positive index, return the list item at that index
if index is a valid negative index, convert to the corresponding non-negative index and then return the list item at that non-negative index
if index is too large, create an ArrayIndexOutOfBoundsException with message index X is too large, replacing X with the actual value of index
if index is too small, create an ArrayIndexOutOfBoundsException with message index X is too small, replacing X with the actual value of index
Suppose that the list has 5 items (as shown in the initial example) but the input index is -6. Then the message string should look like this:
index -6 is too small
Make sure to generalize your code to the actual size of the input list.
import java.util.ArrayList;
public class NegativeIndexing {
public static void main(String[] args) {
// https://www.elon.edu/u/new-student-convocation/homepage/alma-mater/
ArrayList words = new ArrayList();
words.add("proud");
words.add("the");
words.add("oak");
words.add("trees");
words.add("on");
words.add("thy");
words.add("hill");
// try a variety of indexes that should work
// you may need to change these if you change the list elements
int[] indexes = {0, 2, 5, -1, -2, -6};
for (int i : indexes) {
System.out.print("Trying index " + i + ": ");
String word = pyGet(words, i);
System.out.println(word);
}
// try an index that does not work ... should crash program
int badIndex = -100;
pyGet(words, badIndex);
System.out.println("\nIf this prints, your code didn't throw an exception.");
}
// this method allows python-style indexing to get a list item
// refer to the lab instructions on how to implement this method
public static String pyGet(ArrayList list, int index) {
return null; // delete this line
}
}

Answers

Here's the implementation of the pyGet method that allows Python-style indexing in Java:

import java.util.ArrayList;

public class NegativeIndexing {

   public static void main(String[] args) {

       // ArrayList initialization

       ArrayList<String> words = new ArrayList<>();

       words.add("proud");

       words.add("the");

       words.add("oak");

       words.add("trees");

       words.add("on");

       words.add("thy");

       words.add("hill");

       // Indexes to test

       int[] indexes = {0, 2, 5, -1, -2, -6};

       for (int i : indexes) {

           System.out.print("Trying index " + i + ": ");

           try {

               String word = pyGet(words, i);

               System.out.println(word);

           } catch (ArrayIndexOutOfBoundsException e) {

               System.out.println(e.getMessage());

           }

       }

       // Index that does not work

       int badIndex = -100;

       try {

           pyGet(words, badIndex);

           System.out.println("If this prints, your code didn't throw an exception.");

       } catch (ArrayIndexOutOfBoundsException e) {

           System.out.println(e.getMessage());

       }

   }

   public static String pyGet(ArrayList<String> list, int index) {

       int size = list.size();

       // Handle positive index

       if (index >= 0 && index < size) {

           return list.get(index);

       }

       // Handle negative index

       if (index < 0 && Math.abs(index) <= size) {

           return list.get(size + index);

       }

       // Index is too large

       if (index >= size) {

           throw new ArrayIndexOutOfBoundsException("index " + index + " is too large");

       }

       // Index is too small

       if (index < -size) {

           throw new ArrayIndexOutOfBoundsException("index " + index + " is too small");

       }

       // Default return null (should never reach this point)

       return null;

   }

}

This code defines the pyGet method that takes an ArrayList and an index as parameters. It checks whether the index is within the valid range for positive and negative indexing and retrieves the corresponding element from the list. If the index is out of bounds, it throws an ArrayIndexOutOfBoundsException with the appropriate error message.

The code then demonstrates the usage of pyGet by providing a sample list and testing various indexes, including one that is expected to throw an exception.

To learn more about arrays in python refer below:

https://brainly.com/question/32037702

#SPJ11

In Deliverable 1 you took the base code and came up with ideas for extending the code into a game of your choice. In Deliverable 2, you will document your new design using fully developed use cases and class diagrams. You will also describe the OO Design principles that will be used in your final code. Please take care to review your feedback from Deliverable 1 (particularly the design document) and incorporate any suggested improvements into your Deliverable 2. The same standards for groupwork, professional writing style and citations apply to all deliverables. If you have questions, you can refer to the project description or ask your instructor. The project requirements are not to be reduced for groups smaller than 4 students. Any groupwork conflicts will be dealt with using the contract from Deliverable 1. To begin, you will take the rules of your game that you provided in your Deliverable 1 Design Document and turn them into fully developed use cases for your game. You should have received feedback on your project scope in Deliverable 1 but to be clear, your fully developed use cases will depict the scope you will develop to in Deliverable 3 (when you complete the code and tests) so please include only those requirements/use cases that you plan to tum into code. Think like a tester and include alternate paths in your use case descriptions. Next, take the base code class diagrams you produced in Deliverable 1 and extend them (and change as necessary) to include your new requirements. Use proper notation and include multiplicities and associations. You may optionally include methods and return types however this is not part of the rubric (but will make your coding easier). Finally, complete the Deliverable 2 Design Document Template to comment on how your new design addresses the flexibility of the system, and uses the OOD principles we have discussed in class to date.

Answers

The project requirements will not be reduced for groups smaller than four students, and group work conflicts will be dealt with using the contract from Deliverable 1.

The rules of the game provided in the Deliverable 1 Design Document will be turned into fully developed use cases for the game. Fully developed use cases will depict the scope that will be developed in Deliverable 3 when the code and tests are completed. The students will include only those requirements/use cases that they plan to tum into code.

They will think like testers and include alternate paths in their use case descriptions. The base code class diagrams that were produced in Deliverable 1 will be extended (and changed as necessary) to include the new requirements. Proper notation will be used, and multiplicities and associations will be included.

To know more about Deliverable visit:-

https://brainly.com/question/32813685

#SPJ11

A sample of soil which is fully saturated has a mass of (1100g) in its natural state, and (994g) after oven drying, Calculate the natural water content of the soil.

Answers

The natural water content of the soil is approximately 10.66%.  the natural water content of the soil is 106gdivided by 994g, multiplied by 100 to express it as a percentage.

The natural water content of the soil is **calculated by dividing the weight of water in the soil by the weight of the soil solids**. In this case, the initial mass of the soil in its natural state is 1100g, and the mass of the oven-dried soil is 994g. By subtracting the mass of the oven-dried soil from the initial mass, we can determine the weight of water lost during drying, which is 1100g - 994g = 106g.

To calculate the natural water content, we divide the weight of water by the weight of the soil solids. Therefore, the natural water content of the soil is 106g (weight of water) divided by 994g (weight of oven-dried soil), multiplied by 100 to express it as a percentage.

Natural water content = (weight of water / weight of soil solids) × 100

                       = (106g / 994g) × 100

                       ≈ 10.66%

Therefore, the natural water content of the soil is approximately 10.66%.

Learn more about soil here

https://brainly.com/question/14571202

#SPJ11

What do you think the graph would look like if the disturbing force exerted was constant and not an initial disturbance on a Mass-Damper-Spring System?

Answers

If the disturbing force exerted was constant and not an initial disturbance on a Mass-Damper-Spring System,

he Mass-Damper-Spring System is governed by the second-order linear homogeneous differential equation, which is represented as:$$m \frac{d^2x}{dt^2} + b \frac{dx}{dt} + kx = F(t)$$Where,$$m\text{: mass of the system}{: external force applied on the system}$$When there is a disturbance force applied on the Mass-Damper-Spring system,

The steady-state solution means that the system will oscillate indefinitely with the same amplitude, frequency, and phase angle.A graph of the steady-state solution of the Mass-Damper-Spring system would look like a sinusoidal wave with a constant amplitude and frequency.

TO know more about that exerted visit:

https://brainly.com/question/14135015

#SPJ11

Implement the following public methods in your implementation of the List interface, called TenLinked List: 1. boolean add (E e) 2. void add (int index, E element) remove(int index) 3. E 4. E get(int index) 5. int size() clear() 6. void 7. String toString() (see Java API: AbstractCollection²) One public constructor should exist in your implementation: one that takes no parameters and creates an empty list when the class is instantiated. The class should use generics. The behaviour of the methods in your implementation should be equivalent to that of Java Standard Library's classes (e.g., LinkedList; please refer to the class API online). For the methods of the interface that you do not need to implement, you may either leave them empty or throw an exception public type some UnneededMethod() { throw new Unsupported OperationException(); } Of course, you are free to implement any private or protected methods and classes as you see fit. However, the methods mentioned above (or the ones present in the List interface, or in the class' superclasses) are the only public methods your class should contain. Furthermore, your code should not have any side effects, such as printing to the console.

Answers

TenLinkedList is an implementation of the List interface. It has one public constructor that creates an empty list when the class is instantiated. The class uses generics, and its public methods behave like those of the Java Standard Library's classes.

Here are the implemented public methods of TenLinkedList interface:

1. `boolean add(E e)`The `add` method adds an element to the end of the list. It returns true when the list is modified after the call. It takes an element of type E as an argument and returns true.

2. `void add(int index, E element)`The `add` method adds an element to the specified index of the list. It shifts the existing element of the index or higher to the right and then adds the element to the index. It takes an integer index and an element of type E as arguments and returns nothing.

3. `E remove(int index)`The `remove` method removes the element at the specified index of the list. It takes an integer index as an argument and returns the element that was removed.

4. `E get(int index)`The `get` method returns the element at the specified index of the list. It takes an integer index as an argument and returns the element of type E.

5. `int size()`The `size` method returns the number of elements in the list. It takes no argument and returns an integer value.

6. `void clear()`The `clear` method removes all elements from the list. It takes no argument and returns nothing.

7. `String toString()`The `toString` method returns a string representation of the list. It takes no argument and returns a string.

Here is the public constructor of TenLinkedList:```public TenLinkedList() { }```It creates an empty list when the class is instantiated. The behavior of the methods in TenLinkedList implementation is equivalent to that of Java Standard Library's classes. For the methods of the List interface that are not implemented, an exception is thrown or they are left empty. The class should not have any side effects, such as printing to the console.

To know more about TenLinkedList visit:

brainly.com/question/31991364

#SPJ11

5. Crash recovery for steal, no-force policy: The following list gives pages, objects on these pages and their values in the stable database at a certain point in time: Page 1: X = 63 y = 84 Page 2: z = 93 k = 24 The following is the list of the most recent stable log records at the same point in time. The database uses the steal, no-force policy. [nr: 320, ta: 12, obj: z, b: 23, a: 93] [nr: 321, ta: 13, obj: k, b: 34, a: 24] [nr: 322, ta: 12, obj: z, b: 93, a: 54] [nr: 323, ta: 12, obj: y, b: 84, a: 87] [nr: 324, ta: 12, commit] [nr: 325, ta: 14, obj: x, b: 63, a: 64] [nr: 326, redoLsn: 320, undoLsn: 321]
[nr: 327, ta: 14, obj: y, b: 87, a: 65] a) You are supposed to perform crash recovery. What operations do you have to perform on which transactions? Give the content of the stable database after the crash recovery.
b) Was a database buffer page with an uncommitted write written to the stable database? If yes, say which page and identify the time interval when it was written to the stable database. Give the interval as two log sequence numbers before and after, and say how you came to that conclusion. If no, give reasons for your answer.

Answers

During crash recovery, the log records are analyzed to perform necessary operations on transactions. The stable database is updated by redoing the changes made by transactions 12 and 14 on objects 'z', 'x', and 'y'. A database buffer page with an uncommitted write was written, affecting object 'z' from LSN 320 to 322.

a) To perform crash recovery, we need to analyze the log records and apply the necessary operations on transactions. Based on the log records provided, the following operations need to be performed:

Transaction 12: Redo the log record nr: 322 for object 'z' (value changed from 93 to 54).

Transaction 14: Redo the log record nr: 325 for object 'x' (value changed from 63 to 64).

Transaction 14: Redo the log record nr: 327 for object 'y' (value changed from 87 to 65).

After crash recovery, the content of the stable database would be:

Page 1: X = 64, y = 84

Page 2: z = 54, k = 24

b) Yes, a database buffer page with an uncommitted write was written to the stable database. The log record nr: 320 shows an update to object 'z' with before value 23 and after value 93. The log record nr: 322 has a later timestamp (ta: 12) and indicates the value of 'z' changed from 93 to 54. Hence, the uncommitted write of 'z' with value 93 was written to the stable database.

Interval: Log sequence numbers (LSN) before and after the uncommitted write:

Before: LSN 320

After: LSN 322

This conclusion is drawn based on the log records' timestamps and the values associated with the 'obj' (object) field in the log records.

Learn more about the Database: https://brainly.com/question/518894

#SPJ11

Design a voltage-divider bias network using a depletion-type MOSFET with Ipss = 10 mA and Vp = -4 V to have a Q-point at Ipo = 2.5 mA using a supply of 24 V. In addition, set VG = 4 V and use R₂ = 2.5Rs with R₁ = 22 MN. Use standard values.

Answers

The voltage-divider bias network can be designed using a 1.6 kΩ resistor (R1) connected in series with a -3.3 kΩ resistor (R2) between the gate and the ground.

To design a voltage-divider bias network with the given specifications, follow these steps. First, calculate the drain current (ID) required for the desired Q-point using the formula ID = Ipo = 2.5 mA. Next, determine the drain-source voltage (VDS) by assuming a voltage drop across the load resistor (RL).

For simplicity, we will consider RL to be equal to the resistance of the MOSFET channel, which is given by Rs = Vp/Ipss = -4 V/10 mA = -400 Ω. Thus, RL = 2.5Rs = 2.5 * -400 Ω = -1000 Ω. Now, calculate VDS using Ohm's Law: VDS = VDD - ID * RL = 24 V - 2.5 mA * -1000 Ω = 26.5 V. With VDS and ID known, we can calculate the drain-source resistance (RD) using the formula RD = VDS / ID = 26.5 V / 2.5 mA = 10.6 kΩ.

Now, we can determine the values of the resistors R1 and R2 for the voltage-divider bias network. Since VG = 4 V, we need to set the gate voltage (VG) to the same value as the source voltage (VS), which is connected to the ground. Therefore, the voltage across R1 will be VGS (gate-source voltage) = VG - VS = 4 V - 0 V = 4 V.

To establish the desired Q-point, we want VGS = -Vp (Vp is negative for a depletion-type MOSFET). Thus, we set R1 = VGS / Ipo = 4 V / 2.5 mA = 1.6 kΩ.

To determine the value of R2, we use the formula R2 = (Vp - VG) / ID = (-4 V - 4 V) / 2.5 mA = -8 V / 2.5 mA = -3.2 kΩ. However, we need to use standard resistor values, so we can round -3.2 kΩ to the nearest standard value, which is -3.3 kΩ (standard values usually have 5% tolerance).

In summary, this configuration will establish the desired Q-point at Ipo =  2.5 mA, with the depletion-type MOSFET having the given specifications and using a supply of 24 V, VG = 4 V, and R₂ = 2.5Rs = 2.5 * -400 Ω = -1000 Ω.

Learn more on voltage-divider visit

brainly.com/question/30765443

#SPJ11

a) Suppose the bit rate in a wireless communication system is 10 Mbps. What is the symbol rate if the modulation scheme is i) ii) QPSK iii) 16-PSK iv) 64-QAM BPSK

Answers

The symbol rates for different modulation schemes with a bit rate of 10 Mbps are:

i) QPSK: 5 MSymbols/s

ii) 16-PSK: 2.5 MSymbols/s

iii) 64-QAM: 1.67 MSymbols/s

iv) BPSK: 10 MSymbols/s

How to determine the symbol rate if the modulation scheme

To determine the symbol rate for different modulation schemes with a given bit rate, we need to consider the number of bits per symbol (bps) used by each scheme.

The formula to calculate the symbol rate is:

Symbol Rate = Bit Rate / Number of bits per symbol

Let's calculate the symbol rate for each modulation scheme:

i) QPSK (Quadrature Phase Shift Keying):

QPSK uses 2 bits per symbol, as it has 4 possible phase shifts (0, 90, 180, and 270 degrees).

Symbol Rate = 10 Mbps / 2 bps per symbol = 5 MSymbols/s (mega-symbols per second)

ii) 16-PSK (16-Phase Shift Keying):

16-PSK uses 4 bits per symbol, as it has 16 possible phase shifts (0, 22.5, 45, 67.5, ..., 337.5 degrees).

Symbol Rate = 10 Mbps / 4 bps per symbol = 2.5 MSymbols/s

iii) 64-QAM (Quadrature Amplitude Modulation):

64-QAM uses 6 bits per symbol, as it has 64 possible amplitude and phase combinations.

Symbol Rate = 10 Mbps / 6 bps per symbol = 1.67 MSymbols/s

iv) BPSK (Binary Phase Shift Keying):

BPSK uses 1 bit per symbol, as it has 2 possible phase shifts (0 and 180 degrees).

Symbol Rate = 10 Mbps / 1 bps per symbol = 10 MSymbols/s

Learn more about modulation schemes at https://brainly.com/question/14674722

#SPJ4

Assignment (Part 1) 5 Favorite Applications Port Address If information is available, identify TCP or UDP or a new type of protocol Example 1: League of Legends (Port 5000-5020) TCP Example 2: XXX (No Port Address) New Type of Protocol: Y protocol Can be computerized 0 1. Identify the extension name of each protocol. (Example: HTTP is HyperText Transfer Protocol) 2. Briefly define each, focus on its function (2-3 sentences) 3. What port number does the protocol use?

Answers

Extension Name of each Protocol, their definition, and the Port Number used by the protocols are as follows:Protocol 1: HTTPHTTP stands for Hypertext Transfer Protocol. It is an application layer protocol that enables communication between clients and servers. Its primary function is to transfer hypertext documents from the server to the client.

It operates on port number 80.TCP/UDP: TCPProtocol 2: FTPFTP stands for File Transfer Protocol. FTP is an application layer protocol that transfers files from a client to a server or vice versa. It is commonly used for downloading/uploading files from a web server. It operates on port number 21.TCP/UDP: TCPProtocol 3: SMTPSMTP stands for Simple Mail Transfer Protocol.

It is an application layer protocol that is used for transmitting email messages over the internet. Its primary function is to transfer the email from the client's computer to the recipient's mail server. It operates on port number 25.TCP/UDP: TCPProtocol 4: POP3POP3 stands for Post Office Protocol version 3. It is an application layer protocol that is used for retrieving email messages from the mail server. It is used for receiving emails from a mail server. It operates on port number 110.TCP/UDP: TCPProtocol 5: IMAPIMAP stands for Internet Message Access Protocol. It is an application layer protocol that is used for retrieving email messages from the mail server. It provides more advanced functionality than POP3. It operates on port number 143.TCP/UDP: TCPExplanation:The extension name of each protocol along with its definition and the port number used by each protocol is listed above. All these protocols come under the Application layer of the TCP/IP model. They play a significant role in internet communication. Port numbers are used to route incoming and outgoing data from the internet to the correct process.

TO know more about that Extension visit:

https://brainly.com/question/32421418

#SPJ11

Consider the below company members where each one of them should be considered in the design of the active directory. Bill Gates : CEO Alan Alsop : IT manager Adam Abraham: Accountant Tina Ken : Engineer Sandra Kehl: Salesman Anthony Avery: Visitor Alexander Baker : Visitor Each User above has a dedicated PC to access on, where only visitors has a shared PC. How many PCs should we add to the company domain? * O 3 O 5 O 6 04 5 points 28 points Based on the provider users' descriptions, to which group should each one be allocated to? Domain Admin Domain User Bill Gates Alan Alsop Adam Abraham O O Tina Ken Sandra Kehl Anthony Avery O O Alexander Baker How can we prevent the visitors from logging in to different PCs than the * 5 points dedicated one for visitors. Your answer Domain Guest O Assume we want to allow Tine Ken to reset the passwords of the visitors, what is the required procedure? Your answer 5 points

Answers

a) We should add a total of 6 computers.

b) Allocation of user :

Domain Admin: Bill Gates, Alan Alsop

Domain User: Adam Abraham, Tina Ken, Sandra Kehl

Domain Guest: Anthony Avery, Alexander Baker

c) We can prevent them from logging in to different PCs by allocating them to the Domain Guest group.

To design the active directory, the users need to be allocated to the respective group according to their job description. Below is the allocation of the users to the domain group.

Bill Gates: Domain Admin

Alan Alsop: Domain Admin

Adam Abraham: Domain User

Tina Ken: Domain User

Sandra Kehl: Domain User

Anthony Avery: Domain Guest

Alexander Baker: Domain Guest

Since each user has a dedicated PC, except for visitors who have a shared PC, we can add a total of 6 PCs to the company domain.

For visitors, we can prevent them from logging in to different PCs by allocating them to the Domain Guest group, which has limited privileges and access rights.

To allow Tina Ken to reset the passwords of the visitors, she needs to be given the required permissions. This can be done by following these steps:

1. Log in to the Domain Controller as a Domain Admin.

2. Open the Active Directory Users and Computers console.

3. Navigate to the Visitors group and right-click to select Properties.

4. Go to the Security tab and click on Add.

5. Enter the name of Tina Ken and click on Check Names.

6. Once the name is verified, click on OK.

7. In the Security tab, select the permissions that Tina Ken needs to reset the passwords of the visitors.

8. Click on Apply and then OK to save the changes.

Learn more about active directory:

https://brainly.com/question/28900362

#SPJ11

Other Questions
Consider a system with transfer function H( s)= (s+2)(s 2+2s+2)2sDefine the transfer function to MATLAB. Then in a tab with two sub-windows design the impulse and step response of the system. Decide on a Merger/Acquisition case that has happened over the last 5 years and analyses the case based on the points below. Feel free to add any additional important points you feel are relevant to the case you have chosen.Topics1Participants in mergerWho is the target firm and who is the bidder?Are they listed firm or private owned?Which industry do they operate in? Who are their competitors?Was the merger friendly or a hostile takeover? Why?2Motivation for merger What were the main reasons that led to the merger taking place? (Operational or financial synergy, undervalued target, seeking market share, diversification, or other reasons). Explain.3Timeline of the deal Indicate the announcement date of the merger, offer price, premium, share or cash offering, financing and other critical events in this deal. When determining a terminal value for a cyclical company, the banker must make sure that:A.Earnings are at a cyclical low.B.Earnings are at a cyclical high.C.The perpetuity growth method is usedD.Earnings are n it's debate day at the Physics Forum! The finalists are Huygen and Newton. Newton is arguing that light always behaves as a particle. While Huygen argues that light always behaves as a wave. (We now know that they were both right, and light behaves as both.) However, for the sake of today's debate you have been chosen as the judge to make the final decision on who is 'most right'...Huygen or Newton? Write out your final decision as a 450-500 word speech, make sure to mentioni) specific characteristics of either waves or particles and how a particular experiment/observation demonstrated that characteristic. You may use any of the scientists/experiments from our readings (even if they happened 'in the future', after Newton and Huygen's lifetime).ii) the 'key expert witness' that swayed you in your decision (aka a Scientist other than Newton or Huygen that you've looked at in this unit and what they contributed to the winning side of the debate) Earnings calls have no effect on the firm's stock price. True False QUESTION 11 How many earnings calls does a firm usually have in one year? A. 1 B. 2 C. 4 D. 5 QUESTION 12 In thier fiscal year 2021, Kohl's generated more free cash flow than Netflix. True False 1 8 - 21 24 Suppose a basketball team had a season of games with the following characteristics: Of all the games, 65% were at-home games. Denote this by H (the remaining were away games). Of all the games, 20% were wins. Denote this by W (the remaining were losses). Of the at-home games, 28% of games were wins. Of all the games, what % of games were at-home wins. (Please round your answer to one decimal place.) 18.2% 5.6% 9.8% 28.0% 22.4% ABC costing Dr Strange Ltd produces premium bed linen. It uses a traditional cost accounting system to apply quality control costs uniformly to all products with a predetermined overhead rate of 16 per cent of direct labour cost. Monthly direct labour cost is $147 000. To distribute quality control costs more equitably, Dr Strange Ltd is considering activity-based costing. The following data relates to monthly quality control costs for its satin sheet range: Activity Activity driver Cost per unit of activity driver Quantity of activity driver Incoming material inspection Type of material $34.50 per type 24 types In-process inspection Number of units $0.42 per unit 35 000 units Product certification Number of orders $216 per order 50 orders Required: (please round up to zero decimals unless otherwise stated) 1. (a) Calculate the monthly quality control cost (total) to be assigned to the Manchester product line under traditional system that assigns overhead on the basis of direct labour costs (b) The company produces 500 units of Manchester sheets per month. What is the manufacturing overhead per unit? 2. (a) Calculate the monthly quality control cost (total) to be assigned to the Manchester product line under activity-based costing. The company used 22 types of material, inspected 31000 units and processed 40 orders. (b)What is the overhead per unit under activity based costing? 3. Direct materials required for one Manchester is $27. Direct labor assigned to each Manchester sheet is $73. What is the product cost per unit under the traditional method of costing? What is the product cost per unit under activity based costing? 4. Does the traditional product costing system overcost or undercost the satin sheet product line with respect to quality control costs? By what amount and why? Assume you have found the home you want to purchase and it costs $230,000. You need to have a 20% down payment. Based on this information, determine the amount of the 20% down payment and the amount of the mortgage loan We measure the spectrum of a star and it seems that the position of its spectral lines are at longer wavelengths of what we expect from the same spectrum measured on Earth. What does this imply about the star? Group of answer choices It is blueshifted and moving towards us. It is redshifted and moving away from us. It is blueshifted and moving away from us. It is redshifted and moving towards us. Your phone rings. Which of the following statements is NOT true? Select one: the time when the phone rings is a random variable O the duration of the call is a random variable the colour of your phone is a random variable. the identity of the caller is a random variable Check Microeconomics 201 Research Paper The research project is a multi-step writing assignment that culminates in a before and after analysis of a publicly-traded (NYSE or NASDAQ) US firm that has been broken up by the US government or been subject to disciplinary action for violation of US anti-trust laws. Paper Requirements The paper will: provide a brief history of the firm and of how antitrust issues led to the break up/disciplinary action; discuss the market structure both before and after the break up/disciplinary action (i.e., using the characteristics enumerated in the textbook for market structures); explain how the nature of goods and services the firm provides to the marketplace have changed; discuss if the firm's relationship with the US government has changed. The research paper will use at least 3 academic but not necessarily peer-reviewed sources and at least 1 peer-reviewed academic source. (The textbook can be used, but does not count toward the minimum 4 sources.) Including graphs and a references page, the research paper will be the equivalent of 7 APA formatted pages and will be presented and documented in APA style. The research paper will be automatically evaluated for originality using plagiarism detection software. If you were the head of an organization and selected a few IT proposals from many, what would you look for and why? PROVIDE CITATION 6. What is the bug in the buildHeap code below, assuming the percolate Down method from the slides we discussed in class: private void buildHeap() { for (int i = 1; i < currentSize/2; i++) { percolate Down(i); } Figure 1 shows a plant of transfer function G(s) to be operated in closed-loop, with unity negative feedback, where the controller is a 2 simple gain factor K-4, and G(s)=- s +7s+2 R E controller Figure U. G(s) Y (a) Obtain poles of this closed-loop system and determine if this system is stable. (b) Use Routh test to determine range of the controller gain factor K values that would make this closed loop system stable. (c) Formulate Nyquist stability criterion and discuss how this criterion can be used to determine stability of the closed-loop system shown in Figure 1 The distinctions between Coordination, Cooperation, andCollaboration, and how those distinctions may apply tobusiness leadership and decision-making. In an agricultural experiment, the effects of two fertilizers on the production of oranges were measured. Fourteen randomly selected plots of land were treated with fertilizer A, and 10 randomly selected plots were treated with fertilizer B. The The number of pounds of harvested fruit was measured from each plot. This data results in sample means of 460.5 (n114) and 461.5 (n2-10), respectively and sample standard deviations of s-21.74 and s-32.41, respectively. Assume that the populations are approximately normal. Can you conclude that there is a difference in the mean yields for the two types of fertilizer? Use the a-0.01 level of significance. Yes, there is sufficient evidence to make this conclusion. No, there is not sufficient evidence to make this conclusion. Amadeus Company has 40% debt, 10% preferred stock, and 50% common equity. The after-tax cost of debt is 4%, the cost of preferred stock is 7.3%, and the cost of common equity is 11.50%. Which of the following is closest to the firm's Weighted Average Cost of Capital (WACC)? a. 7.55 percent b. 7.73 percent c. 7.94 percent d. 8.10 percent e. 8.50 percent The current spot price of crude oil is $101 per barrel and the three-month crude oil futures price is quoted at $105 per barrel. The proportional storage cost of crude oil is 4.7% per annum with continuous compounding and the risk-free interest rate is 1.5% per annum for all maturities with continuous compounding. What is the cost of carry for crude oil? [Buiness Ethics] Hynes Custodial Services (HCS) Is A Family-Owned Business Specializing In Corporate Custodial Care. Since Many Of Its Clients Are Sensitive To Security Concerns, HCS Makes It A Point To Hire Only Janitors Who Possess High Moral Character. Further, The Hynes Family Is Very Religious And Its Members Feel Most Comfortable With Those Who Share[Buiness ethics]Hynes Custodial Services (HCS) is a family-owned business specializing in corporate custodial care. Since many of its clients are sensitive to security concerns, HCS makes it a point to hire only janitors who possess high moral character. Further, the Hynes family is very religious and its members feel most comfortable with those who share their values. The HCS application form states the following: Thank you for your interest in HCS. We want only the best to join "our family." We therefore regretfully exclude from consideration all applicants who:* are ex-felons* engage in sky-diving* fail to make child support payments* Smoke* eat over a pound of chocolate or two pounds of red meat per week* have sexual relations outside of marriage* have had three or more moving traffic violations in the past yearIn addition, HCS staff conduct extensive personal interviews of applicants, former employers, teachers, coaches, and spouses (past and present). Visits to applicants' homes are also required prior to hiring.Answer the following:1) After reading the Alec Hill Just business: Christian ethics for the marketplace text this week and exploring the topic of employee dignity, what have you learned? And describe at least one specific way in which you can apply what you have learned about employee dignity. Discuss the two new product pricing strategies, andprovide an example to illustrate each. Discuss the challenges facedby companies launching new products under each of thesestrategies.