Question 1 Given the class diagram of Fruit, Apple and Mango. Apple and Mango are children of Fruit. Fruit 1. Apple 2. Mango
Figure 1 Class Diagram In the main method, suppose array fruits stores 200 fruits consist of Apple and Mango objects. Fruit fruits [] = new Fruit [200]; Count and display the number of Mango objects from that array. Use appropriate loop to read all objects in the array.

Answers

Answer 1

The class diagram of Fruit, Apple, and Mango. Apple and Mango are children of Fruit, and in the main method, suppose an array "fruits" stores 200 fruits consisting of Apple and Mango objects.

The array needs to be read to count the number of Mango objects and display it.

In order to achieve that, a loop must be used to read all the objects in the array, as shown below:

public class Fruit {

public String name;

public Fruit(String name) {

this.name = name;

}

}

class Apple extends Fruit

{public Apple(String name) {

super(name);

}

}

class Mango extends Fruit {

public Mango(String name) {

super(name);

}

}

public class Main {

public static void main(String[] args) {

Fruit fruits [] = new Fruit [200];

int count = 0;

for(int i = 0; i < fruits.length; i++) {

if(fruits[i] instanceof Mango) count++;

}

System.out.println("Number of Mango Objects: " + count);}}

Firstly, create a Fruit class with a name property, then create two other classes Mango and Apple that extend the Fruit class.

Secondly, the Main class was created, where an array of 200 Fruit objects was created and named fruits, a count variable was also created, and set to zero.

Thirdly, A loop was created to read the array of Fruit objects, and inside the loop, an if statement was created to check if the Fruit object in the array is an instance of the Mango class. If the instance of the object is a Mango, the count variable was incremented by one. Finally, the output statement prints out the number of Mango objects that were read from the array.

Lear more about array:

https://brainly.com/question/32195604

#SPJ11


Related Questions

. The smaller the unit, or fraction of a unit, on the measuring device, the more precisely the device can measure. [True or False] 6 | P age 2. Compare analog and digital instrument performance with any three points each. 3. The absolute error of the measurement shows how large the error (or difference) is in relation to the true value, while the relative error of the measurement shows how large the error actually is. [True or False] 4. The current passing through an electronic load is known to be exactly 120 milli-amperes. When measured on a new purchased ammeter, it measures 124 milli-amperes. What is the percent error of measurement for the new ammeter? 6|P 5. In this experiment, what is the purpose of measuring and knowing the value of the resistor? Explain.

Answers

Digital instruments are electronic devices used for measuring and displaying different electrical and physical values. They are also known as digital measuring instruments or digital meters.

1. The statement is True. The smaller the unit on a measuring device, the more precisely the device can measure. The unit helps to achieve accuracy in measurement.

2. Analog and digital instruments differ from each other in terms of performance, which can be compared based on the following points: Points of comparison between analog and digital instruments Performance analogue instrument Performance digital instrument. The display type is continuous and uses a pointer and a scale to indicate measurement. The display type is digital and numerical and does not require calibration.

b. Readability Analog instruments can be difficult to read due to parallax errors. Digital instruments can be easily read as they have a numerical readout.

c. PrecisionAnalog instruments provide good precision when readings are taken to half of the smallest scale division. Digital instruments offer high precision by displaying results up to 4 decimal places.

3. The statement is True. The absolute error of the measurement shows how much the error is relative to the true value, while the relative error of the measurement shows how much the error actually is.

4. Percent error = (Measured value - True value)/True value x 100%

Given: Measured value = 124 mA, True value = 120 mA% Error = (124-120)/120 x 100% = 3.33%.

Therefore, the percent error of measurement for the new ammeter is 3.33%.5. In an experiment, the resistor's purpose is to control the current passing through the circuit and measure the voltage drop. Knowing the value of the resistor allows the current through the circuit to be controlled and the voltage drops across it to be measured accurately.

To know more about Digital Instrument visit:

https://brainly.com/question/32347442

#SPJ11

Compute convolution of r(t) and h(t) defined as follows: 2, if-4

Answers

Given r(t) and h(t) as follows:r(t) = { 0, 2, 3, 1, 0 }andh(t) = { -4, 3, 2 }The convolution of r(t) and h(t) is given by the formula:r(t) * h(t) = ∑[ r(n) h(t - n) ]where, n ranges from -∞ to ∞ and the result is defined for every t.To compute convolution of r(t) and h(t), we need to find the values of h(t - n) for each value of n.

Since h(t) is defined for t = 0, 1, 2, the values of h(t - n) can be found as follows:For t = 0,h(t - n) = h(0 - n) = h(-n) = { -4, 3, 2 }For t = 1,h(t - n) = h(1 - n) = h(1 - n) = { -4, -1, 3, 2 }For t = 2,h(t - n) = h(2 - n) = h(2 - n) = { -4, -1, 0, 3, 2 }Now, using the above values of h(t - n), we can compute the convolution of r(t) and h(t) as follows:

r(t) * h(t) = ∑[ r(n) h(t - n) ]n ranges from -∞ to ∞ and the result is defined for every t.For t = 0,r(t) * h(t) = r(-2) h(0 + 2) + r(-1) h(0 + 1) + r(0) h(0) + r(1) h(0 - 1) + r(2) h(0 - 2)= 0 + 0 + ( 2 * ( -4 ) ) + ( 3 * 3 ) + 0= 1For t = 1,r(t) * h(t) = r(-2) h(1 + 2) + r(-1) h(1 + 1) + r(0) h(1) + r(1) h(1 - 1) + r(2) h(1 - 2)= 0 + 0 + ( 3 * ( -4 ) ) + ( 2 * 3 ) + 0= -6For t = 2,r(t) * h(t) = r(-2) h(2 + 2) + r(-1) h(2 + 1) + r(0) h(2) + r(1) h(2 - 1) + r(2) h(2 - 2)= 0 + ( 1 * ( -4 ) ) + ( 1 * ( -1 ) ) + ( 2 * 3 ) + 0= 3

Therefore, the convolution of r(t) and h(t) is given by the following sequence:r(t) * h(t) = { 1, -6, 3 }

To know more about convolution visit:

https://brainly.com/question/31056064

#SPJ11

Fourier Series Coefficients Of Discrete Time Signals (8 Points) Let X[N] Be A Periodic Sequence With A Period N A

Answers

The main answer to the question about Fourier series coefficients of discrete time signals is given below: Given: Periodic sequence X[n] with period NA period NIn order to obtain the Fourier series coefficients of a periodic sequence, we use the following equation:$$c_{k}=\frac{1}{N}\sum_{n=0}^{N-1}X[n]e^{-j\frac{2\pi}{N}kn}, k=0,1,...,N-1$$Here, the kth Fourier series coefficient is given by the expression above. The value of k ranges from 0 to N-1. The exponential factor in the above equation corresponds to the rotating phasor with a frequency of k/N cycles per sample. For each value of k, the Fourier series coefficient c_k determines the amplitude and phase of the corresponding sinusoidal component of the signal. The explanation of the above equation is as follows: In general, the Fourier series coefficients of a periodic sequence with period N are complex numbers.

The real part of the kth Fourier series coefficient c_k represents the amplitude of the sinusoidal component at frequency k/N cycles per sample, and the imaginary part represents the phase shift relative to a reference sinusoid of the same frequency. The explanation of the rotating phasor is as follows: For a periodic sequence, a fundamental frequency (1/T) and its harmonics (2/T, 3/T, 4/T,...) can be represented as a sum of complex exponentials. This representation is known as the Fourier series.

The Fourier series can be viewed as the sum of rotating phasors with different amplitudes and phases. Each phasor represents a sinusoidal component with a particular frequency and phase angle. When all of the phasors are added up, they form a waveform that repeats periodically with a period of T.

To know more about frequency visit:

https://brainly.com/question/30219362

#SPJ11

Consider a function consisting of an arbitrary linear combination of trigonometric functions having dif- ferent amplitudes and frequencies, and then make a discrete sequence of samples obtained from the function. Then, perform DFT for the sampled data and examine Nyquist frequency and Nyquist rate, together with the aliasing effect, for various sampling frequencies. You can use the fast Fourier transform (FFT) implemented in Microsoft Excel, or other mathematics softwares.

Answers

A discrete Fourier transform (DFT) is an important technique in digital signal processing. It is used to extract frequency-domain information from a finite-length time-domain signal.

In this article, we will examine the Nyquist frequency and Nyquist rate, as well as the aliasing effect, for a function composed of an arbitrary linear combination of trigonometric functions with varying amplitudes and frequencies, using DFT for the sampled data. By sampling at a number of different frequencies, we can determine the effects of aliasing and the Nyquist frequency and rate.

The Nyquist rate is the minimum sample rate required to prevent aliasing when sampling a signal. If the signal being sampled has no frequency components greater than half of the sample rate (the Nyquist frequency), the signal can be perfectly reconstructed from the samples.

In the case of the DFT, negative frequencies appear when the signal is under-sampled. When a signal is under-sampled, high-frequency components fold back into the lower-frequency range, resulting in negative-frequency aliases. In conclusion, we can say that the Nyquist rate and Nyquist frequency are significant for proper data sampling in digital signal processing.

To know more about important visit:

https://brainly.com/question/24051924

#SPJ11

Assume the following Ada program was compiled and executed using static scope rules. What value of x is printed in procedure Sub1? Under dynamic scoping rules, what value of x is printed in procedure Sub1? I procedure Main is - of Subl of Subl -- of Sub2 -1 of Sub2 of Main of Main X: Integer; procedure Subl is begin Put (X); end; procedure Sub2 is X: Integer; begin X : = 10; Subl end; -- begin X := 5; Sub2; end; --

Answers

Static scope is a scope where variables are used as they are defined within the program. For instance, in the Ada program shown below, the value of x in Subl is going to be obtained from the global scope, which is 5.In the Sub1 procedure, the output will be 5 if static scope rules are used.

Because in static scope, the variable is used as it is defined within the program. If Sub1 is called in the Ada program, the output will be 5. Under dynamic scope rules, the value of x is printed in procedure Sub1 is 10. This is because dynamic scope rules utilize the value of the most recent call. The call stack is used to implement dynamic scoping. The return value of the current function is saved on the stack, and when a new function is called, the value of the variables is updated. Therefore, if Sub1 is called in the Ada program under dynamic scope rules, the output will be 10.

to know more about Ada program here:

brainly.com/question/14378352

#SPJ11

Three winding transformers: what is the most common configuration of transmission to distribution transformers (GSUS): a) A on the transmission side, grounded Y on the distribution side b) A on the transmission side, A on the distribution side c) Y on the transmission side, Y on the distribution side

Answers

The most prevalent configuration for transmission to distribution transformers is a) A on the transmission side, grounded Y on the distribution side.

The most common configuration for transmission to distribution transformers, also known as GSU (Generator Step-Up) transformers, is A on the transmission side, grounded Y on the distribution side.

In this configuration, the primary winding of the transformer is connected in delta (A) on the high-voltage side, which is typically the transmission side. The secondary winding is connected in a grounded wye (Y) configuration on the low-voltage side, which is usually the distribution side.

This configuration is commonly used in power systems because it provides several advantages. The delta (A) connection on the high-voltage side allows for higher voltages to be transmitted efficiently over long distances. The grounded wye (Y) connection on the low-voltage side provides a neutral point that can be used for grounding and facilitates the connection of loads in a balanced manner.

Option b) A on the transmission side, A on the distribution side, is less common for transmission to distribution transformers. It involves a delta (A) connection on both the high-voltage and low-voltage sides, which is typically used in specific applications such as industrial systems or where the voltage levels remain high on the distribution side.

Option c) Y on the transmission side, Y on the distribution side, is not a common configuration for transmission to distribution transformers. It involves a wye (Y) connection on both the high-voltage and low-voltage sides, which is typically used in systems where the voltage levels are relatively low and there is no need for higher transmission voltages.

Overall, the most prevalent configuration for transmission to distribution transformers is a) A on the transmission side, grounded Y on the distribution side.

Learn more about Transformers click;

https://brainly.com/question/15200241

#SPJ4

marks What advantages are possessed by a three-phase connection in which the primaries are in A and the secondaries provide a neutral wire in addition to the three terminal leads?

Answers

Three-phase connections in which the primaries are in A and the secondaries provide a neutral wire in addition to the three terminal leads have a number of advantages.

The advantages possessed by a three-phase connection in which the primaries are in A and the secondaries provide a neutral wire in addition to the three terminal leads are discussed below. Three-phase connections have the following advantages:

1. In three-phase systems, three separate single-phase transformers are replaced by one three-phase transformer, which saves space, material, and money.

2. In comparison to the single-phase supply, three-phase supplies provide constant power delivery at all times, which is important for industrial purposes.

3. Three-phase power provides a more constant supply voltage, which allows for longer cable runs.

4. Because of the balanced three-phase loading, a three-phase supply requires less conductor material than a single-phase supply with the same volt-ampere rating.

5. The generation of a rotating magnetic field simplifies the operation of three-phase motors.

6. It is simpler to transmit electrical energy over long distances utilizing high-voltage three-phase lines.

7. Three-phase systems are easier to ground than single-phase systems, resulting in better ground fault detection and protection.

To know more about Three-Phase Connections visit:

https://brainly.com/question/32333547

#SPJ11

Web Programming
Lab – 10
Construct a page as shown below than write the jQuery for the given events:
Events:
Button (onclick): paragraph toggle between hide and show
H1 (mouseenter): h1 text color changes to red
UL (mousedown and mouseup): When mouse down the all the list item color changes to blue and when mouse up the color changes to black
Hover image (dbclick): when double click on hover image the image size will be double

Answers

The jQuery library is a great tool to have at your disposal when it comes to programming websites. It provides you with a lot of features that you can use to enhance your web pages. In this lab, you will learn how to use jQuery to create a web page and then write code to respond to certain events.

Welcome to Web Programming Lab 10

This is the paragraph that will be toggled on and off.

List Item 1List Item 2List Item 3

```Next, you will need to create a new file called script.js. This is where you will write the jQuery code to respond to the events.```javascript$(document).ready(function() {  // Toggle Paragraph  $("#toggleBtn").click(function() {    $("#paragraph").toggle();  });  // H1 Mouse Enter  $("h1").mouseenter(function() {    $(this).css("color", "red");  });  // UL Mouse Down  $("ul").mousedown(function() {    $("li").css("color", "blue");  });  // UL Mouse Up  $("ul").mouseup(function() {    $("li").css("color", "black");  });  // Hover Image Double Click  $("#hoverImg").dblclick(function() {    $(this).css("width", $(this).width() * 2);  });});```.

To know more about disposal visit:

https://brainly.com/question/292168765

#SPJ11

3. Assume an employer hired you to design a route management system for a package delivery company. The company receives a list of packages that needs to be delivered and the available drivers every day. Your job is to create the most efficient routes that will deliver all the packages with the given number of drivers for the day. Explain how you would approach this problem and what possible problems you think you will have. If possible you can also provide solutions to the possible problems. (30)

Answers

Approach to Design Route Management System for a Package Delivery Company:To design a route management system for a package delivery company.

The following approach can be taken. It will involve the following steps:1. Collecting data: The first step will be  delivery information and the available drivers.2. Analyzing data: The next step will be to analyze the data collected to identify the best possible delivery route.

The aim is to maximize the number of packages delivered by minimizing the total distance covered by the drivers. This  algorithms that will generate the best routes.3. Creating a database: Once the most efficient routes have been identified.

To know more about Route visit:

https://brainly.com/question/31498865

#SPJ11

In linux!
1. Write a shell script is_equal that takes a number as input and checks
if it is equals to 10,
greater than 10 and less than 10.
2. Write a shell script print_num that takes a number as input and use
while loop to print values
decreasing order. ex. input=10, output: 10 9 8 7 6 5 4 3 2 1
3. Write a shell script display_even_digits that takes a number as input
and use while loop to
display all the even digits within that number. ex input: 10 output: 2 4 6
8 10

Answers

Shell Script to check a number whether it is equal, greater or less than 10:# !/bin/bash # Take input from userecho -n "Enter a number: "read num# Check if number is equal to 10if [ $num -eq 10 ]thenecho "Number is equal to 10."# Check if number is greater than 10elif [ $num -gt 10 ]thenecho "Number is greater than 10.

"# Check if number is less than 10elseecho "Number is less than 10."fi2. Shell Script to print decreasing numbers:# !/bin/bash # Take input from userecho -n "Enter a number: "read num# Use while loop to print values in decreasing orderi=$numwhile [ $i -gt 0 ]doecho -n "$i "let i-=1doneecho ""3. Shell Script to display even digits within a number:# !/bin/bash # Take input from userecho -n "Enter a number: "read num# Use while loop to display even digitsi=$numwhile [ $i -gt 0 ]doif [ $((i%2)) -eq 0 ]thenecho -n "$i "fidoneecho ""

The above three shell scripts will help you in performing the following tasks:

1. The first script checks whether the entered number is equal, greater or less than 10

.2. The second script takes an input number and uses a while loop to print the numbers in decreasing order.

3. The third script takes an input number and uses a while loop to display all the even digits within that number.

To know more about Shell visit :

https://brainly.com/question/13514474

#SPJ11

Draw from the project data model to prepare a statement that would show project name, project
start and end dates, and the sum of estimated project hours. Limit the result set to projects with a start date on or
after July 1, 2021. Use column aliases (including "Total No. of Hours" for the aggregate function) and table aliases.
Sort by the sum of estimated project hours in descending order. Hint: there’s no HAVING clause in this statement.

Answers

Retrieve the project name, start and end dates, and the sum of estimated project hours for projects with a start date on or after July 1, 2021. Sort the results by the sum of estimated project hours in descending order.

Based on the given requirements, the SQL statement can be written as follows:

```sql

SELECT p.project_name,

      p.start_date AS project_start,

      p.end_date AS project_end,

      SUM(p.estimated_hours) AS "Total No. of Hours"

FROM projects p

WHERE p.start_date >= '2021-07-01'

GROUP BY p.project_name, p.start_date, p.end_date

ORDER BY "Total No. of Hours" DESC;

```

In this statement, we are querying the "projects" table and selecting the project name, start date, end date, and the sum of estimated project hours. We use the `SUM` aggregate function to calculate the total hours.

To filter the results, we use the `WHERE` clause to include projects with a start date on or after July 1, 2021. This ensures that only relevant projects are included in the result set.

For better readability, column aliases are used to rename the selected columns and give them meaningful names. Additionally, table alias "p" is used to reference the "projects" table.

Finally, the results are sorted in descending order based on the sum of estimated project hours using the `ORDER BY` clause.

Note: The actual data model and table/column names may vary depending on the specific project data structure.

Learn more about project:

https://brainly.com/question/25009327

#SPJ11

Write a Java method which receives an integer and returns true if that integer is perfect, and false otherwise. Recall that a perfect number is a number that is equal to the sum of its proper divisors. For example 6 = 1+ 2+ 3 is perfect.

Answers

To write a Java method that takes an integer and returns true if the integer is perfect, and false otherwise, you should do the following:

Java method which receives an integer and returns true if that integer is perfect, and false otherwise.

The following is the algorithm:

Declare a variable called sum and initialize it to 0.

Iterate from 1 to the number - 1, and if the number is divisible by the current iteration value, add the iteration value to sum.If sum equals the number, return true, otherwise, return false.

The following code demonstrates how to implement the Java method that takes an integer and returns true if the integer is perfect, and false otherwise:

public static boolean isPerfect(int number){ int sum = 0;for(int i=1;i

To know more about static boolean visit:

https://brainly.com/question/29846003

#SPJ11

Suppose x is the value at the bottom of a std::stack after the following operations: push (1), push (3), push (5), pop (),pop (), push (7), pop (), push (9). What operation sequences make the value at the front of a std::queue equal x (More than one answer may be selected)? A. push (1), push (3), pop (), push (1), push (5), pop (), push (1), push (7) B. push (1), push (3), push (1), push (5), pop (), pop (), pop (), push (7), push (9) C. push (5), push (3), push (1), pop (), pop (), push (9), push (3), push (7), pop () D. push (2), pop (), push (2), push (7), push (1), pop (), push (9), push (4), pop ()

Answers

Options A and B both have operation sequences that make the value at the front of the std::queue equal to x.

The operation sequence that makes the value at the front of a std::queue equal to x can be found by simulating the given operations on both the stack and the queue and comparing the resulting values. Let's analyze each option:

A. push (1), push (3), pop (), push (1), push (5), pop (), push (1), push (7)

This sequence will result in the queue having the elements [1, 3, 1, 5, 1, 7] in that order. The front value of the queue would be 1, which matches x.

B. push (1), push (3), push (1), push (5), pop (), pop (), pop (), push (7), push (9)

This sequence will result in the queue having the elements [1, 3, 1, 5, 7, 9] in that order. The front value of the queue would be 1, which matches x.

C. push (5), push (3), push (1), pop (), pop (), push (9), push (3), push (7), pop ()

This sequence will result in the queue having the elements [5, 3, 1, 9, 3, 7] in that order. The front value of the queue would be 5, which does not match x.

D. push (2), pop (), push (2), push (7), push (1), pop (), push (9), push (4), pop ()

This sequence will result in the queue having the elements [2, 2, 7, 1, 9, 4] in that order. The front value of the queue would be 2, which does not match x.

Therefore, options A and B both have operation sequences that make the value at the front of the std::queue equal to x.

Learn more about operation here

https://brainly.com/question/31953475

#SPJ11

A positive correlation is one in which only one variable moves a causative relationship is shown both variables move in opposite directions both variables move in the same direction

Answers

A positive correlation is when **both variables move in the same direction**. In a positive correlation, as one variable increases, the other variable also tends to increase. This indicates a direct relationship between the two variables.

In a positive correlation, there is a **causative relationship** between the variables, meaning that a change in one variable influences the change in the other variable. For example, if there is a positive correlation between studying hours and exam scores, it means that as the number of hours spent studying increases, the exam scores also tend to increase.

Positive correlations are commonly represented by a correlation coefficient (r) that ranges from 0 to +1. A correlation coefficient of +1 indicates a perfect positive correlation, where the variables move in perfect synchronization. However, it is important to note that correlation does not imply causation, and there may be other factors at play influencing the relationship between the variables.

Understanding the direction and strength of correlations is essential in various fields such as statistics, social sciences, and finance. By identifying positive correlations, researchers and analysts can gain insights into relationships between variables and make informed decisions based on their findings.

Learn more about correlation here

https://brainly.com/question/30739665

#SPJ11

.7 Given that the position vectors of points T and S are 4a, + 6a, -a, and 10a, + 12a, + 8a, respectively, find: (a) the coordinates of T and S, (b) the distance vector from 1 to S, (c) the distance between T and S. 1.11 Given that 1.12 If A = 4a, P = 2a, -a, - 2a. Q = 4a, + 3a, + 2a. R=- + ay + 2a find: (a) P+Q-R, (b) P (e) (PXQ) X (QX R), (f) cos - QX R, (c) QX P R. (d) (PXQ) (Q X R), pr. (g) sin po PR = 6a, + a, and B 2a, + 5a,, find: (a) A B +2|B|² (b) a unit vector perpendicular to both A and B 1.17 Points P, Q, and R are located at (-1, 4, 8), (2, -1, 3), and (-1, 2, 3), respectively. Determine (a) the distance between P and Q, (b) the distance vector from P to R, (c) the angle between QP and QR, (d) the area of triangle PQR, (e) the perimeter of triangle PQR.

Answers

Given that the position vectors of points T and S are 4a, + 6a, -a, and 10a, + 12a, + 8a, respectively. We need to find:(a) the coordinates of T and S.(b) the distance vector from 1 to S.(c) the distance between T and S.(a) The coordinates of T and S are T (4a, 6a, -a) and S (10a, 12a, 8a).(b) Let vector a = vector OS = 10a, 12a, 8a. Let O be the origin, then position vector of O is (0,0,0).Vector 1S is given by vector 1S = OS - O.Where the position vector of S is given as 10a, 12a, 8a, the position vector of O is 0, 0, 0.

The distance vector from 1 to S = 10a i + 12a j + 8a k.(c) The distance between T and S is given by using the distance formula i.e. the distance between T and S is √[(10a - 4a)² + (12a - 6a)² + (8a + a)²] = √[6² + 6² + 9²]a = 3√21a.1.11 Given that A = 4a, P = 2a, -a, - 2a. Q = 4a, + 3a, + 2a. R=- + ay + 2a, we need to find:(a) P + Q - R(b) P × Q(c) Q × R(d) (P × Q) × (Q × R)(e) cos∠Q × R(f) Q × P + R(g) sin∠POP = 6a, + a, and B 2a, + 5a, we need to find:(a) A .

B + 2 | B |²(b) A × B/| A × B |(a) A . B + 2 | B |² is equal to (4a, 6a, -a).(2a, 5a) + 2 | 2a, 5a |² = 8a² + 30a² + 4 | B |² = 38a².(b) A × B/| A × B | is equal to (4a, 6a, -a) × (2a, 5a)/| (4a, 6a, -a) × (2a, 5a) | = (2a, -6a, 22a)/√620(a) - √656(a).(c) Unit vector perpendicular to both A and B = A × B/| A × B |.Thus, the unit vector perpendicular to both A and B is (2a, -6a, 22a)/√620(a) - √656(a).

To know more about vector visit:

brainly.com/question/33183349

#SPJ11

High Voltage Power Lines Suspended In Air May Be Subject To Galloping And Corona Effects. For Each Of These Effects, (I) Briefly Describe The Effect And Its Cause. [10%] (Ii) Describe The Impact On The System And Give A Mitigation Strategy Commonly Used. [10%] (Iii) What Additional Benefit Does Corona Mitigation Confer To The Power Line? [5%]

Answers

The Galloping effect and Corona effect in high voltage power lines suspended in air is given below:Galloping effect:

The cause of this effect is the negative damping impact of the wind on the transmission line conductors. High wind speeds are more likely to result in galloping, and this issue is more prevalent in regions where high winds are common.Impact on the system: Galloping can cause power outages, as transmission lines may clash with each other, resulting in system failure.

As a result, the stability and reliability of the electrical power system are compromised.Mitigation strategy:Vibration dampers are commonly used to mitigate galloping in high voltage power lines. They have weights that dampen the motion and reduce the risk of damage caused by the oscillation.Corona effect:When high voltage transmission lines suspend in the air and ionize the surrounding air molecules, it is referred to as the Corona effect. When there is a high voltage in transmission lines, the air around the conductor ionizes, producing corona discharge. This happens when the electric field is high enough to strip the electrons from the air molecules.The cause of this effect is the electric field strength around the transmission line's conductors.  By reducing the electric field intensity around the conductors, this reduces the risk of corona discharge.Additional benefits of corona mitigation on power lines:Improved transmission efficiency: Corona discharge on the transmission lines results in power losses. As a result, the reduction in corona discharge leads to improved transmission efficiency and reduces power loss.

To know more about voltage visit:

https://brainly.com/question/12017821

#SPJ11

What will the following program output? #include using namespace std; int main() { int arr[] = {4, 5, 6, 7}; int *p = (arr + 1); cout << *p; return 0; }

Answers

The program returns 0. Therefore, the output of the program will be 5. The program will output the value of the element present at the position arr[1], which is 5. This program is an example of pointers.

Pointers are variables that can store memory addresses. The memory address is the location of a variable in the memory, whereas the variable itself is an item with a value, and it is stored in the memory.The program creates an integer array named arr that holds four values, i.e., {4, 5, 6, 7}.

Then, it creates a pointer variable named p that is initialized with the address of the second element (i.e., arr[1]) of the array. It means that p now points to arr[1].Next, the program prints the value stored at the memory location pointed to by p using the dereference operator. Since p points to arr[1], the value of arr[1] will be printed, which is 5.

Finally, the program returns 0. Therefore, the output of the program will be 5.

To know more about program visit:

brainly.com/question/13199117

#SPJ11

Find the solution of the given initial-value problem and give the largest interval / over which the solution is defined L+Ri= E, i (0) = io, L, R, E, io Constants A. i (t) = + (io) ezt, B. i(t) = + (io) e, C. i (t) = + (io) et, D. i (t) = (io) e, the solution is defined at (-[infinity], [infinity]0) the solution is defined at (-[infinity], [infinity]) the solution is defined at (0, [infinity]) the solution is defined at (-[infinity]0, 0) E. None. OC OD OA OB OE

Answers

Given the initial-value problem L + Ri = E, i(0) = io.

The answer is i(t) = (io)e^(-tR/L) + (E/R) (1-e^(-tR/L)).The largest interval over which the solution is defined is (-∞,∞).Proof:To solve this problem, we use the integrating factor method. The integrating factor for this differential equation is e^(Rt/L).Multiplying both sides of the differential equation L + Ri = E by e^(Rt/L), we get the equivalent equation e^(Rt/L) L + e^(Rt/L)Ri = e^(Rt/L)E.The left-hand side of this equation can be written as the derivative of a product by the product rule. Specifically, d/dt [e^(Rt/L) i] = e^(Rt/L)Ri + e^(Rt/L) L di/dt.So our differential equation becomes d/dt [e^(Rt/L) i] = e^(Rt/L)E.Then integrating both sides of this equation with respect to t gives e^(Rt/L) i = (E/R) e^(Rt/L) + C. Here C is a constant of integration. Substituting i(0) = io, we get C = io - E/R.Now solving for i, we get i(t) = (io)e^(-tR/L) + (E/R) (1-e^(-tR/L)).This expression for i is defined for all t in (-∞,∞), so the solution is defined over this entire interval.

Hence, the answer is (A) the solution is defined at (-∞,∞).

To know more about initial visit:

https://brainly.com/question/32209767

#SPJ11

Use a block diagram to explain the von Neumann architecture (3 points) 2. Convert decimal number -39 to binary using radix complement. (3 points) 3. For the operation "Add 39H with E6H", determine Flag Register status. (3 points) 4. If the (CS) = A8H, (IP) = 5H, determine the physical address of the current instruction. (3 points) 5. What memory location is accessed by MOV AL, [BX+DI+2080H]? Assume that the DS register contains 200H, register BX contains 3600H, and register DI contains 5H? (6 points) 6. What is the addressing mode for the above [BX+DI+2080H]? (3 points).

Answers

The versatility and power of the instruction set architecture, allowing for more efficient memory access and manipulation in a wide range of applications.

1. **Von Neumann architecture block diagram**: The Von Neumann architecture is a basic computer architecture that consists of four main components: the CPU (Central Processing Unit), the memory, the input/output devices, and the control unit. The CPU includes the arithmetic logic unit (ALU) and the control unit (CU). The memory stores both the program instructions and data. The input/output devices allow communication between the computer and the external world. The control unit manages the flow of data and instructions within the computer.

In the Von Neumann architecture, the CPU fetches instructions from the memory one by one, decodes them, and executes them sequentially. The fetched instruction is stored in the instruction register (IR). The control unit coordinates the execution of instructions by generating control signals that direct the flow of data between the CPU and memory. The ALU performs arithmetic and logical operations on data. The input/output devices enable the computer to interact with users and external devices.

2. **Conversion of decimal number -39 to binary using radix complement**: To convert a negative decimal number to binary using radix complement, we follow these steps:

4. **Physical address of the current instruction with (CS) = A8H and (IP) = 5H**: In x86-based architectures, the physical address of an instruction is calculated by combining the segment address (CS) with the offset address (IP). In this case, with (CS) = A8H and (IP) = 5H, the physical address can be calculated as follows:

Physical address = (CS * 16) + IP

                 = (A8H * 16) + 5H

                 = 1680H + 5H

                 = 1685H

Therefore, the physical address of the current instruction is 1685H.

5. **Memory location accessed by MOV AL

, [BX+DI+2080H]**: To determine the memory location accessed by the instruction MOV AL, [BX+DI+2080H], we need to calculate the effective address. The effective address is calculated by adding the values of BX, DI, and the offset 2080H.

Effective address = BX + DI + 2080H

                 = 3600H + 5H + 2080H

                 = 5685H

Assuming the DS register contains 200H, the final memory location accessed is obtained by adding the effective address to the value in the DS register.

Memory location accessed = DS + Effective address

                        = 200H + 5685H

                        = 5885H

Therefore, the memory location accessed by MOV AL, [BX+DI+2080H] is 5885H.

In this case, the registers BX and DI are used, along with the immediate offset 2080H, to calculate the effective address. The values in BX and DI are added together, and then the offset value is added to the result. The effective address obtained is then used to access the memory location.

The based indexed addressing mode is particularly useful when accessing arrays or data structures where the memory location is determined dynamically based on the values in multiple registers and an offset. It provides the flexibility to access memory locations efficiently based on varying input parameters.

6. **Addressing mode for [BX+DI+2080H]**: The addressing mode used in the instruction [BX+DI+2080H] is known as based indexed addressing mode. This addressing mode allows for more flexible memory access by using the sum of multiple registers and an immediate offset value.

Overall, the based indexed addressing mode enhances the versatility and power of the instruction set architecture, allowing for more efficient memory access and manipulation in a wide range of applications.

Learn more about versatility here

https://brainly.com/question/30590666

#SPJ11

Consider the following system of linear equations 2x1​+4x2​−x3​=157x1​−3x2​+3x3​=−44x1​−3x2​−8x3​=19​ a) Will Gauss-Seidel method converge for the above system of linear equations? Clearly state your convergence criteria. b) Perform two iterations of the Gauss-Seidel method and fill the following table. You must provide the updating formula. Use x10​,x20​,x30​ as follows: c) Use Cramer's rule to find the true value ( xtrue ​) of x2​ and compute percentage relative true error for x21​.

Answers

Gauss-Seidel convergence criteria are Diagonal dominance or positive-definiteness of the coefficient matrix.

a) To determine if the Gauss-Seidel method will converge for the given system of linear equations, we need to check for diagonal dominance or positive definiteness of the coefficient matrix. If the diagonal elements of the matrix are greater in magnitude than the sum of the absolute values of the off-diagonal elements in each row, or if the matrix is positive-definite, then the method will converge.

b) To perform two iterations of the Gauss-Seidel method, we start with initial guesses for x1, x2, and x3 and use the updating formula derived from the system of equations. After each iteration, we substitute the updated values into the formula to obtain the new values of x1, x2, and x3.

c) Cramer's rule can be applied to find the true value (xtrue) of x2 by solving the system of equations using determinants. The percentage relative true error for x21 can be calculated by comparing the absolute difference between x21 and xtrue with xtrue, and then multiplying by 100.

To learn more about “matrix” refer to the https://brainly.com/question/11989522

#SPJ11

Given: 100 meters of stem wall that are 3’ wide x 6’ deep, which the total length sits on top of continuous concrete footers with dimensions of 4’ wide and 13" thick. Fineness Ratio of 2.90 and a nominal aggregate size of 1.0". What is the minimum volume in cubic yards of wet placed concrete? What is the minimum volume of coarse aggregate?

Answers

The minimum volume of wet placed concrete and the minimum volume of coarse aggregate for the given dimensions and specifications.

To calculate the minimum volume of wet placed concrete and the minimum volume of coarse aggregate, we need to consider the dimensions of the stem wall, the continuous concrete footers, and the given fineness ratio and nominal aggregate size.

The stem wall has a length of 100 meters, a width of 3 feet, and a depth of 6 feet. To convert the dimensions to the same unit, we will use the metric system. 3 feet is approximately 0.9144 meters, and 6 feet is approximately 1.8288 meters. Therefore, the stem wall has dimensions of 100 meters (length) x 0.9144 meters (width) x 1.8288 meters (depth).

The continuous concrete footers have a width of 4 feet, which is approximately 1.2192 meters, and a thickness of 13 inches, which is approximately 0.3302 meters. Therefore, the continuous concrete footers have dimensions of 100 meters (length) x 1.2192 meters (width) x 0.3302 meters (thickness).

To calculate the minimum volume of wet placed concrete, we need to add the volume of the stem wall and the continuous concrete footers. The total volume of wet placed concrete is the sum of these two volumes.

To calculate the minimum volume of coarse aggregate, we need to multiply the total volume of wet placed concrete by the fineness ratio, which represents the ratio of the volume of coarse aggregate to the volume of wet placed concrete.

Given the nominal aggregate size of 1.0", we can calculate the minimum volume of coarse aggregate by multiplying the total volume of wet placed concrete by the proportion of coarse aggregate in the mix.

Learn more about aggregate here

https://brainly.com/question/29610001

#SPJ11

What will be the output of the following Python code snippet? print('xyyxyyxyxyxxy'.replace('xy', '12', (100 а) хуухуухухухху 6) 12y12y1212x12 c) none of the mentioned d) error

Answers

The output of the python code will be

d) error

What is wrong with code

The given code snippet contains syntax errors. The parentheses and the numbers within them are not properly formatted, which would result in a syntax error.

Additionally, the question itself contains some irrelevant characters that further confuse the code. A corrected version of the code snippet should look like this:

print('xyyxyyxyxyxxy'.replace('xy', '12', 6))

With this corrected code, the output would be:

12y12y1212x12

Learn more about python code at

https://brainly.com/question/26497128

#SPJ4

A continuous-time signal is given by S[a]t x(t) 0 where a=2. Calculate the average power P. - -5 < t < 5 elsewhere

Answers

The average power of the given signal is 33.33.

We have been given signal, the continuous-time signal is given by S[a]t x(t) 0 where a=2 and -5<t<5.

To determine the average power, we need to find the square of the signal and integrate it over the given limits.

The formula to calculate the average power of the signal is:

Average power P = (1/T) ∫T/2 -T/2 x²(t) dt

Here, the limits are -5 to 5, and T = 10

Then Substituting the given values in the above formula, we get,

Average power ,P = (1/10) ∫5 -5 [2t]² dt

= (1/10) ∫5 -5 4t² dt

= (1/10) [4t³/3]5 -5

= (1/10) [(500/3)-( -500/3)]

= (1/10) (1000/3)≈ 33.33

Learn more about the average power ;

https://brainly.com/question/32839812

#SPJ4

Briefly explain the Nyquist Rate in the Sampling Theorem. Sketch frequency domain plots to help explain.

Answers

In conclusion, the Nyquist rate in the sampling theorem is the minimum sampling rate that is required to avoid aliasing during digitization. The sampling rate must be at least two times the highest frequency of the signal to reconstruct the original signal accurately.

The Nyquist rate refers to the minimum rate at which a signal should be sampled to avoid aliasing during digitization. The Nyquist rate is half the sampling frequency (f_s) or double the maximum frequency of a band-limited signal. The sampling rate must be at least two times the highest frequency of the signal to reconstruct the original signal precisely.The Nyquist rate can be explained through the sampling theorem, which states that a continuous-time signal is completely defined by its equally spaced samples if the signal is band-limited to less than half of the sampling frequency.The frequency domain plot is used to depict the spectrum of the signal being sampled. It's a graph of the amplitude of each frequency component versus frequency. It demonstrates the upper and lower frequency bounds that are sampled. A band-limited signal can be completely reconstructed from its samples if the sampling rate is greater than or equal to twice the signal's maximum frequency.In conclusion, the Nyquist rate in the sampling theorem is the minimum sampling rate that is required to avoid aliasing during digitization. The sampling rate must be at least two times the highest frequency of the signal to reconstruct the original signal accurately.

To know more about Nyquist rate visit:

https://brainly.com/question/32195557

#SPJ11

Write a mathematical program using array lists, to obtain the smallest integer x where x*y calculates to a perfect square. y is the user input from the user in order to complete the calculation. The program must be written as a single class where the package name is course and class name is xysquare

Answers

Here is the program using array lists, to obtain the smallest integer x where x*y calculates to a perfect square. y is the user input from the user in order to complete the calculation.

The program must be written as a single class where the package name is course and class name is xysquare.import java.util.ArrayList;import java.util.List;import java.util.Scanner;public class xysquare {  public static void main(String[] args) {    Scanner sc = new Scanner(System.in);    System.out.println("Enter the value of y: ");    int y = sc.nextInt();    int i = 1;    List arrList = new ArrayList<>();    while (arrList.size() < 1) {      if (Math.sqrt(y * i) % 1 == 0) {        arrList.add(i);      }      i++;    }    System.out.println("The smallest integer x is: " + arrList.get(0));  }}In this program, we first import the required classes, that is, ArrayList, List, and Scanner. We then create the main function where we take input from the user, that is the value of y. We initialize the value of i to 1 and create an empty ArrayList.

We then use a while loop to check if the square root of y * i is a whole number. If it is, we add the value of i to the ArrayList. We then increment i. Once we have found the first integer that satisfies the condition, we print it out, which is the required output of the program.

To know more about whole number visit:

https://brainly.com/question/29766862

#SPJ11

Activity Selection
In the Activity Selection problem, we wish to select a maximum-size subset of mutually compatible activities
We know that ordering by the finish times produces an optimal solution.
1. Show an input for which ordering by the starting times does not produce an optimal solution.
2. Show an input for which ordering by length (shortest to longest) does not produce an optimal solution.
3. The degree of an activity is the number of activities whose time intervals intersect with it. Show an input for which ordering by degree (smallest to largest) does not produce an optimal solution.

Answers

Activity Selection In the activity selection problem, a maximum-sized subset of mutually compatible activities is selected.

It is essential to understand that in some cases, ordering the activities according to certain criteria may not produce an optimal solution. This can be illustrated through different inputs as shown below:1. For an input consisting of the following activities, ordering by starting times would not produce an optimal solution.

Activity Starting time Finishing timeA15B23C14D34E17F28The activities that can be selected based on the maximum size of mutually compatible activities using the starting time criterion include A, C, E, and F. The maximum-sized subset would consist of four activities.

To know more about selection visit:

https://brainly.com/question/31641693

#SPJ11

Question 5 SET 1/20 marks) You are asked to write a MATLAb program that does the following: a) Create a function called plotting, which takes three inputs e.a. b. The value of c can be either 1, 2 or 3. The values of a and bare selected such that a

Answers

This will generate a plot of the cosine function with 1000 points between 0 and 5*pi, using the color yellow. The program will also print the chosen color.

Based on the given question, here's a MATLAB program that creates a function called "plotting" with three inputs (c, a, b). The function plots the formula "cos(r)" where r is a vector that has 1000 points equally spaced between a and b. The value of c is used to specify the color of the plot.

function plotting(c, a, b)

   % Generate vector r with 1000 points between a and b

   r = linspace(a, b, 1000);

   

   % Evaluate the function cos(r)

   y = cos(r);

   

   % Plot the function with the specified color

   if c == 1

       plot(r, y, 'r');

       color = 'red';

   elseif c == 2

       plot(r, y, 'b');

       color = 'blue';

   elseif c == 3

       plot(r, y, 'y');

       color = 'yellow';

   else

       error('Invalid color choice. Please choose either 1, 2, or 3.');

   end

   

   % Set plot title and labels

   title('Plot of cos(r)');

   xlabel('r');

   ylabel('cos(r)');

   

   % Print the chosen color

   fprintf('The plot color is %s.\n', color);

end

You can call the "plotting" function with the desired inputs to create the plot. For example, to call the function with c = 3, a = 0, and b = 5 * pi, you can use the following command:

plotting(3, 0, 5 * pi);

Know more about MATLAB program here:

https://brainly.com/question/30890339

#SPJ11

Define the degree of freedom and describe the functions of four basic four basic components of a robot. Note: provide proper explanation for each part with a neat sketch

Answers

In robotics, the degree of freedom refers to the number of independent parameters that define the motion or configuration of a robot. It represents the ways in which a robot can move.

Actuators: Actuators generate the motion in a robot by converting energy into mechanical motion. They can be electric motors, hydraulic cylinders, or pneumatic pistons. Actuators provide the force and torque required to move the robot's joints and end effector.

Sensors: Sensors allow robots to perceive and interact with their environment. They provide feedback on various parameters such as position, velocity, force, and proximity. Sensors include encoders for position feedback, force/torque sensors, proximity sensors, and vision sensors. Sensors provide valuable information for the robot to make decisions and adapt its behavior.

To know more about valuable visit-

brainly.com/question/32958988

#SPJ11

*stock = *stock - count; //Directory

Answers

The given code subtracts the value of the count from the value of the stock and assigns the result to the stock variable.

In the given code,*stock = *stock - count; the value of the stock variable is updated by subtracting the value of the count variable from it. The subtracted value is then assigned back to the stock variable. This operation is also known as a compound assignment operator since it combines two operations in a single line of code. The above code is equivalent to the following line of code: stock = stock - count; This line of code performs the same operation as the first one. The operator used in the first line of code is a compound assignment operator (-=), and the operator used in the second line of code is a simple assignment operator (=).

Both these operators can be used to assign the result of an expression to a variable. The difference is that the compound assignment operator combines the arithmetic operation and the assignment operation into a single operator, making the code more concise and readable.

To know more about the stock variable visit:

https://brainly.com/question/27883525

#SPJ11

Given a string, write a Python program to check if that string is a pangram or not. Return the Python boolean True if the string is a pangram; otherwise, return the Python boolean false. For example, if the input is The quick brown fox jumps over the lazy dog output is True If the input is The Queen. output is False Input to program If your code requires input values, provide them here. Undo Redo DateParser.py Load default template... 's', I 1 2 user_input = input() 3 txt = ['a', 'b', 'c', 'd', 'e', 'f', 'g', 'h', 'i', 'j', 'k', 'l', 'm', 'n', 'o', 'p', 'a', 'r' 4 'w', 'x', 'y', 'z'] 5 def pangram(user_input): 6 "''Write your code here'' 7 # TODO: return True if the pangram else return false 8 9 if __name_- '__main__': 10 print(pangram(user_input))

Answers

Python code checks whether a given string is a pangram or not. It defines a function called is_pangram that takes the user input. In the if __name__ == '__main__': block, the user input is taken and passed to the is_pangram function. The result is then printed.

A modified version of the provided code to check if a string is a pangram or not:

def is_pangram(user_input):

   alphabet = set('abcdefghijklmnopqrstuvwxyz')

   input_set = set(user_input.lower())

   return alphabet.issubset(input_set)

if __name__ == '__main__':

   user_input = input()

   print(is_pangram(user_input))

In this code, the is_pangram function takes the user input as a parameter. It creates a set of all the lowercase alphabets and another set from the user input (converted to lowercase).

It then uses the issubset() method to check if the set of alphabets is a subset of the input set. If it is, it means that all the alphabets are present in the input, making it a pangram. The function returns True if it is a pangram and False otherwise.

To learn more about Python: https://brainly.com/question/26497128

#SPJ11

Other Questions
Complete the unsigned subtraction of 161-76 in binary.Show calculation. What was the decision made by the court? Stopping from doing something you have the legal right to do is enough to be consideration for a legally binding contract. The court ruled that there was no legally binding contract because no drinking and smoking was only for Hamer's good. The court ruled that $5,000 was owed by the Nephew to the Uncle. Sidway's estate does not have a legally write to spend the funds if it is not to a family relative left in a legally binding will. Count the number of your 75 prices that exceed the 20th price listed in your data set and state 38 Use n=75 and the number of successes as this number to create a 90% confidence interval for the proportion of all stocks in your population that exceed this price. Provide the sample proportion and the Simple Asymptotic confidence interval from the printout here: Sample Proportion: 0.50667 Simple Asymptotic 90% CI: (0.41171, 0.60162) a. Give a practical interpretation for this interval. We can say that we are 90% confident that the proportion of all the American muscle cars priced above the 20th price will be between 0.041171 and 0.60162. b. Is the sample size for this problem considered large? Why or why not? A human resource professional, as we have learned, has many disparate duties and responsibilities. One of the duties that is increasing in its importance is risk management. In fact, this duty was once a central part of a human resource professional, but now many mid-to-large organization have created a separate departmentreporting to the human resources directordevoted to risk management. In the following discussion question, discuss the following:Define what is meant by "risk management" in a typical organization.Assess how the responsibility of "risk management" has morphed/grown over the past 10 years for both a human resource professional and an organization.Finally, discuss why an effective risk management program is of critical benefit for employees, not simply for their own physical and mental well-being, but how/why an effective risk management program can lead to a more productive and rewarding work environment. A large industrial firm allows a discount on any invoice that is paid within 30 days. Of all invoices, 15% receive the discount. In a company audit, 20 invoices are sampled at random.(HINT: Binomial Distribution, Excel Function: BINOMDIST(x, n, p, cumulative))What is the probability that fewer than 6 of the 20 sampled invoices receive the discount?What is the probability that more than 6 of the 20 sampled invoices receive the discount? Develop an action planI will need collaborate to identify options and develop plans to resolve CRM issues.During the consultation session you will be discussing the issues that have occurred including: sales and marketing staff have not been adequately trained to use the new CRM some configuration and settings issues that the IT department didnt properly configure need to be resolved and tested.When developing the Action Plan using the provided template, you must document: what actions need to take place who will have responsibility for each action the date that each action needs to be completed The demand and supply curves for a good are given by Q D=502P and Q S=P1. a. Calculate the price elasticity of demand at the equilibrium price. b. Calculate the price elasticity of supply at the equilibrium price. c. Is supply or demand more elastic at equilibrium price? What is the approximate latitude and longitude of Shibuya City include minutes and seconds (along with degrees)2. What is the elevation3. How far is the distance to the ocean of Shibuya City (use the ruler function)4. Do you consider Shibuya City to be rural or urban? Why?5. How do you think the temperature controls such as latitude, elevation, distance from ocean (land-water heating differences), urban environment, and clouds influence the weather at Shibuya City? 2-3 sentences is perfect! You have a friend/relative who displayed the following symptoms (sequentially):inability to form sentencesunconsciousnessseizurealtered/garbled speech post seizurereturn to normal speech and behavior Quiz A.4 Consider a voltage step propagating in a transmission line with matched termination, driver output resistance is Ro-Z. and Voo-2V. Only one of these sentences is correct, select it. a) The power consumption at termination is Pd=Vco/(4Z-) b) The voltage at termination can be higher than Voo c) The voltage at termination is null. d) The power consumption at termination is Pd=Voo/(2Z) Hello, Please solve/find the final answer to those functionsa,b, and c with steps appreciate to solve in word format.differentiation / derivative5) (a) If f(x) = (2x7 + 7x5)(5x2 + 2x )3, then find f'(x) 8(x) = (3x2 - 94 (4x-6)7 (b) Differentiate: (c) If y = u - 4u + 2u - 1 and u = x + 6, find dy dx when x = -2 Calculate the amount (in pesos) that will appear on the bill of a residential user subject to Tariff 1 who consumed 413 kWh in the two-month period between March 1 and April 30, 2021. Include the 16% corresponding to VAT. expert that helps you learn core concepts.See AnswerQuestion: According To The CAPM: 1) An Investor Who Is Risk Adverse Should Hold At Least Some Of The Risk-Free Asset In His Portfolio. 2) All Investors Who Take On Risk Will Hold The Identical Portfolio Of Risky Assets. 3) A Stock With High Risk, Measured As Standard Deviation Of Returns, Will Have High Expected Returns In Equilibrium. 4) Individual Investors Are Factors Influencing The Role Of Management Accountant.?Organization size: Huge entities have the resources to engage accountants to do specific management accounting duties. Their operations also tend to cover a wider area (probably global) and therefore require many aspects of management accounting.Market competition: There is an urgent need for more management accounting information when the competition becomes more intensified. For example, a Balanced Scorecard helps measure both financial and non-financial dimensions of the operations, and a balanced scorecard is a strategic management accounting tool.Nature of the entity's business: For example, if the entity is a huge retailer having several outlets across the country, there is certain management accounting information that will be key to the operations. Such as inventory management system, cost-volume-profit analysis of each retail outlet, return on investment of each outlet, etc. You invested $7,000 at the end of each year for 7 years in an investment fund. If the balance in the fund at the end of 7 years was $62,000, what was the nominal interest rate compounded annually? % Round to two decimal places The space probe New Horizons flew past Pluto in July 2015. The shape of its trajectory past Pluto was a/an [-/1 Points] HINT: Use units of AU for distance and years for time. The semimajor axis of Pluto's orbit is 39.482 astronomical units. What is the period of that orbit? Which one of the following is correct? (a) (2,0][0,2)= (c) (2,0][0,2)={0} (b) (2,0][0,2)=(2,2) (d) (2,0][0,2)={2,1,0,1,2} 2. Let A=(1,6] and B=[1,2]. What is A\B ? (a) [2,6] (b) [1,3] (c) (2,6] (d) (1,3] 3. A function is defined as f:DR, with f(x)=x+2.D is a subset of the reals. The function has range (f)=[1,5]. Which of the following must be D ? (a) [3,7] (b) [1,5] (c) R (d) [1,3] 4. What is the range of the function f:RR, with f(x)=e x 2? (a) (1,[infinity]) (b) [1,[infinity]) (c) (0,[infinity]) (d) R 5. Which of the following is true for any function with domain D, codomain C and range R ? (a) RC (b) R=D (c) R=C (d) RD 1. Three sets are listed below: A=[3,5),B={1,2,3,4,5},C={3k+2kZ,k2} Draw the sets,(ZB)\(AC) and (R\A)(BC) on a number line. Show your working / explain your reasoning where appropriate. 2. Consider the following three objects: - f:RR,f(x)= x- g:R[0,[infinity]),g(x)=x 2- h:R[0,[infinity]),h(x)=(fg)(x) Which of these are functions, and why? 3. For each question, either come up with an example of such an object (and explain why it has the desired property,) or explain why no such object exists. (a) Can you find two sets A,B that both contain infinitely many numbers, such that AB= {0,1}? (b) Can you find two sets A,B that both contain infinitely many numbers, such that AB= {0,1} ? (c) Can you find two sets A,B that both contain infinitely many numbers, such that A\B= {0,1} ? In the Hesson, Al-Ameed, and Samaka (2007) article, at the completion of the reengineering project, what remained as an obstacle to change?A growing backlog of applicationsManagement resistance to changePoor employee motivationALL were obstaclesCustomer demand and resistance to change Water flows through a pipe of diameter 1.16 m at a velocity of 2.6 m/s. If someone puts a nozzle on the end of the pipe, reducing the diameter to 0.29 m, at what speed will the water exit the pipe? 41.6 m/s Set up the partial fraction decomposition for a given function. Do not evaluate the coefficients. f(x) - 16x+12+10x + 2 (x44x)(x | x | 1)(x 3x 2)(x4 | 3x2 2)