Earned Value Management (EVM) is a commonly used method of performance measurement for projects.
Earned Value Management (EVM) is a project management technique used to measure the performance and progress of a project in terms of scope, schedule, and cost. It allows project managers to assess the project's performance against the planned objectives and identify any deviations or variances.
Parametric estimating involves using a statistical relationship between relevant historical data and other variables to calculate a cost estimate for project work.
Parametric estimating is a technique that involves using historical data and statistical relationships to estimate project costs. Instead of estimating costs for each individual work package, parametric estimating relies on predetermined parameters and variables to calculate a cost estimate for the project.
In earned value management, the cost variance is equal to EV minus AC.
The cost variance in earned value management is the difference between the earned value (EV) and the actual cost (AC). It helps project managers determine if the project is under or over budget by comparing the planned value of work performed (EV) with the actual costs incurred (AC).
Given BAC = 200, PV = 100, AC = 120, EV = 80, and assuming that all future work will be performed at the budgeted rate, the estimate to complete (ETC) is 120.
To calculate the estimate to complete (ETC), we need to subtract the earned value (EV) from the budget at completion (BAC). In this case, the BAC is 200 and the EV is 80, so the ETC is 120. This means that, based on the current performance, an additional 120 units of work are estimated to complete the project within the budget.
To learn more about Earned Value Management visit: brainly.com/question/32631607
#SPJ11
Tiger corporation, a large manufacturer, has a taxable income of $18,000,000. Tiger Corporation’s tax is:
A. $5,440,000
B. $3,780,000
C. $5,600,000
D. $3,680,000
Tiger Corporation's tax is $3,780,000 (Option B). This can be calculated by applying the applicable tax rate to the taxable income.
To determine the tax liability of Tiger Corporation, we need to apply the appropriate tax rate to the taxable income of $18,000,000. The tax rate is not provided in the given information, so we cannot calculate the exact tax amount. However, we can use the provided answer options to identify the closest match.
Let's evaluate the answer options:
A. $5,440,000: This is not the correct tax amount since it is higher than the other available options.
B. $3,780,000: This is the correct tax amount based on the answer options provided. However, we need to verify if it is the most accurate choice.
C. $5,600,000: This is higher than the taxable income itself, which is not possible. It is an incorrect tax amount.
D. $3,680,000: This option is lower than the other available options. It does not match the taxable income, so it is an incorrect tax amount.
Considering the given options, the closest match to the taxable income of $18,000,000 is $3,780,000 (Option B). Therefore, the correct tax amount for Tiger Corporation is $3,780,000.
Learn more about tax liability here:
brainly.com/question/31965060
#SPJ11
___________ can be achieved in many ways, ranging from joint meetings to combined information system.
A. Communication
B. Integration
C. Management
D. Leadership
The term that can be achieved in many ways, ranging from joint meetings to combined information system is integration. Integration refers to the process of combining or bringing together different elements or systems to work as a unified whole.
In this context, integration can be achieved through various methods, such as holding joint meetings where different teams or departments come together to discuss and collaborate on common goals, as well as implementing a combined information system that allows for the seamless sharing and exchange of information between different systems or platforms. Integration is essential for promoting effective communication, coordination, and cooperation among individuals, teams, or organizations. Therefore, the correct answer is B. Integration.
To know more about achieved visit:
https://brainly.com/question/10435216
#SPJ11
Describe the the implemententation of any 2 Sustainable Development Goals in EUROPA COUNTRIES ( Discuss the process by which it is implemented )
a. Assess the different challenges the choice of your choice is experiencing in terms of maintaining environmental sustainability
b. Propose different strategies that can address the challenges mentioned in letter
C. How does the government in the country you identified in Letter a, promote sustainable development?
D. What is your conclusion on the success of the sustainable development based on the previous discussion.
Sustainable development is a vital element in promoting environmental sustainability. The Sustainable Development Goals (SDGs) is a comprehensive plan to improve the lives of people while ensuring environmental sustainability.
The European Union (EU) countries have implemented several SDGs initiatives. Two of these SDGs will be discussed in this essay. They include SDG 13 and SDG 15.
SDG 13 seeks to take urgent action to fight climate change and its impacts. The implementation of this goal in EU countries has several approaches. The first approach is to increase renewable energy sources like wind, solar, and hydropower. Countries like Sweden, Denmark, and Portugal have been successful in implementing this approach. The second approach is to reduce carbon emissions. The EU has implemented the European Union Emission Trading System, which sets a cap on emissions and requires companies to buy permits to pollute.
SDG 15 aims to protect, restore, and promote sustainable use of terrestrial ecosystems. In EU countries, the implementation of this goal has been through afforestation programs, restoring degraded ecosystems, and promoting biodiversity. Countries like Germany and Sweden have been successful in implementing this goal.
The challenges experienced by these SDGs initiatives include insufficient funding, lack of political will, and slow progress in some countries. Strategies that can address these challenges include increased funding, public awareness campaigns, and collaboration among countries.
The EU governments promote sustainable development by implementing policies and regulations that promote environmental sustainability. These policies include the European Green Deal, which aims to make the EU climate-neutral by 2050.
In conclusion, the implementation of SDGs initiatives in EU countries has been successful in promoting environmental sustainability. However, there are still challenges that need to be addressed. These challenges require a collaborative effort among governments, citizens, and private sectors to achieve the desired outcome.
To know more about Sustainable development visit:
https://brainly.com/question/28847854
#SPJ11
how does hernando de soto know that the vendors have some money? group of answer choices they drive nice cars. they have saved up to build a solid house. they are constantly improving and renovating their businesses. their bank accounts are larger than he would expect.
Hernando de Soto knows that the vendors have some money because they are constantly improving and renovating their businesses.The correct option is B.
This is because vendors in informal economies have to establish and maintain relationships of trust with their customers, suppliers, and even competitors.These relationships are based on a reputation for reliability and quality of service that can only be achieved by continuous investment in business premises, equipment, and stock. Hernando de Soto is a renowned Peruvian economist who became famous for his work on informal economies and their relationship with the formal legal and financial systems. He conducted a survey of vendors in Lima, the capital city of Peru, to understand how they operate and how they are affected by legal and financial barriers. De Soto found that the vendors in Lima's informal economy had created their own system of property rights and contract enforcement, which enabled them to conduct their businesses and earn a living.The vendors in Lima's informal economy are constantly investing in their businesses to maintain their reputation for quality and reliability. They do this by renovating and improving their premises, acquiring new equipment and stock, and developing new products and services.These investments are funded by the profits they make from their sales, which are often reinvested in the business rather than taken as personal income.
Hernando de Soto found that the vendors in Lima's informal economy had accumulated significant amounts of capital through their investments in their businesses. This capital was in the form of physical assets such as property, equipment, and stock, as well as financial assets such as cash and bank deposits.
De Soto argued that this capital could be used to generate further economic growth if it could be integrated into the formal legal and financial systems.The correct option is B.
For more such questions on businesses
https://brainly.com/question/24553900
#SPJ8
the cost of goods sold account is closed by:multiple choice debiting cost of goods sold and crediting income summary. debiting cost of goods sold and crediting retained earnings. debiting income summary and crediting cost of goods sold. debiting retained earnings and crediting cost of goods sold.
The correct answer is debiting income summary and crediting cost of goods sold. When closing the cost of goods sold account, we need to transfer its balance to the income summary account.
This is done through a journal entry, where we debit the income summary account and credit the cost of goods sold account. The income summary account is used to summarize all the revenues and expenses for the period. Then, in the closing process, the income summary account is closed by transferring its balance to the retained earnings account.
However, the cost of goods sold account is not closed directly by crediting retained earnings. Therefore, the correct option is debiting income summary and crediting cost of goods sold.
To know more about earnings visit:
https://brainly.com/question/30702029
#SPJ11
wetheros has decided to end its policy of not trading with the rest of the world. when it ends its trade restrictions, it discovers that it is importing incense, exporting steel, and neither importing nor exporting rugs. which groups in wetheros are better off as a result of the new free-trade policy?
In Wetheros, the groups that are better off as a result of the new free-trade policy are the consumers of incense and the producers of steel. With the end of trade restrictions, Wetheros is now able to import incense, which benefits the consumers by giving them access to a wider variety of incense products.
On the other hand, the producers of steel are better off because they can now export their steel to other countries, expanding their market and potentially increasing their profits.
However, the group that neither imports nor exports rugs does not experience any direct impact from the new policy.
It's important to note that the specific impacts of the policy will depend on various factors such as demand, supply, and competition in the respective markets.
to know more about free trade policy visit:
https://brainly.com/question/29446599
#SPJ11
Use a production possibilities curve to distinguish between
maximum
attainable combinations, attainable but inefficient combinations
and
unattainable combinations of the production of two goods
The production possibility curve shows the maximum attainable combination, attainable but inefficient combinations, and unattainable combinations of the production of two goods. Any point on the frontier of the curve represents the maximum attainable combination, any point inside the curve represents an attainable but inefficient combination, and any point beyond the curve represents an unattainable combination.
The production possibility curve shows a graphical representation of the production of two goods in an economy. It is used to show the combination of goods that can be produced using a given level of resources. Here are the three possibilities:
Maximum Attainable Combinations: These are the combination of goods that can be produced when all the available resources are used efficiently. Any point on the production possibility curve that lies on the frontier represents the maximum attainable combination of the two goods. This is because the resources available are utilized to their fullest potential. Any point beyond the frontier is unattainable.
Attainable but Inefficient Combinations: These are the combination of goods that can be produced when resources are not used efficiently. If an economy is not using its resources to their fullest potential, then the combination of goods produced will be inefficient. Any point inside the production possibility curve represents an attainable but inefficient combination of the two goods. This is because the resources are not being used to their fullest potential.
Unattainable Combinations: These are the combination of goods that cannot be produced using the available resources. Any point beyond the production possibility curve is unattainable. This is because the resources available are not enough to produce the combination of goods at that point.
Conclusion:
In summary, the production possibility curve shows the maximum attainable combination, attainable but inefficient combinations, and unattainable combinations of the production of two goods. Any point on the frontier of the curve represents the maximum attainable combination, any point inside the curve represents an attainable but inefficient combination, and any point beyond the curve represents an unattainable combination.
To know more about production visit
https://brainly.com/question/30333196
#SPJ11
What was the change in Global's book value of equity from 2018 to 2019 according to Table \( 2.1 \quad \) ? Does this imply that the market price of Global's shares increased in 2019? Explain.
From 2018 to 2019, Global's book value of equity increased by $1.7 million. A number of variables, such as changes in the value of the company's assets, liabilities, paid-in capital, or retained earnings, can have an impact on the book value of equity.
An increase in book value does not always translate into an increase in the share price of Global. -Numerous occurrences that do not appear on the balance sheet could have an impact on Global's future profitability and, consequently, the share price. The price at which a share of a company's stock can be purchased on the open market, such as on a stock exchange, is known as market value per share.
To learn more about company's, click here.
https://brainly.com/question/30532251
#SPJ4
Next question A stock is bought for $22.50 and sold for $28.00 one year later, immediately after it has paid a dividend of $1.50 What is the capital gain rate for this transaction? OA. 12.22% OB. 4.89% OC. 24.44% OD. 19.55%
Option c is correct, The capital gain rate for the transaction is 24.44%.
To find the capital gain rate, we need to calculate the difference between the selling price and the buying price, and then divide it by the buying price.
The buying price of the stock is $22.50, and the selling price is $28.00. Therefore, the difference between the selling price and the buying price is $28.00 - $22.50 = $5.50. However, it's important to note that the question specifies the capital gain rate immediately after the dividend is paid. In this case, the dividend is already factored into the selling price.
To calculate the capital gain rate, we divide the difference by the buying price and multiply it by 100 to express it as a percentage. So, the capital gain rate is ($5.50 / $22.50) * 100 = 24.44%.
To learn more about stock -
brainly.com/question/31940696
#SPJ11
Sony's experience in VCR's and compact disks had taught it to manage the multiple dimensions of value very well when developing its PlayStation 2 video game console. In other words, Sony had ________.
a) a dominant design that dominated a product category.
b) developed absorptive capacity when developing VCRs and compact disks that allowed it to learn something useful when developing gaming consoles.
c) a complementary good in VCRs that allowed the PlayStation 2 to have network effects.
d) pure modularity.
The statement "Sony's experience in VCR's and compact disks had taught it to manage the multiple dimensions of value very well when developing its PlayStation 2 video game console" implies that Sony had learned to develop absorptive capacity while creating VCRs and CDs which enabled them to use that knowledge to create PlayStation
developed absorptive capacity when developing VCRs and compact disks that allowed it to learn something useful when developing gaming consoles Absorptive Capacity is the ability of a company to identify, understand, and incorporate external knowledge and best practices into its operations and development activities. It means the capability of an organization to learn from others in the industry,
acquire, assimilate, transform, and implement knowledge to improve performance. When companies develop absorptive capacity, they're able to learn and use new knowledge and processes more effectively.The Sony had developed absorptive capacity when developing VCRs and compact disks that allowed it to learn something useful when developing gaming consoles.
TO know more about that experience visit:
https://brainly.com/question/15088897
#SPJ11
4) Your company's latest ad appears on a popular news website alongside ads from several other companies. What element in the macromodel of the communication process do these other ads represent? A) Encoding B) Noise C) Decoding D) Messaging E) Media
The other ads from different companies appearing alongside your company's ad on a popular news website represent the element of "Media" in the macro model of the communication process. So the right answer is (E) Media.
In the macro model of the communication process, the media refers to the channel or medium through which the message is transmitted. It is the platform or vehicle that carries the communication to the intended audience.
In this case, the popular news website serves as the media through which your company's ad, as well as the ads from other companies, are being displayed.
Therefore, the other ads from different companies represent the element of "Media" in the communication process.
For more questions on: Media
https://brainly.com/question/32775614
#SPJ8
"An age-based profit-sharing plan is a plan in which A) the
employer contribution is allocated in such a way that the benefit
at retirement is guaranteed. B) allocations to participants are
made in profit"
An age-based profit-sharing plan is a plan
A) the employer contribution is allocated in such a way that the benefit at retirement is guaranteed.
An age-based profit-sharing plan is a type of retirement plan where the employer makes contributions based on the age of the employees. The contributions are allocated in a way that ensures a guaranteed benefit for the employees at retirement. The allocation may take into account factors such as the employee's age, years of service, and salary level.
This type of plan aims to provide retirement income security by considering the employees' age and providing a guaranteed benefit based on their years of service. It is different from a plan where allocations are made solely based on profits, as age-based plans focus on ensuring retirement benefits rather than profit distributions.
To know more about profit here
https://brainly.com/question/32864864
#SPJ4
Give an example - real or fictive - of a company where the conventional value chain is supported by the virtual value chain in its internationalizing process and describe in detail how this interaction process works!
One example of a company where the conventional value chain is supported by the virtual value chain in its internationalizing process is Amazon. Initially an online bookstore, Amazon has evolved into a global e-commerce giant that operates in various countries worldwide.
Amazon's Conventional Value Chain: Amazon's conventional value chain includes sourcing products, warehousing, inventory management, order fulfillment, and delivery. These activities are performed through physical infrastructure, including warehouses, distribution centers, and logistics networks. The conventional value chain ensures that products are sourced, stored, and delivered efficiently and effectively to customers. Amazon's Virtual Value Chain: Amazon's virtual value chain refers to its business operations' digital and technological aspects. This includes the company's online platform, website, mobile applications, customer reviews, recommendation algorithms, and data analytics capabilities. These digital components are crucial in supporting and enhancing the conventional value chain. The interaction between Amazon's conventional and virtual value chains can be described as follows: a) Sourcing and Inventory Management: Amazon uses its online platform and data analytics capabilities to identify customer demand patterns and trends. This information is utilized in the conventional value chain to efficiently source products and manage inventory. The virtual value chain helps predict and track product demand, ensuring that the right products are available in the right quantities at the right time. b) Order Fulfillment and Delivery: Once orders are received, Amazon's virtual value chain facilitates order processing, tracking, and delivery coordination. Customers can track their orders online, receive shipping notifications, and access customer support through the virtual platform. The conventional value chain, including warehouses and logistics networks, ensures that products are promptly picked, packed, and shipped to customers. c) Customer Experience and Feedback: Amazon's virtual value chain is crucial in enhancing the customer experience. The online platform lets customers browse products, read reviews, and make informed purchasing decisions. Customer feedback and reviews collected through the virtual platform also provide valuable insights for improving product offerings and customer satisfaction. d) Expansion and Market Penetration: The virtual value chain supports Amazon's international expansion efforts. The online platform is the entry point into new markets, enabling the company to reach customers worldwide. The virtual value chain allows for localization of the website, language preferences, and personalized recommendations, making it easier for customers in different countries to access and engage with Amazon's offerings.
Learn more about Value Chain here: https://brainly.com/question/33748115.
#SPJ11
EXERCISE 2: IBM AND "DIVERSITY AND INCLUSION" Go to the IBM website, and look for information on the topic "diversity and inclusion." Questions: 1. What does IBM mean by "diversity and inclusion?" 2. What do you think of IBM's present efforts to promote diversity? 3. Do you think IBM's approach to diversity could work in a smaller organization? Why or why not? http://www-03.ibm.com/employment/us/diverse/. QUESTIONS FOR BUSINESS INSIGHTS READINGS
IBM defines diversity and inclusion as valuing and embracing unique perspectives, experiences, and backgrounds. Their efforts are commendable, and smaller organizations can adapt their approach to foster an inclusive culture.
According to the IBM website, "diversity and inclusion" refers to creating an environment that values and embraces the unique perspectives, experiences, and backgrounds of individuals, regardless of their race, gender, ethnicity, disability, age, sexual orientation, or any other dimension of diversity. IBM believes that fostering a diverse and inclusive workforce leads to innovation, improved business outcomes, and a more equitable society.
As an AI language model, I don't have personal opinions, but based on available information, IBM has made significant efforts to promote diversity and inclusion. They have implemented various initiatives, such as establishing employee resource groups, setting diversity goals, and implementing inclusive hiring practices. IBM also advocates for policies that promote diversity and inclusion beyond its own organization. However, a comprehensive assessment of their present efforts would require a more in-depth analysis of their specific actions, impact, and ongoing commitment.
IBM's approach to diversity and inclusion could serve as a valuable model for smaller organizations. By creating a culture that values diversity, smaller companies can benefit from increased innovation, improved employee engagement, and broader perspectives. However, the implementation may differ depending on the organization's resources and size. Smaller companies may need to tailor their initiatives to fit their specific circumstances, such as building partnerships with external organizations or leveraging technology to overcome resource constraints. Overall, while there may be challenges, the principles and goals of diversity and inclusion can be adapted and applied effectively in organizations of various sizes.
To learn more about IBM click here
brainly.com/question/32153649
#SPJ11
Because a car wash good is considered a(n) __________ good, a consumer has a low level of involvement for the "information seeking" and "evaluation of alternatives" steps of the process.
The term that fits in the blank is "Low Involvement."A low involvement good is a product that is less significant or important to a consumer than a high involvement good. These are products that have a small effect on the consumer's lifestyle and are less valuable to them.
Because a car wash good is considered a low involvement good, a customer has a low level of involvement for the "information seeking" and "evaluation of alternatives" steps of the process.
The car wash good is not going to have a significant impact on the consumer's lifestyle, and because of that, they are likely to choose a car wash that is convenient to their location.
A car wash is a low-involvement good because it is considered to be a service that a customer uses only when they require it. When compared to other high-involvement goods such as buying a new car or buying a house, the importance of car wash good in the customer's lifestyle is much less.
So, customers do not spend too much time researching different options or comparing prices before making a decision. They are more likely to go to the nearest car wash.
For more question on product
https://brainly.com/question/25922327
#SPJ8
A car wash scenario represents a convenience good, indicating that consumers display a low level of involvement in 'information seeking' and 'evaluation of alternatives' steps of the buying process, usually opting for their preferred or the most accessible brands.
Explanation:A car wash good is considered a convenience good. These are products and services that consumer purchases frequently, immediately, and with minimal comparison and buying effort. Typical examples are fast food, cleaning services, or personal care items. For such goods, the consumer usually goes for their preferred brand or what's most accessible, implying a low level of involvement in the 'information seeking' and 'evaluation of alternatives' steps of the buying process.
Learn more about Convenience Good here:https://brainly.com/question/9421790
#SPJ2
Suppose the supply cure is given by D(p)=1+p, where p is the price. If the price change from 4 to 8, what is the change in producer's surplus? a. 15 b. 28 c. 24 d. 22
Therefore, the change in producer’s surplus is 22.Answer: d. 22
The supply curve is given by D(p)=1+p, where p is the price. The price changes from 4 to 8.
We need to determine the change in the producer's surplus.Step-by-step explanation
The producer’s surplus can be given by the difference between the amount that producers are willing to sell goods for (the supply price) and the price they actually receive for those goods.
The area of producer’s surplus is shown as a green shaded area in the graph below. It is the area between the supply curve and the actual price received by the producer. As per the given information:
Original price
= 4O riginal quantity supplied
= 1+4
= 5
New price = 8
New quantity supplied = 1+8
= 9
Change in producer’s surplus can be calculated as follows:
Producer’s surplus (original) = 1/2 * (4-1) * (5-1)
= 6
Producer’s surplus (new) = 1/2 * (8-1) * (9-1)
= 28
Change in producer’s surplus = Producer’s surplus (new) - Producer’s surplus (original)
= 28-6
= 22
Therefore, the change in producer’s surplus is 22. Answer: d. 22
To know more about supply visit;
brainly.com/question/28285610
#SPJ11
QUESTION 6
A coach supports an individual; whereas, a mentor is someone who has experience from which a person wants to learn.
True
False
QUESTION 7
Which of the following are examples of flexible working:
Flexi-time, job sharing, reduced workweeks, remote working
Job sharing, reduced worksheets, more vacation time
Remote working, childcare, flexi-time
None of the above
QUESTION 8
When attempting to bring about diversity and inclusion changes, it's important to focus your energy on the symptom before working on the root problem.
True
False
6. True: A coach supports an individual, while a mentor is someone from whom a person wants to learn.
7. Flexi-time, job sharing, reduced workweeks, and remote working are examples of flexible working.
8. False: When attempting to bring about diversity and inclusion changes, it's important to focus on the root problem rather than just addressing the symptoms.
6. A coach typically provides guidance, motivation, and support to an individual in achieving their goals. On the other hand, a mentor is an experienced person who shares their knowledge, expertise, and advice with someone who seeks to learn from them.
7. Flexible working options include flexi-time, job sharing, reduced workweeks, and remote working. Flexi-time allows employees to choose their own working hours within certain limits.
Job sharing involves two or more people sharing the responsibilities of one full-time position. Reduced workweeks refer to working fewer days or hours per week. Remote working enables employees to work from a location outside the traditional office setting, often using technology to stay connected.
8. When addressing diversity and inclusion, it is crucial to identify and address the root problem rather than merely treating the symptoms.
Focusing on the root problem involves understanding the underlying causes of inequality or exclusion, challenging systemic biases and structures, and implementing proactive measures to create a more inclusive and diverse environment.
Learn more about job sharing here:
https://brainly.com/question/15690520
#SPJ11
True or false. There is some evidence that the degree of income inequality in the United States has increased in recent decades. True False True or false. Worldwide income inequality has increased substantially since 1980 because the high income industrial economies have been growing more rapidly than populous less developed countries such as India and China. True False True or false. In this video, economists Tyler Cowen argues that globalization has led to a significant increase in worldwide income inequality during the past three decades. 115 True or false. Worldwide income inequality has increased substantially since 1980 because the high income industrial economies have been growing more rapidly than populous less developed countries such as India and China. True False True or false. In this video, economists Tyler Cowen argues that globalization has led to a significant increase in worldwide income inequality during the past three decades. True False
TRUE/FALSE
True
There is strong evidence that the degree of income inequality in the United States has increased in recent decades. According to the Congressional Research Service, in 2018, the top 1% of households in the United States accounted for 15.3% of pre-tax income and 17.1% of after-tax income. Meanwhile, the bottom 20% of households accounted for just 3.1% of pre-tax income and 5.3% of after-tax income. As a result, the Gini coefficient, which is a common measure of income inequality, has risen significantly in the United States since the 1970s.
True
Worldwide income inequality has increased substantially since 1980 because high-income industrial economies have been growing more rapidly than populous less developed countries such as India and China. According to the World Inequality Database, the share of global income going to the top 1% of earners increased from 16% in 1980 to over 20% in 2016, while the share going to the bottom 50% declined from over 8% in 1980 to just under 8% in 2016.
True
In the video, economist Tyler Cowen argues that globalization has led to a significant increase in worldwide income inequality during the past three decades. He points to the fact that high-income countries have been able to take advantage of globalization by outsourcing low-skilled jobs to countries with lower labor costs, while many people in less developed countries have not been able to take advantage of the opportunities provided by globalization due to a lack of education and access to capital. As a result, he argues, income inequality has increased both within and between countries.
To know more about TRUE/FALSE visit:
https://brainly.com/question/29988421
#SPJ11
suppose that the board of directors of old navy declared a cash dividend of $1.50 per share on 36000 shares of common stock on july 15, 2025. the dividend is to be paid on august 15, 2025 to stockholders of record on july 31, 2025. the journal entry to record the declaration of the dividends on july 15, 2025 will include a
The journal entry to record the declaration of dividends on July 15, 2025 will include a debit to Retained Earnings and a credit to Dividends Payable.
Here's the breakdown of the journal entry:
1. Debit to Retained Earnings: This reflects the decrease in the company's retained earnings as a result of declaring dividends. The amount debited would be calculated as follows: $1.50 per share x 36,000 shares = $54,000.
2. Credit to Dividends Payable: This represents the liability created by declaring dividends. The amount credited would be equal to the total dividend declared, which is $1.50 per share x 36,000 shares = $54,000.
Remember, the debit to Retained Earnings reduces the company's equity, while the credit to Dividends Payable increases the liability owed to the stockholders. These entries accurately reflect the declaration of the cash dividends on July 15, 2025. suppose that the board of directors of old navy declared a cash dividend of $1.50 per share on 36000 shares of common stock on july 15, 2025. the dividend is to be paid on august 15, 2025 to stockholders of record on july 31, 2025. the journal entry to record the declaration of the dividends on july 15, 2025 will include a
To know more about Retained Earnings visit:
https://brainly.com/question/28580073
#SPJ11
The journal entry to record the declaration of the dividends on July 15, 2025 will include the following steps:
1. Debit: Dividends Payable - This account represents the amount of dividends declared but not yet paid to the stockholders. In this case, we will debit Dividends Payable for the total amount of the declared dividend, which is $1.50 per share multiplied by 36,000 shares, equaling $54,000.
2. Credit: Dividends Declared - This account represents the total amount of dividends declared by the company. We will credit Dividends Declared for the same amount as the debit, $54,000.
The journal entry will look like this:
Dividends Payable 54,000
Dividends Declared 54,000
By recording this journal entry, we acknowledge the obligation of the company to pay dividends to the stockholders. The Dividends Payable account will later be adjusted when the dividends are actually paid on August 15, 2025, and the stockholders of record on July 31, 2025, will receive their dividends.
Learn more about Dividends Payable from a given link :
https://brainly.com/question/19865936
#SPJ11
According to Maslow's need hierarchy, which of the following statements is true?i
a. Higher-level needs are more important than lower-level needs.
b. One can never be fully satisfied.
c. People are motivated to satisfy lower-level needs before higher level needs.
d. Once a need is satisfied, it becomes a powerful motivator.
e. Unsatisfied needs will not motivate performance.
Organizations are becoming a more heterogeneous mix of people in terms of gender, age, race, ethnicity, and sexual orientation
Select one:
True
False
The correct statement according to Maslow's need hierarchy is: c. People are motivated to satisfy lower-level needs before higher-level needs.
According to Maslow's hierarchy of needs, individuals are motivated to fulfill their physiological needs (such as food, water, and shelter) and safety needs (such as security and stability) before moving on to higher-level needs.
Once the lower-level needs are satisfied, individuals are then motivated to satisfy their social needs, esteem needs, and finally, self-actualization needs.
Regarding the second statement:
Organizations are becoming a more heterogeneous mix of people in terms of gender, age, race, ethnicity, and sexual orientation.
The correct answer is:
True.
Organizations are indeed becoming more diverse and heterogeneous in terms of gender, age, race, ethnicity, and sexual orientation.
There is a growing recognition of the importance of diversity and inclusion in the workplace, and organizations are making efforts to create inclusive environments that embrace and value individuals with diverse backgrounds and identities.
This diversity brings unique perspectives, experiences, and skills to the organization, leading to greater innovation, creativity, and overall success., leading to greater innovation, creativity, and overall success.
learn more about workplace here :brainly.com/question/19965171
#SPJ11
Q1 You are working with a manufacturer under Boards Co. this company creates shop work benches from scratch. They had the following forecasted and budgeted for the full 2017 year: Budgeted 2017 Jan - Dec Sales in dollars $ 500,000 Selling price per unit $ 50 lumber pieces used per set 10 Cost for one unit of lumber $ DLH per unit, $25 per 0.5 At the end on 2017, they knew the following: 120,000 100 Actual 2017 Jan-Dec Sales in dollars $ Selling price per unit $ lumber pieces used (total) Cost for one unit of lumber $ DLS paid total, $24 per hour $ 20,000 5 140,000 A) You remember from your university days, there is a middle step between "static" budget and "actual" budget calcs, and you first have to calculate the flexible revenue budget amount below. Complete all steps necissary to calculate revenue expectations and show it below: B) Boards has no idea what to make of the differences between flexible budgeted and actual. What creates the variance? Can you quantify and explain if the above is Favorable or UNfavorable?
A. Flexible revenue budget amount = (Budgeted sales in dollars) + (Variable cost per unit * Actual units produced)
= $500,000 + ($5 * 100)
= $550,000
How to solve for varianceB. The variance between flexible budgeted and actual revenue is $50,000.
This is unfavorable because actual revenue was $50,000 less than what was expected. The variance is caused by a combination of factors, including:
The actual number of units produced was 20% higher than the budgeted number of units.
The actual cost per unit of lumber was $5 less than the budgeted cost per unit of lumber.
Quantitatively, the variance is calculated as follows:
Favorable variance due to increased production = ($50 * 20) = $10,000
Unfavorable variance due to decreased cost per unit = ($5 * 100) = $5,000
Total variance = $10,000 - $5,000 = $5,000 (unfavorable)
Read more about variance here:
https://brainly.com/question/9304306
#SPJ1
In the figure above, start at an equilibrium point were D1=S1. If there was a(n) decrease in the price of paper used in the production of books, which graph best represent this event? C
The graph that best represents a decrease in the price of paper used in the production of books is graph B.
In the given scenario, a decrease in the price of paper used in the production of books would impact the supply curve. Graph B represents this event by shifting the supply curve to the right. As a result, the new supply curve, S2, shows that suppliers are willing to supply a larger quantity at each price level.
This shift in the supply curve indicates that with the decrease in the price of paper, producers can now produce books at a lower cost. As a result, they are willing to supply a greater quantity of books at the existing prices.
The demand curve, D1, remains unchanged in this scenario, as the change in paper price does not affect consumer demand directly.
By shifting the supply curve to the right, graph B represents the decrease in the price of paper used in the production of books, leading to an increase in the quantity supplied and a potential decrease in the equilibrium price of books.
Learn more about equilibrium price at:
https://brainly.com/question/29099220
#SPJ11
The complete question is:
In the figure above, start at an equilibrium point were D1=S1. If there was a(n) decrease in the price of paper used in the production of books, which graph best represent this event?
C
B
E
D
A
T/F Two of the steps in the Taking Action set of tools in the EMERGE Public Leadership Performance Platform are Continuous Leadership Learning and Contextual Intelligence Discernment
The Statement is true. Two steps in the Taking Action set of tools in the EMERGE Public Leadership Performance Platform are Continuous Leadership Learning and Contextual Intelligence Discernment.
The EMERGE Public Leadership Performance Platform includes a set of tools to support effective leadership. Two of the steps in the Taking Action set of tools are Continuous Leadership Learning and Contextual Intelligence Discernment.
Continuous Leadership Learning emphasizes the importance of ongoing learning and development for leaders. It recognizes that leadership skills and knowledge need to evolve to meet the challenges of a changing environment. This step encourages leaders to engage in continuous learning through various means such as reading, attending workshops, participating in leadership programs, and seeking feedback from mentors or peers.
Contextual Intelligence Discernment focuses on developing the ability to understand and navigate complex and dynamic contexts. It involves gaining a deep understanding of the political, social, economic, and cultural factors that influence decision-making and leadership. This step encourages leaders to gather information, analyze the context, and make informed decisions based on a thorough understanding of the environment in which they operate.
Both Continuous Leadership Learning and Contextual Intelligence Discernment are essential components of effective leadership and are included in the Taking Action set of tools in the EMERGE Public Leadership Performance Platform.
Learn more about Continuous Leadership Learning at:
https://brainly.com/question/32519254
#SPJ11
Critically analyze the emerging consumer behavior, in terms of the AIDAA model and Moment of truth in Marketing?
The emerging consumer behavior can be analyzed using the AIDAA model (Attention, Interest, Desire, Action, and Advocacy) and the Moment of Truth in marketing. These frameworks provide insights into how consumers interact with brands and make purchasing decisions.
The AIDAA model breaks down the consumer journey into five stages: Attention, Interest, Desire, Action, and Advocacy. In the Attention stage, marketers strive to capture consumers' attention through various marketing channels. In the Interest stage, they aim to generate curiosity and engage consumers with compelling content. The Desire stage involves creating a strong desire for the product or service through effective messaging and positioning. The Action stage is where consumers make the purchase decision and complete the transaction. Finally, in the Advocacy stage, satisfied customers become brand advocates and spread positive word-of-mouth.
The Moment of Truth concept, coined by Procter & Gamble, refers to the critical points when consumers make judgments about a brand or product. It includes the First Moment of Truth (FMOT) when a consumer encounters a product on the shelf and decides to purchase it, and the Second Moment of Truth (SMOT) when the consumer uses the product and forms an opinion about its quality and performance. In today's digital age, the Zero Moment of Truth (ZMOT) is also crucial, as consumers research and gather information online before making a purchase decision.
Emerging consumer behavior indicates changes in these models. With the rise of e-commerce and social media, consumers have more control and access to information, influencing their attention, interest, and desire stages. They seek personalized experiences, authenticity, and social proof. The AIDAA model needs to adapt to these changes by leveraging digital channels, targeted messaging, and influencer marketing.
Furthermore, the digital landscape has expanded the Moments of Truth. Consumers now have multiple touchpoints and interactions with brands, including pre-purchase research, online reviews, and social media engagement. Marketers must carefully manage each moment, ensuring consistent messaging, exceptional customer experiences, and prompt issue resolution to foster advocacy.
In summary, analyzing emerging consumer behavior through the AIDAA model and Moment of Truth in marketing helps marketers understand the evolving consumer journey, adapt their strategies to digital platforms, and deliver personalized experiences at critical touchpoints.
Learn more about the AIDAA model here: brainly.com/question/27333732
#SPJ11
Abdullah have invested in shares and securities. He regularly receives dividend on his investment. He has to pay tax on dividends and this tax is an example of:
O a. None of the option
O b. indirect tax
O c. direct tax O d. excise duty
The tax on dividends that Abdullah has to pay is an example of a direct tax. Direct taxes are imposed directly on individuals or entities based on their income, wealth, or activities. In this case, the tax is levied directly on Abdullah's dividend income.
Direct taxes are taxes that are levied directly on individuals or entities and are based on specific criteria such as income, wealth, or activities. They are typically imposed by the government to generate revenue and fund public services and infrastructure.
In the case of dividends, they are a form of income earned by individuals who have invested in shares or securities of companies. When a company generates profits, it may distribute a portion of those profits to its shareholders as dividends. These dividends are considered income for the shareholders and are subject to taxation.
The tax on dividends is directly imposed on the individual who receives the dividend income. The tax rate is usually determined by the individual's income bracket or other factors specified by the tax laws of the country. The individual is responsible for reporting their dividend income and paying the applicable tax on that income.
Therefore, based on these characteristics, the tax on dividends qualifies as a direct tax because it is levied directly on the individual receiving the dividend income.
Learn more about tax here : brainly.com/question/12611692
#SPJ11
"""0.The Bolten Corporation had earnings per share of $2.60 in
2012, and book value per share at the end of 2011 (beginning of
2012) was $13. a. What was the fi rm’s return on
equity (book value) i"
ROE is typically calculated using the following formula: ROE = Net Income / Average EquityTo calculate the return on equity (ROE), we need the net income and the average equity for the period.
Given information:
Earnings per share (EPS) in 2012 = $2.60
Book value per share at the end of 2011 = $13
To calculate the average equity, we need to know the equity value at the beginning and end of the period. However, the beginning equity value is not provided in the question. Without that information, we cannot calculate the exact ROE.
ROE is typically calculated using the following formula:
ROE = Net Income / Average Equity
Since the beginning equity value is not given, we are unable to calculate the average equity and determine the precise ROE.
To know more about ROE :
https://brainly.com/question/32935876
#SPJ4
A divisional manager read on the internet that sales of their division's products an expected to view by 50% next year They then read a second sticle which suggested growm would be only 30% and a third which forecast 12% The sains budget was constructed using growth of 50% A year lace it was confirmed that sales had risen by 12% What type of bias affected the divisional manager's decision making? A Self-selection B Cognitive C. Confirmation D Anchoring
The confirmation bias led the divisional manager to selectively focus on information that aligned with their preconceived notion of 50% growth and disregarded information that challenged or contradicted it. The bias that affected the divisional manager's decision-making in this scenario is Confirmation Bias (Option C).
Confirmation Bias refers to the tendency of individuals to seek and interpret information in a way that confirms their preexisting beliefs or hypotheses, while disregarding or downplaying conflicting information. In this case, the divisional manager initially came across an article suggesting a 50% growth in sales, and they used this information to construct the sales budget.
However, when they encountered subsequent articles indicating lower growth rates of 30% and 12%, the divisional manager still maintained their initial belief and stuck with the 50% growth figure in the sales budget. They ignored or downplayed the conflicting information that suggested lower growth rates. As a result, their decision-making was influenced by their confirmation bias, which can lead to suboptimal or biased decision outcomes.
To learn more about divisional manager, visit:
https://brainly.com/question/31524913
#SPJ11
In its first month of operations, McLanie Company made three purchases of merchandise in the following sequence: (1) 300 units at $6, (2) 400 units at $8, and (3) 500 units at $9. Calculate the average unit cost.
The McLanie Company made three purchases of merchandise in the first month of operations, at prices of $6, $8 and $9. The company bought 300 units of merchandise for $6, 400 units of merchandise for $8, and 500 units of merchandise for $9.
To determine the average unit cost of the merchandise, we must calculate the total cost of the merchandise units and divide it by the total number of merchandise units. Thus;The total cost of the 300 units of merchandise is $1,800 (300 × $6).
The total cost of the 400 units of merchandise is $3,200 (400 × $8).The total cost of the 500 units of merchandise is $4,500 (500 × $9).The total cost of the merchandise units is: $1,800 + $3,200 + $4,500 = $9,500.The total number of merchandise units is: 300 + 400 + 500 = 1,200.
To know more about merchandise visit:-
https://brainly.com/question/32628986
#SPJ11
The production manager for the Coory soft drink company is considering the production of two kinds of soft drinks: regular and diet. Two of her limited resources are production time (8 hours = 480 minutes per day) and syrup (1 of the ingredients), limited to 675 gallons per day. To produce a regular case requires 2 minutes and 5 gallons of syrup, while a diet case needs 4 minutes and 3 gallons of syrup. Profits for regular soft drink are $3.00 per case and profits for diet soft drink are $2.00 per case. Which of the following is not a feasible production combination?
Question 10 options:
90R and 75D
135R and 0D
75R and 90D
40R and 100D
Answer: 40R and 100D is not a feasible production combination.
One of the primary functions of production management is to determine the most efficient way to produce the required product(s) while using limited resources. In the problem statement, the production manager of the Coory soft drink company is considering producing two types of soft drinks: regular and diet.
Two of her restricted resources are production time (480 minutes per day) and syrup (675 gallons per day). To manufacture a case of regular soft drink, 2 minutes and 5 gallons of syrup are needed. On the other hand, 4 minutes and 3 gallons of syrup are needed to produce a case of diet soft drink.
The profit margin for a regular case is $3.00,
while the profit margin for a diet case is $2.00.
The feasible combinations for the production of regular and diet soft drinks are computed as follows:
Let R be the number of regular cases produced per day, and D be the number of diet cases produced per day.
2R + 4D ≤ 480, production time constraint
5R + 3D ≤ 675,
syrup constraint
R ≥ 0 and D ≥ 0, non-negativity constraints
The first and second constraints represent the maximum number of minutes and syrup allocated for the production of the two varieties. The feasible area in the first quadrant of the xy-plane, which is the non-negative solution region of the above inequalities, is the set of possible combinations of R and D.
In order to maximize profits, we must determine the solution that satisfies all constraints and yields the maximum profit. Let's use the Trial-and-Error Method to see which of the following options is not a feasible production combination.
40R and 100D
Total Production Time:
2(40) + 4(100) = 520 minutes > 480 minutes (violates production time constraint)
Total Syrup Used:
5(40) + 3(100) = 520 gallons > 675 gallons (violates syrup constraint)
So, 40R and 100D is not a feasible production combination, hence is the answer.
To know more about feasible production visit:
https://brainly.com/question/32562118
#SPJ11
Gene purchased land five years ago as an investment. The land cost him $200,000 and is now worth $530,000. Gene plans to transfer the land to Dee Corporation, which will subdivide the land and sell individual parcels. Dee Corporation's profits on the land will be ordinary income. What are the tax consequences of the asset transfer and land sales if Gene contributes the land to Dee Corporation in exchange for all of its stock? What alternative methods can be used to structure the transaction to achieve better tax consequences? Please thoroughly explain your answer.
If Gene contributes the land to Dee Corporation for stock, there are no immediate tax consequences. Alternatively, options like installment sale or Section 1031 exchange may provide better tax outcomes.
Step 1: Tax Consequences of the Asset Transfer and Land Sales:
If Gene contributes the land to Dee Corporation in exchange for all of its stock, the tax consequences will depend on whether the transaction qualifies as a tax-free exchange under the provisions of Section 351 of the Internal Revenue Code (IRC).
1. Tax Consequences of the Asset Transfer:
a. No immediate tax recognition: Generally, under Section 351, the transfer of property to a corporation in exchange for stock is not immediately taxable. Gene will not recognize any gain or loss on the transfer of land to Dee Corporation.
b. Carryover basis: Gene's basis in the land will carry over to the stock received from Dee Corporation. In this case, Gene's basis in the stock will be the same as his basis in the land, which is $200,000.
2. Tax Consequences of the Land Sales by Dee Corporation:
a. Ordinary income treatment: If Dee Corporation sells the subdivided land parcels, any profits derived from the sales will be treated as ordinary income. This means that Dee Corporation will be subject to ordinary income tax rates on the profits instead of capital gains tax rates.
Step 2: Alternative Methods for Better Tax Consequences:
To achieve better tax consequences, Gene and Dee Corporation can consider alternative methods to structure the transaction. Here are a few options:
1. Installment Sale: Instead of transferring the land for stock, Gene can sell the land to Dee Corporation in an installment sale. This would allow Gene to recognize the gain over a period of time as payments are received, potentially spreading out the tax liability.
2. Section 1031 Exchange: If Gene intends to reinvest the proceeds from the land sale, he could explore a like-kind exchange under Section 1031 of the IRC. This would allow him to defer the recognition of gain by acquiring a similar investment property within a specified timeframe.
3. Joint Venture or Partnership: Gene and Dee Corporation could form a joint venture or partnership to develop and sell the land parcels together. This could provide more flexibility in terms of sharing profits and losses and potentially offer more advantageous tax treatment.
It is important to note that each alternative method has its own specific requirements, limitations, and potential tax consequences. It is recommended that Gene consults with a tax professional to evaluate the specific circumstances and choose the most suitable approach for his situation, considering both short-term and long-term tax implications.
To learn more about Internal Revenue Code (IRC) click here: brainly.com/question/30360007
#SPJ11