State whether the following statement is true or false: the
Fanning friction factor is a function of the pipe’s roughness in
the turbulent flow regime.

Answers

Answer 1

The statement "the Fanning friction factor is a function of the pipe’s roughness in the turbulent flow regime" is true. The Fanning friction factor is commonly used to calculate the frictional pressure drop in a pipe flow system and is affected by the roughness of the pipe's inner surface.

In the turbulent flow regime, the fluid moves in a chaotic, irregular manner, with eddies and vortices causing a mixing of fluid layers. The roughness of the pipe's inner surface affects the frictional drag between the fluid and the pipe wall, which in turn affects the Fanning friction factor.

The roughness of a pipe's inner surface is typically characterized by the absolute roughness, ε, which is defined as the average height of surface irregularities relative to the pipe's diameter.

[tex]f = ΔP / (0.5 * ρ * V^2 * L / D)[/tex]where ΔP is the pressure drop along the pipe, ρ is the fluid density, V is the mean flow velocity, L is the pipe length, and D is the pipe diameter.

The Fanning friction factor, f, is a function of the Reynolds number, Re, which is defined as the ratio of inertial forces to viscous forces. In the turbulent flow regime, the Fanning friction factor is also affected by the pipe roughness, and it can be calculated using empirical relations such as the Colebrook equation.

To know more about Fanning friction visit:-

https://brainly.com/question/31302311

#SPJ11


Related Questions

Question 45 (1 point) Saved As long as properly designed sprinkler systems are used, the ability of a building structure to withstand fire is not important. True False

Answers

The given statement "As long as properly designed sprinkler systems are used, the ability of a building structure to withstand fire is not important" is a false statement. Properly designed sprinkler systems are crucial in fire protection, but they do not eliminate the need for a building structure that is built to withstand fire.

As the fire begins, sprinklers play a vital role in the protection of lives and property by immediately controlling the spread of the fire. A properly designed fire sprinkler system that is well-maintained can even extinguish the fire before the fire department arrives. However, even if a building has a fire sprinkler system in place, if the building's structure cannot withstand fire, it can collapse, causing fatalities or other injuries, and property loss.

Therefore, it is essential to have a building that can withstand fire and a properly designed fire sprinkler system to ensure the highest level of fire safety. A building structure must be constructed with fire-rated materials and building components such as walls, floors, roofs, doors, and windows.

The ability of a building structure to withstand fire and a properly designed fire sprinkler system are both important aspects of fire protection. They work together to provide a comprehensive fire protection strategy, and one should not be compromised at the expense of the other.

To know more about sprinkler visit:-

https://brainly.com/question/32565846

#SPJ11

Tammy, age 18 months, has a beach ball and a Nerf ball, and she knows what a basketball and a tennis ball are. When she encounters a golf ball for the first time, she mentally adds this new example to her "ball" scheme. Adding another example to an existing scheme is a process that Piaget called ________.

Answers

Answer:

Explanation:

The process that Piaget called "adding another example to an existing scheme" is called assimilation. Assimilation refers to the cognitive process of incorporating new information or experiences into existing mental schemas or frameworks. In this case, Tammy assimilates the new example of a golf ball into her existing "ball" scheme, expanding her understanding of what falls under the category of a ball.

Design two (2) equal volume pancake type anaerobic digestion system. Design parameters are:
Design example)
Amount of sludge: 24,000 GPD
% solids: 3.5% (80% primary and 20% WAS)
68% VS/TS
Design digestion temperature: 55°C or 131°F (Thermophilic digestion temperature)
Feed sludge temperature: 70°F (Southern region)
18 day SRT
Completely mixed pancake type tank, Flat bottom
45% VSR assumed due to higher digestion temperature
Biogas volume: 12 ft/lb VSR
Biogas heat value: 600 btu/ft³
Boiler efficiency: 80%
Tank heat loss = 1 btu/hr/1000ft³
(a) Dimension of the tank (Diameter and tank height in ft.) Assume SF = 1.1
(b) Daily biogas volume generation (ft³/day)?
(c) Total heat requirement for the digester. Please include heat for sludge and tank loss.
Assume that raw sludge temperature is 70°F. Use safety factor, 1.35.
(d) Design total heat generation in a dual fuel boiler in btu/hr. Use boiler efficiency, 80%.

Answers

Anaerobic digestion (AD) is a biological process that involves breaking down organic matter (OM) in the absence of oxygen. The breakdown produces methane and carbon dioxide that can be used as a fuel source, and also a nutrient-rich digestate. The process is ideal for treating high-strength organic waste streams, such as sludge from wastewater treatment plants, and produces biogas that can be used as a fuel source.

The design of two equal volume pancake-type anaerobic digestion systems with given parameters are as follows: Assumptions: Tank volume is calculated as per the assumption of 45% VSR.1 ft3 = 7.4805 Gallon1 ft3 gas = 600 Btu Boiler efficiency = 80%Tank heat loss = 1 Btu/hr/1000ft3Safety factor = 1.35.

(a) Dimension of the tank (Diameter and tank height in ft.):Tank volume = 24,000 GPD × 0.035 × 8.34 lb/gallon × 18 days/1 = 14,830 ft3 Assuming a safety factor of 1.35,Sizing factor = 1.35 × 1.1 = 1.485Volume of each digester = 14,830 ft3 ÷ 2 = 7,415 ft3Tank volume = 7,415 ft3 ÷ 0.45 = 16,477 ft3Assuming a flat-bottomed tank, where:

Volume of tank = Area of tank bottom × Height of tank Bottom area = Volume of tank ÷ Height of tank Assuming a cylindrical tank: Bottom area = π × Diameter2 / 4Diameter = √(4 × 16,477 ft3 ÷ (π × 0.8 × 18)) = 59.3 ft Height = Diameter × 0.8 = 47.4 ft The diameter of each tank is 59.3 ft, and the height is 47.4 ft.

(b) Daily biogas volume generation (ft3/day)?Biogas volume generated per lb VS destroyed = 12 ft3/lb VSRTotal VS generated = 24,000 GPD × 0.035 × 68 / 100 = 6,216 lb/day Biogas volume generated = Biogas volume per lb VS destroyed × VS generated= 12 ft3/lb VS × 6,216 lb/day= 74,592 ft3/day(c) Total heat requirement for the digester:

To know more about digestate visit:

https://brainly.com/question/29030031

#SPJ11

Explain the challenges facing Singapore in i) developing new
water resources & ii) managing the existing resources for long
term water security.

Answers

Singapore is a small island nation that faces several challenges when it comes to developing new water resources and managing existing resources for long-term water security.

Singapore's water supply has always been limited by its small size, limited land area, and lack of natural water sources. These challenges have led to the development of innovative technologies and policies to ensure water security.
One of the biggest challenges facing Singapore in developing new water resources is the country's limited land area. To overcome this challenge, Singapore has implemented a range of measures, including the development of new water sources, such as desalination plants, NEWater facilities, and rainwater harvesting systems.
In addition to developing new water resources, Singapore also faces challenges in managing its existing resources for long-term water security.

One of the biggest challenges is the limited availability of freshwater resources, which are vulnerable to pollution and overuse. Another challenge facing Singapore in managing its existing water resources is the impact of climate change. Singapore is vulnerable to rising sea levels, which could lead to saltwater intrusion and contamination of freshwater sources.
To know more about  long-term  visit:

brainly.com/question/30197447

#SPJ11

A XYZ construction company you are employed in has been granted a project for a road rehabilitation from Braamfontein to N1 Pretoria. An approximate distance is 45Km. A purpose of pavement rehabilitation is to restore pavement surface to extend it service life and to improve performance and the durability of pavement structure. Several meetings have been held to commence with the project. A site meeting is an important meeting where administration officers are to ensure quality of work done within a given period of road rehabilitation. A given duration for a rehabilitation of a road is 2 years. Gauteng season is as follows, rainy in summer and dry in winter.
Question 2 2.1. Determine and sketch the scheduling flexibility using Critical Path Method for the Rehabilitation project?

Answers

Critical Path Method (CPM) is an effective project management tool utilized to schedule and manage complex projects with multiple tasks.

It aids project managers in identifying the most crucial tasks and calculating the time it takes to finish the entire project. The steps involved in the CPM are: Identify all the tasks involved in the project and the duration of each task.


Determine the critical path, which is the longest path through the network and identifies the minimum time required.
Determination and Sketching of the Scheduling Flexibility using Critical Path Method for the Rehabilitation project:
The critical path for the rehabilitation project of XYZ construction company is shown below:

TO know more about Critical visit:

https://brainly.com/question/31835674

#SPJ11

which is more desirable a large PDOP or a small PDOP

Answers

In GPS, PDOP stands for Position Dilution of Precision. PDOP is a statistical measure of the GPS accuracy that's provided by the GPS receiver. It's a significant factor in determining the actual GPS accuracy.

The lower the PDOP value, the better the GPS accuracy. Therefore, a smaller PDOP is more desirable than a larger one. In reality, a PDOP value of 1 indicates ideal GPS accuracy, while a value of 10 indicates GPS accuracy that is extremely bad. In most situations.

GPS devices with a smaller PDOP are more costly. They are typically utilized in professional and high-precision applications, such as surveying and mapping.

TO know more about stands visit:

https://brainly.com/question/30381306

#SPJ11

(c) Describe briefly the main objectives of the following monitoring programs:
Activate emergency
11. Obtain historical record
Ensure suitability of substance

Answers

Monitoring programs play an essential role in keeping the public and environment safe. The following are brief descriptions of the main objectives of three different monitoring programs:

1. Activate Emergency Program The Activate Emergency Program's primary goal is to prevent the immediate loss of human life by warning of imminent dangers and providing information to emergency services. The objective of this monitoring program is to provide a prompt and effective response to any emergencies that may occur. It also includes the timely communication of safety information to the public and emergency responders.2. Obtain Historical Records Program The primary objective of this program is to collect historical records on the use and storage of hazardous substances, such as asbestos and lead, to identify potential hazards.

The historical records help identify areas where hazardous substances may have been released into the environment and enable authorities to take appropriate action.3. Ensure Suitability of Substance ProgramThis monitoring program ensures that the chemicals and substances used in the environment, including pesticides and fertilizers, are safe for humans and the environment. The primary objective of this program is to identify and regulate the use of hazardous substances and ensure that their use is safe. This program includes the monitoring of water and soil quality, the enforcement of regulations to prevent contamination, and the identification of safer alternatives to hazardous chemicals.

To know more about  monitoring programs visit:

brainly.com/question/30619991

#SPJ11

A wastewater flow with the following characteristics is to be treated in a completely mixed activated-sludge system. This system is operated at the HRT of 8 hrs and treats wastewater flowing at 15,000 m3/d. Average influent BODs is 250 mg/L and 98% BODs should be removed to meet state regulation. Yield is 0.6 kg biomass/kg BODs and decay coefficient is kd = 0.06 d-?. The reactor is designed to operate at a biomass concentration of 2,700 mg/L and sludge wastage is 150 m3/d. (a) SRT in days? (b) Return biomass concentration, Xi in mg/L? (c) Sludge recycle ratio? (d) Do you think the system is healthy, if optimum F/M ratio is 0.2?

Answers

(a) SRT:

Sludge age,[tex]θc = HRT × Xcθc = 8 hours × 2.7 g/L = 21.6 g/L[/tex]Biomass decay rate

kd = 0.06/dayθc = 1/kd = 16.67 days

f is the fraction of total biomass which is active [tex]SRT = 16.67 × f[/tex] The value of f is generally taken as 0.5 for a completely mixed activated sludge system SRT = 8.34 days

(b) Calculation of Xi (return biomass concentration):

Μ = yield coefficient × F/MF/[tex]M = (250 mg/L × 0.98 × 0.6) / XiF/M = 0.147 mg/mg/day0.2 = 0.147 / XiXi = 0.735 mg/L[/tex]

(c) Calculation of Sludge recycle ratio:

Recycle ratio, Qr = Sludge flow rateQ = influent flow rateXc = MLVSS concentration in aeration tank

[tex]R = (150 m³/d ÷ 15000 m³/d) × (0.735 g/L ÷ 2.7 g/L)R = 0.05[/tex]

(d) Discussion: If the system's F/M ratio is 0.2, it indicates that the system is underloaded. The optimum F/M ratio for a healthy and stable operation ranges from 0.2 to 0.4. The system needs to be operated closer to the higher range of the F/M ratio, such as 0.3 or 0.4.

This is accomplished by increasing the influent flow or decreasing the aeration tank volume. The higher F/M ratio causes more sludge production, resulting in more biomass available for treatment.

To know more about Discussion visit:-

https://brainly.com/question/32400704

#SPJ11

In a direct shear test using a shear box of 50 x 50 mm in plan. The shear machine is designed to operate with the lever arm assembly arranged to multiply a hangar load by 11. Compute a normal stress (kPa) on the sample when the hangar load is kg ( 1 dp). Use gravitational acceleration of 9.81 m/s2.

Answers

A shear machine that is designed to operate with the lever arm assembly arranged to multiply a hangar load by 11 was used in a direct shear test using a shear box of 50 x 50 mm in plan. The problem asks to calculate a normal stress (kPa) on the sample when the hangar load is kg ( 1 dp).

Gravitational acceleration is used in this computation, and its value is 9.81 m/s2.Direct shear test is a process in which the shear strength of a soil sample is determined by shearing it through the application of a shear force. The shear strength of the sample is determined by plotting the shear stress vs. the shear strain, and the slope of the line is the shear strength. This test is essential in the determination of a soil's shear strength parameters.

The normal stress on the sample is computed as follows :Normal stress = Hangar load / (Area of the sample x lever arm arrangement)The area of the sample is given as 50 x 50 mm = 2500 mm2, and the lever arm assembly is arranged to multiply a hangar load by 11. Thus, the normal stress on the sample is: Normal stress = (hangar load x gravitational acceleration) / (Area of the sample x lever arm arrangement)Normal stress = (kg x 9.81 m/s²) / (2500 mm² x 11)Normal stress = (kg x 9.81 m/s²) / (27,500 mm²)Normal stress = (kg x 0.00981 m/s²) / (27.5 cm²)Normal stress = 0.3576 kg/cm², or 35.76 kPa (approximate)Therefore, the normal stress on the sample when the hangar load is kg (1 dp) is 35.76 kPa.

To know more about  calculate visit:

brainly.com/question/30781060

#SPJ11

A 14-ft wide square footing on clay soil is carrying a 492 kip load. What is the expected pressure from that load (just delta p in psf) at a depth of 18-ft (ie, not the midpoint)?
Report your answer to the nearest whole number. Do not include the units in your answer.

Answers

Therefore, the expected pressure from the load is 2163 psf at a depth of 18-ft.

Width of the square footing (B) = 14-ft

Area of the footing (A) = [tex]B² = 14² = 196 sq-ft[/tex]

Load on the footing (W) = 492 kip

Depth of point of interest (d) = 18-ft

Unit weight of soil () = 120 pcf

Formula used:

[tex]$$\large\Delta p = \frac{W}{A} + \gamma d$$[/tex]

[tex]$\Delta p$[/tex] = pressure from load on soil.

Calculation:,

Load on the footing (W) = 492 kipArea of the footing [tex](A) = B² = 14² = 196 sq-ft[/tex]

[tex]$$\Delta p = \frac{W}{A} + \gamma d$$$$\Delta p = \frac{492}{196} + (120×18)$$$$\Delta p = 2.51 + 2160$$$$\Delta p = 2162.51$$[/tex]

To know more about pressure visit:-

https://brainly.com/question/30673967

#SPJ11

1) given a single person with a $96000 income, apply the standard deduction and tax rate in 2015, which of the following is closest to the tax this person should pay? Assume single filing status.
2)What is the main driver in petroleum projects, and why?
Note: I need all two answers (Please post two answers as soon as possible)
Note : Use below textbook.
Notes: Construction Management, 5th Edition
Author: Daniel W Halpin, Bolivar A. Senior, Gunnar Lucko
Publisher: Wiley
Edition: 5th Edition
ISBN: ISBN-13: 978-1-119-25680-9
This is the primary textbook
Project Management in the Oil and Gas Industry
Author: Mohamed A. El-Reedy
Publisher: Wiley
ISBN: 978-1-119-08361-0
Supplementary book for three modulus sponsored by the Center for Midstream Management and Science (must be used)
Software
Microsoft Project;
Microsoft Excel.
After the first week, I will request the student license of MS Project for you.

Answers

The tax that the person with a $96,000 income should pay can be calculated by Subtract the standard deduction amount from the taxable income. For single filers, the standard deduction amount was $6,300 in 2015. So the taxable income is [tex]$96,000 - $6,300 = $89,700[/tex].the tax amount can be calculated as:

[tex]$9,225 × 0.10 = $922.50[/tex]

[tex]$28,225 ($37,450 - $9,225) × 0.15 = $4,233.75[/tex]

$52,250 ($89,700 - $37,450) × 0.25 = $13,062.50

Total tax amount =[tex]$922.50 + $4,233.75 + $13,062.50 = $18,218.75[/tex]

Therefore, the tax that the person with a $96,000 income should pay is approximately $18,219.

The main driver in petroleum projects is the price of crude oil. The price of crude oil is a critical factor that determines the profitability of petroleum projects.

The price of crude oil affects all aspects of petroleum projects, including exploration, production, transportation, and refining. When the price of crude oil is high, petroleum projects become more profitable, and oil companies invest more in exploration, drilling, and production activities.

Weather conditions, such as hurricanes and storms, can disrupt the production, transportation, and refining of crude oil. global economic conditions, such as inflation, interest rates, and exchange rates, can also affect the price of crude oil.

To know more about global economic visit:-

https://brainly.com/question/11222779

#SPJ11

(b) When a well is pumped, a zone of low pressure is created centred on the well creating the so-called cone of depression. The difference between the potentiometric or phreatic surfaces before and after pumping is known as the drawdown.
(i) Name three different methods by which measurements of drawdown can be used to determine the transmissivity (T) and storativity (S) of an aquifer. For one of these explain what data are needed and the analysis required to compute T and S.
(ii) A well in a confined aquifer is pumped at a rate of 3,650 m³/day. Two and a half days after pumping begins, the drawdown in an observation well located 18 m from the pumped well is 5.7 m. Given K = 12.6 m/day and W(u) = 7.63, and using Table Q4(b), calculate the coefficients of transmissivity and storativity for the aquifer and the aquifer thickness.

Answers

When pumping a well, it results in a zone of low pressure, creating the so-called cone of depression. The difference between the potentiometric or phreatic surfaces before and after pumping is called drawdown. Drawdown can be measured in different ways to determine the transmissivity and storativity of an aquifer.

The transmissivity can be calculated using the following formula:

[tex]T = Q/4πh (2.303)log (r2/r1)[/tex]

the value of h should be in the same units as the distance r1 and r2.

To calculate storativity, we can use the formula: S = W(u)T/b

[tex]T = Q/4πh (2.303)log (r2/r1)[/tex]

Substituting the values, we get:

[tex]T = (3650/4π x 5.7) (2.303)log (18/0)T = 20.98 m²/day[/tex]

We can use the formula: S = W(u)T/b

Substituting the values and given K = 12.6 m/day, we get:

[tex]7.63 x 20.98/b = 12.6[/tex]

Solving for b, we get: b = 1.22 m

The coefficient of transmissivity for the aquifer is 20.98 m²/day, the coefficient of storativity for the aquifer is 19.6 x 10-5, and the thickness of the aquifer is 1.22 m.

To know more about storativity visit:-

https://brainly.com/question/30902591

#SPJ11

Evaluate whether the benefits of BitLocker encryption with TPM are worth the risks to data in the event of motherboard failure or TPM chip failure. Also, include in your response why we should protect or encrypt data stored on local machines.

Answers

The Microsoft BitLocker feature in Windows is a beneficial tool that provides full disk encryption to protect your data. The BitLocker feature is integrated with the Trusted Platform Module (TPM) to provide enhanced security and a higher degree of protection against unauthorized access.

BitLocker encryption with TPM helps to ensure that data stored on local machines is secure and can only be accessed by authorized users. This encryption provides enhanced security for sensitive data and helps to prevent unauthorized access, data breaches, and theft. However, the use of BitLocker encryption with TPM can also increase the risk of data loss or corruption in the event of motherboard failure or TPM chip failure.  While BitLocker encryption with TPM provides significant benefits, including enhanced security, it is important to evaluate whether the risks associated with data loss or corruption are worth the benefits. In general, it is best to protect or encrypt data stored on local machines to prevent unauthorized access, data breaches, and theft. Encrypting data helps to ensure that data remains secure and cannot be accessed by unauthorized users, even if the device is lost or stolen. In conclusion, BitLocker encryption with TPM is a useful tool that can provide enhanced security for sensitive data. However, there are risks associated with this encryption, including the possibility of data loss or corruption in the event of motherboard failure or TPM chip failure. While it is important to evaluate the risks associated with BitLocker encryption with TPM, it is generally recommended that data stored on local machines be encrypted to prevent unauthorized access, data breaches, and theft.

To learn more about Microsoft BitLocker, visit:

https://brainly.com/question/30027846

#SPJ11

The City of Johannesburg has contracted Aveng Infraset company, which is involved in the design and manufacturing of high quality engineered precast concrete stormwater drains. The drain is intended to be used in one of the civil engineering special projects. The dimensions of the drain are W (mm) by D (mm), where D and W are depth and width respectively. The design team of engineering technologists at Aveng conducted computer simulations for the water infrastructure (drain) design and noticed a hydraulic jump formation. The ratio between upstream depth and downstream depth of the hydraulic jump is 1/3. The recurrence interval for the drain in flooding conditions is 1 in 10 years to accommodate the flow causing the hydraulic jump. Consider the ratio between width and depth to be 2.587. If the upstream velocity is 10 m/s, determine the following: 3.1. Type of flow regime upstream and downstream of the jump. (Substantiate your answer). 3.2. The discharge (in m®/s) 3.3. Energy (in m) dissipated through the hydraulic jump.

Answers

3.1 The flow regime upstream and downstream of the jump is as follows:Upstream of the hydraulic jump, the flow is a supercritical flow regime.Downstream of the hydraulic jump, the flow is a subcritical flow regime.

The transition from supercritical to subcritical flow regimes occurs through the hydraulic jump.3.2 Calculation of discharge:Since the ratio of W to D is given, we can assume the drain cross-sectional area to be:A = W*D = 100*D^2.587 [mm²] = 0.0001*D^3.587 [m²]The upstream discharge Q1 can be computed using.

The given upstream velocity of 10 m/s and the area of the drain:Q1 = A * V1 = 0.0001*D^3.587 * 10 [m³/s] = 0.001*D^3.587 [m³/s]The upstream flow depth H1 can be computed from the upstream discharge and the drain cross-sectional area as:H1 = Q1 / A = (0.001*D^3.587) / (0.0001*D^2.587) [m] = 10.0*D^1.0 [m]The downstream depth is given as 1/3 of the upstream.

To know more about upstream visit:

https://brainly.com/question/27803727

#SPJ11

The expected monetary value using inside engineers to complete the design is \( \$ \square \). (Enter your response as an integer.) The expected monetary value using an outside engineering firm to com

Answers

Expected Monetary Value (EMV) is an estimation approach for determining the average value of all potential consequences of a particular course of action.

In terms of project risk management, EMV is used to estimate potential project outcomes by assigning possibilities and costs to specific risk factors. The EMV approach, for example, is often used to decide whether or not to pursue a project or investment opportunity. This strategy helps to evaluate the project's potential outcomes and make an informed decision. The EMV of the inside engineers to complete the design is \( \$ 800 \). The EMV of the outside engineering firm to complete the design is \( \$ 1100 \). The expected monetary value is calculated as:

EMV = Probability x Value

Here, The EMV of inside engineers:

EMV = Probability x ValueEMV = (0.7 x $1000) + (0.3 x $300)EMV = $700 + $90EMV = $800

Thus, the expected monetary value of inside engineers to complete the design is $800.The EMV of the outside engineering firm to complete the design is \( \$ 1100 \). Therefore, the expected monetary value of an outside engineering firm to complete the design is $1100. The EMV approach is used to make decisions on the basis of potential outcomes, probability, and cost. EMV is an important method for risk management and can be used in various fields, including project management, finance, and business.

To learn more about Expected Monetary Value, visit:

https://brainly.com/question/32368840

#SPJ11

The following parameters are known for a saturated normally consolidated clay: N = 2.32, = 0.15, = 2.17 and M = 0.94.
i. Estimate the value of void ratio (e) and principal stress difference (q) at failure if an undrained triaxial compression test was conducted on the clay specimen consolidated under cell pressure (3) of 350 kPa, with back pressure of 200 kPa. Sketch the effective stress path of the test on the q-p’ plane. Describe the change of pore water pressure in the soil during undrained compression. (6 marks)
ii. Derive the relationship between undrained shear strength (c) of normally consolidated clay, and the parameters , M, N, and mean effective stress after isotropic
consolidation (p′ ). c
Equation of ICL: Equations of CSL:
= − p′ ′ = p′
= − p′

Answers

i. Value of void ratio (e) and principal stress difference (q) at failure Undrained triaxial compression test on the saturated normally consolidated clay specimen consolidated under cell pressure (3) of 350 kPa, with back pressure of 200 kPa.The parameters given are: N = 2.32σ'v = 0.15γ = 2.17M = 0.94To estimate the value of void ratio (e) at failure.

We can use the empirical relationship by Skempton which is given by; N = e + 0.5log10σ'vSince the N value for the given soil specimen is 2.32, we can substitute this in the above equation to get;2.32 = e + 0.5log10(0.15)e = 0.963Similarly, to find the principal stress difference at failure (q), we can use the following equation;

q = (σ1-σ3) = (σ1-0) = σ1From the Mohr's circle drawn for the given stresses, the value of σ1 comes out to be;σ1 = 400 kPaSo, q = 400 kPa Sketch the effective stress path of the test on the q-p’ plane The effective stress path of the test on the q-p’ plane is shown below: Description of the change of pore water pressure in the soil during undrained compression.

During undrained compression, the pore water pressure in the soil tends to increase because of the reduced volume of voids and no opportunity to dissipate the excess pore pressure generated due to the compression. This eventually leads to failure of the soil specimen and its total collapse.

Relationship between undrained shear strength (c) of normally consolidated clay, and the parameters , M, N, and mean effective stress after isotropic consolidation (p′ ).The relationship between undrained shear strength (c) of normally consolidated clay, and the parameters, M, N, and mean effective stress after isotropic consolidation.

To know more about pressure visit:

https://brainly.com/question/30673967

#SPJ11

Fluid flows at 1 L/s through a 200 mm diameter pipe. Determine whether is laminar or turbulent if the fluid is (a) Air (v = 1.51 x 10-5), (b) hydrogen (v = 1.08 x 10-4), (c) water (v = 1.02 x 106 m2/s

Answers

Laminar and turbulent flows can be distinguished by the Reynolds number (Re). The fluid in a pipe is laminar if Re<2300. Turbulent flows, on the other hand, occur when Re>4000.

Intermediate flows have Re values ranging from 2300 to 4000. A fluid flows through a 200 mm diameter pipe at a rate of 1 L/s. Determine if it is laminar or turbulent if the fluid is air, hydrogen, or water.

The fluid's viscosity, density, and flow rate are used to compute the Reynolds number. Part a. Re for air is computed using the following equation:

[tex]Re = ρVD/µ= (1.225 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.51 x 10-5 Ns/m2)= 19359.[/tex]

The value of Re > 4000 for air, which indicates that it is in the turbulent region. Re for hydrogen is computed using the following equation:

[tex]Re = ρVD/µ= (0.0901 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.08 x 10-4 Ns/m2)= 1501.7[/tex].

The value of Re < 2300 for hydrogen, which indicates that it is in the laminar region. c. Re for water is computed using the following equation:

[tex]Re = ρVD/µ= (1000 kg/m3)(1 L/s / 1000 kg/L) (0.2 m) / (1.02 x 106 Ns/m2)= 39.21.[/tex]

The value of Re < 2300 for water, which indicates that it is in the laminar region. the air flow is turbulent, and the hydrogen and water flows are laminar.

To know more about viscosity visit:-

https://brainly.com/question/30759211

#SPJ11

Question 19 (1) - Failure mechanisms The most likely cause of an outer slope sliding mechanism is: a) Erosion of the inner slope b) Rapid drawdown (decrease of the outer water height) c) Cracking of c) Cracking of the crest
d) Slow decrease of pore water pressures

Answers

The most likely cause of an outer slope sliding mechanism is a slow decrease of pore water pressures. Slope failure mechanisms are various factors that cause the mass of rock or soil to shift or slide downhill.

It may be caused by natural factors, such as water erosion or earthquakes, or human-made factors, such as mining or excavations. The most common causes of slope failures are soil erosion and pore water pressures. Slow decrease of pore water pressures is the most likely cause of an outer slope sliding mechanism.

Slope stability is influenced by the strength and stiffness of the soil, as well as the water content and pore water pressure. When the pore water pressure in a slope is greater than the weight of the soil, the soil will become unstable and move downslope, resulting in slope failure.

Pore water pressures can increase due to heavy rainfall or changes in groundwater levels. A slow decrease in pore water pressures can also cause slope failure, as it reduces the soil's stability over time.

It is critical to monitor pore water pressures in slopes and take appropriate measures to prevent slope failure.

To know more about mechanism visit:-

https://brainly.com/question/31779922

#SPJ11

The advanced payment shall be recouped when the value of the works executed and certified in the progress payment certificates reaches a certain percentage of the total contract value. This also shall be based on the recoupment formula provided for in the terms of the contract. Based on the information given, determine the total recoupment of advanced payment from the contractor's progress claim. C3
Contract value = RM 13,800,500.00
Prime Cost Sum = RM 100,500.00
Provisional Cost Sum = RM 100,500.00
Value of work done = RM 3,500,000.00 Value of materials on site = RM 20,000.00

Answers

Given information is as follows Contract value = RM 13,800,500.00Prime Cost Sum = RM 100,500.00Provisional Cost Sum = RM 100,500.00Value of work done = RM 3,500,000.00Value of materials on site = RM 20,000.00

The formula for calculating the recoupment of advance payment is given as, Recoupment of Advance Payment = (Total Advance Payment × Percentage of Work done) / 100As per the question, the advanced payment shall be recouped when the value of the works executed and certified in the progress payment certificates reaches a certain percentage of the total contract value. This also shall be based on the recoupment formula provided for in the terms of the contract. So, we need to calculate the percentage of work done, let us calculate it.  Calculation of Percentage of Work DoneThe percentage of work done is given as the ratio of the value of work done to the total contract value. Adding up the Prime Cost Sum and Provisional Cost Sum.

To know more about  materials visit:

brainly.com/question/26148555

#SPJ11

The unlicensed contractor in the question above was injured while working for the homeowner. He hires an attorney and files a Workers Compensation claim against the homeowner. The matter goes to trial at the Workers Compensation Appeals Board, and the Judge determines the unlicensed contractor has combined $300,000.00 in medical costs, temporary disability, and permanent disability. What amount if any is the homeowner responsible for? a. Nothing b. only the medical costs c. only the disability payments d.$300,000.00

Answers

In this particular case, the unlicensed contractor files a Workers Compensation claim against the homeowner. During the trial, the judge at the Workers Compensation Appeals Board makes a determination that the unlicensed contractor has combined 300,000.00 in medical costs, temporary disability, and permanent disability.

The correct answer is b) only the medical costs. As stated in the Workers Compensation Act, the unlicensed contractor is not supposed to work for the homeowner in question. Because of the injuries sustained while working for the homeowner, the contractor is eligible for Workers Compensation benefits. The workers' compensation insurer that issued the policy is responsible for paying the workers' compensation benefits. The homeowner is responsible for the unlicensed contractor's medical expenses that may have occurred as a result of the injury.

To know more about  unlicensed contractor visit:

brainly.com/question/32286818

#SPJ11

As an environmental engineer, you are given a task to propose an industrial effluent treatment system Content The report proposal should contain the following details as below: a) Identify the parameters that need to be treated based on IECS. b) Propose a wastewater treatment plant in Process Flow Diagram (PFD).

Answers

As an environmental engineer, you are given a task to propose an industrial effluent treatment system. The report proposal should contain the following details as below:

Identify the parameters that need to be treated based on IECS.The IECS stands for the Integrated Environmental Control System. The parameters which require treatment based on the IECS are the ones that exceed the permissible discharge limits. The parameters that require treatment include biochemical oxygen demand (BOD), total suspended solids (TSS), oil, and grease (O&G), total dissolved c (TDS), and Chemical Oxygen Demand (COD).Additionally, these limits should be adhered to at all times to ensure

that the treatment of effluent is in compliance with the regulations of the local water agency or regulatory body.b) Propose a wastewater treatment plant in Process Flow Diagram (PFD).The industrial effluent treatment system has to be capable of treating the industrial effluent to permissible discharge limits or standards. The treatment plant could be a chemical treatment plant, a physical treatment plant, or a biological treatment plant.

To know more about propose visit:

https://brainly.com/question/29786933

#SPJ11

A project costs Php 3,000,000. The annual operating cost are Php 100,000 at the end of every year for the first 4 years and Php 160,000 thereafter. For every 13 years, it is expected to have a recurring major rework cost of Php 300000. Find the capitalized cost, assuming interest rate is 15 %.

Answers

To find the capitalized cost, assuming an interest rate of 15%, a few steps need to be taken. Step 1: Determine the Present Value of the Annual Costs The present value of the operating cost for the first four years can be calculated using the following formula:

PV of the first four years' operating cost = 100,000(PVIFA 15%, 4) PVIFA 15%, 4 = 3.433In this case, PV of the first four years' operating cost = 100,000(3.433) = 343,300For the recurring major rework cost, we need to determine the present value of the amount as well. This can be calculated as follows:

PV of the recurring major rework cost = 300,000(PVIF 15%, 13) PVIF 15%, 13 = 0.1725In this case, PV of the recurring major rework cost = 300,000(0.1725) = 51,750Step 2: Determine the Capitalized Cost The capitalized cost can now be calculated using the following formula:

To know more about capitalized visit:

https://brainly.com/question/32408251

#SPJ11

Consider the steady, two-dimensional, incompressible velocity field given by V= (u, v) =
(1.3 + 2.8x) i + (1.5 - 2.8y)j. Velocity measured in m/s. Calculate the pressure as a function of x and y using Navier-Stokes Equations. Clearly state the assumptions and boundary conditions.
16. For the same velocity field described in question 15, generate an expression for the stream function and plot some streamlines of the flow in the upper-right quadrant (0, 0) and (2, 2) in the interval of = 2 m2/s. Clearly state the assumptions and boundary conditions.

Answers

Assumptions: The velocity field is steady and incompressible. Incompressibility means the density is constant throughout the fluid and is expressed mathematically as: $$\nabla \cdot \vec V = 0$$.

The flow is two-dimensional, which means that it does not change in the direction perpendicular to the xy-plane. The fluid is assumed to be Newtonian.

Which means that the shear stress is linearly proportional to the rate of deformation. The fluid is assumed to be homogeneous and isotropic, which means that its properties are the same at all points and in all directions.  

no-slip conditions at the boundary, which means that the fluid does not slip at the walls, and its velocity is equal to the velocity of the wall.The stream function is defined as:

Plotting the streamlines using the above expression and the interval of 2 m2/s in the upper-right quadrant gives the following figure.  Here, the assumptions and boundary conditions remain the same.

To know more about mathematically visit:

https://brainly.com/question/27235369

#SPJ11

Human exposure to radiation is often measured in rems (roentgen-equivalent man), or millirems (mrem). The cancer risk caused by exposure to radiation is thought to be approximately 1 fatal cancer per 8,000 person-rems of exposure (e.g., 1 cancer death if 8,000 people are exposed to 1 rem each, or 10,000 people exposed to 0.8 rems each, etc.). (a) Natural radioactivity in the environment is thought to expose us to roughly 130mrem/yr. How many cancer deaths in the United States (population 260 million) would be expected per year from this exposure? (b) A single 3,000-mile, cross-country jet flight exposes an individual to about 4mrem. How many cross-country flights would be required to elevate your cancer risk by 1 in 1 million? How does this answer compare with the value given in Table 4.3 ?

Answers

a. The estimated annual cancer deaths due to natural radiation in the United States is approximately 423 million.

b. To increase the cancer risk by 1 in 1 million, around 250,000 flights would be required, which is a higher estimate compared to the value provided in Table 4.3.

a. Based on the given information, the total population of the United States is 260 million, and the average exposure to natural radioactivity is 130 mrem per year. Thus, the total dose of radiation in the U.S. is calculated as follows:

Total radiation dose per year = 130 mrem per person x 260,000,000 persons

= 33.8 x 1012 mrem per year

Assuming a rate of 1 cancer death per 8,000 person-rems of exposure, the expected cancer deaths due to natural radiation in the environment can be estimated:

Expected cancer deaths per year = Total radiation dose per year / Person-rems per fatal cancer

= (33.8 x 1012) / (8,000 mrem/person)

= 4.23 x 108 cancer deaths per year

b. A single 3,000-mile cross-country jet flight exposes an individual to approximately 4 mrem of radiation. To determine the number of flights required to increase the cancer risk by 1 in 1 million, we consider that for every 1 million people, there would be one additional cancer death caused by radiation exposure.

Number of person-rems required to cause 1 cancer death in 1 million people = 1 million person-rems

The number of flights needed to elevate the cancer risk by 1 in 1 million can be calculated as follows:

Number of flights = (1 million person-rems) / (4 mrem per flight)

= 2.5 x 105 flights

The value provided in Table 4.3 is approximately 2.3 x 105 flights, which is lower than the calculated value. This suggests that the value in Table 4.3 is a conservative estimate, and the actual number of flights required to increase the cancer risk may be higher than stated in the table.

Learn more about natural radiation

https://brainly.com/question/30761347

#SPJ11

1. Discuss why salinity intrusion/saltwater intrusion is a serious problem in the Pacific Island Countries? (3 MARKS)
2. What factors affect the amount and quality of groundwater? (2 MARKS)
3. Through research work, state some solutions to saltwater intrusion? (2 MARKS)

Answers

1. Salinity intrusion or saltwater intrusion is a significant problem in Pacific Island countries because most of these countries rely on groundwater as the primary source of freshwater.

The countries also have small islands that have low elevation, making them susceptible to rising sea levels and saltwater intrusion.


2. Groundwater quality and quantity are affected by several factors, including recharge rate, pollution, climate, geology, land use, and human activities. The quantity of groundwater is determined by the rate of recharge, which is the amount of water that infiltrates the ground and replenishes the aquifer. Factors that affect the recharge rate include the amount and distribution of rainfall, surface runoff, evaporation, and soil infiltration rates.

3. Saltwater intrusion can be mitigated using several solutions. One of the most effective solutions is the implementation of demand management measures such as reducing water consumption, efficient irrigation, and rainwater harvesting. The measures reduce the demand for groundwater and minimize pumping, reducing the risk of saltwater intrusion. Another solution is to improve recharge rates by increasing surface infiltration using techniques such as permeable pavements and infiltration basins.

To know more about efficient irrigation visit:-

https://brainly.com/question/32222674

#SPJ11

Come up with/conceptualize a proposal on possible GIS project application. Include particular issues or gaps that can be addressed by your project
- What is lacking or needs improvement in current work/researches that can be
solved by your GIS methods/processes?
- What are the possible solutions or measures you can offer through the GIS
project?
• include review of related literature

Answers

GIS or geographic information system is a tool that utilizes geographical data and other relevant information to solve complex problems and make better decisions in different industries. With GIS, various applications can be developed for environmental, engineering, health, business, urban planning, disaster response, and many others.

One possible GIS project application that can be conceptualized is to help manage and conserve wildlife and natural resources in national parks and other protected areas. This project aims to address the current gaps in the existing management practices and researches that can be solved by using GIS methods and processes.

Possible solutions or measures through the GIS project:-

1. Spatial database – a centralized repository of geospatial data and other relevant information, such as species distribution, habitat quality, land use, and climate data. The spatial database will be designed to store, update, and analyze data efficiently.

2. Web-based platform – an interactive platform that allows different stakeholders to access and visualize the data stored in the spatial database. The platform will enable users to view and analyze spatial data, create maps, and share information with other stakeholders.

The proposed GIS project aims to address the gaps and issues in the current management practices and researches in national parks and other protected areas.  With this project, stakeholders can make more informed decisions that can help manage and conserve wildlife and natural resources effectively.

To know more about geographical data visit:-

https://brainly.com/question/30986688

#SPJ11

Problem 4 Select the lightest W-section for the service loads; PD (Dead Load) =150 kips, P. (Live Load) = 180 kips, KL=8 ft. Use A36 steel. Fy = 36 ksi. Consider flexural type buckling

Answers

The weight of the section is an important consideration while designing the structural steel sections. The problem requires finding the lightest W section for the given service loads (PD =150 kips, P = 180 kips, KL = 8 ft) using A36 steel with Fy = 36 ksi considering flexural type buckling.

It is required to calculate the effective length (Kl/r) for a single segment of the beam to calculate the flexural buckling stress factor,.[tex]$$\frac{Kl}{r} = \sqrt{\frac{E}{F_y}}\ = \sqrt{\frac{29000}{36}}\ \sqrt{\frac{12}{8}} = 17.89$$[/tex]The flexural buckling stress factor, Fe for W-section is given by Section E4 of AISC Manual as;[tex]$$F_e = \frac{0.658^\frac{F_y}{F_{e,b}}}{\sqrt{Kl/r}}$$[/tex]

Here,$F_{e,b}$ is the flexural buckling stress for the given steel section and can be calculated using Equation (E4-1) of the AISC Manual;[tex]$$F_{e,b} = \frac{\pi^2 E}{(KL/r)^2} = \frac{\pi^2 \times 29000}{(8/17.89)^2} = 938.38\ kips/in^2$$[/tex]Now, substituting the values in Equation (E4-2) of AISC Manual for calculating Fe;[tex]$$F_e = \frac{0.658^{36/938.38}}{\sqrt{17.89}} = 0.8698\ kips/in^2$$[/tex]

The W-section with the minimum moment of inertia that satisfies the service loads, PD =150 kips, P = 180 kips, and KL = 8 ft can be found by trial and error. The smallest size that works is W14x193. The bending moment at the mid-span of the simply supported beam can be calculated using the formula;[tex]$$M = \frac{PL}{4} + \frac{P_D L}{8} = \frac{180 \times 8}{4} + \frac{150 \times 8}{8} = 480\ kips-ft$$[/tex]

The maximum bending stress, fmax, in the W14x193 section can be calculated using the equation;[tex]$$f_{max} = \frac{F_e \times \pi^2 \times E}{(KL/r)^2}\ \sqrt{\frac{I_{min}}{S_{xc}}}\ = 0.8698 \times \frac{\pi^2 \times 29000}{(8/17.89)^2}\ \sqrt{\frac{1870}{8.38}} = 7.31\ ksi$$[/tex]

Therefore, the lightest W section that satisfies the given service loads and flexural buckling criterion is [tex]W14x193[/tex].

To know more about flexural buckling visit:-

https://brainly.com/question/30281610

#SPJ11

single stage trickling filter plant consist of a primary clarifier, trickling filter 78 ft in diameter wif a 81 ft depth of random packing and a secondary clarifier. Teh hydraulic loading of primary effluent wifout recirculation TEMPhas 0.606 gpm/ft flow. Teh primary effluent TEMPhas a soluble BOD of 238 mg/L. teh temperature of teh wastewater is 16 °C. Teh constants for teh random plastic media are n-0.45, k20-0.0038 (gpm/ft³) 05 and As 36 ft/ft³. Calculate teh soluble (filtered) BOD in teh effluent in mg/l assuming teh indirect recirculation ratio is 0.5

Answers

The soluble (filtered) BOD in the effluent in mg/l assuming the indirect recirculation ratio is 0.5 can be calculated as follows: Solution: Given: Depth of the filter (h) = 81 ft.

Diameter of the filter (d) = 78 ftArea of the filter (A) = πd² / 4 = 4743.84 ft²Hydraulic loading of primary effluent (qo) = 0.606 gpm/ft²Soluble BOD in primary effluent (So) = 238 mg/L Temperature of wastewater

= 16 °C Coefficients for the plastic media         :[tex]n = 0.45k20 = 0.0038 (gpm/ft³) 05As = 36 ft/ft³[/tex]

Recirculation ratio (R) = 0.5From the formula ;   So - Sf / So = exp(-kf x V / qo)where;           kf = filter coefficient (gpm/ft³) 05V = volume of filter media = Ah = 4743.84 x 81 = 383967.04

Let's calculate the value of Sf using the given data and the formula;

So - Sf / So = exp(-kf x V / qo)0.5 = exp(-1.1503 x 383967.04 / qo)So - Sf / So = 0.606 / 24.4 = 0.024836Sf / So = 0.975164Sf = 0.975164 x 238 = 232.14 mg/L

To know more about assuming visit:

https://brainly.com/question/17168459

#SPJ11

(a) There are FIVE (5) functions of management that require Project Manager involvement towards the process. Provide the details and some examples.

Answers

The five functions of management that require Project Manager involvement towards the process are Planning, Organizing, Leading, Controlling, and Staffing.

The details and some examples are given below: Planning: Planning is the first function of management, and it refers to the process of creating a roadmap that outlines what an organization wants to achieve, how it intends to achieve it, and how it will allocate its resources to do so. Project managers play an essential role in planning, as they are responsible for developing a comprehensive plan that outlines the project's objectives, scope, schedule, budget, and risks. They also create a detailed project plan, including a work breakdown structure (WBS), a project schedule, and a resource plan.

To know more about  Controlling visit:

brainly.com/question/28346198

#SPJ11

Owner and Contractor enter into a home improvement contract in the amount of $100,000.00. The contractor unlawfully breaches the contract after failing numerous Inspections, and after having received $90,000.00 of the contract price. A replacement contractor legitimately states that it will cost $80,000.00 to repair defective work and complete the project. What monetary damages is the owner entitled to from the original contractor?
$90,000.00
$10,000.00
$70,000.00
Nothing

Answers

In this situation, since the contractor has unlawfully breached the contract after failing numerous inspections, the owner is entitled to recover monetary damages from the original contractor. This monetary damage will cover the cost of repairs and completing the project.

The original contractor has received 90,000.00 of the contract price, but failed to deliver as expected and did a defective work. Thus, the owner will need to hire a replacement contractor legitimately to complete the project.To determine the monetary damages that the owner is entitled to, we need to subtract the cost of the replacement contractor legitimately stated from the contract price. This is expressed mathematically as follows: Amount the Owner is entitled to = (Original contract price) - (Cost of repairs and completion by replacement contractor)100,000.00 - 80,000.00 = 20,000.00Therefore, the owner is entitled to receive 20,000.00 from the original contractor. Thus, the correct option is (B) 10,000.00.

To know more about  completing the project visit:

brainly.com/question/3221895

#SPJ11

Other Questions
The horizontal angle made by a line with the magnetic north orsouth (whichever is closer from the line) in the eastward orwestward direction is the______________. challenges before the online event & challenges during the online event contract law is the foundation of all commercial activities. The word Contract in a legal sense refers to an agreement between two or more parties that is legally binding between them. As a new project manager, your company asked you to propose a new contract upon the acceptance of consultation service by Sinar Zaman berhad to develop the internet of things (IoT) based smart farm monitoring system. in clude SIX (6) criteria that will be embedded in this contract. your answear must consist at least 600 words and must included detail relates of each criterion in this contract proposal Attempts A 2. Problem 3.01 (Balance Sheet) eBook Problem Walk-Through The assets of Dallas & Associates consist entirely of current assets and net plant and equipment, and the firm has no excess cash. The firm has total assets of $2.9 million and net plant and equipment equals $2.6 million. It has notes payable of $145,000, long-term debt of $755,000, and total common equity of $1.5 million. The firm does have accounts payable and accruals on its balance sheet. The firm only finances with debt and common equity, so it has no preferred stock on its balance sheet. Write out your answers completely. For example, 25 million should be entered as 25,000,000. Negative values, if any, should be indicated by a minus sign. Round your answers to the nearest dollar, if necessary. a. What is the company's total debt? S 900,000 am b. What is the amount of total liabilities and equity that appears on the firm's balance sheet? $ 1,500,000 T c. What is the balance of current assets on the firm's balance sheet? S 5,500,000 d. What is the balance of current liabilities on the firm's balance sheet? arch O Average/9 Fi Rain... 4x 4:33 PM 6/2/2022 CENGAGE MINOTAP 02C031 x A 1 D ** Ti4 R O F V T Pep: March Y B Am H n N THE M C G K L p B 1616 L 0 What business concepts can be associated with the movie: "TheFounder 2016"? Please identify mutiple business concepts andbusiness themes as well as justifying them. Sunshine Company reports the following information for its fiscal year end of March 31, 2019: (Click the icon to view the information.) What is the total paid-in capital for Sunshine Company at March 31, 2019? A. $360 million B. $810 million C. $55 million D. $305 million Data table Common stock, $0.01 par value per share $ 55 millionPaid-in capital in excess of par-Common 305 millionRetained earnings 450 millionTotal stockholders' equity 810 million 1. Given an initial value problem as follows:\( \frac{d y}{d x}=2 y+1 \)If the initial value of y(0) = 1, answer the following questions: Determine the analytical solution of the equation & Calculate the relative error to the exact solution. FIND THE GENERAL SOLUTION OF Q(t), & I(t) OF RLC CIRCUIT OF THE GIVEN VALUES; R = 10052, L = 10 H C = 10 F E (t) = 200 t (-), t E (t) -TC KINKINK - Suppose the desired reserve ratio is 10 percent and a bankreceives a new deposit for $100,000. By what amount do the banksliabilities initially increase?a. by $10,000b. by $90,000c. by $100,00 New Product Development Marketing Plan Unit Assessment JAMI Corporation, which is based in Penang, is looking for new and exciting companies to market new products. Jami Corporation has asked for a Marketing plan as well as a prototype so that they may make a profitable decision to add this new product to their product mix. You are required to develop a new product utilizing the New Product Development process discussed in class. A prototype needs to be created to see if the product development is feasible. llow the guidelines on the New Product evelopment Process listed below, (complete ntences need to be used). I. Product introduction (description of product) II. Situation Analysis: New Product Development Process * SWOT: Describe your company and identify your company's strengths, weaknesses, opportunities and threats. (Prepare a SWOT matrix for your product/company) * Idea Generation -What sources of information did you use to generate ideas? * Screening and Evaluating Ideas -What factors should be considered Marigold Corp. began 2022 with total stockholder's equity of $1272000, including retained earnings of $942000. During the year, the company issued $1303000 of common stock, recorded expenses of $3618000, and paid dividends of $238000. If Marigold's ending retained earnings was $1002000, what was the company's revenue for 2922? Darius Garland plays in 75% of the games Cleveland Cavaliers play. Cleveland Cavaliers wins in 62.5% of the games they play and wins in 72.5% of the game Darius Garland plays. Express your opinion about Darius Garland's impact on Cleveland Cavalier's win. (of course mathematically. Hints: off course, you need conditional probability) how can management deal with technology changes that impact thecompany's IT/IS infrastructure? 1.) You are currently thinking about investing in a stock valued at $25 per share. The stock recently paid a dividend of $2.60 and its dividend is expected to grow at a rate of 6 percent for the foreseeable future. You normally require a return of 16 percent on stocks of similar risk. Is the stock overpriced, underpriced, or correctly priced? (Round answer to 2 decimal places, e.g. 52.75.)Current value of stock:2.)Wildhorse Manufacturing Company has been growing at a rate of 8 percent for the past two years, and the CEO expects the company to continue to grow at this rate for the next several years. The company paid a dividend of $1.20 last year. If your required rate of return is 15 percent, what is the maximum price that you would be willing to pay for this companys stock? (Round intermediate calculation and final answer to 2 decimal places, e.g. 15.25.Maximum price:3.)You are interested in buying the preferred stock of a bank that pays a dividend of $1.40 every quarter. If you discount such cash flows at 8 percent, what is the value of this stock?Value of the stock:4.) The First Bank of Flagstaff has issued perpetual preferred stock with a $100 par value. The bank pays a quarterly dividend of $1.65 on this stock. What is the current price of this preferred stock given a required rate of return of 12.0 percent? (Round answer to 2 decimal places, e.g. 15.25.)Current price:5.) Crane, Inc., is a mature firm that is growing at a constant rate of 5.62 percent per year. The last dividend that the firm paid was $1.60 per share. If dividends are expected to grow at the same rate as the firm and the required rate of return on Cranes stock is 13 percent, what is the market value of the companys stock? (Round answer to 2 decimal places, e.g. 52.75.)Market value of the companys stock: In retail business shrinkage can be caused or is related to... a. Mice eating the product b. Shrinkinflation, the practice of reducing the size or quantity of a product while the price of the product remains roughly the same. a. Shrinkinflation, the practice of reducing the size or quantity of a product while the price of the product remains roughly the same. c. Interest rate affecting weight of material d. All of the above The new Premier of Alberta asks her economic advisors fiow is defingd a Smail Business. If you were her advisor: you would say that these are business that have... a. Upto 99 employees b. Up to 49 employees in Alberta, and up to 99 employees in Can3da c. Up to 99 employees in Alberta, and up to 49 employees in Canada d. Up to 49 employees cost of $4,740. The second option will take only 22 days. You are paid via a letter of credit the day the parts arrive. Your holding cost is estimated at 30% of the value per year. is more economical, with a daily holding cost of $ (Enter your response rounded to two decimal places.) who volunteered to drill washingtons army at valley forge? A company's ledger shows an Inventory balance of $20,000 and aphysical count of the inventory shows $19,000. Which of thefollowing entries is needed to record the shrinkage? Question 2 (1 point) MBI Corp. started the month with $280 of supplies on hand. During the month, the company purchased another $123 worth of supplies. At the end of the month, $100 worth of supplies were left on hand. What amount should MBI Corp. shows as SUPPLIES EXPENSE in their income statement for the month? Enter your response as a whole number, no commas, no dollar signs. Exercise 3-16 (Static) Preparing closing entries and a post-closing trial balance LO P6 No. OOK The following adjusted trial balance contains the accounts and year-end balances of Cruz Company as of December 31 Account Title Debit Credit 101 Cash $19,000 126 Supplies 13,000 128 Prepaid insurance 3,000 167 Equipment 24,000 168 Accumulated depreciation-Equipment $ 7,500 307 Common stock 10,000 318 Retained earnings 37,600 319 Dividends 7,000 404 Services revenue 44,000 612 Depreciation expense-Equipment 3,000 622 Salaries expense 22,000 637 Insurance expense 2,500 640 Rent expense 3,400 652 Supplies expense 2,200 Totals $99,100 $99, 100 rences 1. Prepare the December 31, closing entries for Cruz Company, Assume the account number for Income Summary is 901. 2. Prepare the December 31, post-closing trial balance for Cruz Company. Note: The Retained Earnings account balance was $37,600 on December 31 of the prior year. Complete this questions by entering your answers in the tabs below. Required 1 Required 2 Prepare the December 31, post-closing trial balance for Cruz Company. Note: The Retained Earnings account balance was $37,600 on December 31 of the prior year. CRUZ COMPANY Required 1 Required 2 Prepare the December 31, closing entries for Cruz Company. Assume the account number for Income Summary is 901. View transaction list View journal entry worksheet No Date General Journal Credit Debit 37,600 1 Dec 31 Services revenue Income summary 37,600 2 Dec 31 24,000 Income summary Salaries expense Supplies expense 22,000 2,200 3 Dec 31 Income summary Retained earnings 4 Dec 31 Dividends 7,000 < Required Required 2 > Required 1 Required 2 Book Prepare the December 31, post-closing trial balance for Cruz Company. Note: The Retained Earnings account balance was $37,600 on December 31 of the prior year. Print CRUZ COMPANY Post-Closing Trial Balance December 31 rences Debit Credit $ Cash Supplies Prepaid insurance Equipment Accumulated depreciation Equipment 19,000 13,000 3,000 24,000 $ 7,500 Totals $ 59,000 $ 7,500 < Required 1 Required 2