The critical path is the sequence of activities that determine the latest date by which the project can be evaluated.
a. true
b. false

Answers

Answer 1

The statement given about the critical path is true.

To find the answer, we have to know more about the critical path.

What is critical path?The longest series of tasks in a project plan that must be finished on time for it to be finished by the deadline is known as the critical path. The critical route is the set of actions that, when carried out in a timely manner while taking into account all the aforementioned factors, will take the longest to accomplish the project. Because it is the "red alert" of paths, the critical path is referred to as "critical". Your project won't be successfully completed before the deadline if it doesn't follow the critical path's timing and order.

Thus, we can conclude that, the statement given about the critical path is true.

Learn more about the critical path here:

https://brainly.com/question/15091786

#SPJ4


Related Questions

A body accelerate uniformly from rest at 2m/s^2.calculate its velocity after traveling 9m.

Answers

Answer:

The final velocity of the body is 6 m/s.

Explanation:

To solve this question, we can use one of the kinematic equations. Let's go over what variables we know and what we are trying to find. We know the acceleration (a = 2m/s²), the displacement (Δx = 9m), and the initial velocity (v1 = 0 m/s). We are trying to find the final velocity, v2.

The equation that uses all of these variables is the following:

v2² = v1² + 2*a*Δx

If we plug in the given values and simplify, we get:

v2² = 2*(2)*(9)

v2² = 36

Finally, we can take the square root of both sides to get:

v2 = 6 m/s

Therefore, the answer is 6 m/s.

Here are some other questions that also involve using the kinematic equations for you to check out:

https://brainly.com/question/2506873

https://brainly.com/question/14093368

Assuming the diode is ideal but with a forward voltage drop of. 65 volts, what is the current in ma if v1=0v, and r1=490ω?

Answers

The current in the ideal diode with forward biased voltage drop of 65V is 132.6 mA.

To find the answer, we have to know more about the ideal diode.

What is an ideal diode?A type of electronic component known as an ideal diode has two terminals, only permits the flow of current in one direction, and has less zero resistance in one direction and infinite resistance in another. A semiconductor diode is the kind of diode that is used the most commonly. It is a PN junction-containing crystalline semiconductor component that is wired to two electrical terminals.How to find the current in ideal diode?Here we have given with the values,

                       [tex]V_2=65V\\V_1=0V\\R_1=490Ohm.[/tex]

We have the expression for current in mA of the ideal diode with forward biased voltage drop as,

                [tex]I=\frac{V_2-V_1}{R_1} =\frac{65}{490} =132.6mA[/tex]

Thus, we can conclude that, the current in mA of the ideal diode with forward biased voltage drop of 65 V is 132.6.

Learn more about the ideal diode here:

https://brainly.com/question/14988926

#SPJ4

When conducting a hypothesis test for a given sample size, if α is increased from 0.05 to 0.10, then __________.

Answers

When conducting a hypothesis test for a given sample size, if α is increased from 0.05 to 0.10, then the probability of incorrectly rejecting the null hypothesis increases ,the probability of incorrectly failing to reject the null hypothesis decrease, the probability of Type II error decreases.

A. the probability of incorrectly rejecting the null hypothesis increases

B. the probability of incorrectly failing to reject the null hypothesis decreases

C. the probability of Type II error decreases

Higher values of α make it easier to reject the null hypothesis, so choosing higher values for α can reduce the probability of a Type II error. The consequence here is that if the null hypothesis is true, increasing α makes it more likely that we commit a Type I error.

A type 1 error is also known as a false positive and occurs when a researcher incorrectly rejects a true null hypothesis. This means that your report that your findings are significant when in fact they have occurred by chance.

hence , all the options are correct

To learn more about null hypothesis here

https://brainly.com/question/19263925

#SPJ4

A charge of 12 c passes through an electroplating apparatus in 2. 0 min. what is the average current?

Answers

A charge of 12 c passes through an electroplating apparatus in 2.0 min, then the average current is 0.1 ampere.

What is an electric charge?

Charged material experiences a force when it is exposed to an electromagnetic field due to the physical property of electric charge. You can have a positive or negative electric charge.

Electric current is defined as the charge per unit of time.

The mathematical relation between current and the electric charge

I =Q/T

where I is the current flowing

Q is the total electric charge

T is the time period for which the current is flowing

As given in the problem A charge of 12 c passes through an electroplating apparatus in 2.0 min

Let us first convert the time period of minutes into seconds

1 min = 60 seconds

2 min = 2*60 seconds

         =120 seconds

By using the above relation between electric current and electric charge

and by substituting the respective values of the charge and the time period

I =Q/T

I = 12c/120 seconds

I = 0.1 Ampere

Thus, the average current flowing through the apparatus would be 0.1 Ampere.

Learn more about an electric charge from here

brainly.com/question/8163163

#SPJ4

A circular loop of wire of radius 10 cm carries a current of 6. 0 a. what is the magnitude of the magnetic field at the center of the loop? (μ0 = 4π × 10-7 t ∙ m/a)

Answers

The magnitude of the magnetic field at the center of the loop is [tex]3.77*10^{-5} T[/tex]

Given,

μ0 = 4π × [tex]10^{-7}[/tex] t ∙ m/a, I=6 A, R = 10cm =0.1m

magnetic field(B)=μ0*I/2R=[tex]\frac{4*3.14*10x^{-7}*6 }{2*0.1}[/tex]=[tex]3.77*10^{-5} T[/tex]

Magnetic field

When it comes to the magnetic influence on moving electric charges, electric currents, and magnetic materials, we use the vector field of a magnetic field. A force perpendicular to the charge's own velocity and the magnetic field acts on it when the charge is travelling in a magnetic field. Iron and other ferromagnetic elements are drawn to a permanent magnet's magnetic field, which also draws or repels other magnets. Furthermore, a magnetic field with varying localization will impose a force on a variety of non-magnetic materials by altering the velocity of their outer atomic electrons. Magnetic fields surround magnetised materials and are produced by electric currents, like those found in electromagnets, and by electric fields with changing time constants.

A circular loop of wire of radius 10 cm carries a current of 6. 0 a. what is the magnitude of the magnetic field at the center of the loop? (μ0 = 4π × 10-7 t ∙ m/a)

Learn more about magnetic field here:

https://brainly.com/question/23096032

#SPJ4

A proton travels with a speed of 8. 34×10^5 m/s at an angle of 32. 3° with the direction of a magnetic field. the field exerts a force of 3. 00×10^−17 n on the proton. What is the strength of the field?

Answers

Magnetic field strength of the field is  4.2 × [tex]10^{-4}[/tex] T

What is Magnetic Field ?

The region of space where magnetic force is experienced is known as magnetic field.

The force on a particle of charge q moving at speed v at an angle Ф to a uniform magnetic field of flux density B is given as

F = BqvsinФ

Given that a proton travels with a speed of 8. 34×10^5 m/s at an angle of 32. 3° with the direction of a magnetic field. the field exerts a force of 3. 00×10^−17 N on the proton. What is the strength of the field?

The parameters are;

Force F = 3.0 × 10^−17 NSpeed V = 8.34 × 10^5 m/s Angle Ф =  32. 3°Magnetic field strength B = ? Proton charge = 1.6 x [tex]10^{-19}[/tex] C

Substitute all the parameters into the formula

F = BqvsinФ

3.0 × [tex]10^{-17}[/tex] = ( 1.6 x [tex]10^{-19}[/tex]  x 8.34 x [tex]10^{5}[/tex] x sin 32.3 ) B

3.0 × [tex]10^{-17}[/tex]  = 7.13 × [tex]10^{-14}[/tex] B

Make B the subject of formula

B = 3.0 × [tex]10^{-17}[/tex] / 7.13 × [tex]10^{-14}[/tex]

B = 4.2 × [tex]10^{-4}[/tex] T

Therefore, Magnetic field strength of the field is  4.2 × [tex]10^{-4}[/tex] T

Learn more about Magnetic field strength here: https://brainly.com/question/27750890

#SPJ1

Move the chemistry book across the physics book again. study the thermometer to determine whether there’s a change in the physics book’s temperature. what do you find?

Answers

Heat is always transferred through the movement of matter in the convection mode of heat transmission.

What is heat transfer ?

Heat transfer is the movement of heat from one solid or liquid item to another. Always, heat moves from one body with a greater temperature to one with a lower temperature. To put it another way, heat always transfers from a hotter body to a cooler body.

Heat energy is transferred through the mechanism of conduction when nearby atoms or molecules collide. In solids and liquids, where particles are more closely spaced, conduction happens more easily than in gases, where particles are more widely spaced.

Here we can say that heat is transfer when there is movement between two books and hence there is change in temperature.

Learn more about Heat transfer here:

https://brainly.com/question/12072129

#SPJ4

Answer:

The temperature of the physics book increases as the chemistry book slides across it.

Explanation:

pluto

In a similar rolling race (no slipping), the two objects are 2 solid cylinders of the same mass but different radii. which reaches the bottom first?

Answers

The solid cylinder reaches the bottom first.

A (solid) cylinder is a solid that has two parallel planes and a cylindrical surface surrounding it. An element of the cylinder is a line segment that is determined by an element of the cylindrical surface between two parallel planes. A cylinder's components are all the same length. The material's velocity would be higher if the moment of inertia was lower and the radius of gyration k was smaller. In comparison to a hollow cylinder with k as 1, a solid cylinder with k as 1/2 will move at a faster speed. Their energies at both levels, including potential energy and energy lost through friction, would stay the same because they had the same mass and radius.

Learn more about solid cylinders here brainly.com/question/18801887

#4269

A solid cylinder and a hollow cylinder of the same mass and radius, both initially at rest, roll down the same inclined plane without slipping. Choose the correct options.

The solid cylinder reaches the bottom first.

A solid object will always roll down the ramp faster than a hollow object of the same shape regardless of their exact mass or diameter.

The solid cylinder has a lower moment of inertia than the hollow one does. Although they have the same mass, all the hollow cylinder's mass is concentrated around its outer edge so its moment of inertia is higher.

The velocity would be greater for the material with radius of gyration k is lower of for which the moment of inertia is lower. Solid cylinder with k as 1/2 will have greater velocity as compared to hollow cylinder which has k as 1. As they have same mass and radius their energies at both the levels would remains same including the potential energy and energy lost due to friction.

learn more about moment of inertia from here: https://brainly.com/question/28167913

#SPJ4

A fisherman's scale stretches 3. 2 cm when a 2. 6 kg fish hangs from it. part a what is the spring stiffness constant?

Answers

The spring stiffness constant is  796.25 N/m.

A spring's "spring constant" is a property that quantifies the relationship between the force acting on the spring and the displacement it produces.

The slope of the plot of the straight line W vs x represents the spring constant, K. Weight (W) is defined as mass times the gravitational acceleration (g), where g is equal to approximately 980 cm/sec².

Mass of the fish = 2.6 kg

Length of the fisherman's scale, x = 3.2 cm

                                                          = 3.2/100 m

                                                          = 0.032 m

We have to find the value of k;

We know that,

                       F = - kx

Where k is the spring constant,

           F is the force applied over x

           x is the displacement by the spring expressed in N/m.

                       mg = - kx

                       g = 9.8 m/s²

                       [tex]K = \frac{mg}{x}[/tex]

                           [tex]= \frac{2.6*9.8}{0.032}[/tex]

                           [tex]= 796.25 N/m[/tex]

Therefore, the spring's constant is 796.25 N/m.

Learn more about spring constant here:

https://brainly.com/question/23885190

#SPJ4

 

Mercury at 25°c flows over a 3-m-long and 2-m-wide flat plate maintained at 75°c with a velocity of 0. 01 m/s. Determine the rate of heat transfer from the entire plate?

Answers

The rate of heat transfer from the entire plate is 710.8 kW

The properties of mercury at the film temperature of (75+25)/2= 50°C

k = 8.83632 W/m °C

v = 1.056 × [tex]10^-^7[/tex] m²/s

Pr = 0.0223

The local Nusselt number relation for liquid metals is given by

 [tex]N_u =\frac{h_sx}{k} = 0.565 9Re_x Pr)^\frac{1}{2}[/tex]

The average heat transfer coefficient for the entire surface can be determined from

[tex]h = \frac{1}{L} \int\limits^1_0 {h_x} \, dx[/tex]

Substituting the local Nusselt number relation into the above equation and performing the integration we obtain

[tex]N_u = 1.13 (Re_s Pr)^\frac{1}{2}[/tex]

The Reynolds number is

[tex]Re_L = \frac{VL}{v} = \frac{(0.01)(3m)}{1.056 * 10^-^7 m^2/s} = 0.028 * 10^7[/tex]

Using the relation for the Nusselt number, the average heat transfer coefficient and the heat transfer rate are determined to be

                       Q = 710.8 kW

Therefore, the rate of heat transfer from the entire plate is 710.8 kW

Learn more about heat transfer here:

https://brainly.com/question/16055406

#SPJ4

A car drives around a curve with a radius of 42 m at a velocity of 24 m/s. what is the centripetal acceleration of the car? m/s2

Answers

Answer:

13.7 m/s^2

Explanation:

Radius, r= 42m

Velocity, v= 24m/s

Ac= V^2/r

Ac=(24)^2/42

Ac= 13.7m/s2

The centripetal acceleration is 13.7 m/s².

Calculation:

Centripetal acceleration is given by,

Ac = v²/r

where,

Ac = centripetal acceleration

v = velocity

r = radius

Given,

v = 24 m/s

r = 42 m

To find,

Ac =?

Put the value in the formula,

Ac = v²/r

    = (24)²/42

    = 576/42

    = 13.7 m/s²

Hence, the centripetal acceleration is 13.7 m/s².

Learn more about centripetal acceleration here:

https://brainly.com/question/11445192

#SPJ4

What is the horsepower of a 1,500 kg car that can go to the top of a 360 m high hill in exactly 1 min?

Answers

Answer:

W = m g h        work that must be done on car

P = W / t       power that must be input (in Watts)

P = m g h / t = 1500 kg * 9.8 m/s^2 * 360 m /  60 sec

P = 88,200 watts

P = 88,200 watts / 746 watts / hp = 118 hp

The horsepower of a 1,500 kg car that can go to the top of a 360 m high hill in exactly 1 min is 118.23 hp.

To find the power, the given values are,

Mass m = 1500 kg

Height h = 360 m

Time t = 1 minute = 60 seconds

g = 9.8 m/s

What is Power?

Power is the amount of work that is done per unit of time. It can be associated with the speed of a change of energy within a system, or the time it takes to perform a job.

There are different types of power,

Mechanical power: is that work performed by an individual or a machine in a certain period of time.Electric power: which is the result of the multiplication of the potential difference between the ends of a load and the current flowing there.

Formula for Power is,

Power = mgh/t

Power = (1500 x 9.8 x 360)/60

Power = 8.8 x 10⁴ watts

Recall

746watts = 1hp

8 x 10⁴ watts = 8 x 10⁴ / 746

Power = 118.23 hp

Thus, Power was calculated as 118.23 hp.

Learn more about Power,

https://brainly.com/question/13357691

#SPJ2

Energy in inductors: you need an inductor that will store 20 j of energy when a 3. 0-a current flows through it. what should be its self-inductance?

Answers

The self inductance can be calculated as 4.444 Henry.

The inductor will store energy = 20 joule,

current = 3 ampere.

What is Self inductance?

     The current carrying conductor which allows or opposes the change of flow of current is known as self-inductance. The rate of change of current can also be given through self inductance.

Formula can be given  for the energy in the inductor as,

                      E = 1 / 2 × L × I² joule.

where as,    E - Energy

                    L - Inductance

                    I - Current flowing through the coil.

The equation can be rearranged as,

                      L =  2 E/ I²

                         =  2 × 20 / 3²

                         =  40 / 9

Hence,           L =  4.4444 Henry

Learn more about energy in inductors,

https://brainly.com/question/28030901

#SPJ4

1. Consider the potential energy diagram shown below. This graph shows the chemical potential energy in a reaction system over time. The y-axis is potential energy in kilojoules. The x-axis is the reaction progress or time.
Does this graph represent an endothermic or an exothermic reaction? Explain your answer.
What is the enthalpy change, ΔH, for this reaction? Show your work.
What is the activation energy, Ea, for this reaction? Show your work.
THE GRAPH IS BELOW

Answers

150 kJ of energy was given out over the course of the reaction and 200kJ is required for the reactants to be converted into products.

What is the potential energy graph?

We know that the combination of the reactants is what leads to the formation of products. The interaction of the reactants and the products is what is shown on the potential energy curve. The hump at the highest point of the graph is the activation energy while the difference between the energy of the reactant and the products is the enthalpy of the reaction.

Now; the enthalpy change is given as;

ΔH = 200 kJ - 50 kJ = 150 kJ

Ea = 250 kJ - 50 kJ = 200kJ

We can see that 150 kJ of energy was given out over the course of the reaction and 200kJ is required for the reactants to be converted into products.

Learn more about reaction profile:https://brainly.com/question/23528085

#SPJ1

A resistor, an inductor, and a capacitor are connected in series to an ac source. under what conditions will the impedance of the circuit increase as the inductive reactance increases?

Answers

180° is the phase angle. An AC source is linked in series with a resistor, an inductor, and a capacitor. Inductive reactance rises with frequency because an alternating current has a time-averaged rate of change that is proportional to frequency.

Impedance of RLC series circuit

2= P²R² + (XL-X₁) ²

Here &         4 tan² (x₁=X₂) $ R +1 180° tan (XL R tan 180° = XL-X C R XL-XC R ..

                   XL-XC R X₁-X ₁ = 0 XL = Xc 2 = √√√ R² + 0² 2 2 = R

Resonance is the condition in question here. When induction occurs as well as capacitive reactances equal are equivalent but cancel due to the fact that they have degrees of phase separation. During resonance, Impedance is very low.

learn more about resistors: https://brainly.com/question/24043073

#SPJ4

A particular star's spectrum shows the same hydrogen line at a wavelength of 486.0 nm. what can we conclude?

Answers

We can conclude that The star is moving toward us; shift to a shorter wavelength.

The transfer of an electron to a higher energy level, such as n = 1 or n = 2, occurs when a hydrogen atom absorbs a photon. The Balmer series refers to this group of hydrogen emission spectra.

The phrase "blueshift" describes how light waves change as an object approaches toward us in space, shifting wavelengths toward the blue end of the spectrum. Change to a shorter wavelength when the star approaches us. A shorter wavelength indicates a blueshift (shift to the blue end of the spectrum), which indicates that the object is travelling in our direction.

Therefore, We can conclude that The star is moving toward us; shift to a shorter wavelength.

Learn more about blueshift here:

https://brainly.com/question/5368237

#SPJ4

Two objects have the same velocity. These two objects have different masses. Which object will

have greater momentum? Why?​

Answers

Answer:

The object with the greater mass will have the greater momentum

Explanation:

The momentum of an object with mass m, moving with velocity , is given by the formula

M = mv

Since both objects have the same velocity v, it is clear that the object with the bigger mass will have the greater momentum

In a transformer, energy is carried from the primary coil to the secondary coil by:________

Answers

In a transformer, energy is carried from the primary coil to the secondary coil by magnetic field in the iron core.

To find the answer, we have to know more about the transformer.

How transformer works?An item utilized in the transfer of electric energy is a transformer. AC current is used for transmission. It is frequently used to modify the supply voltage between circuits without altering the AC frequency.The fundamentals of mutual and electromagnetic induction govern how the transformer operates. Magnetic field through the primary coil changes when primary coil current varies. the iron core of the secondary coil likewise has a magnetic field. EMF is therefore generated in the secondary coil.

Thus, we can conclude that, in a transformer, energy is carried from the primary coil to the secondary coil by magnetic field in the iron core.

Learn more about the transformer here:

https://brainly.com/question/26787198

#SPJ4


A proton moves a distance 10 cm in a uniform electric field of 3.5 kN C, in the direction of the field.
Calculate the change in potential energy of the proton.

Answers

The change in potential energy of the proton is  5.6 x [tex]10^{-17}[/tex] Joule

What is a Uniform Electric Field ?

A uniform electric field is where the electric field strength is the same at all points in the field. In the uniform field, the force experienced by a charge is the same no matter where it is placed in the field.

Given that a proton moves a distance 10 cm in a uniform electric field of 3.5 kN C, in the direction of the field.

The distance d = 10 cm = 0.1 mElectric field E = 3.5 KN/CProton charge q = 1.6 x [tex]10^{-19}[/tex] C

The Work done = Fd

but F = Eq

Recall that Electric field E = F/q = V/d

Where V = potential difference.

Let us first calculate the V

E = V/d

V = Ed

Substitute all the parameters into the formula above

V = 3.5 × 10³ × 0.1

V = 350 v

from F/q = V/d

make F the subject of formula and substitute it in work formula

F = Vq/d

W.D = Vq/d x d

W.D = Vq

Substitute all the parameters into the formula above

W.D = 350 x 1.6 x [tex]10^{-19}[/tex]

W.D = 5.6 x [tex]10^{-17}[/tex] J

Work done = Energy = Potential Energy

Therefore, the change in potential energy of the proton is 5.6 x [tex]10^{-17}[/tex] Joule

Learn more about Electric Field here: https://brainly.com/question/14372859

#SPJ1

For most people in most environments, the reaction range for iq is about 25 points. this means that:_______

Answers

For most people in most environments, the reaction range for IQ is about 25 points, this means that: the environment is the primary determinant of mental health.

Reaction range :

Reaction range refers to limits set on IQ by heredity. Environment determines where IQ will lie within these limits. There is a discrepancy in IQ scores between whites and some minority groups. There are both hereditary and environmental explanations for this discrepancy.

What is the range of reaction principle?

Range of reaction asserts that our genes set the boundaries within which we can operate, and our environment interacts with the genes to determine where in that range we will fall.

Personality or intelligence quotient (IQ) :

Is shaped by genes as well as by an individual's upbringing and surrounding environment. However, in recent time many scientists and researchers have succeeded to identify certain personality characteristics or attributes to some specific genes.

Learn more about Reaction range for IQ :

brainly.com/question/23110716

#SPJ4

A boy on board a cruise ship drops a 30. 0 gm marble into the ocean. If the resistive force proportionality constant is 0. 500 kg/s. What is the terminal speed of the marble in m/s?.

Answers

The terminal speed of the marble is 0.588 m/s.

Calculation:

We know that,

F = mg                                                   ......(1)

where,

F = force

m = mass

g = acceleration due to gravity

Also,

v = F/k                                                       ......(2)

where,

v = terminal speed

k = proportionality constant

Substituting the value of F from equation (1) in equation (2)

v = mg/k                                                         .......(3)

Given,

m = 30 g = 0.030 kg

k = 0.500 kg/s

g = 9.8 m/s²

To find,

v =?

Put the values in equation (3)

v = mg/k              

v = 0.03(9.8)/ 0.500

  = 0.294/0.500

  = 0.588 m/s

Hence, the terminal speed of the marble is 0.588 m/s.

Learn more about calculation of force here:

https://brainly.com/question/15562875

#SPJ4

.

0.588 m/s

0.588 m/s is the terminal speed of the marble.

Calculation:

We know that,

F = mg  ----> eq(1)

where,

F = force

m = mass

g = acceleration due to gravity

We also know,

v = F/k ----> eq(2)

where,

v = terminal speed

k = proportionality constant

On substituting the value of F from eq(1) in eq(2)

v = mg/k  

Given,

m = 30 g = 0.030 kg

k = 0.500 kg/s

g = 9.8 m/s²

we need to find,

v =?

substitute the values in equation (3)

v = mg/k            

v = 0.03(9.8)/ 0.500

 = 0.294/0.500

 = 0.588 m/s

Hence, the terminal speed of the marble is 0.588 m/s.

To learn more about calculation of force visit:

https://brainly.com/question/15562875

#SPJ4

Picking up sound waves is the stage of listening that most people refer to as what?
A. hearing
B. perceiving
C. understanding
D. evaluating

Answers

A. Picking up sound waves is the stage of listening that most people refer to as hearing.

What is hearing?

Hearing, or auditory perception, is the ability to perceive sounds through an organ, such as an ear, by detecting vibrations as periodic changes in the pressure of a surrounding medium.

During learning process, when someone picks up the sound waves directed to him/her, it is known as the act of hearing,

Thus, picking up sound waves is the stage of listening that most people refer to as hearing.

Learn more about hearing here: https://brainly.com/question/14185060

#SPJ1

Waves start as a disturbance (an input of energy) in a medium (water, air, the earth etc). The energy of the disturbance is moved from the starting point to other places in the medium by what means?
A
It depends on whether the wave is longitudinal or transverse. Transverse waves move energy differently than longitudinal waves.

B
The means of energy movement in a wave depends on the magnitude (force) of the original wave. Strong waves propagate by a different method than weak ones.

C
Molecules in the original disturbance disturb (move) adjacent molecules which disturb more adjacent molecules and so the wave travels.

D
It depends on the wavelength of the wave, short wavelength waves travel faster and move energy differently than long wavelength waves.

Answers

C. Molecules in the original disturbance disturb (move) adjacent molecules which disturb more adjacent molecules and so the wave travels.

What is wave?

A wave can be defined as a propagating dynamic disturbance of one or more quantities.

A wave can be propagated in longitudinal or transverse method.

When waves start as a disturbance (an input of energy) in a medium (water, air, the earth etc).

The energy of the disturbance is moved from the starting point to other places in the medium by molecules in the original disturbance disturb (move) adjacent molecules which disturb more adjacent molecules and so the wave travels.

Thus, the correct option is C.

"Molecules in the original disturbance disturb (move) adjacent molecules which disturb more adjacent molecules and so the wave travels".

Learn more about waves here: https://brainly.com/question/25847009

#SPJ1

The lift on a spinning circular cylinder in a freestream with a velocity of 50m/s and at standard sea level conditions is 10n/m of span. calculate the circulation around the cylinder

Answers

The circulation around the cylinder is 0.163Js/kg.

To find the answer, we have to know more about the stream flow.

How to find the circulation around the cylinder?We have,

                [tex]v=50m/s\\L=10N/m\\d=1.23kg/m^3[/tex] , where d is the density at the sea level.

We have the expression for lift per unit circulation as,

                 [tex]L=dvc\\[/tex]

Thus, the circulation around the cylinder is,

                 [tex]c=\frac{L}{dv} =\frac{10}{1.23*50}=0.163Js/kg[/tex]

Thus, we can conclude that, the circulation around the cylinder is 0.163Js/kg.

Learn more about stream flow here:

https://brainly.com/question/13024453

#SPJ4

How much brighter is a sun-like star than the reflected light from a planet orbiting around it?.

Answers

It is about a billion times brighter.

What is the brightness of a star called?A star's apparent magnitude, or how bright it seems to be from Earth, and absolute magnitude, or how brilliant it looks at a standard distance of 32.6 light-years, or 10 parsecs, are words used by astronomers to describe stellar brightness. How bright are planets compared to stars?Although planets and stars light up the night sky, planets usually appear much brighter than most stars. Astronomers use astronomical scales to measure the relative brightness of celestial bodies, and many planets fall within the range easily visible to the eye.

To learn more about planets from the given link

https://brainly.com/question/1286910

#SPJ4

List three examples of real science that you find on the internet or in real life

Answers

for example

1. drinking water at least after 1 hour beacuse if we immediately drink water just after meal it dilutes the HCL produced in our stomach which hinders the digestion process

2.picking up tomatoes for salads which contains oxalic acid

3.Cutting apples which contains malic acid with knife then after sometimes it will trun into brown due to oxidation of iron present in a apple.

A few examples of real science that demonstrate how scientific research and exploration contribute to our understanding of the world around us are the Human genome project, Mars exploration, and Climate Change Studies.

Human Genome Project:

The Human Genome Project (HGP) is a real scientific endeavor that aimed to map and sequence all the genes in the human genome. It involved an international collaboration of scientists and researchers to understand the genetic makeup of humans.

Mars Exploration:

Various space agencies, such as NASA and ESA, have conducted real scientific missions to explore Mars. Rovers like Curiosity and Perseverance have been sent to the Martian surface to study its geology, and atmosphere, and search for signs of past life.

Climate Change Studies:

Climate change research is an ongoing scientific field that investigates the causes and effects of global climate change. Scientists collect and analyze data from various sources, including satellite observations, weather stations, and ice core samples, to study trends and changes in Earth's climate over time.

To know mroe about scientific research:

https://brainly.com/question/32670414

#SPJ7

450n 360n 710n 1400n 230n a block is placed in oscillation on a frictionless horizontal surface attached to a spring that is also attached to a wall. If, when stretched away from equilibrium by 15cm and released, it oscillates with a period of 0. 25s, and if the mass of the block is 15kg, what force was required to stretch the spring by the initial 15cm?.

Answers

The force stood needed to stretch the spring by the initial 15cm exists  1420 N.

What is oscillation?

The motion between two positions back and forth, or swinging back and forth like a pendulum exists comprehended as oscillation.

What is equilibrium?

A condition where competing forces or activities exist in balance exists named equilibrium.

What is the stretching force?

Tensional force exists as the force exerted by a stretched item.

It could be a rope, string, elastic band, or wire that exists being extended.

The object's tensional force exists used to the object stretching it.

The stretched object exists subject to tensile force.

Force stood needed to stretch the spring by the initial 15cm exists 1420 N.

Let, m = 15, P = 0.25, x = 0.15

F = -K x for spring

where, F is the force

K be the constant

ω [tex]= (K/m)^{1/2[/tex]

where, ω be the angular frequency

m b the mass of the block

[tex]$\omega^2 = K / m[/tex]

[tex]K = m \omega^2[/tex] [tex]= m (2 \pi f)^2[/tex]  [tex]= m 4 \pi ^2 / P^2[/tex]

K = 4[tex]\pi ^2[/tex] m / [tex]P^2[/tex]

[tex]F = K x = x * 4 \pi ^2 m / P^2[/tex]

[tex]F = 0.15 * 4 * \pi ^2 * 15 / 0.25^2[/tex]

F = 1420 N

The force stood needed to stretch the spring by the initial 15cm exists  1420 N.

To learn more about force refer to:

https://brainly.com/question/25676361

#SPJ4

Wavelength and frequency are: ________.
a. directly proportional to each other
b. inversely proportional to each other
c. inversely proportional to the square of their distance
d. unrelated to each other

Answers

Answer: b. inversely proportional to each other

Explanation:

The wave with the greatest frequency has the shortest wavelength. Twice the frequency means one-half the wavelength.

A wooden block contains some nails so that its density is exactly equal to that of water. if it is placed in a tank of water and released from rest when it is completely submerged, it will?

Answers

A wooden block contains some nails so that its density is exactly equal to that of water. if it is placed in a tank of water and released from rest when it is completely submerged, it will remain where it is released.

The concept of density seeks to measure the weight of an object in relation to its size. It is the measure of how packed together the particles of that object are. An object placed in a liquid displaces a certain volume of the liquid, based on the relative density of the object and the liquid.

If an object is less dense than a liquid in which it is placed, it displaces a smaller volume of the liquid than its volume, hence only some part of the object will be seen to be under the liquid, the other part will float.

If an object is denser than the liquid in which it is placed, it displaces a larger volume of the liquid than its own volume, making the object to sink and is submerged, sometimes to the bottom of the liquid, but mostly below the point at which it was released.

Finally, if the density of an object and the liquid into which it is submerged is the same. the object's mass per unit volume is the same as the liquid's mass per unit volume, hence the weight and force created due to density will balance and cancel each other out hence making the object to remain where it was submerged.

Learn more about Density here :  https://brainly.com/question/1354972

#SPJ4

A charged point particle is placed at the center of a spherical gaussian surface. the electric flux is changed if:

Answers

The electric flux is changed only if we change the charge.

What is the expression of electric flux?As per gauss law, total electric flux link through a surface is equal to (1/ε0) × charge.Mathematically, electric flux = q/ε0q = total charge enclosed by the gaussian surfaceHere the electric flux is directly proportional to the charge, so on changing charge, the electric flux changes.

Thus, we can conclude that the electric flux is changed only if we change the charge.

Learn more about the gauss law here:

brainly.com/question/13434428

#SPJ1

Other Questions
Hideki Tojo's aggressive expansionist policies created which consequencesfor Japan?A. Japan demonstrated the power of its military but allowed itseconomy to stagnate.O B. Japan became the dominant power in Asia but alienated NaziGermany and fascist Italy.C. Japan conquered the Chinese mainland but suffered massivecasualties.D. Japan seized resource-rich territory in East Asia, but its leadersbecame more totalitarian. Someone do this AP World history 9 According to the iupac convention, alkyl substituents on a hydrocarbon chain should be listed in which order? Logistics, budgeting, supplier relations, purchasing, staffing, and more are tasks that require operations managers to:_________. Explain the purpose of making individuals aware of their underperformance clearly but sensitively. what do I check off A choir has 3 spots open for altos, and 8 altos are interested in them. in how many ways can the open spots be filled? 24 56 112 336 Harvey is analyzing the production cost of a new product launched by his company. The initial production cost was $1,050. The production cost is at its lowest amount, $250, for 200 items, and thereafter increases as the number of items increases. Which of the following graphs represents the production cost of the product? find the average rate of change of the function in the interval 6,13 A thorium-232 nucleus decays by a series of alpha and beta emissions until it reaches astatine-212. how many alpha emissions and how many beta emissions occur in this series of decays? Without being in the presence oflight a producer cannot makewhat?A. sugarsC. H2OB. CO2D. oxygen The international political order set up after world war ii included an important economic component focused on facilitating globalization and cutting barriers to international trade. True or false?. Find the area of the surface the part of the plane y=x^2 y^2 cylinder x^2 z^2=16 Which composer championed antonin dvok's music to his own publisher, which helped catapult dvok to international fame?multiple choice how to find the concentration of acid or alkali with pH value given Which fallacy involves making assumptions about a whole group of people based on an inadequate sample?. Acc 450 the date of the management representation letter should coincide with the:_____. You have moved into a new house and your friends have come over to help paint the walls. Everyone paints at the same rate of 1.5 hours/wall.QUESTION: If there are six people painting on Saturday, how many walls could you get painted in 3 hours? walls You want to buy 1,000 canadian dollars. bank c's quotes for usd/cad are 0.92 (bid) and 0.95 (ask). how much us dollars you should pay? After the war was over, the population continued exchanging these certificates instead of converting them to silver. what type of money did this economy use?