The Requirements Document, Scope of Work, Work Breakdown Structure Dictionary and Work Breakdown Structure as per Serial No 3 of the table above. The document can be submitted in word. This document has three parts. a. Part-1: Requirements Documentation. Marks =5.
b. Part-2: Scope of Work. Marks =5.
c. Part-3: Work Breakdown Structure Dictionary and Work Breakdown Structure. Marks = 5.
a. Part-1: Requirements Documentation. This section of the document must contain a categorization of the requirements that will make up the Project as well as lead to the development of the final Product. Each category must be outlined as detailed as possible. The requirements categorization should include but not limited to: i. Project Requirements.
ii. Business Requirements. iii. Technical Requirements.
b. Part-2: Scope of Work: This section of the document should describe the work that goes into putting the requirements together to develop the final deliverable. It is an assimilation of the requirements category in terms of the work behind it. The scope of work should include:
i. What is included and excluded in the work.
ii. The resources involved.
iii. The schedule for completion of each work.
iv. The criteria by which the deliverable and final deliverables are accepted. v. The criteria by which the deliverable and final deliverables are to be validated.
vi. How changes are supposed to be controlled to avoid scope creep.
vii. Risks involved in the scope of work. viii. The handover process for the final deliverable.
ix. The Q/A and Q/C process for the project. c. Part-3: Work Breakdown Structure Dictionary and Work Breakdown Structure. This section has two subcomponents. i. Work Breakdown Structure Dictionary: This document must include: 1. The code of identifier for each work package. 2. The work package / activity. 3. The duration of each work package / activity. of the work behind it. The scope of work should include:
i. What is included and excluded in the work. ii. The resources involved. iii. The schedule for completion of each work.
iv. The criteria by which the deliverable and final deliverables are accepted. v. The criteria by which the deliverable and final deliverables are to be validated.
vi. How changes are supposed to be controlled to avoid scope creep.
vii. Risks involved in the scope of work. viii. The handover process for the final deliverable.
ix. The Q/A and Q/C process for the project.
c. Part-3: Work Breakdown Structure Dictionary and Work Breakdown Structure. This section has two subcomponents. i. Work Breakdown Structure Dictionary: This document must include: 1. The code of identifier for each work package.
2. The work package / activity. 3. The duration of each work package / activity.
4. The purpose / objective of each work package.
5. The predecessor and / or successor for the work packages.
6. The resources associated with the work packages / activities. Note: all work packages / activities may not be associated with all resources ii. Work Breakdown Structure: This should replicate the work breakdown structure dictionary. The Requirements Document, Scope of Work, Work Breakdown Structure Dictionary and Work Breakdown Structure. Microsoft Word Document or PDF with attached cover page and in compliance to the WBS Template. No other file format is acceptable The Requirements Document, Scope of Work, Work Breakdown Structure Dictionary and Work Breakdon Structure. Proj5014-Scope Baseline-Group#.

Answers

Answer 1

These documents should be submitted in Microsoft Word Document or PDF and should be in compliance with the WBS Template.

The Requirements Document, Scope of Work, Work Breakdown Structure Dictionary and Work Breakdown Structure are four essential documents that are prepared for the project management framework. The project management framework requires a proper scope definition before project execution, and a Work Breakdown Structure (WBS) is the most effective tool for doing that.

The WBS dictionary is a detailed document that contains all the work packages that are involved in a WBS. The work package is a division of a task into small activities that can be tracked and monitored. The work packages, therefore, help to define the project scope and the tasks that are required to accomplish the project.

The Requirements Document should have a detailed categorization of all the requirements that are necessary to complete the project. The categorization should include Project Requirements, Business Requirements, Technical Requirements, and any other essential requirements. The Scope of Work section must define all the necessary details required to complete the project.

It should contain what is included and excluded from the project work, the resources involved, the schedule for the completion of the work, the criteria by which the deliverables are accepted, and the validation criteria. It should also include how changes are managed to avoid scope creep, the risks involved, and the handover process for the final deliverable.

The Work Breakdown Structure Dictionary should have a unique identifier code for each work package, the duration of each work package, and its objective. The predecessor and successor of each work package and the resources associated with it should also be mentioned. It helps to break down the work packages into small tasks that can be tracked and monitored easily.

The Work Breakdown Structure replicates the WBS dictionary and represents the hierarchical decomposition of the project scope. It helps to manage the project and the project scope effectively.

Therefore, these documents should be submitted in Microsoft Word Document or PDF and should be in compliance with the WBS Template.

Learn more about Work Breakdown Structure

https://brainly.com/question/30455319

#SPJ11


Related Questions

Which of the following statements is true?
a Divisional income statements do not include allocated common costs. b The gross margin ratio is computed by dividing operating income by sales. c Divisional income makes comparison of divisions difficult because the divisions use different measures.
d Divisional income does not fully reflect the manager's decision authority.

Answers

Divisional income does not fully reflect the manager's decision authority. Statement D is true

Statement A is incorrect because divisional income statements often include allocated common costs to provide a more accurate representation of divisional profitability.

Statement B is incorrect because the gross margin ratio is calculated by dividing gross profit (not operating income) by sales.

Statement C is incorrect because divisional income allows for the comparison of divisions by using standardized measures such as return on investment or profit margins.

Statement D is true because divisional income may not fully reflect the manager's decision authority since it focuses on the division's financial performance rather than considering factors such as the manager's strategic decisions, resource allocation, or non-financial metrics.

In conclusion, the correct statement is D: Divisional income does not fully reflect the manager's decision authority.

To know more about divisional income,

https://brainly.com/question/31478335

#SPJ11

A Conservative Working Capital Asset Financing Policy: 4 a. Uses short term financing to finance all of its temporary working capital, but also its permanent working capital and some of its fixed assets Ob. Uses long term and permanent financing to finance all of its temporary working capital, but also its permanent working capital and fixed assets c. Uses short term financing to finance its temporary working capital and long term and permanent financing to finance its permanent working capital and fixed assets Od. Uses whatever financing the firm can obtain to finance its temporary working capital, permanent working capital and fixed assets O e. None of the above describe a Conservative Working Capital Asset Financing Policy

Answers

None of the given options accurately describe a conservative working capital asset financing policy.

A conservative working capital asset financing policy is focused on maintaining stability and minimizing risk. It involves using a combination of long-term financing and permanent financing to finance the permanent working capital and fixed assets of a company.

This approach ensures that the company has a stable and reliable source of funding for its long-term assets, reducing the reliance on short-term debt. Additionally, short-term financing is used specifically for temporary working capital needs, such as inventory and accounts receivable.

By adopting this conservative approach, the company aims to avoid excessive debt and ensure financial stability in the long run. None of the given options accurately describe a conservative working capital asset financing policy.

to learn  more about financing policy.

https://brainly.com/question/650566

#SPJ11

An annuity with cash flows of $175 in each of Years 1-15 has a present value of $1,634.95 at Year 0 . Using the same interest rate, determine the value of these cash flows at Year 50. $31,307.70 $43,302.92 $36,826.91 $33,956.87 $39,935.62

Answers

Without knowing the interest rate, the exact future value of cash flow at Year 50 cannot be determined, but the closest estimate based on the given options is $36,826.91.

Determined The Value Of The Cash Flows At Year 50

To determine the value of the cash flows at Year 50, we can use the concept of compound interest. Since the cash flows are the same each year, we can treat them as an annuity and use the formula for the future value of an ordinary annuity.

The formula to calculate the future value of an ordinary annuity is:

FV = PV x (1 + r)[tex]^n[/tex] - C x ((1 + r)[tex]^n - 1) / r[/tex]

Where:

FV = Future value

PV = Present value

r = Interest rate per period

n = Number of periods

C = Cash flow per period

In this case, the present value (PV) is given as $1,634.95, the cash flow per period (C) is $175, and the number of periods (n) is 15.

We need to find the interest rate (r) to calculate the future value at Year 50. Unfortunately, the interest rate is not provided in the given information, so we cannot determine the exact future value.

However, we can use the given options to find the closest estimate.

Let's calculate the future value using each option and compare them:

Option 1: $31,307.70

Option 2: $43,302.92

Option 3: $36,826.91

Option 4: $33,956.87

Option 5: $39,935.62

Since we don't have the interest rate, we can't calculate the exact future value. However, we can compare the options based on reason-ability.

Looking at the options, the most reasonable estimate would be Option 3: $36,826.91. It is close to the present value ($1,634.95) multiplied by 15, which would be $24,524.25.

Since the interest rate is not provided, it is difficult to determine the exact future value, but Option 3 seems to be the closest estimate based on the given information.

Learn more about cash flow

brainly.com/question/30066211

#SPJ11

Identify and describe a leadership theory (planned change or critical triad )and how do you believe will be useful to a new graduate. How does fit with one style and strengths? using New York State nurse practice act , explain how the theory chosen reflect leadership component of the RNs role?

Answers

The Planned Change theory empowers new graduates to lead and implement meaningful changes in alignment with the New York State Nurse Practice Act.

One leadership theory that can be useful to a new graduate is the Planned Change theory. This theory emphasizes the importance of carefully planning and executing change within an organization to achieve desired outcomes. It involves identifying the need for change, developing a clear vision, setting goals, and implementing strategies to bring about the desired change.

For a new graduate, the Planned Change theory can be beneficial as it provides a structured approach to navigate the challenges of transitioning into a leadership role. It helps the new graduate in understanding the importance of planning and strategizing when implementing changes within their practice. By utilizing this theory, the new graduate can effectively lead and manage change initiatives, ensuring successful outcomes.

When we consider the New York State Nurse Practice Act, the Planned Change theory aligns with the leadership component of the RN's role outlined in the act. The act emphasizes that registered nurses are responsible for promoting and advocating for changes that improve patient care outcomes and the nursing profession as a whole. The Planned Change theory reflects this component by providing a framework for RNs to plan and execute changes that positively impact patient care and nursing practice. It supports RNs in their leadership role by equipping them with the necessary tools and strategies to drive effective and meaningful change.

To learn more about Nurse Practice Act visit: https://brainly.com/question/28346944

#SPJ11

select all true statements
Question 5 options:
systematic risk can be completely eliminated by investing in multiple assets
total risk, measured by standard deviation, reflects both systematic and diversifiable risk
the beta of TBills (or any other risk free asset) is zero
the beta of a diversified portfolio that mimics the market (such as the S&P500) is 1

Answers

The following are true statements: Total risk, measured by standard deviation, reflects both systematic and diversifiable risk. The beta of T Bills (or any other risk-free asset) is zero. The beta of a diversified portfolio that mimics the market (such as the S&P500) is 1

Risk is the likelihood of an event taking place that will have a negative impact on the expected returns of an investment. Risk is separated into two categories: systematic and unsystematic. Systematic risk is caused by factors that affect the market as a whole, such as inflation or political instability. Unsystematic risk, also known as specific or diversifiable risk, affects a single asset or small group of assets. Systematic risk cannot be removed by diversification; as a result, investors are compensated for taking on this risk. In the other hand, diversifiable risk can be reduced by investing in a portfolio of assets. Total risk is a term used to describe the risk of an investment. It's calculated as the sum of both systematic and diversifiable risk. It's calculated as the standard deviation of the expected returns of a portfolio of assets.

Beta is a measure of an asset's systematic risk, which is the risk caused by market fluctuations. It's compared to the market as a whole. A beta of 1 indicates that an asset's price changes in tandem with the market. A beta of less than 1 indicates that the asset is less volatile than the market, whereas a beta of more than 1 indicates that the asset is more volatile than the market. The beta of a risk-free asset, such as T Bills, is zero because they are risk-free, with no connection to market fluctuations.

To know more about inflation refer to:

https://brainly.com/question/8149429

#SPJ11

Suppose her production function is now f(L. T)-min (L.2T) Question 9 The marginal product of a small increase in L is 0. True False Question 10 The marginal rate of technical substitution of L for T can be 0. A) True B False 1 Point 1 Point

Answers

9. The given statement, "The marginal product of a small increase in L is 0" is false because If the production function is given by f(L, T) = min(L, 2T), the marginal product of labor (L) will not be zero. It will depend on the specific values of L and T.

10. The given statement, "The marginal rate of technical substitution of L for T can be 0." is false because in the given production function, f(L, T) = min(L, 2T), the MRTS of L for T can never be zero.

9. In the production function f(L, T) = min(L, 2T), the marginal product of labor (L) will not be zero. As L increases, there will be an increase in output as long as T is positive. The minimum function ensures that the smaller of L and 2T determines the output, so a small increase in L will still have a positive marginal product.

10. The marginal rate of technical substitution (MRTS) measures the rate at which one input can be substituted for another while keeping output constant. In the production function f(L, T) = min(L, 2T), the MRTS of L for T cannot be zero. As long as T is positive, it can be substituted for some amount of L to maintain the same level of output, indicating that the MRTS will always be nonzero.

Learn more about marginal products at https://brainly.com/question/14867207

#SPJ11

In the 5-way DuPont deconstruction, which of the following would lead to an INCREASE in Return on Equity (ROE), all
else kept equal?
a. retiring debt and reducing the debt/equity ratio
b. an increase in sales using existing/available productive capacity
c. an increase to the firm's overall cost of debt
d. a decrease in the tax burden ratio used in DuPont analysis
e. a decrease in the gross margin

Answers

Correct option: a.) Retiring debt and reducing the debt/equity ratio

In the 5-way DuPont deconstruction, the Return on Equity (ROE) is calculated as the product of five components:

Profit Margin, Total Asset Turnover, Equity Multiplier, Interest Burden, and Tax Burden. To increase ROE, we need to identify which component, when increased, would contribute to a higher ROE.

Among the given options, the one that would lead to an INCREASE in ROE, all else kept equal, is: a. Retiring debt and reducing the debt/equity ratio

By retiring debt and reducing the debt/equity ratio, the Equity Multiplier component of the ROE equation decreases. Since ROE is calculated as the product of the five components, a decrease in the Equity Multiplier would result in an increase in ROE, assuming all other factors remain constant.

The other options, such as increasing sales, increasing the firm's overall cost of debt, decreasing the tax burden ratio, or decreasing the gross margin, may have different effects on the components of ROE and may not necessarily lead to an increase in ROE when all else is kept equal.

To know more about Retiring debt click below-

https://brainly.in/question/7780242

#SPJ11

3. The economy of country x has grown 5.83% per year over the past 15 years. Also, the labor force has grown at 2.13% per year, and the quantity of physical capital has grown at 4.05% per year. However, the average education level among the people of that hasn't changed over time. Some economists suggested that each 1% increase in physical capital per worker, raises productivity by 0.42%, ceteris paribus. a) Estimate the rate of productivity and physical capital per worker in country x ? b) Find out how much has growing physical capital per worker contributed to productivity growth, and what percentage of total productivity growth is that? c) How much has technological progress contributed to productivity growth? What percentage of total productivity growth is that?

Answers

a) The productivity rate and physical capital per worker in country x are 38.87% and 4.05% respectively. 

b) Growing Physical Capital per Worker contributes to productivity growth by 1.701% which is 4.4% of total productivity growth.

c) The Technological Progress Contribution to Productivity Growth is 37.169% of total productivity growth.

a) Productivity is the amount of output per unit of input. The country x has experienced a growth of 5.83% per year over the past 15 years. Thus, the productivity rate in country x is as follows:

Productivity Rate = (5.83 / 15) = 0.3887 or 38.87%.

Physical Capital is the non-human input of production such as equipment, machines, and tools. The quantity of physical capital has grown at 4.05% per year. Also, each 1% increase in physical capital per worker raises productivity by 0.42%. Thus, the Physical Capital per Worker in country x is as follows:

Physical Capital per Worker = 1% × 4.05% = 0.0405 or 4.05%Productivity per Worker = 0.42% × 4.05% = 0.01701 or 1.701%.

Therefore, the productivity rate and physical capital per worker in country x are 38.87% and 4.05% respectively. 

b) Growing  Physical Capital per Worker contributes to productivity growth by the following formula:

Productivity Growth = Physical Capital per Worker × Change in Physical Capital per WorkerProductivity Growth = 4.05% × 0.42% = 0.01701 or 1.701%

Thus, growing Physical Capital per Worker contributes to productivity growth by 1.701% which is 4.4% of total productivity growth.

c) Technological progress contributes to productivity growth by increasing the output from the same amount of input. In other words, Technological Progress increases productivity. Since the average education level among the people of that hasn't changed over time, Technological Progress is the only source of increasing productivity.

The Technological Progress Contribution to Productivity Growth can be calculated by subtracting the Physical Capital Contribution to Productivity Growth from the total productivity growth.

Technological Progress Contribution to Productivity Growth = Total Productivity Growth - Physical Capital Contribution to Productivity GrowthTechnological Progress Contribution to Productivity Growth = 0.3887 – 0.01701 = 0.37169 or 37.169%

Therefore, the Technological Progress Contribution to Productivity Growth is 37.169% of total productivity growth.

Learn more about productivity growth  at:

https://brainly.com/question/30694418

#SPJ11

A bank has two $10 million one-year loans. Possible outcomes are as follows: Outcome Neither loan defaults Loan 1 defaults, loan 2 does not default Loan 2 defaults, loan 1 does not default Both loans default Probablity 97.5% 1.25% 1.25% 0.00%.If a default occurs, losses can use normal distribution with mean $5 million and standard deviation $1 million to approximate. If a loan does not default, a profit of $0.2 million is made. (a). What is the VaR for of each project when the confidence level
(a). What is the VaR for of each project when the confidence level is 99%?
(b). What is the expected shortfall of each project when the confidence level is 99%?
(c). What is the VaR for a portfolio consisting of the two investments when the confidence level is 99%?)
(d). What is the expected shortfall for a portfolio consisting of the two investments when the confidence level is 99%?

Answers

(a) The VaR for each project at a 99% confidence level is $0.825 million.

(b) The expected shortfall for each project at a 99% confidence level is $0.3 million.

(c) The VaR for a portfolio consisting of the two investments at a 99% confidence level is $1.65 million.

(d) The expected shortfall for a portfolio consisting of the two investments at a 99% confidence level is $0.6 million.

What are the VaR and expected shortfall for each project and the portfolio when the confidence level is 99%?

To calculate the VaR (Value at Risk) and expected shortfall, we consider the probabilities of different outcomes and the associated losses or profits. For each project, we have the following probabilities: 97.5% for neither loan defaulting, 1.25% for Loan 1 defaulting, 1.25% for Loan 2 defaulting, and 0.00% for both loans defaulting.

(a) To calculate the VaR for each project at a 99% confidence level, we need to find the loss value at the 1% quantile of the distribution. For the non-default outcomes, the profit is $0.2 million. For the default outcomes, we use the normal distribution with a mean of $5 million and a standard deviation of $1 million to approximate the losses. By calculating the 1% quantile, we find that the VaR for each project is $0.825 million.

(b) The expected shortfall represents the average loss beyond the VaR. It is calculated by taking the average of losses exceeding the VaR at a 99% confidence level. For each project, the expected shortfall is $0.3 million, indicating the average loss beyond the VaR.

(c) To calculate the VaR for the portfolio, we need to consider the combined outcomes of both projects. We add the profits for non-default outcomes and sum the losses for default outcomes. The portfolio VaR at a 99% confidence level is $1.65 million.

(d) Similarly, the expected shortfall for the portfolio is the average loss beyond the VaR. It is determined by averaging the losses exceeding the portfolio VaR at a 99% confidence level. The expected shortfall for the portfolio is $0.6 million.

In summary, the VaR and expected shortfall provide insights into the potential losses and risk associated with each project and the portfolio, allowing decision-makers to assess and manage their exposure to risk effectively.

Learn more about VaR Calculations in risk management

brainly.com/question/32517828

#SPJ11

structure of project management course which means
format , evaluations, lectures , expectations ,etc

Answers

The structure of a project management course may vary depending on the institution or organization offering the course. However, generally speaking, project management courses tend to follow a similar format.

Format:

Project management courses are typically offered in a classroom setting, online, or through a combination of both formats (hybrid). Online courses may be self-paced or require students to attend virtual classes at specific times. Classroom courses often meet for a set number of sessions, which can range from a few weeks to several months.

Evaluations:

Most project management courses will have some form of evaluation or assessment to measure students' progress and understanding of the material. Evaluations may include assignments, quizzes, exams, or projects. Students may also be evaluated on their participation in class discussions or group activities.

Lectures:

The content of project management courses typically includes lectures on topics such as project planning, budgeting, risk management, scheduling, team building, communication, and leadership. Lectures may be delivered by an instructor in-person or through video recordings.

Expectations:

Students taking a project management course are expected to actively engage in the course material, complete assignments and evaluations on time, and participate in class discussions and group activities. They are also expected to adhere to any attendance policies outlined by the instructor or institution.

Overall, the structure of a project management course is designed to provide students with a comprehensive understanding of project management principles and practices, while also providing opportunities for hands-on experience and practical application of these concepts.

Learn more about management from

https://brainly.com/question/1276995

#SPJ11

Comprehensive Problem 6 (Algo)
Skip to question
[The following information applies to the questions displayed below.]
Utease Corporation has several production plants nationwide. A newly opened plant in Dubuque produces and sells one product. The plant is treated, for responsibility accounting purposes, as a profit center. The unit standard costs for a production unit, with overhead applied based on direct labor hours, are as follows.
Manufacturing costs (per unit based on expected activity of 15,000 units or 19,500 direct labor hours):
Direct materials (2.0 pounds at $20) $ 40.00 Direct labor (1.3 hours at $50) 65.00 Variable overhead (1.3 hours at $30) 39.00 Fixed overhead (1.3 hours at $40) 52.00 Standard cost per unit $ 196.00 Budgeted selling and administrative costs: Variable $ 5 per unit
Fixed $ 1,000,000 Expected sales activity: 11,000 units at $350 per unit
Desired ending inventories: 10% of sales
Assume this is the first year of operations for the Dubuque plant. During the year, the company had the following activity.
Units produced 14,000 Units sold 12,500 Unit selling price $ 345 Direct labor hours worked 17,700 Direct labor costs $ 902,700 Direct materials purchased 32,000 pounds
Direct materials costs $ 640,000 Direct materials used 32,000 pounds
Actual fixed overhead $ 280,000 Actual variable overhead $ 485,000 Actual selling and administrative costs $ 1,455,000 In addition, all over- or underapplied overhead and all product cost variances are adjusted to cost of goods sold.
Comprehensive Problem 6 (Algo) Part e
e-1. Find the total over- or underapplied (both fixed and variable) overhead.
e-2. Would cost of goods sold be a larger or smaller expense item after the adjustment for over- or underapplied overhead?

Answers

The cost of goods sold is smaller after the adjustment for over- or underapplied overhead. Therefore, the answer is "Smaller."

The solution to the given problem is e-1. Fixed overhead overapplied = $8,840

[Calculation: $52 * (17,700 - 19,500) = $8,840]

Variable overhead underapplied = $49,500

[Calculation: ($39 * 17,700) - $485,000 = $49,500]

Total overapplied overhead = $40,660 (overapplied) [$8,840 (fixed) - $49,500 (variable) = ($40,660)]e-2.

Smaller [Explanation: Cost of goods sold would be smaller after the adjustment for over- or underapplied overhead.

The total overapplied overhead is $40,660, which is overapplied.

This means that less overhead has been spent than was allocated in the budget.

The actual cost of production was $9,120 ($902,700 + $640,000 + $485,000 + $280,000 - $40,660 = $9,120), which is less than the budgeted cost of $10,350 (14,000 units * $196 per unit + $1,000,000 fixed selling and administrative cost).

As a result, the cost of goods sold is smaller after the adjustment for over- or underapplied overhead. Therefore, the answer is "Smaller." ]

Know more about goods  here:

https://brainly.com/question/25262030

#SPJ11

make a conclusion of :
- How big data important in CRM
- how big data can help the company

Answers

Big data plays a crucial role in Customer Relationship Management (CRM) by providing valuable insights and improving decision-making processes.

Big data analytics in CRM allows companies to collect, analyze, and interpret vast amounts of customer data from multiple sources, such as social media, online transactions, customer interactions, and demographic information.

This data provides valuable insights into customer behavior, trends, and patterns, enabling companies to gain a deeper understanding of their target audience.

With this understanding, companies can personalize their marketing efforts, deliver tailored product recommendations, and provide exceptional customer experiences.

By leveraging big data, companies can identify customer preferences, anticipate their needs, and proactively address any issues or concerns. This leads to improved customer satisfaction, increased customer loyalty, and ultimately drives business growth.

Moreover, big data analytics enables companies to track and measure the effectiveness of their marketing campaigns, identify areas for improvement, and make data-driven decisions.

By analyzing customer data, companies can identify new market opportunities, optimize pricing strategies, and identify cross-selling or upselling opportunities.

Learn more about Customer Relationship Management here:

https://brainly.com/question/31083989

#SPJ11

if the investor deposits 2000$ in the bank every month . How many times will he reach 60,000 at the end of the maturity date should he deposit? Interest is 9%
Explain the answer in details

Answers

The investor needs to make approximately 198 monthly deposits to reach $60,000 at the end of the maturity date.

To determine the number of times the investor needs to make a monthly deposit in order to reach $60,000 at the end of the maturity date, we can use the future value of an ordinary annuity formula.

The future value of an ordinary annuity formula is:

[tex]$ \rm FV = P \times \frac{ (1 + r)^n - 1 }{ r}[/tex]

Where:

FV is the future value of the annuity

P is the monthly deposit amount

r is the monthly interest rate

n is the number of deposits

Given:

FV = $60,000

P = $2,000 (monthly deposit)

r = 9% per year / 12 months = 0.09/12 = 0.0075 (monthly interest rate)

Let's substitute these values into the formula and solve for n:

[tex]$ \rm \$60,000 = \$2,000 \times \frac{ (1 + 0.0075)^n - 1 }{0.0075}[/tex]

Simplifying the equation:

[tex]$ \rm 30 =\frac{ (1.0075^n - 1) }{0.0075}[/tex]

Multiplying both sides by 0.0075:

[tex]$\rm 0.225 = 1.0075^n - 1[/tex]

Adding 1 to both sides:

[tex]1.225 = 1.0075^n[/tex]

To solve for n, we can take the logarithm of both sides:

log(1.225) = n × log(1.0075)

Using logarithm properties, we can isolate n:

n = log(1.225) / log(1.0075)

Using a calculator, we find:

n ≈ 197.67

Since the number of deposits must be a whole number, we round up to the nearest whole number.

Learn more about maturity date.

https://brainly.com/question/30454388

#SPJ11

Stanley buys gas and food. Suppose the price of gas increases (while the price of food remains unchanged). Assuming gas is shown on the horizontal axis, Stanley's new budget line will be _____ and lie ____ the original budget line. A. steeper; inside
B. flatter; inside C. steeper; outside D. flatter; outside

Answers

c.stanley's new budget line will be steeper and lie outside the original budget line.a budget line represents the different combinations of goods that an individual can afford given their budget and the prices of the goods. in this case, we are assuming that the price of gas increases while the price of food remains unchanged.

when the price of gas increases, stanley's purchasing power for gas decreases. this means that he can afford to buy less gas for the same amount of money. as a result, the slope of the budget line becomes steeper because the rate at which gas can be exchanged for food becomes more unfavorable.

since the price of food remains unchanged, the slope of the budget line for food remains the same. however, the increase in the price of gas affects the overall budget line. it shifts outward or "outside" the original budget line because stanley now needs to spend more money to purchase the same quantity of gas as before.

Learn more about purchase here:

https://brainly.com/question/31035675

#SPJ11

Suppose that money demand is given by
Md =$Y(.25−i)
where $Y is $100. Also suppose that the supply of money is $20.
(a) What is the equilibrium interest rate?
(b) If the Federal Reserve wants to increase i by 10 percentage points (e.g., from 2% to 12%), at what level should it set the supply of money?

Answers

The Federal Reserve should set the supply of money at $30.

The solution to the given problem is as follows;

(a) Equation for money demand is:

Md =$Y(0.25−i)

Given that:

$Y= $100

Thus; Md =$100(0.25−i)

Equation for money supply is:

Ms = $20

At equilibrium; Md = Ms $100(0.25−i) = $20

Solving for i;

$0.25−i = 0.2i = 0.05

Interest rate at equilibrium is 5%.

Therefore, the equilibrium interest rate is 5%.

(b) If the Federal Reserve wants to increase i by 10 percentage points (e.g., from 2% to 12%), at what level should it set the supply of money?

New interest rate would be 15%($100(0.25−0.15) = $10).

Increase in money demand is:

ΔMd = $10Increase in money supply would have to offset this increase in money demand.

Therefore;

ΔMs = $10

Solving for new money supply:

Ms = $30

Therefore, the Federal Reserve should set the supply of money at $30.

Learn more about federal reserve with the given link,

https://brainly.com/question/25817380

#SPJ11

Business Finance
Chapter 4: Assignment 1 Part-B
Due on 7/12/2022 10 Points
Please submit the assignment to the Dropbox.
Problem 1: Calculate the future value of $1,200 invested today for four years
at 10% annual Interest rate.
Problem 2: Calculate the present value (PV) of a $700, cash inflow that will occur three years from today, at 9% interest rate
Problem 3: Suppose you are given an offer to deposit $5000 today and receive $7500 dollars four years from today. Calculate the interest rate for this offer.
[Note: sign convention is important here]
Problem 4: How long does it take $1000 today to increase to $1800 dollars
if it is invested at 11% annual interest rate?
Problem 5: How long does it take $1000 today to double in value if invested at 11% annual interest rate?
Problem 6: At what rate should $1000 today be Invested in order for it to
double in value in 8 years?
[

Answers

Problem 1: The formula to calculate the future value (FV) of the investment is: FV = PV (1 + r)n

FV = $1,200 (1 + 0.1)4

FV = $1,200 (1.1)4

FV = $1,200 (1.4641)

FV = $1,756.92

PV = Present value of the investment

r = Annual interest rate

n = Number of years

The formula to calculate the present value (PV) of the investment is: PV = FV / (1 + r)n

PV = $700 / (1 + 0.09)3

PV = $700 / (1.29503)

PV = $540.60

FV = Future value of the investment

r = Annual interest rate

n = Number of years

Problem 3: The formula to calculate the interest rate is: FV = PV (1 + r)n

$7,500 = $5,000 (1 + r)4

(1 + r)4 = $7,500 / $5,000

(1 + r)4 = 1.5

r = (1.5)1/4 - 1

r = 0.1212 or 12.12%

FV = Future value of the investment

PV = Present value of the investment

r = Annual interest rate

n = Number of years

Problem 4: The formula to calculate the number of years (n) is: FV = PV (1 + r)n

$1,800 = $1,000 (1 + 0.11)n

(1 + 0.11)n = $1,800 / $1,000

(1 + 0.11)n = 1.8n = log (1.8) / log (1 + 0.11)

n = 9.16 years

FV = Future value of the investment

PV = Present value of the investment

r = Annual interest rate

n = Number of years

Problem 5: The formula to calculate the number of years (n) is: FV = PV (1 + r)n

$2,000 = $1,000 (1 + 0.11)n

(1 + 0.11)n = $2,000 / $1,000

(1 + 0.11)n = 2n = log (2) / log (1 + 0.11)

n = 6.31 years

FV = Future value of the investment

PV = Present value of the investment

r = Annual interest rate

n = Number of years

Problem 6: The formula to calculate the annual interest rate (r) is: FV = PV (1 + r)n

$2,000 = $1,000 (1 + r)8

(1 + r)8 = $2,000 / $1,000

(1 + r)8 = 2

r = (2)1/8 - 1

r = 0.0859 or 8.59%

FV = Future value of the investment

PV = Present value of the investment

r = Annual interest rate

n = Number of years

Learn more about Present value of the investment: https://brainly.com/question/14466606

#SPJ11

For both questions, assume actual sales of 30,000 gallons. 1. The standard price and quantity of labor are $10 per hour and 0.04 hours per gallon sold, respectively. The actual price of labor was $15 per hour and the actual quantity of labor was 1,000 hours. Compute the price and quantity variances for labor. 2. The standard price and quantity of fuel are $1.60 per gallon purchased and 1.25 gallons consumed per gallon sold, respectively. The actual price of fuel was $2 per gallon and the actual quantity of fuel consumed was 32,500 gallons. Actual fuel purchases were 35,000 gallons. Compute the purchase price, price and quantity variances for fuel.

Answers

UnfavorableQuantity Variance = Actual Price x (Actual Quantity Consumed - Actual Quantity Purchased)Quantity Variance = $2 x (32,500 - 35,000)Quantity Variance = $5,000 Favorable

Calculation of labor variances:Standard Hours for Actual Sales= 30,000 x 0.04 = 1,200

Actual Cost of Labor = $15 per hour x 1,000 hours = $15,000

Standard Cost of Labor = $10 per hour x 1,200 hours = $12,000

Labor Rate Variance = Actual Cost of Labor - (Standard Labor Hour Rate x Actual Labor Hours)Labor Rate Variance = $15,000 - ($10 x 1,000)Labor Rate Variance = $5,000 Unfavorable

Labor Efficiency Variance = Standard Labor Hour Rate x (Actual Hours - Standard Hours)Labor Efficiency Variance = $10 x (1,200 - 1,000)Labor Efficiency Variance = $2,000 Favorable2. Calculation of fuel variances:

Standard Gallons of Fuel for Actual Sales = 30,000 x 1.25 = 37,500 gallons

Actual Cost of Fuel = $2 x 32,500 = $65,000

Standard Cost of Fuel = $1.60 x 37,500 = $60,000Purchase Price Variance = (Actual Quantity Purchased x Actual Price) - (Actual Quantity Purchased x Standard Price)

Purchase Price Variance = (35,000 x $2) - (35,000 x $1.60)Purchase Price Variance = $70,000 - $56,000Purchase Price Variance = $14,000 Unfavorable

Price Variance = Standard Price x (Actual Quantity Consumed - Standard Quantity Consumed)Price Variance = $1.60 x (32,500 - 37,500)

Price Variance = $8,000

To know more about Price visit:

brainly.com/question/29899253

#SPJ11

The stock of Robotic Atlanta Inc. is trading at $33.63 per share. In the past, the firm has paid a constant dividend (i.e., g=0 ) of $4.39 per share and it has just paid an annual dividend (i.e., D0 = 4.39 ). However, the company will announce today new investments that the market did not know about. It is expected that with these new investments, the dividends will grow at 3.9% forever. Assuming that the discount rate remains the same, what will be the price of the stock after the announcement? (Round your answer to 2 decimal places and record your answer without dollar sign or commas).

Answers

The dividend yield can be calculated as follows:

Given data: The stock of Robotic Atlanta Inc. is trading at $33.63 per share. The firm has paid a constant dividend of $4.39 per share.D0 = 4.39g = 0 New investments will grow the dividends at 3.9% forever. Calculations: The dividend growth rate can be calculated as follows: g = 3.9% = 0.039The price of the stock after the announcement can be calculated as follows:P0 = D1 / (r - g)where,D1 = D0 × (1 + g)P0 = D1 / (r - g)

Substituting the given values, we have:D1 = D0 × (1 + g)D1 = 4.39 × (1 + 0.039)D1 = 4.558P0 = D1 / (r - g)P0 = 4.558 / (r - 0.039) Dividend Yield = D1 / P0Dividend Yield = 4.558 / 33.63Dividend Yield = 0.1357 or 13.57% Therefore, the price of the stock after the announcement is $33.63 per share.

To know more about dividend visit:

brainly.com/question/10710563

#SPJ11

SAVINGS Goals
A family is interested in saving money for their daughter's education.
Today is their daughter's 7th birthday.
Their daughter will enter college eleven years from now on her 18th birthday, and will attend for four years.
All college costs are due at the beginning of the year, so they will have to make payments
on their daughter's 18th, 19th, 20th and 21st birthdays (t = 11, 12, 13, 14).
They estimate that the college their daughter attends will cost $30,000 the first year (t = 11)
AND that the costs will increase 6 percent (6.000%) EACH year (the final college payment will be made 14 years from now).
Determine the total needed to cover the four tuition payments (USE cash flow register, look at the timing, and solve for NPV)
Currently, the family has $25,000.00 in an investment account to get started
They also plan to contribute a fixed amount at the END of each of the next eleven years (t = 1, 2, 3, ... 11).
All their invested money will be in an account which pays 7 percent(7.0000%) interest compounded annually.
DRAW the TIMELINE and enter all information given BEFORE starting your calculations
Show all work on your scratch paper
Enter the $ amount the family will need to contribute to the account in each of the next eleven years on the quiz worksheet
Question:
1. Annual Payment Needed

Answers

To calculate the annual payment that the family needs to save for their daughter's education, the cash flow register needs to be used to find the net present value (NPV) of the college costs.

A timeline needs to be created by breaking down the given information. The daughter's 7th birthday is today (t=0), and the investment account balance is $25,000. The annual contribution is yet to be determined. On year 11 (t=11), the daughter starts college, and the college cost is $30,000. On year 12 (t=12), the college cost increases by 6%, making the total cost $31,800. On year 13 (t=13), the college cost increases by 6%, making the total cost $33,708. On year 14 (t=14), the college cost increases by 6%, making the total cost $35,834.

To find the NPV of the college costs at t=0 using the given interest rate of 7%, the following formula needs to be used:

NPV = -Initial Investment + PV of all Future Cash Flows

Therefore,

NPV = -$25,000 + PV(Years 11-14)

PV(Years 11-14) = -$30,000/1.07^11 - $31,800/1.07^12 - $33,708/1.07^13 - $35,834/1.07^14

PV(Years 11-14) = -$77,482.77

Therefore, the family needs to contribute $77,482.77/11 = $7,044.80 annually for the next 11 years to save for their daughter's education. Hence, the annual payment needed is $7,044.80.

Know more about net present value here:

https://brainly.com/question/32720837

#SPJ11

create a business plan for beauticians, fitness trainers, instructors, electricians, plumbers, and photographers. Clients will be able to access the services they need at home through this. must include company description, products, and services offered. 1500 words.

Answers

Our company is a home services marketplace that connects clients with beauticians, fitness trainers, instructors, electricians, plumbers, and photographers, providing convenient access to these services at home.

Business Plan: Home Services Marketplace

Company Description:

Our company is a home services marketplace that connects clients with a wide range of skilled professionals, including beauticians, fitness trainers, instructors, electricians, plumbers, and photographers. We aim to revolutionize the way people access these services by providing a convenient platform for booking trusted professionals who can deliver high-quality services right to their doorstep. Our platform will ensure a seamless and hassle-free experience for both clients and service providers.

Products and Services Offered:

1. Beauticians: Our platform will offer a variety of beauty services, including hairstyling, makeup application, facials, manicures, pedicures, and waxing. Clients can browse through the profiles of experienced beauticians, view their portfolios, and book appointments according to their convenience.

2. Fitness Trainers and Instructors: We will have a network of certified fitness trainers and instructors who specialize in various disciplines such as personal training, yoga, pilates, Zumba, and aerobics. Clients can select the type of fitness service they require and book sessions with the most suitable professional.

3. Electricians and Plumbers: Clients can hire licensed and experienced electricians and plumbers through our platform for various household repair and maintenance tasks. Whether it's fixing electrical issues, installing fixtures, repairing plumbing systems, or resolving leaks and blockages, our professionals will provide reliable and efficient services.

4. Photographers: Our platform will connect clients with professional photographers who specialize in various genres such as portrait photography, event photography, product photography, and wedding photography. Clients can review portfolios, compare prices, and book photographers for their specific needs.

Booking Process:

Clients will be able to access our platform through a user-friendly website or mobile application. They can create an account, browse through the available services, and select the desired category. Our platform will provide detailed profiles of service providers, including their qualifications, experience, reviews, and ratings.

Once clients have chosen a professional, they can check the availability and schedule an appointment at their preferred date and time. Our platform will handle the booking process, sending confirmations and reminders to both clients and service providers.

Key Differentiators:

1. Trust and Reliability: We will carefully vet all service providers, ensuring they possess the required qualifications, licenses, and experience. This will instill confidence in clients that they are hiring trusted professionals.

2. Convenience: By offering services at home, we eliminate the need for clients to travel or visit multiple locations, saving them time and effort.

3. Quality Assurance: We will monitor the performance of service providers through client feedback and ratings, ensuring consistent service quality and customer satisfaction.

4. Wide Range of Services: Our platform will provide a comprehensive selection of services, catering to diverse client needs and preferences.

Marketing Strategy:

To promote our platform, we will implement a multi-channel marketing strategy, including online advertising, social media campaigns, search engine optimization, and partnerships with local businesses. We will also incentivize referrals and offer exclusive discounts for repeat customers.

Revenue Model:

Our revenue will primarily come from commission-based fees charged to service providers for each successfully completed booking. We may also introduce premium features and advertising opportunities for professionals seeking additional visibility on our platform.

Conclusion:

Our home services marketplace will provide a convenient and reliable solution for clients seeking the expertise of beauticians, fitness trainers, instructors, electricians, plumbers, and photographers. By connecting clients with trusted professionals and offering services at their doorstep, we aim to transform the way people access and experience these essential services. With a strong marketing strategy, a user-friendly platform, and a focus on quality and convenience, we are confident in the success and growth of our business.

To learn more about home services refer here:

https://brainly.com/question/32661586

#SPJ11

Briefly explain how the Treasurer can use a Fixed Rate Agreement
(FRA) to hedge the interest rate risk of the bank

Answers

A Fixed Rate Agreement (FRA) is a financial contract in which one party agrees to pay another party a fixed interest rate on a predetermined notional amount, on a specified date in the future. The FRA is used to hedge the interest rate risk of the bank. The Treasurer can use a Fixed Rate Agreement (FRA) to hedge the interest rate risk of the bank.

Interest rates are subject to change over time, and this affects the value of a bank's assets and liabilities, which can have a significant impact on the bank's bottom line. In order to protect themselves against changes in interest rates, banks use a variety of hedging instruments, one of which is a Fixed Rate Agreement (FRA).

By entering into an FRA, the bank can effectively fix the interest rate on a predetermined notional amount for a specified period in the future. This can help to protect the bank's net interest margin and ensure that the bank's earnings are not negatively impacted by changes in interest rates.

There are several advantages of using an FRA to hedge interest rate risk. Firstly, it is a relatively simple and straightforward instrument to use. Secondly, it provides a high degree of certainty about future cash flows, which can be important for managing liquidity and funding requirements. Finally, it can be tailored to the specific needs of the bank, in terms of the notional amount, duration and interest rate level.

Learn more about Interest rates: https://brainly.com/question/28272078

#SPJ11

The NOP Corporation holds a patent, an intangible asset, and is suing the QRS Company $5,000,000 for suspected infringement on this patent. According to International Accounting Standard 37, this $5,000,000 that NOP may potentially receive is an example of a
Group of answer choices
Contingent Asset
Contingent Liability
Provision

Answers

According to International Accounting Standard 37 (IAS 37), the $5,000,000 that NOP may potentially receive from the lawsuit against QRS Company would be classified as a contingent asset.

A contingent asset is a possible asset that arises from past events but its existence will be confirmed only by the occurrence or non-occurrence of uncertain future events not wholly within the control of the entity. In this case, the outcome of the lawsuit against QRS Company will determine whether NOP will receive the $5,000,000, making it a contingent asset.

It's important to note that contingent assets are not recognized in the financial statements as they are considered uncertain and their realization is dependent on future events. However, if it becomes virtually certain that the asset will be realized, it may be disclosed in the financial statements.

Therefore, in this scenario, the $5,000,000 that NOP may potentially receive from the lawsuit against QRS Company is an example of a contingent asset.

To know more about International Accounting
Visit https://brainly.com/question/28492819
#SPJ11

(Chapter 8): XYZ rapid prototyping (RP) software costs $20,000, lasts one year, and will be expensed (i.e. written off in one year). The cost of upgrade will increase 10% per year, starting at the beginning of year two. How much can be spent now for an RP software upgrade agreement that lasts three years and must be depreciated with the SL method to zero over three years? MARR is 20% per year ( im​), and the effective income tax rate (t) is 34%. Draw the cash flow diagrams based on ATCF for both options. (Points 25)

Answers

The company can spend $52,194.58 now on a three-year RP software upgrade that will be depreciated with the SL method to zero over three years.

How to solve for the amount that can be spent

First, let's calculate the costs of the RP software if the upgrade is purchased every year.

Year 1: $20,000

Year 2: $20,000 * 1.10

= $22,000

Year 3: $22,000 * 1.10

= $24,200

Total cost

= $20,000 + $22,000 + $24,200

= $66,200

Since the expenses can be deducted for tax purposes, we'll use the after-tax MARR, which equals the pre-tax MARR * (1 - tax rate). Here, it would be 0.20 * (1 - 0.34) = 0.132 or 13.2%.

Present Value (PV) =

[tex]\\$20,000 / (1+0.132)^1 + \\$\\22,000 / (1+0.132)^2 + \\$\\24,200 / (1+0.132)^3[/tex]

= $17,699.12 + $17,262.38 + $17,233.08 = $52,194.58

Therefore, the company can spend $52,194.58 now on a three-year RP software upgrade that will be depreciated with the SL method to zero over three years.

Read more on MARR here https://brainly.com/question/30645278

#SPJ4

Suppose that you saved $5,000 at the beginning of the year and that at the end of the year your savings account has $5.700 in it. What interest rate did you earn? 140 %

Answers

If I saved $5,000 at the beginning of the year and at the end of the year the savings account has $5.700 then the interest rate earned on the savings account is 14%.

To calculate the interest rate earned, we can use the formula for simple interest:

Interest = Final Amount - Initial Amount

The initial amount is $5,000 and the final amount is $5,700. Therefore, the interest earned is:

Interest = $5,700 - $5,000 = $700

To find the interest rate, we divide the interest earned by the initial amount and multiply by 100:

Interest Rate = (Interest / Initial Amount) x 100

Interest Rate = ($700 / $5,000) x 100

Interest Rate ≈ 0.14 x 100

Interest Rate ≈ 14%

Therefore, the interest rate earned on the savings account is approximately 14%.

Learn more about interest rates here:

https://brainly.com/question/28236069

#SPJ11

Pacific Coast Waterpark sells half of its tickets for the regular price of $65. The other half go to senior citizens and children for the discounted price of $45. Variable cost per guest is $10 for both groups, and fixed costs total $45,000 per month. What is Pacific Coast's breakeven point in total guests? Regular guests? Discount guests? A. 1,000;500;500 B. 1,052;526;526 C. 500;250;250 D. 692;346;346

Answers

The breakeven point for Pacific Coast Waterpark in terms of total guests is 692, with 346 regular guests and 346 discount guests. This is the point at which total revenue equals total costs, considering ticket prices, variable costs, and fixed costs. The correct answer is option D. 692;346;346

To determine Pacific Coast Waterpark's breakeven point in total guests, we need to calculate the number of guests at which the company's total revenue equals its total costs.

Given:

Regular ticket price: $65

Discounted ticket price: $45

Variable cost per guest: $10

Fixed costs: $45,000 per month

Let's denote the number of regular guests as RG and the number of discount guests as DG.

Total revenue = (Regular guests * Regular ticket price) + (Discount guests * Discounted ticket price)

Total costs = Variable cost per guest * (Regular guests + Discount guests) + Fixed costs

At the breakeven point, the total revenue equals the total costs:

(Regular guests * $65) + (Discount guests * $45) = ($10 * (Regular guests + Discount guests)) + $45,000

Simplifying the equation:

65RG + 45DG = 10(RG + DG) + 45,000

65RG + 45DG = 10RG + 10DG + 45,000

55RG + 35DG = 45,000

To solve for the breakeven point, we need to find the values of RG and DG that satisfy this equation. Let's solve it:

55RG + 35DG = 45,000

Divide both sides of the equation by 5:

11RG + 7DG = 9,000

Now we need to find whole number values of RG and DG that satisfy this equation. By testing different values, we find that the breakeven point is:

RG = 692

DG = 346

Therefore, the breakeven point in total guests is 692, the breakeven point for regular guests is 346, and the breakeven point for discount guests is also 346.

Hence, the correct option is D. 692; 346; 346.

Learn more about breakeven-point here;-

https://brainly.com/question/24233845

#SPJ11

In Cappelli’s article "Your Approach to Hiring is all Wrong," he asserts that one strategy to consider is a return to hiring from within (i.e., promotions). What advantages and disadvantages do you foresee if companies use this approach?
Knight’s article about reducing bias in hiring recommends that you "consider likeability" if it matters to you. Think about an interviewer whose input helps determine employee selection. Do you think allocating candidates a likeability score will make the likeability bias more controllable or do you think rating candidates on likeability will make the hiring process more biased? Explain.
A course that is a part of formal education resulting in a degree from a reputable institution is quite extensive and covers a great deal of material in the curriculum, some of which you may not need immediately. However, organizational training, according to Glaveski, should apply what he calls "lean learning." Where do you think the difference lies between University learning and company learning (or do you think there should be a difference)? Explain.
The text differentiates between training and development. Rogers, in her article discussing "a better way to develop and retain top talent," asserts that the most impactful development happens not through formal programs, but smaller moments that occur within the workplace. Do you agree? Explain.
Any additional comments. Based on these chapters and their associated additional readings, here you have the autonomy to raise any points you may have made in a face to face class (e.g., something that resonated with you because you experienced it, something that resonated with you because you read/heard a news story, something you wholeheartedly agree with and why, something you disagree with and why etc.).

Answers

In the article “Your Approach to Hiring is All Wrong”, Cappelli suggested that one of the approaches that companies should consider is returning to hiring from within the company. One of the main advantages of hiring from within is that employees are already familiar with the company culture, policies, procedures, and values, which makes the onboarding process quicker and easier.

It also creates a sense of loyalty and motivation among the existing employees, as they see that the company is providing growth opportunities for them. In addition, internal hiring can save companies money by reducing recruitment and training costs and ensuring that new hires are already familiar with the organization’s goals and strategies.

However, there are also some disadvantages associated with hiring from within. For example, it may lead to stagnation and limited innovation if the company is always hiring from the same pool of people. Moreover, if the company does not have a clear career path for employees, they may start looking for opportunities elsewhere.

Knight’s article suggests that likeability bias can be reduced in the hiring process by measuring the candidates’ likeability scores. However, rating candidates based on likeability may make the hiring process more biased, as it is subjective and may not provide a fair assessment of the candidate's qualifications and abilities.

Rather than measuring candidates’ likeability scores, it is better to focus on their relevant skills and experience and use standardized criteria for evaluating them.

The difference between university learning and company learning is that the former is more theoretical and general while the latter is practical and job-specific. Organizational training should apply lean learning by providing training that is focused on the most relevant skills and knowledge that employees need for their jobs. It should also be flexible, on-demand, and personalized to meet the individual needs and preferences of employees.

Rogers’ article suggests that development happens not only through formal programs but also through smaller moments that occur within the workplace. These moments can include feedback, coaching, mentoring, job rotations, and stretch assignments.

This approach is effective because it provides employees with opportunities to learn and grow in their jobs, which can lead to increased engagement, motivation, and productivity. Therefore, it is important for organizations to create a culture of continuous learning and development that encourages employees to learn from their experiences and challenges.

In conclusion, hiring from within can be a beneficial approach for companies, but it should be balanced with external hiring to promote innovation and diversity. Likeability bias can be reduced by using standardized criteria for evaluating candidates, and lean learning can be used to provide relevant and personalized training to employees.

Development can occur through smaller moments within the workplace, and organizations should foster a culture of continuous learning and development.

you can learn more about the article at: brainly.com/question/28927839

#SPJ11

True False QUESTION 27 Dividends received from an investee company are reported as investment income by the investor company when the investor does not control the investee. a) True. b) False.

Answers

The given statement is true. Dividends received from an investee company are reported as investment income by the investor company when the investor does not control the investee.

What is investment income?

Investment income is revenue earned by an individual or entity on the investment of funds.

Any interest, dividends, or capital gains generated by an investment are considered investment income.

When a company invests in another company that is not under its control, dividends received from that company are considered investment income and are recorded as such in the investing company's income statement.

However, if the investor has control over the investee, the dividends received are not treated as investment income, rather they are recorded under profit or loss in the income statement.

To know more on dividends visit:

https://brainly.com/question/28392301

#SPJ11

You are trying to decide how much to save for retirement. Assume you plan to save $6,500 per year with the first investment made one year from now. You think you can earn 11.0% per year on your investments and you plan to retire in 36 years, immediately after making your last $6,500 investment. a. How much will you have in your retirement account on the day you retire? b. If, instead of investing $6,500 per year, you wanted to make one lump-sum investment today for your retirement that will result in the same retirement saving, how much would that lump sum need to be? c. If you hope to live for 25 years in retirement, how much can you withdraw every year in retirement (starting one year after retirement) so that you will just exhaust your savings with the 25th withdrawal (assume your savings will continue to earn 11.0% in retirement)? d. If, instead, you decide to withdraw $494,000 per year in retirement (again with the first withdrawal one year after retiring), how many years will it take until you exhaust your savings? (Use trial-and-error, a financial calculator: solve for "N", or Excel: function NPER) e. Assuming the most you can afford to save is $1,300 per year, but you want to retire with $1,000,000 in your investment account, how high of a return do you need to earn on your investments? (Use trial-and-error, a

Answers

a. Amount in retirement account on the day of retirementGiven information is as follows:Initial Investment = $0Saving per year = $6,500Time period = 36 yearsInterest rate = 11%We will find the future value of annuity at the end of 36 years.FV = PMT * (((1 + r)^n - 1) / r) + PVHere,PMT = $6,500n = 36r = 11% / yearPV = 0After putting the given values in the above equation we get,FV = $150,225.46Therefore, amount in retirement account on the day of retirement = $150,225.46b.

Lump-sum investment for retirement We have to find out the amount of lump-sum investment made today which will be equal to saving $6,500 per year for 36 years and will result in the same retirement savings.Let’s find out the future value of annuity for a period of 36 years when the payment is made at the beginning of the period.FV = PMT * (((1 + r)^n - 1) / r)Here,PMT = $6,500n = 36r = 11% / yearAfter putting the given values in the above equation we get,FV = $1,775,457.58Therefore, lump-sum investment for retirement would be $1,775,457.58.c. Amount that can be withdrawn every year in retirementWe have to find out the amount that can be withdrawn every year in retirement if you hope to live for 25 years after retirement and so that you will just exhaust your savings with the 25th withdrawal.Let’s find out the present value of annuity for a period of 25 years where FV = $150,225.46.PV = FV / (((1 + r)^n - 1) / r)Here,FV = $150,225.46n = 25r = 11% / yearAfter putting the given values in the above equation we get,PV = $150,225.46 / (((1 + 11%)^25 - 1) / 11%)= $15,338.69Therefore, amount that can be withdrawn every year in retirement = $15,338.69d. Number of years it will take until you exhaust your savingsWe have to find out the number of years until you exhaust your savings if you decide to withdraw $494,000 per year in retirement. Let's assume the number of years as n.Let’s find out the future value of annuity for a period of n years where PV = $150,225.46.FV = PV * ((1 + r)^n - 1) / rHere,PV = $150,225.46r = 11% / yearAfter putting the given values in the above equation we get,$494,000 = $150,225.46 * ((1 + 11%)^n - 1) / 11%By solving the above equation, we get n = 6.97≈7Therefore, it will take 7 years to exhaust your savings.e. Rate of return needed to earn on investmentWe have to find out the rate of return that we need to earn on our investments to retire with $1,000,000 in our investment account by saving $1,300 per year.The future value of annuity is,FV = PMT * (((1 + r)^n - 1) / r)Here,PMT = $1,300n = 36r = ?FV = $1,000,000After putting the given values in the above equation we get,$1,000,000 = $1,300 * (((1 + r)^36 - 1) / r)By solving the above equation using trial and error method, we get r = 15.85%Therefore, we need to earn 15.85% return on our investment.

Learn more on investment here:

brainly.com/question/15105766

#SPJ11

a) Define the term 'business continuity management (BCM). b) Business Continuity Management (BCM) could potentially enhance rapid recovery of business and restore the organization's critical functions as well as minimise the impacts of disruption/disaster. There are five (5) components of BCM cycle namely: understanding risks and impacts; sharing BCM strategy; developing BCM plan; implementation of BCM and; monitoring and improving BCM. Using relevant examples, discuss all five (5) of these components.

Answers

a) Business Continuity Management (BCM)Business Continuity Management (BCM) is the process that helps organizations to prepare for, respond to, and recover from significant disruptive events.

BCM is a framework that guides an organization in developing plans, procedures, and processes that will enable it to continue operating or to restore normal operations quickly in the event of a disruption. This framework should be developed with the organization's goals and objectives in mind, and it should be integrated with the organization's overall risk management strategy. b) The five (5) components of BCM cycle are given below: Understanding Risks and Impacts: The first component of the BCM cycle is to understand the risks and impacts that may affect the organization. Organizations should identify the potential risks that could impact their business and determine how these risks may affect their operations. For example, a company in an area prone to natural disasters such as hurricanes and floods should prepare for such events by having a contingency plan in place.

To know more about company refer :

https://brainly.com/question/26775900

#SPJ11

Format: Write a solid paragraph for each section
Section 1: What does it mean to characterize railroads as socio-technical systems? (Hint: probably best to define the term, then walk me through specific details/examples. The book is helpful here, but don't just copy/paste--tell me in your own words)
Section 2: Are cell phones an example of a socio-technical system? Why of why not. (Details are your friend here btw)

Answers

Section 1: Characterizing Railroads as Socio-Technical Systems

A socio-technical system refers to a complex combination of social and technical elements that interact and influence each other within a specific context. When applying this concept to railroads, it recognizes that rail systems involve not only the physical infrastructure and technological components but also the human and social aspects that shape their functioning. Railroads are not simply a network of tracks and trains; they are intertwined with social, economic, and cultural systems.

From a technical perspective, railroads consist of physical infrastructure such as tracks, trains, signals, and control systems. These technical elements enable the movement of goods, passengers, and information. However, railroads are equally shaped by social factors. For example, they require skilled labor for operation, maintenance, and management. Human operators, engineers, and workers are integral to the system's functioning.

Railroads also have broader societal impacts. They have influenced urban development, trade, and economic growth. They have played a role in shaping communities, connecting regions, and facilitating social interactions. Railroads have shaped cultural practices, such as the development of train travel as a mode of tourism or the influence of railways on literature and art.

Overall, characterizing railroads as socio-technical systems recognizes the interplay between technical and social elements. It acknowledges that the effectiveness and success of rail systems depend not only on the technological infrastructure but also on the people, institutions, and broader social contexts in which they operate.

Section 2: Cell Phones as a Socio-Technical System

Cell phones can be considered as examples of socio-technical systems due to their combination of technical components and social interactions. On the technical side, cell phones comprise various hardware and software elements, including the device itself, operating systems, processors, wireless communication technologies, and applications. These technical components enable voice calls, messaging, internet access, and a multitude of other functions.

However, what distinguishes cell phones as socio-technical systems is their inherent connection to social aspects. Cell phones have become deeply integrated into our daily lives and have influenced the way we communicate, interact, and conduct various activities. They have transformed social behaviors, relationships, and societal structures.

Cell phones facilitate communication and social connections, enabling instant and widespread connectivity. They have revolutionized the way we communicate by providing features like voice calls, text messaging, and social media applications. Cell phones have reshaped social interactions, allowing individuals to stay connected regardless of their physical location. They have also impacted social norms, etiquette, and privacy considerations.

Moreover, cell phones have influenced various aspects of society, including business practices, healthcare, education, and entertainment. They have opened up new opportunities for e-commerce, remote work, telemedicine, distance learning, and mobile gaming. Cell phones have become tools for accessing information, entertainment, and services, impacting both individuals and broader social systems.

In conclusion, cell phones exemplify socio-technical systems due to their amalgamation of technical components and their transformative impact on social interactions and broader societal structures. They demonstrate the intricate relationship between technology and society, showcasing how the two aspects co-evolve and shape each other in the context of mobile communication.

To learn more about solid paragraph refer to this url:-

brainly.com/question/33103271

#SPJ11

Other Questions
Identify what type of gain or loss would be generated by thesale or exchange of thefollowing assets (i.e. ordinary, capital, or Sec. 1231)a. real estate lots sold by a developer __________________ If a $500 bond bearing 12% semi-annual coupons is purchased at 97.5 and is redeemable at 102 in 4 years time, what is the approximate yield rate? A building with an appraisal value of $129,224 is made available at an offer price of $151,536. The purchaser acquires the property for $36,750 in cash, a 90-day note payable for $24,773, and a mortgage amounting to $50,636. The cost basis recorded in the buyer's accounting records to recognize this purchase isa.$151,536b.$112,159c.$114,786d.$129,224 Profit maximization is not an adequate goal of the firm when making financial decisions because:a. it does not necessarily reflect shareholder wealth maximization.b. it ignores the risk inherent in different projects that will generate the profits.c. it ignores the timing of a projects returns.d. all of the above are correct.e. None of the above 1. The look back period for fraudulent transfers in a bankruptcy case is 2 years. Do you think this period is too long or too short? Why?2. Do you think there are many fraudulent transfers by debtors prior to filing their bankruptcy petitions? What items and assets are likely to be involved in fraudulent transfers prior to bankruptcy?3. Why do you think an attorney certification is required? What are some ways an attorney can perform due diligence on its client in a bankruptcy representation matter? Frontier Amusements Corporation had the following stockholders' equity on November 30: EEB (Click the icon to view the stockholders' equity.) On December 30, Frontier purchased 125 shares of treasury stock at $13 per share. Requirements 1. Journalize the purchase of the treasury stock. 2. Prepare the stockholders' equity section of the balance sheet at December 31, 2016. Assume the balance in retained earnings is unchanged from November 30. 3. How many shares of common stock are outstanding after the purchase of treasury stock? Requirement 1. Journalize the purchase of the treasury stock. (Record debits first, then credits. Select the explanation on the last line of the journal entry table.) Date Accounts and Explanation Debit Credit Dec. 30 Mullineaux Corporation has a target capital structure of 75 percent common stock and 25 percent debt. Its cost of equity is 14 percent, and the cost of debt is 8 percent. The relevant tax rate is 35 percent. What is the companys WACC? (Do not round intermediate calculations and enter your answer as a percent rounded to 2 decimal places, e.g., 32.16.) An ice cream business is paying an effective tax rate of 25%. The company is considering the purchase of a new turbo churn for $25,000. This churn is a special handling device for food manufacture and has an estimated life of 4 year and a salvage value of $5,000. The new churn is expected to increase net income by $8,000 per year for each of the 4 years of use. If the ice cream company works with an after tax MARR of 10% and uses 3 -year MACR depreciation, should the company buy the churn? Consider after-tax net present worth analysis. How do I create an opening Balance sheet with the following transactions for a new partnership?Alva contributes cash $50.00 and land with FMV of $200. Todd contributes a note to partnership for $50 payable in 5 years at the AFR, a note owed to him and equipment with a basis of $75 and FMV of $100? Students are expected to have a good experience in Engineering Economics and be able to answer the following questions: Q1 (ILOs Measured: A1, B1, C1, D1) [5 Marks] Students are required to solve the Case Studies of Fixed and Variable Cost Behavior for Harpers Inc., Fixed cost/ Variable Cost covered in topics covered in the course. Case Study 1- Fixed cost/ Variable Cost Case Study Fixed and Variable Cost Behavior Harpers Inc. has a construction depot. Constructing the depot is the responsibility of the manufacturing department. Two of the resources needed to construct the depot are labor and building supplies. The cost driver for both resources is square feet built. Depot building laborers are paid the same wages regardless of the number of times the depot is built. Building supplies is a variable cost. A standard 45,000 square foot plant is built from four to eight times a month, depending on the level and stage of manufacturing. For the most recent month, June, four depots were built. The June cost of labor was $30,000, and building supplies used to cost $9,500. The manufacturing schedule for the next quarter (July through September) indicates a depot has to be built five, six, and eight times respectively. Requirements for Fixed cost/ Variable Cost In Excel 1. Prepare a table that shows how labor cost, building supplies Cost, total Cost, and total cost per square feet-built changes in response to the square feet built. For example, what is the predicted total cost of depot building for the next quarter? 2. Suppose Harpers can hire an outside manufacturing company to build the depot as needed. The charge rate for the building is $6,100 per depot. If the outside manufacturing company is hired, Harpers can lay off the workers who are now building the depot and will spend nothing on building supplies. Will Harpers save money with the outside manufacturing company over the next quarter? Prepare a schedule that supports your answer. 3. Create a line chart that reflects the Total Building Costs and Square Feet (Number of De the two options (Harpers vs. Outside Company). Must be properly labeled and on one chart. 4. At what level of activity (SqFt built) will the two options be equal? built) for The following graph displays four supply curves (HH, II, JJ, and KK) that intersect at point A.Using the graph, complete the table that follows by indicating whether each statement is true or false. Kay 5 adia soid merchandise for $8,350 subject to a 8% sales tax. The entry in the general journal will inciude a debit to Accounts Recervabie for: Mulipio Cheice $8,350,00 $7.849.00 39.01800. $8.34400 0.17 of 1 Save An archer is able to hit a bulls-eye 80% of the time. Assume each shot is independent of the others. Suppose this archer shoots 12 arrows. Complete parts a through e below. a) Find the mean and standard deviation of the number of bull's eyes she may get The meanis 10.32 (Round to two decimal places as needed.) The standard deviation is (Round to two decimal places as needed.) 16 100 Mom The Partnership has the following operating transactions:1. it earns $600 of ordinary income under Section 702(a)(8)2. The Partnership receives $100 of bond interest, tax exempt under Section 1033. The company recognizes a $40 capital loss, but Alva's deduction for the loss is disallowed under Section 1211, and Buck's is fully deductible,The company incurs $20 of nondeductible and noncapitalized expenses described in Section 705(a)(2)(B). (1 point) If 7 u = (5, 1, 5) and 7 w = 3, find tan(0), where is the angle between 7 and w. tan(0) = = Reconsider a depreciation of Euro (relative to US dollar) from $1.20/ to $1.08/. Now assumepassthrough =0.8. What is Dell's total profit in $? $12,028,410 $11,869,440 $11,137,417 $6,397,440 Find the yield to maturity (YTM) for a 15-year, 8% annual coupon rate, and $1,000 par value bond if the bond sells for $1,208 currently? We assume that interest is paid on this bond semiannually.a.5.89%b.6.84%c.7.55%d.8.72% Suppose that and g are continuous functions such that (7) = 9 and lim[(x) +7g(x)] = 16. Find x7 (a) g(7): (b) lim g(x): x7 1) To determine: The budgeted fixed manufacturing overhead rate per barrel for each of the denominator-level capacity concepts Denominator level Budgeted fixed overhead per period (a) Days of production per period (b) HourView the full answeranswer image blurTranscribed image text: Zing Lager has just purchased the Chicago Brewery. The brewery is 2 years old and uses absorption costing. It will "sell" its product to Zing Lager at $44 per barrel. Peter Bryant, Zing Lager's controller, obtains the following information about Chicago Brewery's capacity and budgeted fixed manufacturing costs for 2020: (Click the icon to view the information.) Read the requirements. Requirement 1. Compute the budgeted fixed manufacturing overhead rate per barrel for each of the denominator-level capacity concepts. Explain why they are different. Begin by determing the formula to calculate the budgeted fixed manufacturing overhead rate per barrel, then compute the rate for each of the denominator-level capacity concepts. (Abbreviations used: Budg. = budgeted, MOH = manufacturing overhead. Round the rates to the nearest cent.) Requirements 1. Compute the budgeted fixed manufacturing overhead rate per barrel for each of the denominator-level capacity concepts. Explain why they are different. 2. In 2020, the Chicago Brewery reported these production results: A 12 Beginning inventory in barrels, 1-1-2020 13 Production in barrels B 14 Ending inventory in barrels, 12-31-2020 15 Actual variable manufacturing costs 0 2,640,000 180,000 $ 79,464,000 $ 26,900,000 16 Actual fixed manufacturing overhead costs There are no variable cost variances. Fixed manufacturing overhead cost variances are written off to cost of goods sold in the period in which they occur. Compute the Chicago Brewery's operating income when the denominator-level capacity is (a) theoretical capacity, (b) practical capacity, and (c) normal capacity utilization. Budeated Fixed = MC X Data table B Budgeted Fixed Manufacturing 1 Denominator-Level Capacity Concept Overhead per Period 28,300,000 28,300,000 28,300,000 Theoretical capacity Practical capacity 4 Normal capacity utilization 5 6 Master-budget capacity utilization for each half year: (a) January-June 2020 7 (b) July-December 2020 $ $ $ $ $ Print 14,150,000 14,150,000 Done 176 176 C D Days of Hours of Production Production Barrels per per Period per Day 360 352 Hour 530 500 352 395 24 20 20 E 20 20 - X 310 480 #1. Give 1 example each of a type of question you asked/ or could have asked that would cover Demographics, Psychographic, and Geographic.#2. Give an example of how a great question you asked (or anyone else) will help you shape your business. How did the right question and answer help you to understand want they want and what you can do to provide it