There are four critical paths in a network. A-B-C-D- E, A-F-E, A-B-H-J-K-E and A-S-T-E. Each activity in this network can be crashed by a maximum of 3 weeks. The crashing cost (per week), for the first week (crashing first time), for activity A is: $580, E is $595 and all other activities is : $145 (per week per activity). The crashing cost, second week and onwards(crashing second time), for activity A is $1450 per week, E is $1740 per week and for all other activities is $290 per activity per week. You have a maximum crashing budget of $3630. The maximum possible reduction in the project duration will be: O a. 3 weeks O b. 2 week O c. 6 weeks O d. 4 weeks O e. 5 weeks

Answers

Answer 1

The maximum possible reduction in the project duration will be 4 weeks.

To determine the maximum possible reduction in the project duration, we need to analyze the critical paths in the network and the crashing cost of each activity. The crashing cost for the first week is $580 for activity A, $595 for activity E, and $145 for all other activities. The crashing cost for the second week and onwards is higher.

Given a crashing budget of $3630, we can allocate it strategically to crash the activities along the critical paths. By selecting the most cost-effective activities, we can reduce the project duration by a maximum of 4 weeks, optimizing the crashing cost within the budget constraints.

Learn more about maximum possible reduction here:

https://brainly.com/question/33040839

#SPJ11


Related Questions

you invest in a project that will pay you $500 per year for 5 years and then $750 per year for the following 10 years (payments are made at the end of the year). you require a 6% rate of return on this type of investment. given your required return, what is the maximum amount you would be willing to pay today for the cash flow stream associated with this project?

Answers

The maximum amount you would be willing to pay today for the cash flow stream associated with this project, considering a required rate of return of 6%, is approximately $902.13.

We can calculate the present value of each cash flow using the formula for the present value of an annuity:

Present Value = Cash Flow / (1 + r)ⁿ

where r is the required rate of return and n is the number of years.

Calculating the present value for each cash flow:

PV1 = $500 / (1 + 0.06)⁵

PV1 ≈ $500 / 1.338225

PV1 ≈ $373.57

PV2 = $750 / (1 + 0.06)⁶

PV2 ≈ $750 / 1.418519

PV2 ≈ $528.56

Next, we calculate the present value of the cash flow stream by summing the present values of the individual cash flows:

Present Value = PV1 + PV2

Present Value ≈ $373.57 + $528.56

Present Value ≈ $902.13

Therefore, the maximum amount you would be willing to pay today for the cash flow stream associated with this project, considering a required rate of return of 6%, is approximately $902.13.

To know more about cash flow :
https://brainly.com/question/27994727

#SPJ4

By taking an example of your organisation or an organisation of your choice, evaluate the effectiveness of the benefits and incentives schemes practised by the organisation to attract, motivate and retain talents.

Answers

We use the Malaysian manufacturing company as an example because they implement a proper award system and give their employees growth opportunities through training and development programs. This encourages them to complete their work on time and also boosts the company's profitability because it attracts more customers.

The discipline of engineering known as "manufacturing company" is responsible for planning and streamlining the procedures that turn raw materials into finished goods. The product design and material requirements are the first steps in the production process. The final product is created by manufacturing these materials into different forms.

All intermediate steps in the manufacture and integration of a development programs components are included in modern manufacturing. Instead, the word fabrication is used in some businesses, such those that create semiconductors and steel.

Learn more about manufacturing company, from :

brainly.com/question/32460282

#SPJ4

Although task conflict can degenerate into relationship conflict, it is easy to prevent this from happening. a. True
b. False

Answers

The given statement "Although task conflict can degenerate into relationship conflict, it is easy to prevent this from happening." is false.

While task conflict can potentially escalate into relationship conflict, it is not always easy to prevent this from happening. Task conflict refers to disagreements and differences of opinion related to the task or work at hand, while relationship conflict involves personal conflicts and negative emotions among individuals.

While it is possible to manage and mitigate task conflict through effective communication, collaboration, and conflict resolution strategies, preventing it from escalating into relationship conflict requires proactive efforts, such as fostering a positive work environment, promoting open and respectful communication, and addressing conflicts promptly and constructively.

Without proper management and intervention, task conflict can indeed lead to relationship conflict, which can be detrimental to team dynamics and organizational performance.

So, the given statement is false.

Learn more about task conflict:

https://brainly.com/question/29979741

#SPJ11

What are the 6 principles of American public budgeting and
finance? Please be specific in your answer.

Answers

The six principles of American public budgeting and finance are as follows:1. Accountability: This principle relates to the measures taken by public officials and organizations to ensure that the government's financial resources are being used in a transparent and responsible manner.

Public officials should be held accountable for their actions and must maintain strict control over public funds.2. Participation: This principle ensures that all citizens have the right to participate in the budgetary process. The government should provide information to the public about how public funds are being used and encourage citizens to participate in budget planning

Flexibility: This principle requires that budgets be flexible and adaptable to changing circumstances.4. Efficiency: This principle requires that the government use resources in an efficient manner. This involves minimizing costs and maximizing the value of public services.5. Effectiveness: This principle ensures that the government uses its resources effectively to achieve its objectives. ublic officials to be innovative in their approaches to budgeting and finance. This involves exploring new ideas and methods for delivering public services in a cost-effective and efficient manner.

To Know more about budgeting visit:

brainly.com/question/32506173

#SPJ11

Using these factors of choice: Project • Convenience for customers • Attractiveness of building Nearness to raw materials • • Large amounts of power • Pollution controls • Labor cost and Availability • Transportation costs • Construction costs Choose one sector among the following one: Restaurants • Automotive . ITC • Airplanes • Real Estate • Pharmacy And determine where the best place is to establish a new company among these 10 cities: 1. Madrid 2. Istanbul 3. Johannesburg 4. Buenos Aires 5. Hanoi 6. Tokyo 7. Prague 8. Toronto 9. Mexico City 10. Rio de Janeiro Explain your choice using 500 words

Answers

When it comes to establishing a new company in a particular city, various factors need to be taken into account, including proximity to raw materials, labor costs, transportation costs, construction costs, availability of labor, attractiveness of building, pollution controls, convenience for customers, and large amounts of power.

The automotive industry is chosen to establish a new company in the city of Tokyo among these 10 cities, which is well-known for its automobile industry and offers excellent potential for businesses in this sector. The city provides adequate transportation links and has a strong manufacturing sector that can support the needs of the industry. Moreover, it offers a stable economy, excellent infrastructure, high-quality labor, and a favorable business climate. These conditions make it a good location for establishing an automotive company. Furthermore, the Japanese government offers incentives to investors who establish manufacturing companies in Tokyo.

The city offers several benefits, including a highly skilled workforce, excellent infrastructure, and an attractive business environment. Moreover, Tokyo is known for its excellent quality of life and relatively low crime rates. This factor will help to attract the right kind of talent for the company and create a good working environment.The city's strong economic performance, together with its supportive business environment, has been a significant driver for attracting new investment. The Japanese government offers a range of incentives, such as subsidies, tax exemptions, and low-interest loans, to attract investors.

To know more about infrastructure visit:

https://brainly.com/question/32687235

#SPJ11

If the marginal propensity to save (MPS) equals 0.75 and the government increases spending by $300 billion, the total impact on GDP will be approximately: a) $400 billion. b) $75 billion. c) $1,200 billion. d) $225 billion. e) -$225 billion.

Answers

If the marginal propensity to save (MPS) equals 0.75 and the government increases spending by $300 billion, the total impact on GDP will be approximately $400 billion. A is the correct option .

The total impact on GDP can be calculated using the formula for the expenditure multiplier, which is equal to 1 divided by the marginal propensity to save (MPS). In this case, the MPS is 0.75, so the expenditure multiplier is 1/0.75 = 4/3.

To determine the impact on GDP, we multiply the increase in government spending ($300 billion) by the expenditure multiplier (4/3):

Total impact on GDP = $300 billion * (4/3) = $400 billion.

Therefore, the total impact on GDP will be approximately $400 billion. This corresponds to option (a) in the given choices.

To learn more about GDP, click here:

brainly.com/question/31199521

#SPJ11

On January 1, 2024, Pet Friendly Stores adopted the retail inventory method. Inventory transactions at both cost and retail, and cost indexes for 2024 and 2025 are as follows:
024 2025 Cost Retail Cost Retail Beginning inventory $ 162,500 $ 250,000 Purchases 800,000 1,084,000 $ 680,000 $ 1,063,000
Purchase returns 7,000 12,150 2,000 4,300
Freight-in 12,500 2,000 Net markups 6,900 11,800
Net markdowns 4,750 8,000
Net sales to customers 950,000 722,000
Sales to employees (net of 25% discount) 22,500 22,500
Normal spoilage 4,200 6,900
Price Index: January 1, 2024 1.00 December 31, 2024 1.25 December 31, 2025 1.25 Required:
2. Estimate the 2024 ending inventory and cost of goods sold using the average cost retail method.
Note: Round your cost-to-retail percentage to 2 decimal places and round your final answers to nearest whole dollar.
3. Estimate the 2024 ending inventory and cost of goods sold using the conventional retail method.
Note: Round your cost-to-retail percentage to 2 decimal places and round your final answers to nearest whole dollar.

Answers

Average Cost Retail Method to estimate 2024 ending inventory and cost of goods sold.

The Average Cost Retail method is used to calculate the inventory by taking the average cost of all goods available. The inventory is then multiplied by the percentage of total sales in retail prices to calculate the cost of goods sold. Here's how to calculate the ending inventory and cost of goods sold:

Cost-to-Retail Percentage for 2024= Cost of Goods Available for Sale at Cost / Goods Available for Sale at Retail Cost-to-Retail Percentage for 2024 = ($1,015,650/$2,879,150) = 35.22%Average Cost Per Unit = Cost of Goods Available for Sale at Cost / Goods Available for Sale at Retail Average Cost Per Unit = $1,015,650 / $2,879,150 = $0.3522Ending Inventory = Goods Available for Sale at Retail × (1 - Cost-to-Retail Percentage)Ending Inventory = $3,169,550 × (1 - 0.3522) = $2,056,159Cost of Goods Sold = Goods Available for Sale at Retail × Cost-to-Retail Percentage

Cost of Goods Sold = $3,169,550 × 0.3522 = $1,118,835

Ending inventory = $2,056,159; Cost of goods sold = $1,118,8353. Conventional Retail Method to estimate 2024 ending inventory and cost of goods sold.

The Conventional Retail Method is a method used to estimate the cost of goods sold and the ending inventory. Here's how to calculate the ending inventory and cost of goods sold:

Calculate the Ending Inventory:

Markup Percentage = Net Sales – Cost of Goods Sold / Cost of Goods Sold

Markup Percentage = ($950,000 - $664,500) / $664,500

Markup Percentage = 43.17%

Retail Value of Ending Inventory = Goods Available for Sale at Retail - Sales - Normal Spoilage - Markdowns

Retail Value of Ending Inventory = $2,879,150 - $950,000 - $4,200 - $8,000

Retail Value of Ending Inventory = $1,917,950

Cost of Ending Inventory = Retail Value of Ending Inventory × Cost-to-Retail Percentage

Cost of Ending Inventory = $1,917,950 × 35.22%

Cost of Ending Inventory = $674,855

Calculate the Cost of Goods Sold:

Goods Available for Sale at Cost - (Goods Available for Sale at Retail × Cost-to-Retail Percentage) = Cost of Goods Sold$1,015,650 - ($2,879,150 × 35.22%) = $664,500

Ending inventory = $674,855; Cost of goods sold = $664,500

Learn more about Average Cost Retail method: https://brainly.com/question/29440995

#SPJ11

Angelo works as an engineer earning a salary of $120 000 per year (after taxes). He has been thinking about taking a one-year leave of absence from his job to volunteer with an environmental nonprofit organization in Australia. The $3 500 round trip cost of travelling to Australia would have to be paid by Angelo. While volunteering, his living expenses would fall by $300 per month as the organization is willing to pay part of the expenses. What would be the opportunity cost of volunteering for one year if we consider only monetary costs and not any intrinsic value of the experience to Angelo?

Answers

The opportunity cost of volunteering for one year, considering only monetary costs, would be $119,900.

The opportunity cost of volunteering for one year, considering only monetary costs, can be calculated as follows:

Opportunity cost = Salary foregone + Travel cost - Reduction in living expenses

Salary foregone = $120,000

Travel cost = $3,500

Reduction in living expenses = $300/month * 12 months = $3,600

Opportunity cost = $120,000 + $3,500 - $3,600

Opportunity cost = $119,900

Therefore, the opportunity cost of volunteering for one year, considering only monetary costs, would be $119,900.

Learn more about Monetary costs here

https://brainly.com/question/31180735

#SPJ11

Simple Inc. had sales of $1,500,000, including: $30,000 of goods sold that were on consignment from an unrelated company on December 28, 2021 $10,000 of goods shipped F.O.B shipping point on December 28, 2021. $20,000 of goods shipped F.O.B. destination point on December 31, 2021. On its income statement, what amount of net sales should Simple Inc. record for 2021? O a. $1,470,000 O b. $1,490,000 O c. $1,440,000 O d. $1,480,000 ☀

Answers

Simple Inc. should record net sales of $1,490,000 on its income statement for 2021.

To calculate the net sales, we need to consider the different types of sales and their specific terms.

Given the information provided:

Sales of goods sold on consignment: $30,000

Goods shipped F.O.B. shipping point: $10,000

Goods shipped F.O.B. destination point: $20,000

Total sales: $1,500,000

Consignment sales are not considered as Simple Inc.'s own sales because the goods are on consignment from an unrelated company. Therefore, the $30,000 of goods sold on consignment should be excluded from the net sales calculation.

F.O.B. shipping point indicates that the ownership of the goods transfers to the buyer at the shipping point. Hence, the $10,000 of goods shipped F.O.B. shipping point should be included in the net sales.

F.O.B. destination point indicates that the ownership of the goods transfers to the buyer at the destination point. Therefore, the $20,000 of goods shipped F.O.B. destination point should not be included in the net sales because the ownership transfer occurred after the end of the year (December 31, 2021).

To calculate the net sales, we subtract the excluded consignment sales and include the F.O.B. shipping point sales:

Net sales = Total sales - Consignment sales + F.O.B. shipping point sales

Net sales = $1,500,000 - $30,000 + $10,000

Net sales = $1,480,000

Thus, Simple Inc. should record net sales of $1,490,000 on its income statement for 2021.

To learn more about net sales, click here brainly.com/question/28729600

#SPJ11

A bond is sold at , if the YTM (yield to maturity) is the coupon rate.
A) par; less than. B) par; higher than. C) premium; equal to. D) premium; higher than. E) discount; higher than.

Answers

A bond is sold at discount if the YTM (yield to maturity) is higher than the coupon rate. This is because the bond is offering a coupon payment that is less than the yield to maturity. Hence, it will be sold at a discount. Want to learn more about bonds Bonds are essentially IOUs issued by governments and corporations.

The investor loans a certain amount of money to the bond issuer, who promises to pay interest on the money at specific intervals and then repay the initial investment at the end of the bond's term. The bond’s yield to maturity (YTM) is the total return anticipated on a bond if it is held until it matures.

Yield to maturity includes all interest income, plus any gain or loss on the bond if it is held until it matures. The coupon rate is the interest rate that the bond issuer pays to the bondholders as the bond's fixed interest rate. When a bond's coupon rate is equal to the YTM, the bond will be sold at par because its price will be equivalent to its face value.

When the coupon rate is less than the YTM, the bond will be sold at a discount. On the other hand, when the coupon rate is greater than the YTM, the bond will be sold at a premium. Therefore, a bond is sold at discount if the YTM (yield to maturity) is higher than the coupon rate, which is option E.

To know more about corporations visit:

https://brainly.com/question/32217998

#SPJ11

In January, Sheila decided she needs a new truck. She only drives F-250 Ford pickups. Sheila, and probably many other consumers, know that Ford Truck Month occurs in February and March of each year, so they decide to wait a month buy a new Ford. Identify the appropriate changing non-price determinant(s) and draw a market graph to illustrate what happens in the market for Ford F-250 pickups in January. 1. Draw your own graph on a piece of paper (don't download a graph from the internet). 2. Clearly label all axes, lines and equilibriums. Include all relevant information.

Answers

According to the question Consumer expectation of Ford Truck Month in February and March, leading to a delay in purchases, is the changing non-price determinant affecting the market for Ford F-250 pickups in January.

In January, consumer expectation of Ford Truck Month occurring in February and March acts as the changing non-price determinant in the market for Ford F-250 pickups. As consumers, including Sheila, anticipate discounts and incentives during Ford Truck Month, they delay their purchase decisions.

This anticipation leads to a decrease in demand for Ford F-250 pickups in January. Graphically, this can be illustrated by shifting the demand curve to the left, indicating a decrease in quantity demanded at each price level.

The new equilibrium point reflects a lower quantity demanded and potentially a lower price. The anticipation of Ford Truck Month influences consumer behavior and market dynamics in January.

To know more about anticipate visit-

brainly.com/question/32913923

#SPJ11

Using ___________ is a visual way to establish one-on-one connections with individual members of the audience while delivering a presentation.
______ is the best way to do an excellent job during a presentation.

Answers

Using eye contact is a visual way to establish one-on-one connections with individual members of the audience while delivering a presentation. Eye contact is a vital aspect of public speaking and can significantly influence how effectively a presentation is conveyed to the audience. When delivering a presentation, maintaining eye contact can improve the speaker’s connection with the audience and boost the audience's engagement.

It allows the speaker to identify which members of the audience are engaged, to keep the audience alert, and, most importantly, to demonstrate confidence and command over the material.One of the best ways to do an excellent job during a presentation is by practicing and being prepared. A good presentation is a result of planning and preparing adequately.

In addition to that, practicing in front of a mirror or a group of people can significantly improve the delivery of the presentation. Also, creating clear and concise notes or slides can make the delivery of the presentation more efficient, organized, and understandable to the audience. Finally, using engaging visuals, such as graphs, charts, and diagrams, and audio or video clips can make the presentation more memorable and engaging to the audience. A well-prepared presentation can help the speaker deliver a better performance and achieve their goals of informing, entertaining, and persuading the audience.

Learn more about Eye contact here,eye contact serves which of the following functions in western cultures? (choose every correct answer.)

https://brainly.com/question/31851740

#SPJ11

An investor is considering the purchase of a(n) 7.250 %. 18-year corporate bond that's being priced to yield 9.250%. She thinks that in a year, this bond will be priced in the market to yield 8.250%. Using annual compounding, find the price of the bond today and in 1 year. Next, find the holding period return on this investment, assuming that the investor's expectations are bome out. The price of the bond today is $420.91 (Round to the nearest cent.)

Answers

Corporate bond Price = (Coupon Payment / (1 + Yield/100)^1) + (Coupon Payment / (1 Yield/100)^2) + ... + (Coupon Payment + Face Value / (1 + Yield/100)^n)

Where:

Coupon Payment = Annual coupon payment

Yield = Yield to maturity

n = Number of years

Given information:

Coupon Payment = 7.250% of the Face Value

Yield to maturity = 9.250%

Face Value = $100 (Assuming a face value of $100 for simplicity)

a. Price of the bond today:

Using the provided yield to maturity of 9.250% and 18-year maturity:

Price today = (7.250 / (1 + 9.250/100)^1) + (7.250 / (1 + 9.250/100)^2) + ... + (7.250 + 100 / (1 + 9.250/100)^18)

Price today = (7.250 / (1.0925)^1) + (7.250 / (1.0925)^2) + ... + (7.250 + 100 / (1.0925)^18)

Evaluating the above expression will give us the price of the bond today.

Using the provided price of the bond today as $420.91, we can check if it matches the calculated price.

b. Price of the bond in 1 year:

Using the expected yield of 8.250% in 1 year:

Price in 1 year = (7.250 / (1 + 8.250/100)^1) + (7.250 / (1 + 8.250/100)^2) + ... + (7.250 + 100 / (1 + 8.250/100)^18)

Price in 1 year = (7.250 / (1.0825)^1) + (7.250 / (1.0825)^2) + ... + (7.250 + 100 / (1.0825)^18)

Evaluating the above expression will give us the price of the bond in 1 year.

c. Holding Period Return:

The holding period return is the total return earned from an investment over a specific period, including both capital gains and coupon payments.

Holding Period Return = (Price in 1 year - Price today + Coupon Payments) / Price today

We can calculate the holding period return using the calculated prices and the coupon payment of the bond.

Learn more about Corporate bond here

https://brainly.com/question/31532990

#SPJ11

At what stage of the new product development process are product ideas most likely to be rejected? A. Idea screening B. Market testing с. Idea generation D. Commercialisation

Answers

By rejecting unsuitable ideas early on, resources can be focused on developing and refining ideas that have a higher chance of success. Therefore, idea screening plays a crucial role in ensuring that only viable and promising product ideas progress further in the development process(Option A).

At the idea screening stage of the new product development process, product ideas are most likely to be rejected. Idea screening is the process of evaluating and filtering product ideas to determine their feasibility and alignment with the organization's goals and resources.

During this stage, the ideas are evaluated based on various criteria such as market potential, technical feasibility, profitability, and strategic fit. Ideas that do not meet the predetermined criteria or fail to align with the company's objectives are typically rejected at this stage to focus resources on more promising ideas. Therefore, option A, Idea screening, is the correct answer.

To know more about development process:

https://brainly.com/question/15019597
#SPJ11

Explain how has international trade has grown and what are some of the drivers (competition, market, technology) to the importance of international trade.
Expert Answer

Answers

International trade refers to the exchange of goods and services across borders. In recent years, international trade has grown significantly due to various factors, including competition, market, and technology.

Competition: Competition has driven international trade by creating opportunities for businesses to expand their operations into new markets and access new customers. Competition has increased due to the global economy, and businesses have realized that international trade can provide significant opportunities for growth and increased profitability.

Market: The market is another driver of international trade. Global markets are becoming more integrated, and businesses are looking to expand their reach and tap into new markets to increase their revenue. This has led to an increase in international trade as businesses seek to establish a presence in new markets.

Technology: Technology has also played a significant role in the growth of international trade. Advances in technology have made it easier for businesses to communicate, conduct transactions, and move goods across borders. The internet has made it easier for businesses to access information about international markets, find potential customers, and promote their products and services.

International trade has become increasingly important due to the many benefits it offers, including access to new markets, increased revenue, and the opportunity to expand operations. As the global economy continues to grow, international trade is expected to continue to play an essential role in the growth and success of businesses around the world.

To know more about International trade:

https://brainly.com/question/13650474


#SPJ11

Q1. Briefly Describe the 10 Characteristics of a servant leader with one example of each characteristic.
- Include two citations
- double space your assignment according to APA
- Have a title page
- Reference page.
-Write in paragraph form

Answers

Servant leadership is a leadership style that focuses on serving others before considering personal goals and objectives. According to Greenleaf (2017), servant leadership is characterized by ten characteristics.

These are listening, empathy, healing, awareness, persuasion, conceptualization, foresight, stewardship, commitment to the growth of people, and building community. This essay will discuss each characteristic, providing an example for each.  
1. Listening: A servant leader actively listens to the people they lead. They pay attention to the needs of others and put the needs of others above their own. An example of listening is when a teacher listens to the needs of their students and adjusts their teaching methods to meet those needs. 
2. Empathy: A servant leader is empathetic towards the people they lead. They have the ability to see things from the perspective of others and understand their feelings. An example of empathy is when a manager provides support to an employee who is going through a difficult personal situation. 
3. Healing: A servant leader has the ability to heal emotional wounds. They care for the well-being of others and take steps to help those who are hurting. An example of healing is when a nurse provides emotional support to a patient who is recovering from surgery. 
4. Awareness: A servant leader is self-aware and aware of the environment around them. They have the ability to pick up on cues and respond appropriately. An example of awareness is when a police officer recognizes when someone is in distress and takes action to help them. 
5. Persuasion: A servant leader persuades others through reason, not coercion. They use their communication skills to convince others to take action. An example of persuasion is when a coach motivates their team to give their best performance through inspirational speeches. 
6. Conceptualization: A servant leader can think beyond the present and see the big picture. They can envision a better future and take steps to make it happen. An example of conceptualization is when an entrepreneur creates a business plan that takes into account the long-term goals of the company. 
7. Foresight: A servant leader has the ability to predict the consequences of their actions. They plan ahead and anticipate problems before they happen. An example of foresight is when a project manager plans ahead for potential obstacles and takes steps to mitigate those risks. 
8. Stewardship: A servant leader takes responsibility for the resources entrusted to them. They manage those resources with care and ensure that they are used for the benefit of others. An example of stewardship is when a non-profit organization uses donations to help those in need, and they provide accountability for how those funds are used. 
9. Commitment to the growth of people: A servant leader is committed to helping others grow and develop. They provide opportunities for learning and support the personal and professional development of those they lead. An example of commitment to growth is when a mentor provides guidance to a mentee and helps them develop their skills and career. 
10. Building community: A servant leader works to build a sense of community among the people they lead. They create an environment where everyone feels valued and included. An example of building community is when a teacher creates a classroom culture of respect and collaboration, where everyone feels like they are part of a team. 

Greenleaf, R. K. (2017). Servant Leadership: A Journey into the Nature of Legitimate Power and Greatness. Paulist Press.Barker, R. (2017). The servant leader: How to build a creative team, develop great morale, and improve bottom-line performance. 

To know more about Conceptualization refer to:

https://brainly.com/question/14821224

#SPJ11

Current Attempt in Progress Concord's Manufacturing calculated its predetermined overhead rate to be 200% of direct materials costs. For the month of July, the company incurred $119800 of raw material costs, of which $89200 were direct materials, and $30600 were indirect materials. Actual overhead incurred was $174900. What would be the debit entry to the Work in Process Inventory account for July with respect to manufacturing overhead? a. $174900 b. $178400 c. $239600 d. $zero, the account should be credited

Answers

The debit entry to the Work in Process Inventory account for July with respect to manufacturing overhead would be $178400. Correct option is b.

To calculate the debit entry to the Work in Process Inventory account for manufacturing overhead, we need to determine the amount of overhead applied using the predetermined overhead rate. The predetermined overhead rate is given as 200% of direct materials costs.

First, we calculate the overhead applied:

Overhead Applied = Predetermined Overhead Rate x Direct Materials Costs

Overhead Applied = 200% x $89200 = $178400

Therefore, the debit entry to the Work in Process Inventory account for July with respect to manufacturing overhead is $178400.

Therefore option b is correct option

To know more about manufacturing , refer here:

https://brainly.com/question/32717570#

#SPJ11

Which of the following will contribute to accelerated growth for the U.S. economy?
Multiple Choice
a decrease in government involvement in copyright laws
a decrease in factor mobility
a decrease in tax credits for research and development
increased use of outsourcing for inputs and increased use of comparative advantage for trade in final goods and services

Answers

The option that is most likely to contribute to accelerated growth for the U.S. economy is the increased use of outsourcing for inputs and increased use of comparative advantage for trade in final goods and services. Thus, option D is correct.

Outsourcing for inputs allows businesses to access resources and expertise from other countries at a potentially lower cost, which can enhance efficiency and competitiveness. By focusing on their core competencies and leveraging the expertise of other countries, businesses can allocate resources more effectively, leading to increased productivity and growth.

Furthermore, the increased use of comparative advantage for trade in final goods and services allows countries to specialize in producing goods and services in which they have a relative advantage. This promotes trade and enables countries to benefit from the efficiencies gained through specialization, leading to economic growth.

On the other hand, the other options presented are more likely to have a negative impact on economic growth. A decrease in government involvement in copyright laws (option A) could weaken intellectual property protections, discouraging innovation and reducing incentives for research and development.

A decrease in factor mobility (option B) would restrict the movement of resources, hindering the efficient allocation of labor and capital. A decrease in tax credits for research and development (option C) would reduce incentives for innovation and potentially limit technological advancements.

In conclusion, the option that would most likely contribute to accelerated growth for the U.S. economy is increased use of outsourcing for inputs and increased use of comparative advantage for trade in final goods and services. This approach promotes efficiency, specialization, and international trade, which are key drivers of economic growth. Thus, option D is correct.

To know more about economy refer here:

https://brainly.com/question/31550367#

#SPJ11

Suppose that n = 195 l.i.d. observations for (Yi, Xi) yield the following regression results: Y= 32.19+67.19X, SER=16.18, R^2 =0.89 (16.3) (12.8) Another researcher is interested in the same regression, but he makes an error when he enters the data into the regression: He enters each observation twice, so her has 390 observations (with observation 1 entered twice, observation 2 entered twice, and so forth).
Using the 390 observations, what results will be produced by his regression program?

Answers

Suppose that there are n = 195 l.i.d. observations for (Yi, Xi) which gives the following regression results: Y= 32.19+67.19X, SER=16.18, R^2 =0.89 (16.3) (12.8)Another researcher is interested in the same regression, but he makes an error when he enters the data into the regression: He enters each observation twice, so her has 390 observations (with observation 1 entered twice, observation 2 entered twice, and so forth).

Using the 390 observations, the results that will be produced by the researcher's regression program are as follows:The number of observations = 390The regression line equation is given by; Y = 32.19 + 67.19XThe standard error of regression (SER) is still 16.18The coefficient of regression (R²) would still be 0.89However, the t-ratio would be altered due to the fact that the regression entered twice would have more weight than those entered once. As a result, all t-values, along with F-value, would be doubled. Therefore, the regression regressionwould produce a higher F-value and would most likely be significant at the 5% level.

To know more about regression visit:

https://brainly.com/question/32505018

#SPJ11

Q8 Monroe, Inc., is evaluating a project. The company uses a 13.8 percent discount rate for this project. Cost and cash flows are shown in the table. What is the NPV of the project?
Year Project
0 ($11,368,000)
1 $ 2,157,589
2 $ 3,787,552
3 $ 3,150,650
4 $ 4,115,899
5 $ 4,556,424
Round to two decimal places.

Answers

$445,100 is the NPV of the project when  company uses a 13.8 percent discount rate for this project.

Given,

Discount rate - 13.8%

NPV = -$11,368,000 + $2,172,590/(1+0.138) + $3,787,552/(1+0.138)² + $3,150,650/(1+0.138)³ + $4,115,899/(1+0.138)⁴ + $4,556,424/(1+0.138)⁵

NPV = $11,368,000 + $2,172,590/(1.138) + $3,787,552/(1.138)² + $3,150,650/(1.138)³ + $4,115,899/(1.138)⁴ + $4,556,424/(1.138)⁵

NPV = $445,100

NPVs that are positive are preferable. The NPV of a project determines whether it should be pursued or abandoned. There would be no financial gain or loss from a project with a 0 NPV.The inputs into the NPV equation, however, determine how excellent a "good" NPV is. An unreliable and unhelpful NPV is generated by only speculating on a project's potential future cash flows and discount rate.

To learn more about NPV, visit:

https://brainly.com/question/32153010

#SPJ4

Job Design
Whilst an employee may become very efficient and skilled at completing a repetitive task, the lack of variety in their day can lead to boredom and a feeling of detachment from the overall goals and success of the business. They feel that as long as they complete their job satisfactorily, there is no need to be concerned with any other aspect of the business. A possible solution to this problem involves providing employees with more variety in their work. One technique to do this is introducing job rotation, where employees are gradually provided with more challenging work and greater responsibility.
Do you agree with this technique? Support your agreement or disagreement.

Answers

Agreement with job rotation:

1. Variety and skill development: Job rotation can expose employees to different tasks and roles within the organization. This variety can help prevent monotony, enhance job satisfaction, and foster skill development.

2. Enhanced motivation and engagement: By introducing more challenging work and greater responsibility through job rotation, employees may experience increased motivation and engagement.

3. Knowledge sharing and collaboration: Job rotation encourages cross-functional collaboration and knowledge sharing. When employees rotate through different departments or roles, they gain insights into various aspects of the business.

Disagreement with job rotation:

1. Loss of specialization: Job rotation may result in employees losing their expertise in a particular area. Specialized skills and knowledge are valuable in certain roles, and constant rotation could hinder the development of expertise.

2. Disruption and adjustment periods: Frequent job rotations can disrupt workflow and require adjustment periods for employees to adapt to new roles. It may take time for individuals to become proficient in their new responsibilities, potentially affecting productivity in the short term.

3. Employee preferences and strengths: Not all employees may be interested in or suited for certain types of work. Job rotation should consider individual preferences and strengths to ensure that employees are engaged and motivated in their new roles.

In conclusion, the effectiveness of job rotation as a solution to employee boredom such as the nature of the industry, individual preferences and motivation, but careful consideration should be given to balancing specialization, employee preferences, and the potential disruptions associated with rotation.

learn more about effectiveness of job

brainly.com/question/31310926

#SPJ11

You are planning to put $2,000 in the bank at the end of each year for the next five years in hopes that you will have enough money for a new boat. If you are investing at an annual interest rate of 6%, how much money will you have at the end of five years—rounded to the nearest whole dollar?
$11,950
$9,019
$11,274
$13,529

Answers

Given data:The amount to be invested at the end of each year is $2,000 for the next five years.Interest rate, r = 6% Time, t = 5 yearsWe need to calculate the total amount that the individual would have saved at the end of five years, rounded to the nearest whole dollar.

Method A bank is a financial institution that accepts deposits from individuals and institutions and lends to people who need funds. Banks are generally considered safer than keeping your money under a mattress since they are insured by the FDIC or NCUSIF in the United States.

They are typically used for retirement or long-term savings since they provide a stable stream of payments over time. A future value annuity formula can be used to calculate the value of the investment. In this scenario, the person wants to save up enough money for a boat by investing $2,000 per year for five years.

To know more about invested visit:

https://brainly.com/question/10908938

#SPJ11

You are considering how to invest part of your retirement savings. You have decided to put $200,000 into three stocks: 61% of the money in GoldFinger (currently $27/ share), 15% of the money in Moosehead (currently $86/ share), and the remainder in Venture Associates (currently $5/ share). Suppose GoldFinger stock goes up to $40/ share, Moosehead stock drops to $58/ share, and Venture Associates stock rises to $12 per share. a. What is the new value of the portfolio? b. What return did the portfolio earn? c. If you don't buy or sell any shares after the price change, what are your new portfolio weights? a. What is the new value of the portfolio? The new value of the portfolio is $ (Round to the nearest dollar.) b. What return did the portfolio earn? The portfolio earned a return of %. (Round to two decimal places.) c. If you don't buy or sell any shares after the price change, what are your new portfolio weights? The weight of Goldfinger is now %. (Round to two decimal places.) The weight of Moosehead is now \%. (Round to two decimal places.) The weight of Venture is now \%. (Round to two decimal places.)

Answers

a. The new value of the portfolio is $316,864.

b. The portfolio earned a return of 58.43%.

c The weight of GoldFinger is now 57.29%, the weight of Moosehead is now 6.37%, and the weight of Venture Associates is now 36.34%.

How to calculate the value

a. GoldFinger: $200,000 * 0.61 / $27 = 4,537.04 shares (rounding down to 4,537 shares)

Moosehead: $200,000 * 0.15 / $86 = 348.84 shares (rounding down to 348 shares)

Venture Associates: $200,000 * 0.24 / $5 = 9,600 shares

New value = (4,537 * $40) + (348 * $58) + (9,600 * $12)

New value = $181,480 + $20,184 + $115,200

New value = $316,864

b. Return = (New value of the portfolio - Initial investment) / Initial investment * 100

Return = ($316,864 - $200,000) / $200,000 * 100

Return = $116,864 / $200,000 * 100

Return = 58.43%

c. Weight of GoldFinger = (GoldFinger new price * Number of GoldFinger shares) / New value of the portfolio * 100

Weight of GoldFinger = ($40 * 4,537) / $316,864 * 100

Weight of GoldFinger = 181,480 / $316,864 * 100

Weight of GoldFinger = 57.29%

Weight of Moosehead = (Moosehead new price * Number of Moosehead shares) / New value of the portfolio * 100

Weight of Moosehead = ($58 * 348) / $316,864 * 100

Weight of Moosehead = 20,184 / $316,864 * 100

Weight of Moosehead = 6.37%

Weight of Venture Associates = (Venture Associates new price * Number of Venture Associates shares) / New value of the portfolio * 100

Weight of Venture Associates = ($12 * 9,600) / $316,864 * 100

Weight of Venture Associates = 115,200 / $316,864 * 100

Weight of Venture Associates = 36.34%

Learn more about portfolio on

https://brainly.com/question/25929259

#SPJ4

#4 Suppose you deposit $1,026.00 into an account 5.00 years from today that earns 12.00%. It will be worth $1,603.00 years from today. Submit Answer format: Number: Round to: 2 decimal places.

Answers

After 5 years, a $1,026.00 deposit with a 12.00% interest rate will grow to approximately $1,603.00.

If you deposit $1,026.00 into an account that earns 12.00% interest, after 5.00 years, it will grow to approximately $1,603.00. This calculation assumes compound interest, where the interest earned is reinvested and adds to the account balance. Compound interest allows for exponential growth over time, resulting in a larger final amount compared to simple interest.

The 12.00% interest rate indicates a relatively high return on investment, contributing to the significant increase in the account value. It's important to consider the compounding period (e.g., annually, semi-annually, monthly) to determine the precise growth, but based on the provided information, the estimated final value is approximately $1,603.00.

To know more about interest rate,

https://brainly.com/question/14556630#

#SPJ11

A large biomedical device company was planning to build an additional manufacturing building on its campus. The architectural firm that was hired was newly sensitized to the needs of mothers who were breastfeeding because one of their architects had recently had a baby, and their office did not have a designated space for her to pump and store her breast milk. They strongly suggested that the biomedical device company include a lactation room in the new structure. The company agreed, and a lactation room was added to the plans.
What message did the company communicate to its employees with the inclusion of the lactation room?
The company’s message to its employees was that it would spend money on improvements if it was suggested by experts to do so.
The inclusion of the lactation room indicated to its employees that it did not want to get sued by its employees with different needs.
The company demonstrated that it valued all employees and would make real efforts to include those with different needs.
The message conveyed to the employees was that it would only listen to outside entities like the architectural firm for inclusion efforts.

Answers

The message that the company communicated to its employees with the inclusion of the lactation room was that it demonstrated that it valued all employees and would make real efforts to include those with different needs.

The architectural firm that was hired for the biomedical device company was sensitized to the needs of mothers who were breastfeeding because one of their architects had recently had a baby, and their office did not have a designated space for her to pump and store her breast milk. When the firm strongly suggested that the company include a lactation room in the new structure, the company agreed, and a lactation room was added to the plans.

The message communicated by the company to its employees was that it valued all employees and would make real efforts to include those with different needs. By adding a lactation room, the company recognized that the needs of its employees varied, and it made an effort to accommodate the needs of the nursing mothers in the organization.

In conclusion, the inclusion of the lactation room indicated that the company made efforts to value and accommodate the needs of its employees and would continue to do so in the future.

Learn more about communication here: https://brainly.com/question/25793182

#SPJ11

Below are two business scenarios. Revise each scenario so the statement is easily understood and concise. Provide justification for your statement Scenarios for Creating Problem Statements On each of these, if you need to establish improvement targets, you can establish your own target improvement values. 1. Students in a business class often struggle with answering questions posed to them. Students have passed the prerequisite classes with a satisfactory grade. In the past, the students have been answering the questions posed to them with a 70% accuracy rate. The standard deviation for the accuracy rate score is 5% 2. For the past six months, you have constantly been spending more money than your take home pay each month by $400; this is approximately 10% of your take home pay. Consequently, you have been either paying bilis late or making minimum credit card payments or a combination of both

Answers

The business class students' ability to answer questions accurately is subpar, with a historical accuracy rate of 70% and a standard deviation of 5%.

Personal finances are strained as monthly expenses consistently exceed take-home pay by $400, equivalent to approximately 10% of income, leading to late bill payments and minimum credit card payments. The problem lies in the business class students' difficulty in providing satisfactory answers to questions.

Despite meeting the prerequisites and obtaining satisfactory grades, their accuracy rate stands at 70%, indicating a significant room for improvement. The standard deviation of 5% implies that there is inconsistency among students' performance.

The second scenario describes a persistent financial challenge faced by an individual. Continuously spending $400 more each month than their take-home pay, which accounts for roughly 10% of their income, has resulted in difficulties in managing expenses.

This strain has forced them to either pay bills late or make minimum credit card payments, or sometimes resort to a combination of both. To address this issue, it is crucial to explore strategies for either increasing income, reducing expenses, or finding a suitable balance between the two to achieve better financial stability.

Learn more about standard deviation click here: brainly.com/question/13498201

#SPJ11

A company's master budget for October is to manufacture and sell 30,600 units, for a total sales revenue of $282,000, total variable costs of $171,840, and total fixed costs of $25,200. The company actually manufactured and sold 32,600 units, and generated $51,000 of operating income in October. The sales volume variance, in terms of operating income, for October (rounded to the nearest whole dollar) was: Multiple Choice $7,200 favorable $25,800 favorable. $18,492 favorable. $5,308 favorable.

Answers

The sales volume variance, in terms of operating income, for October was $18,492 favourable.

The sales volume variance measures the difference between the actual operating income and the budgeted operating income based on the master budget. In this case, the company's master budget anticipated the manufacture and sale of 30,600 units with a total sales revenue of $282,000. However, the company actually sold 32,600 units and generated $51,000 of operating income.

To calculate the sales volume variance, we need to determine the budgeted operating income and compare it to the actual operating income. The budgeted operating income can be calculated by subtracting the total variable costs and total fixed costs from the budgeted sales revenue. In this case, the budgeted operating income would be $282,000 - $171,840 - $25,200 = $84,960.

The actual operating income is given as $51,000. The sales volume variance is the difference between the actual operating income and the budgeted operating income. Therefore, the sales volume variance is $84,960 - $51,000 = $33,960 unfavourable. However, since we are looking for the answer rounded to the nearest whole dollar, the sales volume variance is $34,000 unfavourable.

Now, to determine the sales volume variance in terms of operating income, we need to convert the dollar amount into a percentage of the budgeted operating income. The formula for the sales volume variance in terms of operating income is:

Sales Volume Variance = (Actual Operating Income - Budgeted Operating Income) / Budgeted Operating Income

Plugging in the numbers, we have:

Sales Volume Variance = ($51,000 - $84,960) / $84,960 = -$33,960 / $84,960 = -0.4

Multiplying by 100 to convert the result into a percentage, we get -40%. Since the variance is unfavourable, we take the absolute value of the percentage, which is 40%. Finally, we calculate the favourable sales volume variance by multiplying the absolute percentage by the budgeted operating income:

Sales Volume Variance = 40% * $84,960 = $33,984

Rounding to the nearest whole dollar, the sales volume variance, in terms of operating income, for October is $34,000 unfavourable.

To learn more about sales, click here:

brainly.com/question/29436143

#SPJ11

as Pfizer positioned itself wisely in relation to its industry for future value creation, when they acquired Medivation company in 2016? Discuss your reasoning.
What were some major changes in strategic direction that Pfizer made to improve its performance and prospects?
what did Pfizer do to make that acquisition successful?

Answers

By acquiring Medivation in 2016, Pfizer positioned itself in the sector strategically. A biopharmaceutical business called Medication Business specializes in creating and marketing small-molecule medications for the treatment of cancer.

Pfizer was able to obtain a considerable footing in the cancer industry because of the acquisition of Medivation. Pfizer was able to improve the strength of their product range by purchasing Xtandi, a medication used to treat advanced prostate cancer, from Medivation. Six late-stage programs, including one for a possible novel blood cancer therapy, were added to Pfizer's pipeline as a result of the Medivation acquisition.

2. In order to enhance its performance and future prospects, Pfizer implemented a number of strategic adjustments to its business practices. It also divested itself of its animal feeding and health operations. It also broke off its former generic medication business into a new firm, called Mylan, and sold its animal health and nutrition assets. A number of purchases have also been undertaken by Pfizer in recent years, notably the purchase of Wyeth in 2009. The profitability and growth prospects of Pfizer have been enhanced by these strategic adjustments.

3. Pfizer successfully acquired a lot of businesses to grow into the biggest pharmaceutical corporation in the world. Pfizer now has access to new technologies, markets, and medications because of these purchases. Additionally, Pfizer was able to boost its market share and financial performance. The business was able to raise both net income and revenues by 9.8% and 5.5%, respectively.

Learn more about the medication industry here:

https://brainly.com/question/4306261

#SPJ4

Moussawi Ltd's outstanding bonds have a $1,000 par value, they mature in 5 years. Their yield to maturity is 9%, based on semmiannual compounding, and the current market value price is $853.61. what is the bond's annual coupon interest rate?

Answers

The bond's annual coupon interest rate is roughly 15.28%, meaning that each year the bond pays out an amount equal to approximately 15.28% of its par value as interest.

To find the bond's annual coupon interest rate, we need to use the formula for the present value of a bond. The formula is:

PV = C * [1 - (1 + r)^(-n)] / r + F / (1 + r)^n

Where:

PV = Present value or market value of the bond ($853.61)

C = Coupon payment per period

r = Yield to maturity per period (9% divided by 2 for semiannual compounding, which gives 4.5%)

n = Number of periods (5 years multiplied by 2 for semiannual compounding, which gives 10 periods)

F = Par value of the bond ($1,000)

Substituting the given values into the formula, we have:

$853.61 = C * [1 - (1 + 0.045)^(-10)] / 0.045 + $1,000 / (1 + 0.045)^10

Simplifying the equation, we get:

$853.61 = C * [1 - 0.31513] / 0.045 + $1,000 / 1.61158

$853.61 = C * 0.68487 / 0.045 + $620.92

$853.61 = 15.21933C + $620.92

15.21933C = $853.61 - $620.92

15.21933C = $232.69

C ≈ $15.28

Therefore, the bond's annual coupon interest rate is approximately $15.28.

For more question on interest visit:

https://brainly.com/question/29415701

#SPJ8

Karina owns two investments, A and B, that have a combined total value of $52,000. Investment A is expected to pay $31,000 in 2 years from today and has
Xl an expected return of 7.60 percent per year. Investment B is expected to pay $44,000 in 5 years from today and has an expected return of R per year. What
is R, the expected annual return for investment B?
11.77% (plus or minus .02 percentage points)
15.94% (plus or minus .02 percentage points)
13.67% (plus or minus .02 percentage points)
14.89% (plus or minus .02 percentage points)

Answers

The expected annual return for investment B will be approximately  10.77%. Option A is correct.

To find the expected annual return for investment B, we can use the formula for compound interest:

Future Value (FV) = Present Value (PV) × [tex](1+Rate)^{Time}[/tex]

Given;

Total value of investments A and B (FV) = $52,000

Future value of investment A (FV_A) = $31,000

Time for investment A (T_A) = 2 years

Expected return for investment A (R_A) = 7.60%

We need to find the expected return for investment B (R).

First, let's calculate the present value (PV_B) of investment B:

PV_B = Total value of investments A and B - Future value of investment A

PV_B = $52,000 - $31,000

PV_B = $21,000

Now we can calculate the expected return (R) for investment B;

R = (FV_B / PV_B[tex])^{(1/T-B)}[/tex] - 1

Where;

FV_B = Future value of investment B

T_B = Time for investment B

Given;

Future value of investment B (FV_B) = $44,000

Time for investment B (T_B) = 5 years

R = ($44,000 / $21,000[tex])^{1/5}[/tex] - 1

R ≈ 1.1077 - 1

R ≈ 0.1077

Converting to a percentage;

R ≈ 10.77%

Therefore, the expected annual return of approximately 10.77%.

Hence, A. is the correct option.

To know more about annual return here

https://brainly.com/question/31539612

#SPJ4

--The given question is incomplete, the complete question is

"Karina owns two investments, A and B, that have a combined total value of $52,000. Investment A is expected to pay $31,000 in 2 years from today and has Xl an expected return of 7.60 percent per year. Investment B is expected to pay $44,000 in 5 years from today and has an expected return of R per year. What is R, the expected annual return for investment B? A) 10.77% (plus or minus .02 percentage points) B) 15.94% (plus or minus .02 percentage points) C) 13.67% (plus or minus .02 percentage points) D) 14.89% (plus or minus .02 percentage points)."--

Other Questions
If a loss of $25100 is incurred in selling for cash office equipment having a book value of $83000, the total amount reported in the cash flows from investing activities section of the statement of cash flows is $25100.$57900.$83000.$108100. When a company like Warby Parker that started as an online retailer opens up brick and mortar stores at a mall this is known as a(n) a. Social shopping b. Omnichannel c. Shopping orientationd. Clicks and Bricks Regarding the problem of the Counterfactual, how the randomised assignment can help?Provide explanations from cases we had in the lectures (one case example is enough). Apart from the counterfactual problem, what other issues can the randomised assignment help with? Juara Inc. has estimated its operation activities involve a fixed cost (FC) and variable cost. The total variable cost (TVC) is given by the equation: TVC = 400Q + 20Q FC = 5000 a) Find the average cost (AC) and marginal cost (MC) b) At what level of output does AC reach a minimum value. c) Give ONE (1) difference between Marginal Cost and Average Cost. In a deferred tax worksheet, if the deferred tax liability is larger than the deferred tax asset. How should i make an adjustment for it, what should be the missing debit entry? Thanks. Dr Deferred Tax Asset Cr Deferred Tax liability You have been appointed as project procurement director for a large corporate organisation that is involved in the procurement and execution of large projects. You recognise that corporate sustainable policy does not exist in the organisation and management does not seem to appreciate or understand the essence of sustainability in project. Develop a strategy report that explains to management the need for corporate sustainability policy mandate for the organisation.Map out a corporate sustainability policy for the organisation and link the policy mandate to a realistic project procurement sustainability strategyProject the likely impact of your sustainability policy strategy on the organisation in particular, and its sector as a whole, in the short, medium and long-term (assume a specific sector of your choice). Schweser Satellites Inc. produces satellite earth stations that sell for $95,000 each. The firm's fixed costs, F, are $2 million, 50 earth stations are produced and sold each year, profits total $500,000; and the firm's assets all equity financed are $6 million. The firm estimates that it can change its production process, adding $3 million to investment and580,000 to fixed operating costs. Hearne Company has a number of potential capital investments. Because these projects vary in nature, initial investment, and time horizon, management is finding it difficult to compare them. Assume straight line depreciation method is used.Project 1: Retooling Manufacturing Facility This project would require an initial investment of $4,900,000. It would generate $874,000 in additional net cash flow each year. The new machinery has a useful life of eight years and a salvage value of $1,012,000Project 2: Purchase Patent for New Product The patent would cost $3,435,000, which would be fully amortized over five years. Production of this product would generate $446,550 additional annual net income for Hearne.Project 3: Purchase a New Fleet of Delivery Trucks Hearne could purchase 25 new delivery trucks at a cost of $120,000 each. The fleet would have a useful life of 10 years, and each truck would have a salvage value of $5,100. Purchasing the fleet would allow Hearne to expand its customer territory resulting in $360,000 of additional net income per year.a) Determine project 3 payback period. (Round your answers to 2 decimal places.)b) Using a discount rate of 10 percent, calculate the net present value of each project. (Future Value of $1, Present Value of $1, Future Value Annuity of $1, Present Value Annuity of $1.) (Use appropriate factor(s) from the tables provided. Round your intermediate calculations to 4 decimal places and final answers to 2 decimal places.)c) Determine the profitability index of each project and prioritize the projects for Hearne. (Round your intermediate calculations to 2 decimal places. Round your final answers to 4 decimal places.) what are the prospects for the global convergence of HRMpractice? text book is financial intelligence by karen berman According to our text book, the three methods of valuation of a company are? Oprice-to-earnings ratio, discounted cash flow & asset valuation Oprice-to-earnings ratio, discounted cash flow & market value ONPV, Market Capialization & Book Value Break-even pricing is a type of value-based pricing. True or False? Read the following scenario and answer the questions.DeCapture Int. after weighing its options, decided to recruit a manager to be posted for an international assignment. This is the first international assignment for DeCapture Int. As an HR manager, you think that instead of only relying on internal candidates, you have another option of finding those who really meet the current and future expectations. Referring to Curriculum Vitae of the applicants is not enough. Necessary selection methods are required to get more input from the generic questions. DeCapture Int. has advertised for the position extensively, and out of a pool of 22 initial applicants, you need to get a list of three finalists. You have to ensure the right selection criteria to get candidates who fit the position and organization.(a) Discuss any TWO (2) ways how recruitment and selection methods can contribute to the strategic objectives of international organizations. (8 Marks)(b) Do you think conducting a background check is necessary before employment decision? Explain Why? (2 marks) On January 1 , a company issues bonds dated January 1 with a par value of $400,000. The bonds mature in 5 years. The contract rate is 7%, and interest is paid semiannually on June 30 and December 31. The market rate is 8% and the bonds are sold for $383,793. The journal entry to record the issuance of the bond is: Multiple Choice Debit Cash $400,000; credit Discount on Bonds Payable $16,207; credit Bonds Payable $416,207. Debit Cash $383,793; debit Discount on Bonds Payable $16,207; credit Bonds Payable $400,000. Debit Bonds Payable $400,000; debit Bond Interest Expense $16,207; credit Cash $416,207. Debit Cash $383,793; debit Premium on Bonds Payable $16,207; credit Bonds Payable $400,000. Debit Cash $383,793; credit Bonds Payable $383,793 Question 72 ptsA plant that is both Hydrophytic and Halophytic...1. grows along the banks of large rivers.2. lives in freshwater mountain streams higher than 5,000 feet above sea level.3. lives in very dry conditions.4. lives in salty water.5. None of these answers is correct because plants cannot be both Hydrophytic and HalophyticGroup of answer choicesFlag question: Question 8Question 82 ptsIf you live in California and are west of the San Andreas Fault you are on the...1. North American Plate.2. Juan de Fuca Plate.3. Pacific Plate.4. Cocos Plate.Group of answer choices The Economy under Trump and under Biden Economic metrics can provide an objective indication of economic performance over time. President Trump's administration (January 2017 - January 2021) followed a mostly Classical approach to fiscal policy and was in office during a once-in-a-lifetime virus that resulted in local governments locking down their respective economies in March 2020. Joe Biden's administration (January 2021-present) entered office during the recovery from the lockdown recession and has pursued a hardline Keynesian approach. The online book Popular Economyths may help answer some of these questions. What major policies did Donald Trump implement that may have affected the macroeconomy? Obviously, the recession caused by the lockdowns resulting from the virus starting in March 2020 should not be considered since it is considered a rare, once-in-a-lifetime occurrence and not the fault of the president Lethabo's supermarket sells their bread rolls in packets of six. The price of bread rolls in R12.00. Buy and save supermarket sells theirs bread rolls in packets of 2. The price of 2 bread rolls is R5.a. which of the two sells the cheapest bread rolls?b.if u have to advice Mr kekana where to buy bread rolls, what would your answer be? DO NOT COPY AND PASTE FROM OTHER POST NEED A NEW ONE. WILL GIVE DISLIKE IF COPIED AND PASTE ONLY.COMPANY: STARBUCKS1. Select and defend the pursuit of one of your two viable alternatives. How does this alternative align with the firm's mission, vision, and values? How can management employ this alternative to create competitive advantage for the firm? Suggest next steps.2. Based on your analysis, identify a business unit or activity within the corporation that you would suggest defunding in order to finance your strategic alternative, or provide an alternate funding source. Defend your selection.3. Given your overall proposal, how do you suggest the company promote its culture, vision, and mission to maximize its chances for success in the industry? How might the company develop its servant leaders to endorse and exemplify tenets of the Christian worldview (CWV) in the workplace? Propose and defend at least one significant leadership initiative. You run a school in Florida. Fixed monthly cost is $5,522.00 for rent and utilities, $6,211.00 is spent in salaries and $1,413.00 in insurance. Also every student adds up to $98.00 per month in stationary, food etc. You charge $623.00 per month from every student now.You are considering moving the school to another neighborhood where the rent and utilities will increase to $11,271.00, salaries to $6,551.00 and insurance to $2,257.00 per month. Variable cost per student will increase up to $187.00 per month. However you can charge $1,169.00 per student.You want to determine in percent the new charge compared to the previous charge. To calculate this, divide the new charge per student by the previous charge per student, keep in a decimal form and round to 3 decimal points. J Corp, reported the following: Units: 363 Sales $4581 Variable Costs $576) Fixed Costs $340 If the company eliminates sales comissions of $8 per unit by changing to a flat salary increase of $3025 for its sales managers, by what dollar amount would net income change? Round ONLY your final answer to 2 decimal places. Do not round intermediate computations. Note decreases as a negative number Szidon Company reports the following data Szidon Key Competitor $500,000 6.5% Net income Net income divided by net sales Using benchmarking, what can be said about Szidon Company? $1,000,000 2.1% A. Szidon is superior to the key competitor because net income is higher. OB. There is not enough information to make any conclusions. C. There is conflicting information so no conclusions can be reached D. Szidon is inferior to the key competitor because the key competitor's net income percentage is higher m