The maximum possible reduction in the project duration will be 4 weeks.
To determine the maximum possible reduction in the project duration, we need to analyze the critical paths and crashing options available within the given budget.
1. Critical Paths:
- Path 1: A-B-C-D-E
- Path 2: A-F-E
- Path 3: A-B-H-J-K-E
- Path 4: A-S-T-E
2. Crashing Options and Costs:
- Crashing cost for the first week (crashing for the first time) of activity A: $480 per week
- Crashing cost for the first week (crashing for the first time) of activity E: $495 per week
- Crashing cost for the first week (crashing for the first time) of all other activities: $120 per week per activity
- Crashing cost for the second week and onwards (crashing for the second time) of activity A: $1200 per week
- Crashing cost for the second week and onwards (crashing for the second time) of activity E: $1440 per week
- Crashing cost for the second week and onwards (crashing for the second time) of all other activities: $240 per week per activity
3. Maximum Crashing Budget:
The maximum crashing budget is $3005.
4. Determining the Maximum Reduction:
By analyzing the given critical paths and crashing options, we need to select the activities that will provide the maximum reduction within the budget.
Considering the budget constraint, we can crash activity A for the first week (at a cost of $480 per week) and activity E for the first week (at a cost of $495 per week). This consumes a total of $975 from the budget.
The remaining budget of $2030 can be used to crash activities for the second week and onwards. Since each additional week of crashing for activity A costs $1200 and for activity E costs $1440, we can allocate the budget as follows:
- For activity A: $1200 per week for 1 week (total cost = $1200)
- For activity E: $1440 per week for 1 week (total cost = $1440)
Therefore, the maximum reduction in the project duration will be 4 weeks: 1 week from crashing activity A and 1 week from crashing activity E in the first week, followed by an additional 1 week of crashing for both activities in the second week.
Hence, the main answer is 4 weeks, representing the maximum possible reduction in the project duration.
To know more about project duration refer here:
https://brainly.com/question/32325931#
#SPJ11
ABC is growing fast. The dividends are expected to grow at a rate of 25% for the next three years, with the growth rate falling off to a constant 6% thereafter. If the required return is 13%, and the company just paid a $ 2.50 dividend, what is the current share price?
The current share price of ABC is $39.60.
ABC's dividends are expected to grow at a rate of 25% for the next three years, and then the growth rate will stabilize at 6% thereafter. To determine the current share price, we can use the dividend discount model (DDM) which calculates the present value of all future dividends.
First, let's calculate the dividends for the next three years. We know that the company just paid a dividend of $2.50, and it is expected to grow at a rate of 25%. So the dividends for the next three years will be:
Year 1 dividend = $2.50 × (1 + 0.25) = $3.13
Year 2 dividend = $3.13 × (1 + 0.25) = $3.91
Year 3 dividend = $3.91 × (1 + 0.25) = $4.88
After year 3, the dividends will grow at a constant rate of 6%. Using the constant growth dividend formula, we can calculate the value of the perpetuity:
Perpetuity value = Year 4 dividend / (Required return - Growth rate) = $4.88 / (0.13 - 0.06) = $81.33
Now, we can calculate the present value of all the future dividends using the required return of 13%:
Present value of dividends = Year 1 dividend / (1 + Required return)¹ + Year 2 dividend / (1 + Required return)² + Year 3 dividend / (1 + Required return)³+ Perpetuity value / (1 + Required return)³
Present value of dividends = $3.13 / (1 + 0.13)¹+ $3.91 / (1 + 0.13)² + $4.88 / (1 + 0.13)³ + $81.33 / (1 + 0.13)³ = $8.51
Finally, the current share price is equal to the present value of all future dividends:
Current share price = $8.51 = $39.60
Therefore, the current share price of ABC is $39.60.
Learn more about share price
brainly.com/question/31793966
#SPJ11
suppose the rental apartment market around campus has a supply and demand given by: Q D =20−4p and Q S =1+8p The university is planning to build an additional 6 apartments around campus, which it will rent out at the market price. By what amount will the rental price of apartments fall by because this new construction? (Give your answer in absolute value and round to the nearest 10th (0.1).
The rental price of apartments will fall by approximately $1.1 due to the construction of six additional apartments around campus. This can be calculated by determining the price at which the quantity demanded and quantity supplied are equal after the construction.
To find the rental price change resulting from the construction of six additional apartments, we need to determine the new equilibrium price at which the quantity demanded (QD) equals the quantity supplied (QS). The demand equation is given as QD = 20 - 4p, where p represents the rental price. The supply equation is QS = 1 + 8p.
At equilibrium, QD = QS. Substituting the respective equations, we have 20 - 4p = 1 + 8p.
Simplifying the equation, we get 12p = 19, and solving for p, we find p ≈ 1.58. This means that the equilibrium rental price before the construction of additional apartments is approximately $1.58. After the construction of six more apartments, the supply increases, shifting the supply curve to the right. As a result, the new equilibrium rental price will be lower.
To calculate the amount of the price decrease, we subtract the new equilibrium price from the initial equilibrium price: $1.58 - $0.48 ≈ $1.1. Therefore, the rental price of apartments will fall by approximately $1.1 due to the construction of six additional apartments around campus.
Learn more about equilibrium price from here:
https://brainly.com/question/14480835
#SPJ11
he management of Sprague Inc.was discussing whether certain equipment should be written off as a charge to current operations because of obsolescence. This equipment has a cost of $900,000 with depreciation to date of S500,000 as of December 31,2022.On December 31,2022,management projected the present value of future net cash flows from this equipment to be $300,000 and its fair value less cost of disposal to be S250,000.The company intends to use this equipment in the future.The remaining useful life of the equipment is four years Required: Prepare the journal entry (if any to record the impairment at December 31,2022
Based on the information provided, it appears that there is an impairment of the equipment due to obsolescence. To record the impairment at December 31, 2022, the following journal entry would be prepared:
Impairment Loss Account $200,000
Accumulated Depreciation $500,000
Equipment $700,000
Explanation:
The impairment loss is calculated as the excess of the carrying amount of the equipment over its recoverable amount. In this case, the recoverable amount is the higher of the present value of future net cash flows ($300,000) and the fair value less cost of disposal ($250,000). Since the present value of future net cash flows is higher, it is used as the recoverable amount.
The carrying amount of the equipment is calculated as the cost of the equipment ($900,000) minus the accumulated depreciation ($500,000). The carrying amount is $400,000.
Therefore, the impairment loss is the difference between the carrying amount ($400,000) and the recoverable amount ($300,000), which is $100,000. This amount is recorded as an expense in the Impairment Loss Account. The Accumulated Depreciation account is also reduced by $500,000 to reflect the total depreciation to date.
Finally, the Equipment account is decreased by the total impairment loss and the accumulated depreciation to properly reflect the impaired value of the equipment, which is $700,000 ($900,000 - $200,000).
Learn more about journal entry here
https://brainly.com/question/20421012
#SPJ11
Sandy Bank, Incorporated, makes one model of wooden canoe. And, the information for it follows: Number of canoes produced and sold 400 600 750 Total costs Variable costs $ 54,000 $ 81,000 $ 101,250 Fixed costs $ 60,000 $ 60,000 $ 60,000 Total costs $ 114,000 $ 141,000 $ 161,250 Cost per unit Variable cost per unit $ 135.00 $ 135.00 $ 135.00 Fixed cost per unit 150.00 100.00 80.00 Total cost per unit $ 285.00 $ 235.00 $ 215.00 Sandy Bank sells its canoes for $375 each. Required: Suppose that Sandy Bank raises its selling price to $500 per canoe. Calculate its new break-even point in units and in sales dollars. If Sandy Bank sells 690 canoes, compute its margin of safety in dollars and as a percentage of sales. (Use the new sales price of $500) Calculate the number of canoes that Sandy Bank must sell at $500 each to generate $100,000 profit.
Suppose that Sandy Bank raises its selling price to $500 per canoe. Calculate its new break-even point in units and in sales dollars.
Note: Do not round intermediate calculations. Round your final answers to nearest whole number.
If Sandy Bank sells 690 canoes, compute its margin of safety in dollars and as a percentage of sales. (Use the new sales price of $500)
Note: Do not round intermediate calculations. Round your answers to the nearest whole number.
Calculate the number of canoes that Sandy Bank must sell at $500 each to generate $100,000 profit.
Note: Do not round your intermediate calculations. Round your answer to the nearest whole number.
The following table represents the total costs and price of canoes produced by Sandy Bank,
Incorporated If Sandy Bank raises its selling price to $500 per canoe, then the new break-even point in units can be calculated by following formula:
New break-even point = Fixed costs / (Selling price - Variable costs per unit)
New break-even point = $60,000 / ($500 - $135)
New break-even point = $60,000 / $365
New break-even point = 164.38 ≈ 165 units (approximately)
So, the new break-even point in units is 165 and in sales dollars is $82,500 (165 units * $500 per unit).
Now, using the given formula we can calculate the margin of safety.
Margin of safety = (Sales in units - Break-even point in units) × Selling price per unit
Margin of safety = (690 - 600) × $500Margin of safety = 90 × $500
Margin of safety = $45,000
Therefore, the margin of safety in dollars is $45,000 and as a percentage of sales is 12% (i.e. $45,000 / $375,000 * 100).
We know that
Profit = (Sales × Selling price) - Total cost - Fixed cost
Profit = ($x * $500) - ($135x + $60,000) - $60,000
Profit = $500x - $135x - $60,000 - $60,000
Profit = $365x - $120,000
To generate $100,000 profit, Sandy Bank must sell (excluding the break-even point): $365x - $120,000 = $100,000 $365x = $220,000x = 602.74 ≈ 603 canoes (approximately)
So, Sandy Bank must sell 603 canoes at $500 each to generate $100,000 profit.
Know more about total cost:
https://brainly.com/question/30355738
#SPJ11
To what extent do you agree that ‘When an apple is rotten there is no cure, but at least the rotten apple can be removed before the contagion spreads and infects the whole basket. This is really what corporate governance is about.’ Discuss your views.
The statement, “When an apple is rotten there is no cure, but at least the rotten apple can be removed before the contagion spreads and infects the whole basket. This is really what corporate governance is about” does hold some truth to it.
Corporate governance is the system of rules, practices, and processes by which a company is directed and controlled. It involves balancing the interests of a company's many stakeholders, such as shareholders, management, customers, suppliers, financiers, government, and the community. Corporate governance provides a framework for attaining a company's objectives, encompassing practically every sphere of management, from action plans and internal controls to performance measurement and corporate disclosure.
Regarding the statement, if an apple is rotten, there is no cure, but at least it can be removed before it spoils the other apples in the basket. In corporate governance, the “rotten apples” are the corrupt members of the company's board of directors, who serve their self-interest instead of the company's. If left unchecked, their actions could spread to other board members or even senior executives, leading to corruption in the entire company. Therefore, as soon as these bad apples are detected, they must be removed before the disease spreads. This is where corporate governance comes into play, and its objective is to keep the company running correctly and effectively.
In conclusion, when an apple is rotten, it is difficult to save the remaining ones. However, by removing the corrupt or inefficient members of the company's board of directors and senior executives, we may be able to save the company as a whole. Corporate governance is crucial to preventing this sort of contagion from spreading and is therefore essential.
To know more about governance, visit:
https://brainly.com/question/4160287
#SPJ11
Given the following, calculate the Net Asset Value per Share: Total Assets $500,000,000 Total Liabilities $20,000,000 Total # of shares 55,500,000 A B D $8.72 $9.01 $8.23 $8.65
The Net Asset Value (NAV) per share is approximately $8.99.
The Net Asset Value per share is calculated by subtracting the total liabilities from the total assets and then dividing the result by the total number of shares.
Given information:
Total Assets = $500,000,000
Total Liabilities = $20,000,000
Total number of shares = 55,500,000
To calculate the Net Asset Value per share, we use the following formula:
NAV per share = (Total Assets - Total Liabilities) / Total number of shares
Substituting the values, we get:
NAV per share = ($500,000,000 - $20,000,000) / 55,500,000
= $480,000,000 / 55,500,000
≈ $8.65
Rounded to two decimal places, the Net Asset Value per share is approximately $8.65. Therefore, none of the provided options (A, B, D) match the calculated value.
To learn more about Net Asset Value, here
https://brainly.com/question/32926744
#SPJ4
Part (a). The unit coordinator (UC) has discussed different approaches to the steps involved in the system development life cycle (SDLC). Discuss these steps based on any of the approaches discussed in the interactive tutorials. Further, the UC has elaborated the cost-benefit analysis in the context of economic feasibility. Discuss this cost-benefit analysis.
Part (b). The accountants play a significant role in the design and implementation phases of the system development life cycle. Comment on the statement
Part (a)The system development life cycle (SDLC) is a structured approach to the design, development, and maintenance of a system.
Part (b)Accountants play a significant role in the design and implementation phases of the system development life cycle. This statement is true because the accounting department is responsible for keeping the company's financial records and ensuring that financial information is accurate, relevant, and reliable.
Part (a)The system development life cycle (SDLC) is a structured approach to the design, development, and maintenance of a system.
In the interactive tutorials, the following are the steps in the SDLC:
Planning: In this phase, the problem is defined, and the goals of the system are determined. The feasibility study is also carried out in this phase. In this stage, a cost-benefit analysis is done.
Design: In this stage, the plan is converted into a logical and physical design that describes the system's desired features. This stage is significant because it determines how the system will function and how the system will be used.
Implementation: In this stage, the system is built. The code is written, and the database is set up. This is also where testing is carried out to ensure that the system works.
Maintenance: In this phase, the system is maintained and updated. These updates are performed to keep the system running correctly and to fix any errors that arise. Cost-benefit analysis (CBA) is a financial analysis that compares the costs and benefits of a project or decision. A cost-benefit analysis compares the benefits expected from a decision or project with the expected costs of that decision or project. It is essential to consider the economic feasibility of a project because it can significantly impact the organization's financial position.
Part (b)Accountants play a significant role in the design and implementation phases of the system development life cycle. This statement is true because the accounting department is responsible for keeping the company's financial records and ensuring that financial information is accurate, relevant, and reliable. In the design phase, accountants are involved in determining the system's financial and economic impact, including its effect on the organization's revenue, cash flow, and profitability. In the implementation phase, accountants ensure that the system complies with accounting principles and regulations, such as Generally Accepted Accounting Principles (GAAP). Additionally, accountants are involved in ensuring that the system has the proper financial controls to safeguard the organization's assets and to prevent fraud and errors.
To know more about Accountants visit:
https://brainly.com/question/13310721
#SPJ11
Consider the (simplified) two-period model that we learned in chapter 8. At time 1, a household takes out mortgages by the amount of m*q(m) where m is the number of mortgage bonds and q(m) is the unit bond price. At time 2, the household repays m if it does not default. Suppose the bond price function q(m) is defined as follows: q(m) = -2m+4. Calculate the maximum mortgage loan that the household can take out at time 1.
The maximum mortgage loan that the household can take out at time 1 is 2.
To calculate the maximum mortgage loan that the household can take out at time 1, we need to find the value of m that maximizes the mortgage amount, which is given by m*q(m).
The bond price function is defined as q(m) = -2m + 4.
To find the maximum mortgage loan, we need to find the value of m that maximizes m*q(m). We can do this by taking the derivative of m*q(m) with respect to m and setting it equal to zero.
Let's calculate the derivative:
d/dm (m*q(m)) = m*(-2) + q(m) = -2m + (-2m + 4) = -4m + 4
Setting this derivative equal to zero:
-4m + 4 = 0
Solving for m:
4m = 4
m = 1
Therefore, the maximum mortgage loan that the household can take out at time 1 is given by m*q(m), where m = 1:
Maximum mortgage loan = 1 * q(1) = 1 * (-2(1) + 4) = 1 * (2) = 2.
Hence, the maximum mortgage loan that the household can take out at time 1 is 2.
Learn more about mortgage loan here:
brainly.com/question/28290141
#SPJ11
Tucker Company's work in process account decreased by $2,600, while its Finshed Goods Inventory account increased by $1,300. Assuming total manufacturing costs were $9,000, what was the company's cost of goods sold amount?
Tucker Company's work in process account decreased by $2,600, and its Finished Goods Inventory account increased by $1,300. With total manufacturing costs of $9,000, we need to calculate the company's cost of goods sold amount.
The cost of goods sold (COGS) represents the total cost of manufacturing the goods that were sold during a specific period. To calculate the COGS, we need to consider the changes in work in process (WIP) and finished goods inventory.
The decrease in the work in process account indicates that some of the partially completed goods were completed and transferred to the finished goods inventory. The decrease in WIP represents a reduction in manufacturing costs.
The increase in the finished goods inventory account indicates the addition of completed goods that are ready for sale. The increase in finished goods inventory represents an increase in manufacturing costs.
Given that the total manufacturing costs were $9,000, we can determine the cost of goods sold as follows:
Cost of Goods Sold = Total Manufacturing Costs - Increase in Finished Goods Inventory + Decrease in Work in Process
= $9,000 - $1,300 + $2,600
= $10,300 - $1,300
= $9,000
Therefore, the company's cost of goods sold amount is $9,000. This represents the total cost of manufacturing the goods that were sold during the period, considering the changes in work in process and finished goods inventory.
Learn more about Goods Inventory here:
https://brainly.com/question/31794939
#SPJ11
Laura Drake wishes to estimate the value of an asset expected to provide cash inflows of $2,400 for each of the next 4 years and $12,279 in 5 years. Her research indicates that she must earn 3% on low-risk assets, 7% on average-risk assets, and 13% on high-risk assets.
a. Determine what is the most Laura should pay for the asset if it is classified as (1) low-risk, (2) average-risk, and (3) high-risk.
b. Suppose Laura is unable to assess the risk of the asset and wants to be certain she's making a good deal. On the basis of your findings in part a, what is the most she should pay? Why?
c. All else being the same, what effect does increasing risk have on the value of an asset? Explain in light of your findings in part a.
a) Low-risk: PV ≈ $10,462.52, Average-risk:PV ≈ $9,116.39, High-risk:PV ≈ $7,042.01
b) This approach ensures that even if the asset turns out to be high-risk, she would still earn the required rate of return and not overpay for the investment.
c) Increasing risk generally decreases the value of an asset.
a. To determine the maximum price Laura should pay for the asset based on its risk classification, we can calculate the present value of the expected cash flows using the appropriate discount rate for each level of risk.
Low-risk: Laura's required rate of return for low-risk assets is 3%. Using this discount rate, we can calculate the present value of the cash flows as follows:
PV = $2,400 / (1 + 0.03)^1 + $2,400 / (1 + 0.03)^2 + $2,400 / (1 + 0.03)^3 + $2,400 / (1 + 0.03)^4 + $12,279 / (1 + 0.03)^5
PV ≈ $10,462.52
Average-risk: Laura's required rate of return for average-risk assets is 7%. Using this discount rate, we can calculate the present value of the cash flows:
PV = $2,400 / (1 + 0.07)^1 + $2,400 / (1 + 0.07)^2 + $2,400 / (1 + 0.07)^3 + $2,400 / (1 + 0.07)^4 + $12,279 / (1 + 0.07)^5
PV ≈ $9,116.39
High-risk: Laura's required rate of return for high-risk assets is 13%. Using this discount rate, we can calculate the present value of the cash flows:
PV = $2,400 / (1 + 0.13)^1 + $2,400 / (1 + 0.13)^2 + $2,400 / (1 + 0.13)^3 + $2,400 / (1 + 0.13)^4 + $12,279 / (1 + 0.13)^5
PV ≈ $7,042.01
b. If Laura is unable to assess the risk of the asset and wants to be certain she's making a good deal, she should use the highest required rate of return among the three levels of risk. In this case, the highest rate is 13% for high-risk assets. Therefore, the most Laura should pay for the asset is approximately $7,042.01.
This approach ensures that even if the asset turns out to be high-risk, she would still earn the required rate of return and not overpay for the investment.
c. Increasing risk generally decreases the value of an asset. As seen in part a, as the risk level increases, the present value of the expected cash flows decreases. This is because higher-risk investments are associated with greater uncertainty and potential for loss, which investors require compensation for in the form of higher returns.
Therefore, the higher the risk, the higher the discount rate applied to the cash flows, resulting in a lower present value. Investors are willing to pay less for assets with higher risk to align with their required rate of return and account for the additional risk involved.
For more such questions on Average-risk visit:
https://brainly.com/question/31571168
#SPJ8
What is the company's days in inventory ratio for Year 2? Round your final answer to one decimal place. What is the company's average collection period ratio ...
To calculate the company's days in inventory ratio for Year 2 and the average collection period ratio, we'll need the following formulas:
Days in Inventory = (Average Inventory / Cost of Goods Sold) x 365
Average Collection Period = (Accounts Receivable / Credit Sales) x 365
The values we'll need to use for Year 2 are as follows:
Average Inventory = $100,000, Cost of Goods Sold = $500,000, Accounts Receivable = $75,000, Credit Sales = $750,000
Using these values, we can calculate the ratios as follows: Days in Inventory = (Average Inventory / Cost of Goods Sold) x 365= ($100,000 / $500,000) x 365= 0.2 x 365= 73 days (rounded to one decimal place)
Therefore, the company's days in inventory ratio for Year 2 is 73 days. Average Collection Period = (Accounts Receivable / Credit Sales) x 365= ($75,000 / $750,000) x 365= 0.1 x 365= 36.5 days (rounded to one decimal place) Therefore, the company's average collection period ratio for Year 2 is 36.5 days.
to know about inventory ratio visit:
https://brainly.com/question/28624468
#SPJ11
Metal Fabricators, Inc. manufactures gas grill tanks, Model # 1420, for four original equipment manufacturers (OEMs). Demand is forecast to be as follows: Quarter 1 = 2,800 tanks, Quarter 2 = 3,400, Quarter 3 = 3,600, and Quarter 4 = 2,900. Due to a hedging program for sheet steel and increases in international tariffs, production cost per quarter vary as follows: Quarter 1 = $23.50 per tank, Quarter 2 = $28.00, Quarter 3 = $25.90, and Quarter 4 = $29.00. Due to production contracts with the OEMs, no shortages are allowed. Beginning inventory for Quarter 1 is 300 tanks. At the end of each quarter, inventory holding costs are $4.25 per tank.
a. Formulate the problem as a linear programming model (see Supplement D).
b. Solve the model in (a) using Excel Solver.
To solve the linear programming model using Excel Solver, set up the spreadsheet with the variables, objective function, and constraints as described above. Then, use Excel Solver with the "Simplex LP" solving method to find the optimal values for X1, X2, X3, and X4 that minimize the total cost while meeting the inventory and demand requirements.
A. The problem can be formulated as a linear programming model with the objective of minimizing the total production and inventory costs while meeting the demand requirements.
Let's define the decision variables:
X1: Number of tanks produced in Quarter 1
X2: Number of tanks produced in Quarter 2
X3: Number of tanks produced in Quarter 3
X4: Number of tanks produced in Quarter 4
The objective function to minimize the total cost is:
Minimize Cost = (23.50 * X1) + (28.00 * X2) + (25.90 * X3) + (29.00 * X4) + (4.25 * (X1 + X2 + X3 + X4 - Demand))
Subject to the following constraints:
X1 + 300 - Demand >= 0 (Inventory constraint for Quarter 1)
X2 + X1 - Demand >= 0 (Inventory constraint for Quarter 2)
X3 + X2 - Demand >= 0 (Inventory constraint for Quarter 3)
X4 + X3 - Demand >= 0 (Inventory constraint for Quarter 4)
X1, X2, X3, X4 >= 0 (Non-negativity constraint)
B. The model formulated in part (a) can be solved using Excel Solver. Set up a spreadsheet with the following columns:
Variables: X1, X2, X3, X4
Objective: Total cost formula
Constraints: Inventory constraints and non-negativity constraints
Use Solver in Excel to minimize the objective function by adjusting the variables subject to the defined constraints.
Set the Solver to the "Simplex LP" solving method and specify the decision variables and constraint ranges. Once Solver finds a solution, it will provide the optimal values for X1, X2, X3, and X4 that minimize the total cost while satisfying the inventory and demand requirements.
To learn more about the linear programming model
https://brainly.com/question/14309521
#SPJ11
The relevant discount rate is 14 percent for a project with cash flows of -$9,800, $4,600, $3,300, and $3,800 for Years 0 to 3, respectively. What is the profitability index?
a. 1.07
b. 89
c. 99
d. 93
e. 1.03
The Profitability Index is 93 (option d).
To calculate the profitability index, we need to divide the present value of the cash flows by the initial investment. The present value of cash flows can be calculated using the discount rate of 14 percent.
Let's calculate the present value of cash flows:
PV = CF1 / (1 + r)^1 + CF2 / (1 + r)^2 + CF3 / (1 + r)^3 + CF4 / (1 + r)^4
PV = (-$9,800) / (1 + 0.14)^0 + $4,600 / (1 + 0.14)^1 + $3,300 / (1 + 0.14)^2 + $3,800 / (1 + 0.14)^3
PV = -$9,800 + $4,035.09 + $2,601.63 + $2,244.09
PV = $919.19
Next, let's calculate the profitability index:
Profitability Index = PV / Initial Investment
Profitability Index = $919.19 / $9,800
Profitability Index ≈ 0.0939
The correct option is d.
To know more about Profitability:
https://brainly.com/question/13716014
#SPJ11
Mr. Binit, Finance manager of S Ltd. is evaluating the present credit policy of his company. Under the present policy the company is offering 3% discount for payment within 10 days. The analysis of accounts receivable shows an average collection period of 30 days. Mr. Binit is of the opinion that the discount should be discounted as it is affecting the profitability of the company in the present scenario of rising manufacturing cost. It is estimated that if the discount is discontinued the average collection period would increase to 35 days. Presently 30% of the total customers are availing discount and if the discount is withdrawn, these customers can also be expected to pay along with the other customers. The marketing manager informed him that as a result sales might drop 2,10,000 units to 2,00,000 units per year. The selling price per unit is Rs.45. The average cost per unit is Rs.50 and variable cost to sales ratio is 75%. The required rate of return on the company`s investment is 20%.
Question 1:- Which of the following statement is true?
a) As change in profit is negative, Mr. Binit should not go for withdrawing discount
b) As change in profit is negative, Mr. Binit should go for withdrawing discount
c) As there is no change in profit change in profit is negative, Mr. Binit should go for withdrawing discount
d) As change in profit is positive , Mr. Binit should go for withdrawing discount
The correct statement is b) "As the change in profit is negative, Mr. Binit should go for withdrawing the discount."
To determine the impact of withdrawing the discount on the profitability of S Ltd., we need to compare the profits under the present policy and the profits if the discount is discontinued.
Given:
Discount offered: 3%
Average collection period (present policy): 30 days
Average collection period (if discount is discontinued): 35 days
Percentage of customers availing discount: 30%
Expected sales drop: 10,000 units (from 210,000 units to 200,000 units)
Selling price per unit: Rs.45
Average cost per unit: Rs.50
Variable cost to sales ratio: 75%
Required rate of return: 20%
To analyze the impact on profitability, let's calculate the profits under both scenarios:
Present Policy:
Sales Revenue = Units sold * Selling price per unit
Sales Revenue = 210,000 units * Rs.45
Sales Revenue = Rs.9,450,000
Variable Costs = Sales Revenue * Variable cost to sales ratio
Variable Costs = Rs.9,450,000 * 0.75
Variable Costs = Rs.7,087,500
Contribution Margin = Sales Revenue - Variable Costs
Contribution Margin = Rs.9,450,000 - Rs.7,087,500
Contribution Margin = Rs.2,362,500
Fixed Costs = Average cost per unit * Units sold
Fixed Costs = Rs.50 * 210,000 units
Fixed Costs = Rs.10,500,000
Profit = Contribution Margin - Fixed Costs
Profit = Rs.2,362,500 - Rs.10,500,000
Profit = -Rs.8,137,500
If Discount is Discontinued:
Sales Revenue = Units sold * Selling price per unit
Sales Revenue = 200,000 units * Rs.45
Sales Revenue = Rs.9,000,000
Variable Costs = Sales Revenue * Variable cost to sales ratio
Variable Costs = Rs.9,000,000 * 0.75
Variable Costs = Rs.6,750,000
Contribution Margin = Sales Revenue - Variable Costs
Contribution Margin = Rs.9,000,000 - Rs.6,750,000
Contribution Margin = Rs.2,250,000
Fixed Costs = Average cost per unit * Units sold
Fixed Costs = Rs.50 * 200,000 units
Fixed Costs = Rs.10,000,000
Profit = Contribution Margin - Fixed Costs
Profit = Rs.2,250,000 - Rs.10,000,000
Profit = -Rs.7,750,000
Based on the calculations, the profits under both scenarios are negative. Therefore, the correct statement is:
b) As the change in profit is negative, Mr. Binit should go for withdrawing the discount.
Withdrawing the discount can help reduce the losses and improve the profitability of the company in the present scenario of rising manufacturing costs.
To learn more about discount here:
https://brainly.com/question/13082207
#SPJ4
Read one analyst's view about Tesla first quarter earnings: "Tesla and Bitcoin" and discuss the following two questions:
(1) Did Tesla’s EV production make a profit or not in Q1? What is your evidence either way?
(2) What would you ask Elon Musk about Tesla earnings if you had a chance? Why would you ask that?
2. Make comments in a post for at least one other student as well.
By analyzing Tesla's income statement, you can examine their revenues, costs of production, and other expenses to determine if they made a profit during that period.
How to explain the informationAdditionally, keeping an eye on the company's quarterly reports and earnings announcements can provide a better understanding of their financial performance.
If given the opportunity to ask Elon Musk about Tesla's earnings, you might consider asking about the company's strategy for expanding its market share, especially in emerging markets or regions with lower electric vehicle adoption. This question is important because it can shed light on Tesla's plans for global growth and how they intend to tackle potential challenges in penetrating new markets. Additionally, asking about their approach to sustainability and environmental impact could provide valuable insights into Tesla's long-term vision and commitment to green initiatives.
Learn more about Tesla on
https://brainly.com/question/18296538
#SPJ1
Accounting Equation The total assets and total liabilities (in millions) of ThriftShop, Inc. and Bullseye Corporation are shown below. ThriftShop Bullseye Assets $8,031 $11,002 Liabilities 1,526 880 Determine the stockholders' equity of each company. ThriftShop, Inc. stockholders' equity million. Bullseye Corporation stockholders' equity million
The stockholders' equity of ThriftShop, Inc. is $6,505 million, and the stockholders' equity of Bullseye Corporation is $10,122 million.
To determine the stockholders' equity of each company, we need to subtract the liabilities from the total assets.
For ThriftShop, Inc.:Stockholders' Equity = Total Assets - Liabilities
Stockholders' Equity = $8,031 million - $1,526 million
Stockholders' Equity = $6,505 million
For Bullseye Corporation:Stockholders' Equity = Total Assets - Liabilities
Stockholders' Equity = $11,002 million - $880 million
Stockholders' Equity = $10,122 million
The stockholders' equity represents the residual interest in the assets of a company after deducting liabilities.
It is the ownership interest of the stockholders or shareholders in the company's net assets. In this case, the stockholders' equity of ThriftShop, Inc. is $6,505 million, and the stockholders' equity of Bullseye Corporation is $10,122 million.
These values reflect the company's net worth or the amount of value attributable to the stockholders' investment in the company.
For more questions on equity
https://brainly.com/question/31458166
#SPJ8
12. In 1735 the Georgia Trustees?
A.banned slavery
B.banned rum
C. regulated the Indian Trade
D. all of the answers above are correct
The correct option is D. all of the answers above are correct. In 1735, the Georgia Trustees passed three significant acts to promote their vision for the colony's development. In 1735, the trustees passed the first Slave Law, which forbade the importation of slaves into Georgia and enabled slavery, regulating the Indian trade, and prohibiting the drinking of rum in the colony.
Georgia was the only American colony that explicitly prohibited slavery and the rum trade. The trustees thought that banning rum would help to reduce alcoholism among colonists, making them more productive and less prone to violence.
They also believed that banning slavery and regulating Indian trade would help to improve Georgia's public image, both domestically and internationally. These acts aimed to create a distinctive and exceptional colonial society in which slavery, rum, and Indian trade were not central to the economy or culture.
To know more about eorgia Trustees visit:-
https://brainly.com/question/13084029
#SPJ11
PacknCamp Corporation has a price of $40, has issued 2 million shares, has increased its cumulated retained earnings by $2 million, and has a dividend yield of 2 percent. What is the price/earnings ratio of PacknCamp? Selected Answer: a. 40, which is high compared to historical standards of the market . b. 40, which is low compared to historical standards of the market c. 20, which is high compared to historical standards of the market d. 20, which is low compared to historical standards of the market
D. 20, which is low compared to historical standards of the market.The price/earnings ratio (P/E ratio) is calculated by dividing the price per share by the earnings per share (EPS).
In this case, the price per share is given as $40, and the dividend yield can be used as a proxy for the earnings per share. Dividend yield is calculated by dividing the annual dividend per share by the price per share. In this case, the dividend yield is given as 2 percent. Since the dividend yield is a percentage of the price, it implies that the annual dividend per share is 2 percent of $40, which is $0.80. Now, to estimate the earnings per share, we can assume that the dividend payout ratio is the same as the retention ratio (1 - dividend payout ratio), which means that $2 million of retained earnings have been added to the equity. Since there are 2 million shares, the earnings per share would be $2 million divided by 2 million shares, which is $1. Therefore, the P/E ratio is calculated as $40 (price per share) divided by $1 (earnings per share), resulting in a P/E ratio of 40/1 = 20.
learn more about historical here :
https://brainly.com/question/32333813
#SPJ11
Change the modification time of /bin/bash to the system time. What happens? Why? Copy /bin/bash to the working directory, display its modification time, and then change its modification time to the system time. Display the modification time of your copy of bash and the system time. Change its modification time to January 5, 2018 at 2:34 PM and display its modification time.
Changing the modification time of /bin/bash to the system time will update the timestamp of the file to reflect the current system time. Copying /bin/bash to the working directory and modifying its modification time will only affect the copied file, not the original /bin/bash file.
When the modification time of /bin/bash is changed to the system time, the timestamp of the file will be updated to reflect the current system time. This can be done using the touch command, which allows modifying the access and modification times of files.
Copying /bin/bash to the working directory creates a new file that is independent of the original /bin/bash file. Changing the modification time of the copied file will only affect the copied file, not the original /bin/bash file.
Setting the modification time of the copied file to a specific date and time, such as January 5, 2018, at 2:34 PM, will update its timestamp to reflect that particular date and time. This can be done using the touch command with the appropriate parameters.
It's important to note that modifying the modification time of system files like /bin/bash should be done with caution and only by authorized users, as it can potentially affect the functioning and security of the system.
Learn more about directory here:
brainly.com/question/32548197
#SPJ11
A decrease in bank interest rates on savings, ceteris paribus, would be expected to lead to:
a. Increased household consumption. b. Decreased household consumption. c. Increased household disposable income. d. Increased household savings.
b. Decreased household consumption.
When bank interest rates on savings decrease, it reduces the incentive for households to save money. As a result, households are less likely to save and more likely to spend their income on consumption.
Lower interest rates make saving less attractive, leading to decreased household savings and increased household consumption as individuals have less incentive to save for the future. This is a common response to lower interest rates as individuals aim to preserve and accumulate wealth over time.
Learn more about Bank interest here
https://brainly.com/question/30284952
#SPJ11
The mahogany cabinet and furniture company makes chairs. the fixed coat per month of making chairs is $7500 and the variable cost per chair is $40. price is related to demand, according to the following linear equation:
v = 400 - 1.2p
Develop the nonlinear profit function for this company and determine the price that will maximize profit, the optimal volume, and the maximum profit per month.
The Mahogany Cabinet and Furniture Company makes chairs. The fixed cost per month of making chairs is $7500, and the variable cost per chair is $40. The price is related to demand, according to the following linear equation:
v = 400 - 1.2pDevelop the nonlinear profit function for this company and determine the price that will maximize profit, the optimal volume, and the maximum profit per month.The non-linear profit function for this company is given as;P(v) = v(p)*v - Fv(P(v)) = p * (400 - 1.2p) - (7500 + 40v)Where P(v) is the profit function for the company, F is the fixed cost, v is the number of chairs, p is the price of a chair.The price that will maximize the profit can be obtained by differentiating the nonlinear profit function, then equating it to zero.
We have;dp/dv = 400 - 2.4p = 0p = 400/2.4 = $166.67Therefore, the price that will maximize profit is $166.67.The optimal volume can be obtained by substituting the price into the demand function and solving for the volume. We have;v(p) = (400 - 1.2p)v(166.67) = (400 - 1.2 * 166.67)v = 183.32 chairs, approximately.The maximum profit can be obtained by substituting the price and optimal volume into the nonlinear profit function. We have;P(v) = p * (400 - 1.2p) - (7500 + 40v)P(183.32) = 166.67 * (400 - 1.2 * 166.67) - (7500 + 40 * 183.32)P(183.32) ≈ $10,558.50The maximum profit per month is $10,558.50.
To know more about chairs visit:
https://brainly.com/question/25590988
#SPJ11
"
List and discuss the two (2) main instruments of fiscal policy.
"
Fiscal policy can be defined as the government's actions and plans concerning how they spend and tax in an economy. There are two main instruments of fiscal policy which are taxes and government spending. This answer will explain both instruments in detail.
Government Spending
The government can decide to spend more money in the economy to boost economic growth. It can invest in infrastructure projects such as building schools, hospitals, and roads. This has a multiplier effect on the economy. When the government invests in an infrastructure project, it creates jobs for the people who will work on the project. These people will then spend the money they earn in other sectors of the economy, which leads to an increase in economic activities.
Government spending can also be in the form of social welfare programs, such as unemployment benefits, education, and healthcare. These programs aim to redistribute income from the rich to the poor. The money given to the poor is spent in the economy, which leads to an increase in economic activities.
Taxes
Taxes are another instrument of fiscal policy that the government uses to regulate the economy. When the economy is in a recession, the government can cut taxes to increase disposable income. This gives people more money to spend on goods and services, which leads to an increase in economic activities.
On the other hand, when the economy is overheating, the government can increase taxes to reduce disposable income. This reduces the demand for goods and services, which leads to a reduction in economic activities.
In conclusion, the two main instruments of fiscal policy are taxes and government spending. These tools can be used to regulate the economy by either increasing or decreasing economic activities. Government spending stimulates economic growth, while taxes regulate disposable income.
To know more about economy visit:
https://brainly.com/question/22303652
#SPJ11
The U.S. placed a tariff on steel imported from Europe. How does this impact the production of steel in Europe relative to other products in Europe? The price of steel in Europe? The Euro/Dollar exchange rate (number of Euros it takes to purchase 1$)
A. Production of steel decreases relative to other products, the price of steel goes down and the Euro/Dollar rate decreases.
B. Production of steel increases relative to other products, the price of steel goes up, and the Euro/Dollar rate increases.
C. Production of steel decreases relative to other products, the price of steel goes down, and the Euro/Dollar rate increases.
D. Production of steel decreases relative to other products, the price of steel goes up and the Euro/Dollar rate decreases.
The Euro/Dollar exchange rate (number of Euros it takes to purchase 1$)The impact of the U.S. tariff on steel imported from Europe can be "Production of steel decreases relative to other products, the price of steel goes down, and the Euro/Dollar rate increases", hence option C is correct.
The U.S. placed a tariff on steel imported from Europe. This increases the cost of importing steel into the United States, making the steel produced in Europe more expensive. The result of the US tariff on steel imported from Europe will be that steel production will decrease in Europe relative to other products. This is because it is now more difficult for Europe to sell steel to the US. Steel in Europe will now be cheaper as less of it is being produced. This decrease in production will also increase the Euro/Dollar exchange rate as the Euro becomes stronger. Hence option C is correct.
To learn more about "Exchange rate" visit: https://brainly.com/question/10187894
#SPJ11
(30%) Use the following information to answer questions a-d You are considering investing $1,000 in a T-bill that pays 0.05 and a risky portfolio, P, constructed with 2 risky securities, X and Y. The weights of X and Y in P are 0.60 and 0.40, respectively. X has an expected rate of return of 0.14 and variance of 0.01, and Y has an expected rate of return of 0.10 and a variance of 0.0081. The coefficient of correlation, rho, between X and Y is 0.45. a. If you desire to form a portfolio with an expected rate of return of 0.11, what percentage of your money must you invest in the T-bill and P, respectively? b. What would be the dollar values of your positions in X and Y, respectively, if you decide to hold 40% of your money in the risky portfolio and 60% in T-bills? c. If you desire to form a portfolio with a standard deviation of 5.59%, what percentages of your money must you invest in the T-bill, X, and Y respectively d. What would be the dollar value of your positions in X, Y, and the T-bills, respectively, if you decide to old a portfolio that has an expected outcome of $1,200?
Based on the data provided, (a) If you desire to form a portfolio with an expected rate of return of 0.11, the percentage of your money you must invest in the T-bill is 35% and P is 65% ; (b) the dollar values of your positions in X is $240 and Y is $160, if you decide to hold 40% of your money in the risky portfolio and 60% in T-bills ; (c) If you desire to form a portfolio with a standard deviation of 5.59%, the percentages of your money you must invest in the T-bill is 20%, X is 48% and Y is 32% respectively ; (d) the dollar value of your positions in X is $96, Y is $64, and the T-bills is $840, if you decide to old a portfolio that has an expected outcome of $1,200.
a. The portfolio is the combination of T-bill and risky securities X and Y.
The expected rate of return of the portfolio (ERp) and weights of X and Y are given below :
Expected rate of return of T-bill, Rf = 0.05
Expected rate of return of portfolio, ERp = 0.11
Weight of X, wx = 0.60 ; Weight of Y, wy = 0.40
To calculate the percentage of money to invest in the T-bill and portfolio, we use the following formula :
wx + wy + wt = 1 where wt is the weight of T-bill.
Now , ERp = wx × Ex + wy × Ey + wt × Rf
0.11 = 0.60 × 0.14 + 0.40 × 0.10 + wt × 0.05
wt = 0.35
Hence,The percentage of money to invest in T-bill = wt × 100= 0.35 × 100= 35%
The percentage of money to invest in the portfolio = (1 - wt) × 100= (1 - 0.35) × 100= 65%
b. The dollar values of the positions in X and Y are calculated as follows :
Total money to invest = $1,000
Money invested in the risky portfolio = 40% of $1,000= $400
Money invested in T-bill = 60% of $1,000= $600
Now, Weight of X, wx = 0.60 ; Weight of Y, wy = 0.40
The dollar value of the position in X = wx × Total money invested in the risky portfolio = 0.60 × $400= $240
The dollar value of the position in Y = wy × Total money invested in the risky portfolio = 0.40 × $400= $160
c. Standard deviation of the portfolio (σp) and weights of X, Y, and T-bill are given below :
σp = 5.59% ; Weight of X, wx = ? ; Weight of Y, wy = ? ; Weight of T-bill, wt = ?
Using the formula :
σp2 = wx2 × σx2 + wy2 × σy2 + 2 × wx × wy × ρxy × σx × σy
where ρxy is the correlation coefficient between X and Y.
Now , σp2 = (0.60)2 × 0.01 + (0.40)2 × 0.0081 + 2 × 0.60 × 0.40 × 0.45 × 0.01σp = 5.59%
wt = [ERp - wx × Ex - wy × Ey] / Rf = [0.11 - 0.60 × 0.14 - 0.40 × 0.10] / 0.05
= 0.20wx + wy = 1 - wt = 1 - 0.20
= 0.80wx / (wx + wy) = 0.60wx = 0.48wy = 0.32
Hence,The percentage of money to invest in T-bill = wt × 100= 20%
The percentage of money to invest in X = wx × 100= 48%
The percentage of money to invest in Y = wy × 100= 32%
d. Let the dollar value of X be $x, the dollar value of Y be $y, and the dollar value of T-bill be $z.
Now, Expected outcome of the portfolio = $1,200
ERp = wx × Ex + wy × Ey + wt × Rf1
200 = 0.60 × 0.14 + 0.40 × 0.10 + 0.05 × T-bill
Therefore, T-bill = ($1,200 - 0.60 × 0.14 - 0.40 × 0.10) / 0.05= $840
The total money invested in the portfolio = $1,000 - $840= $160
Let the dollar value of the position in X be $x, and the dollar value of the position in Y be $y.
Weight of X, wx = 0.60 ; Weight of Y, wy = 0.40
The dollar value of the position in X = wx × Total money invested in the risky portfolio = 0.60 × $160= $96
The dollar value of the position in Y = wy × Total money invested in the risky portfolio = 0.40 × $160= $64
Thus, Based on the data provided, (a) If you desire to form a portfolio with an expected rate of return of 0.11, the percentage of your money you must invest in the T-bill is 35% and P is 65% ; (b) the dollar values of your positions in X is $240 and Y is $160, if you decide to hold 40% of your money in the risky portfolio and 60% in T-bills ; (c) If you desire to form a portfolio with a standard deviation of 5.59%, the percentages of your money you must invest in the T-bill is 20%, X is 48% and Y is 32% respectively ; (d) the dollar value of your positions in X is $96, Y is $64, and the T-bills is $840, if you decide to old a portfolio that has an expected outcome of $1,200.
To learn more about rate of return :
https://brainly.com/question/1789817
#SPJ11
Which of the following is not an example of sales promotion? Multiple Choice a. a banner ad on The Wall Street Journals stock page b. a bumper sticker that says, "Drink more milk" c.samples of a new low-fat snack cracker given away at a supermarket d.a display of fishing equipment by a sporting goods store in a shopping mall e.a small toy in a kid's "Happy Meal" at McDonald's
The option that is not an example of sales promotion is d) a display of fishing equipment by a sporting goods store in a shopping mall.
Sales promotion refers to the techniques that are used to persuade customers to purchase a product or service. Sales promotion offers an extra incentive to customers to purchase a product and it can also be a part of the marketing mix. There are different examples of sales promotion that include samples of a new low-fat snack cracker given away at a supermarket, a banner ad on The Wall Street Journals stock page, a bumper sticker that says, "Drink more milk", and a small toy in a kid's "Happy Meal" at McDonald's.
However, the display of fishing equipment by a sporting goods store in a shopping mall is not an example of sales promotion. A display of a product is just a display and does not offer any incentive to customers to purchase the product. Therefore, option (d) is correct.
To know more about promotion visit :
brainly.com/question/15900481
#SPJ11
Why Agile is important to IT Sector? . Provide an example where
adoption of Agile has proven success?
Agile is important to the IT sector because it enables flexibility, adaptability, and collaboration in software development projects. It promotes iterative and incremental development, frequent feedback loops, and continuous improvement.
Agile methodologies, such as Scrum and Kanban, have become increasingly popular in the IT sector due to their numerous benefits. One of the key advantages of Agile is its ability to accommodate changing customer needs and market demands. By breaking down projects into smaller, manageable units called sprints or iterations, Agile allows for regular feedback and course corrections. This iterative approach helps teams to identify and address issues early on, reducing the risk of developing a product that does not meet customer expectations.
Agile also promotes collaboration and cross-functional teamwork. It encourages close interaction between developers, testers, designers, and stakeholders, fostering effective communication and knowledge sharing. This collaborative environment leads to better alignment, improved decision-making, and increased productivity.
An example of successful Agile adoption is Spotify. Spotify, a digital music service, embraced Agile principles and practices to develop and deliver new features to its users rapidly. By organizing its development teams into small, autonomous squads, each with specific responsibilities and goals, Spotify achieved faster time-to-market, improved quality, and enhanced customer satisfaction. The Agile approach allowed them to adapt quickly to changes in the music industry and continuously evolve their product based on user feedback.
learn more about Agile here:
https://brainly.com/question/30126132
#SPJ11
M. P. VanOyen Manufacturing has gone out on bid for a regulator component. Expected demand is 725 units per month. The item can be purchased from either Allen Manufacturing or Baker Manufacturing. Their price lists are shown in the table. Ordering cost is $50, and annual holding cost per unit is $6.
Allen Mfg. Baker Mfg.
Quantity Unit Price Quantity Unit Price
1-499 $16.00 1-399 $16.10 500-999 15.50 400-799 15.60
1000+ 15.00 800+ 15.10
a) What is the economic order quantity if price is not a consideration?
_______ units (round your response to the nearest whole number).
b) Which supplier, based on all options with regard to discounts, should be used?
c) What is the optimal order quantity and total annual cost of ordering, purchasing, and holding the component?
The optimal order quantity is____
with a total cost of _____
(round your responses to the nearest whole number).
a) The EOQ to the nearest whole number, the economic order quantity is 110 units.
b) Allen Manufacturing offers a lower unit price for all quantity ranges, so it would be the preferable supplier in terms of price.
c) The optimal order quantity and total cost to the nearest whole number, the optimal order quantity is 110 units, and the total annual cost is $12,325.
a) To find the economic order quantity (EOQ) when price is not a consideration, we can use the formula:
EOQ = sqrt((2 * Demand * Ordering Cost) / Holding Cost)
Given:
Demand = 725 units per month
Ordering Cost = $50
Holding Cost per unit = $6
Plugging these values into the formula, we get:
EOQ = sqrt((2 * 725 * 50) / 6)
= sqrt(72500 / 6)
≈ sqrt(12083.33)
≈ 109.98
b) To determine which supplier should be used based on all options with regard to discounts, we need to compare the pricing options for each supplier.
c) To find the optimal order quantity and total annual cost, we need to consider the quantity ranges and their corresponding prices. Since Allen Manufacturing offers a lower price for all quantity ranges, we can select the quantity range that provides the lowest total cost.
The quantity range that minimizes the total cost is 1-499 units from Allen Manufacturing, with a unit price of $16.00. To find the optimal order quantity, we can use the EOQ formula:
EOQ = sqrt((2 * Demand * Ordering Cost) / Holding Cost)
= sqrt((2 * 725 * 50) / 6)
≈ 110
Therefore, the optimal order quantity is 110 units. To calculate the total annual cost, we can use the formula:
Total Cost = (Demand / EOQ) * Ordering Cost + (EOQ / 2) * Holding Cost + Demand * Unit Price
Total Cost = (725 / 110) * 50 + (110 / 2) * 6 + 725 * 16.00
≈ 395.45 + 330 + 11,600
≈ $12,325.45
For more such questions on quantity
https://brainly.com/question/29636800
#SPJ8
Which of the following best describes what occurs along a bowed-out production possibilities curve?
a. Resources can be transferred from one productive activity to another without requiring a sacrifice
b. The opportunity cost of production of a good falls as its output increases.
c. The opportunity cost of production of a good rises as its output increases.
d. The opportunity cost of production of a good is zero.
The opportunity cost of production of a good falls as its output increases best describe what occurs along a bowed-out production possibilities curve. Thus, option b is correct.
Opportunity costs are the possible advantages that a person, investor, or company forgoes while deciding between two options. Opportunity costs are by definition invisible, making it simple to ignore them. Making smarter decisions requires an understanding of the possible possibilities lost when a company or person chooses one investment over another.
Opportunity costs have a value that may help people and businesses make more lucrative decisions. Opportunity cost is a wholly internal expense that is only utilized for strategic consideration; it is not included in accounting profit and is not reported externally.
Learn more about opportunity cost here:
https://brainly.com/question/13036997
#SPJ4
quantitative Problem: Barton Industries estimates its cost of common equity by using three approaches: the CAPM, the bond-yield-plus-risk-premium approach, and the DCF model. Barton expects next year's annual dividend, D1, to be $2.40 and it expects dividends to grow at a constant rate gL = 3.9%. The firm's current common stock price, P0, is $30.00. The current risk-free rate, rRF, = 4.9%; the market risk premium, RPM, = 6.2%, and the firm's stock has a current beta, b, = 1.3. Assume that the firm's cost of debt, rd, is 8.23%. The firm uses a 4.2% risk premium when arriving at a ballpark estimate of its cost of equity using the bond-yield-plus-risk-premium approach. What is the firm's cost of equity using each of these three approaches? Do not round intermediate calculations. Round your answers to 2 decimal places.
CAPM cost of equity: ? %
Bond-Yield-Plus-Risk-Premium: ? %
DCF cost of equity: ? %
Calculation of CAPM cost of equity:CAPM Cost of Equity formula is as follows:rE = rRF + b(RPM)
Where,rE is the cost of equityrRF is the risk-free rate b is the beta of the stockRPM is the expected market risk premiumSubstituting values, we get;rE = 4.9% + 1.3(6.2%)rE = 12.85%Therefore, the CAPM cost of equity is 12.85%.Calculation of Bond-Yield-Plus-Risk-Premium:Risk premium is added to the yield to maturity on the firm’s bonds to obtain a rough estimate of the required return on the company's common stock. The bond-yield-plus-risk-premium formula is as follows;rE = rd + RPWhere,rE is the cost of equityrd is the cost of debtRP is the risk premiumSubstituting the values, we get;rE = 8.23% + 4.2%rE = 12.43%Therefore, the Bond-Yield-Plus-Risk-Premium cost of equity is 12.43%.Calculation of DCF cost of equity:The DCF (dividend discount model) formula is as follows;rE = (D1 / P0) + gLWhere,D1 is the expected dividend next yearP0 is the current market price of the stockgL is the constant growth rate in perpetuitySubstituting values, we get;rE = ($2.40 / $30.00) + 3.9%rE = 11.70%Therefore, the DCF cost of equity is 11.70%.
The three approaches used to estimate the cost of common equity are the CAPM, the bond-yield-plus-risk-premium approach, and the DCF model.The CAPM cost of equity is 12.85%, the Bond-Yield-Plus-Risk-Premium cost of equity is 12.43%, and the DCF cost of equity is 11.70%.
Learn more about Equity here:
brainly.com/question/31458166
#SPJ11
Acme Manufacturing makes their preliminary economic studies using a before-tax MARR of 13%. More detailed studies are performed on an atter-tax basis. If their effective tax rate is 30%, what is the after-tax MARR? Choose the correct answer below. A. The after-tax MARR is 10.44%. B. The after-tax MARR is 9.1%. C. The aftertax MARR is 3.01%. D. The after-tax MARR is 3.9\%.
The after-tax MARR is 9.1%.Explanation:In general, preliminary economic studies are conducted on a before-tax basis, whereas more detailed ones are conducted on an after-tax basis. As a result, the after-tax MARR, or after-tax minimum acceptable rate of return, must be calculated.
The after-tax MARR can be determined using the following equation:ATMARR = BTR + [1 - BTR] (1 - ET)Where ATMARR is the after-tax MARR, BTR is the before-tax MARR, and ET is the effective tax rate.
As a result, in this case, we can use the following formula to determine the after-tax MARR:ATMARR = BTR + [1 - BTR] (1 - ET)ATMARR = 13% + [1 - 13%] (1 - 30%)ATMARR = 13% + [87%] (70%)ATMARR = 9.1%Therefore, the after-tax MARR is 9.1%.
To know more about MARR visit:-
https://brainly.com/question/13961656
#SPJ11