There are four critical paths in a network. A-B-C-D-E, A-F-E, A-B-H-J-K-E and A-S-T-E. Each activity in this network can be crashed by a maximum of 6 weeks. The crashing cost (per week), for the first week, for activity A is: $540, E is $545 and all other activities is : $135 (per week per activity). The crashing cost, second week and onwards, for activity A is $1080 per week, E is $1350 per week and for all other activities is $405 per activity per week. You have a maximum crashing budget of $2300. The maximum possible reduction in the project duration will be: a. 4 weeks b. 2 weeks c. 5 weeks d. 1 week e. 3 weeks

Answers

Answer 1

After analyzing all the critical paths  the maximum possible reduction in the project duration is 1 week. The correct option is d. 1 week.

To determine the maximum possible reduction in the project duration within the given budget, we need to analyze the critical paths and crashing costs.

The crashing cost per week for activity A is $540 in the first week and $1080 per week from the second week onwards. For activity E, it is $545 in the first week and $1350 per week thereafter. For all other activities, the crashing cost is $135 per activity per week in the first week and $405 per activity per week thereafter.

Considering the crashing budget of $2300, let's calculate the maximum reduction for each critical path:

A-B-C-D-E: The total crashing cost for this path is $1350 (for A and E) + $405 (for B, C, and D) = $1755 per week. With a budget of $2300, this path can be crashed for a maximum of $2300 / $1755 = 1.31 weeks. Therefore, the maximum reduction for this path is 1 week.

A-F-E: The total crashing cost for this path is $1350 (for E) + $405 (for F) = $1755 per week. With the given budget, this path can be crashed for a maximum of $2300 / $1755 = 1.31 weeks. Hence, the maximum reduction for this path is 1 week.

A-B-H-J-K-E: The total crashing cost for this path is $1350 (for A and E) + $810 (for B, H, J, and K) = $2160 per week. This path can be crashed for a maximum of $2300 / $2160 = 1.06 weeks. Thus, the maximum reduction for this path is 1 week.

A-S-T-E: The total crashing cost for this path is $1350 (for A and E) + $540 (for S and T) = $1890 per week. This path can be crashed for a maximum of $2300 / $1890 = 1.22 weeks. Hence, the maximum reduction for this path is 1 week.

After analyzing all the critical paths, we observe that the maximum possible reduction in the project duration is 1 week.

The correct option is d. 1 week.

For more such questions on Reduction

https://brainly.com/question/13107448

#SPJ8


Related Questions

In the formula, =2+6*2, addition would be calculated after multiplication. True or False

Answers

Answer:

TRUE

Step-by-step explanation:

PEMDAS rules:

P- Parentheses

E- Exponents

M- Multiplication

D- Division

A- Addition

S- Subtraction

so your answer is TRUE

m∠2 = 52°. Find m∠SQR.

Answers

Can u show the full question please ?

Each member of the football team was asked to report the year he was born. Which measure gives the most common year of birth? Mean Median Mode

Answers

The measure that gives the most common year of birth is the mode.

The mode is the value that appears most frequently in a given dataset. In the context of the football team, each member reported the year they were born, and the mode would be the birth year that is reported by the highest number of team members.

On the other hand, the mean is calculated by summing up all the values in the dataset and dividing by the total number of values. The mean provides the average value and may not necessarily represent the most common year of birth.

The median, on the other hand, is the middle value in a dataset when it is arranged in ascending or descending order. If there is an odd number of data points, the median is the value at the center. If there is an even number of data points, the median is the average of the two middle values. While the median can give us the middle point of the dataset, it does not necessarily indicate the most common year of birth.

Therefore, if you want to find the most common year of birth reported by the football team members, you should look for the mode.

To know more about click mode here:

https://brainly.com/question/31636475

#SPJ4

degrees Fahrenheit follows a periodic pattern. The graph below shows the
temperature over two days, where time t is measured in hours after 12:00
a.m. (midnight) on the first day.
Temperature (in degrees Fahrenheit)
R$33849
(3.52)
(15,66)
(27,52)
(39,66)
2 4 6 8 10 12 14 16 18 20 22 24 26 28 30 32 34 36 38 40 42 44 46 487
Time (in hours)
Write an equation in terms of y, temperature in
degrees Fahrenheit, and t, time in hours, to represent

Answers

The sine function for the temperature is given as follows:

y = 7sin(π/12(x - 14)) + 59.

How to define a sine function?

The standard definition of the sine function is given as follows:

y = Asin(B(x - C)) + D.

For which the parameters are given as follows:

A: amplitude.B: the period is 2π/B.C: phase shift.D: vertical shift.

The function oscillates between 52 and 66, for a difference of 14, hence the amplitude is given as follows:

2A = 14

A = 7.

The function oscillates between -A + 59 and A + 59, hence the vertical shift is given as follows:

D = 59.

The period is of 39 - 15 = 24 units, hence the coefficient B is given as follows:

2π/B = 24

B = π/12.

The function is at it's midline after 14 hours, hence the phase shift is given as follows:

C = 14.

Thus the function is given as follows:

y = 7sin(π/12(x - 14)) + 59.

More can be learned about trigonometric functions at brainly.com/question/21558626

#SPJ1

Which of the following is correct please?

Answers

Answer:  Choice A

Reason:

Cosine and sine are positive in quadrant 1, which is when x > 0 and y > 0.

Recall that [tex]\text{x} = \cos(\theta)[/tex] and [tex]\text{y} = \sin(\theta)[/tex]

Quadrant 1 in the northeast corner corresponds to the interval [tex]0^{\circ} < \theta < 90^{\circ}[/tex]

an item is regularly priced at $91 . it is on sale for 35% off the regular price. use the aleks calculator to find the sale price.

Answers

The sale price of an item that is regularly priced at $91 and is on sale for 35% off the regular price using the aleks calculator is $59.15.

To calculate the sale price of an item that is regularly priced at $91 and is on sale for 35% off the regular price using the aleks calculator we will follow these steps:

Step 1: Calculate the amount of discount = Regular Price × Discount rate

Discount rate = 35/100

Simplifying the value we have:

Discount rate = 0.35

Amount of discount = 91 × 0.35

Amount of discount = $31.85

Step 2: Calculate the sale price

Sale price = Regular price − Amount of discount

Sale price = $91 − $31.85

Sale price = $59.15

Hence, the sale price of an item that is regularly priced at $91 and is on sale for 35% off the regular price using the aleks calculator is $59.15.

Learn more about percentage here:

https://brainly.com/question/29763752

#SPJ11

Determine If The Function Defines An Inner Product On R2, Where U = (Ul,U2) And V-(Y, V2). (Select All That Apply.) (U, V) = U1v1

Answers

No, the function (U, V) = U1V1 does not define an inner product on R2 because it fails to satisfy the linearity, symmetry, and positive definiteness properties required for an inner product.

An inner product on a vector space should satisfy certain properties, including linearity in the first argument, symmetry, and positive definiteness. Let's evaluate these properties for the given function (U, V) = U1V1:

Linearity in the first argument: For the function to be an inner product, it should be linear in the first argument. However, the given function is not linear since (U, aV) = U1(aV1) ≠ a(U1V1) when a is a scalar. Thus, it fails the linearity property.Symmetry: An inner product should be symmetric, meaning (U, V) = (V, U) for all U and V. In this case, we have (U, V) = U1V1 but (V, U) = V1U1. Since U1V1 and V1U1 are not always equal, the symmetry property is not satisfied.Positive definiteness: An inner product should have a positive definite property, meaning (U, U) > 0 for all nonzero U. In the given function, (U, U) = U1U1, which is only positive if U1 ≠ 0. However, if U1 = 0, then (U, U) = 0, violating the positive definiteness property.

In conclusion, the given function (U, V) = U1V1 does not define an inner product on R2 as it fails to satisfy the linearity, symmetry, and positive definiteness properties.

To learn more about Linearity, visit:

https://brainly.com/question/2030026

#SPJ11

I need the vertex, roots, and y-intercept.

Answers

The vertex, roots, and the y-intercept are (18, -4608), 6 & -6 and h(0) = 576

How to determine the vertex, roots, and y-intercept

From the question, we have the following parameters that can be used in our computation:

Initial height = 576

Given that there is no initial force, the equation of the function is

h(t) = -16t² + 576

For the vertex, we have

t =-576/(2 * -16)

t = 18

So, we have

h(t) = -16(18)² + 576

h(t) = -4608

So, the vertex is (18, -4608)

For the y-intercept, we have

h(0) = -16(0)² + 576

h(0) = 576

For the roots, we have

-16t² + 576 = 0

t² = 36

So, we have

t = 6 and -6

Read more about height function at

https://brainly.com/question/10837575

#SPJ1

Neglect a is constructive response to job satisfaction. True False

Answers

Neglect a is constructive response to job satisfaction is the false statement.

Neglect is not a constructive response to job satisfaction. It refers to a situation where employees feel ignored, unappreciated, or unsupported in their work, which can negatively impact their job satisfaction. Constructive responses to job satisfaction involve addressing concerns, providing support, and promoting a positive work environment.

Job satisfaction refers to an individual's level of contentment and fulfillment with their job. It is influenced by various factors such as work environment, compensation, relationships with colleagues, opportunities for growth, and alignment with personal values.

When employees experience job dissatisfaction, they may respond in different ways. One possible response is neglect, which refers to a passive and disengaged attitude towards work. Neglectful employees may become indifferent, withdraw their effort, or mentally check out from their responsibilities.

Learn more about statisfaction at https://brainly.com/question/31484119

#SPJ11

Let f be the function defined above, where b is a constant. For what values of b, if any, is f continuous at x=3.
f(x) = a2 + x2 for x < 3 a (x + 3) for x > or equal to 3

Answers

For the function f to be continuous at x = 3, the value of b must be equal to 3.

To determine the values of b for which the function f is continuous at x = 3, we need to check if the left-hand limit and the right-hand limit of the function exist and are equal at x = 3.

The left-hand limit of f(x) as x approaches 3 is given by:

lim(x→3-) f(x) = lim(x→3-) (a^2 + x^2)

Since the function f(x) is defined as (a^2 + x^2) for x < 3, we can substitute x = 3 into this expression:

lim(x→3-) f(x) = a^2 + 3^2 = a^2 + 9

Similarly, the right-hand limit of f(x) as x approaches 3 is given by:

lim(x→3+) f(x) = lim(x→3+) (a(x + 3))

Since the function f(x) is defined as a(x + 3) for x ≥ 3, we can substitute x = 3 into this expression:

lim(x→3+) f(x) = a(3 + 3) = 6a

For the function f to be continuous at x = 3, the left-hand limit and the right-hand limit must be equal.

Therefore, we have the equation:

a^2 + 9 = 6a

Rearranging the equation:

a^2 - 6a + 9 = 0

This is a quadratic equation in terms of a. To find the values of a that satisfy this equation, we can factor it:

(a - 3)(a - 3) = 0

The equation is a perfect square, and the only solution is a = 3.

To know more about function refer here:

https://brainly.com/question/24589309#

#SPJ11

Find an nth-degree polynomial function with real coefficients satisfying the given conditions.
n=4
2i and 3i are zeros
f(-1)=150

Answers

An nth-degree polynomial function with real coefficients satisfying the given conditions and n = 4, 2i and 3i are zeros and f(-1) = 150 can be found as follows:First of all, the complex conjugate of 2i is -2i and that of 3i is -3i. Since all coefficients of the polynomial are real, so their product must also be a factor of the polynomial.

The factor of the polynomial whose zeroes are 2i and -2i is(x - 2i) (x + 2i) = (x^2 + 4).Similarly, the factor of the polynomial whose zeroes are 3i and -3i is(x - 3i) (x + 3i) = (x^2 + 9).Therefore, the nth-degree polynomial function with real coefficients satisfying the given conditions is:f(x) = a (x^2 + 4) (x^2 + 9)Where a is the constant of proportionality.To find the value of a, substitute the value of x as -1 in the equation given in the problem and equate it to 150.

f(-1) = a ((-1)^2 + 4) ((-1)^2 + 9)150 = a (5) (10)a = 150/50a = 3

Hence, the required nth-degree polynomial function with real coefficients satisfying the given conditions is:f(x) = 3 (x^2 + 4) (x^2 + 9) and it has been obtained above.

To know more about polynomial visit :

https://brainly.com/question/11536910

#SPJ11

Given sin 56=q
Determine without the use of a calculator, the value of the following

1.Cos 146
2.Sin 112


Determine the general Solution of cos 2theta + 4sin²theta -5sintheta-4=0

Answers

1. cos 146 = -cos(124).

2. sin 112 = sin(68).

3.   The general Solution of cos 2theta + 4sin²theta -5sintheta-4=0 6sin²theta - 5sin theta - 5 =0

How do we calculate?

1.

We will make use of the unit circle and the periodicity of the cosine function.

Since cos(theta) represents the x-coordinate of a point on the unit circle corresponding to an angle theta.

We go ahead and determine  an angle in the range [0, 360) that is close to 146.

146 is larger than 90, so we subtract 90 from it to get 56.

cos(56) is the same as cos(180 - 56) because cosine is an even function.

We hence determine the reference angle by subtracting 56 from 180, which gives us 124.

cos is positive in the second and third quadrants and

cos 146 is the same as cos(180 + 124) = cos(124).

2.We also use the unit circle and the periodicity of the sine function.

sin(theta) is a representation of the y-coordinate of a point on the unit circle corresponding to an angle theta.

we then determine an angle in the range [0, 360) that is close to 112.

112 is larger than 90, so we subtract 90 from it to get 22.

sin(22) is the same as sin(180 - 22)

We as well find the reference angle by subtracting 22 from 180, which gives us 158.

Since sin is positive in the first and second quadrants,

sin 112 is the same as sin(180 - 112) =  sin(68).

3. The general solution of

cos 2theta + 4sin²theta - 5sin theta - 4 = 0

cos 2theta + 4sin²theta - 5sin theta - 4 = 0

We write cos 2theta using the double-angle formula:

2cos²theta - 1 + 4sin²theta - 5sin theta - 4 = 0

2cos²theta + 4sin²theta - 5sin theta - 5 = 0

2(cos²theta + 2sin²theta) - 5sin theta - 5 = 0

The identity has it that sin²theta + cos²theta = 1:

2(1 - cos²theta + 2sin²theta) - 5sin theta - 5 = 0

2 - 2cos²theta + 4sin²theta - 5sin theta - 5 = 0

-2cos²theta + 4sin²theta - 5sin theta - 3 = 0

substitute cos²theta = 1 - sin²theta:

-2(1 - sin²theta) + 4sin²theta - 5sin theta - 3 = 0

-2 + 2sin²theta + 4sin²theta - 5sin theta - 3 = 0

6sin²theta - 5sin theta - 5 =0

learn more about sine function at:

https://brainly.com/question/12595712

#SPJ1


HELP WITH AREA AND VOLUME!!! Due at 11:59 !! 40pts

Answers

The values are;

1.Volume = 70 cm³

Area = 379. 7 cm²

2.  Volume = 1017. 36 cm³

Area = 565. 2 cm²

3.  Volume = 864 cm³

Area  = 93. 24cm²

4. Volume = 1200cm³

Area = 12√3cm²

How to determine the values

We have that the volume of a triangular prism is expressed as;

1.

Volume = Base × height

Substitute the values, we have;

Volume = 14 ×5

Volume = 70 cm³

Area = bh + (s₁+ s₂+ s₃)l

Substitute the values as shown, we have;

Area = 14 ×12.12 + (14 + 14 + 14) 5

Multiply the values, we have;

Area = 169. 68 + 210

Area = 379. 7 cm²

2. Volume of the cylinder = πr²h = 3.14 × 6²×9

Volume = 1017. 36 cm³

Area of the cylinder = 2πrh + 2πr²

Area = 339. 12 + 226. 08

Area = 565. 2 cm²

3. Volume =3abh = 3× 8 ×6 × 6

Volume = 864 cm³

Area = 3√3/2a² = 2. 59 × 36 = 93. 24cm²

4. Volume = lwh = 10 × 10 × 12 = 1200cm³

Area = pq/2 = 12 ×2√3/2 = 12√3cm²

Learn more about area at: https://brainly.com/question/25292087

#SPJ1

the equation needed to calculate the experimentally determined magnitude of the coulomb force as a function of l, xball, m, and the local gravitational constant g. note that xball is a variable. all the other symbols are constants.

Answers

The equation to calculate the experimentally determined magnitude of the Coulomb force as a function of l, xball, m, and the local gravitational constant g can be given as:

[tex]F=(k*q1*q2)/(l^2+xball^2)^(3/2)[/tex]

Where:

F is the magnitude of the Coulomb force.

k is the electrostatic constant.

q1 and q2 are the charges involved.

l is a constant representing the separation distance in one dimension.

xball is the variable representing the distance in the other dimension (it can vary).

m is a constant representing the mass of the objects involved.

g is the local gravitational constant.

The equation takes into account the inverse square relationship between the separation distance and the magnitude of the Coulomb force. The distance in both dimensions (l and xball) contributes to the overall distance between the charges. The constant terms (k, q1, q2, m, and g) are used to factor in the specific values of the charges and masses involved.

Please note that this equation assumes a simplified scenario and may not account for other factors or complexities that could affect the Coulomb force in a specific experimental setup.

To know more about coulomb force:

https://brainly.com/question/28306447

#SPJ4

Need help asap!

1. sin theta =

-15/17
8/17
15/17
-8/17

2. cos theta =

-8/17
15/17
-15/17
8/17

3. tan theta =

8/15
15/8
-15/17
-15/8

4. csc theta =

-17/8
-17/15
17/15
17/8

5. sec theta =

17/15
-17/8
-17/15
17/8

6. cot theta =

15/8
-15/17
-15/8
8/15

Answers

Based on the given values, we can use the acronym SOHCAHTOA to determine sin theta, cos theta, and tan theta as:

sin theta = opposite/hypotenuse = -15/17
cos theta = adjacent/hypotenuse = 8/17
tan theta = opposite/adjacent = -15/8

Then, using the reciprocal identities, we can determine csc theta, sec theta, and cot theta as:

csc theta = 1/sin theta = -17/15
sec theta = 1/cos theta = 17/8
cot theta = 1/tan theta = -8/15

Therefore, the answers are:
1. sin theta = -15/17
2. cos theta = 8/17
3. tan theta = -15/8
4. csc theta = -17/15
5. sec theta = 17/8
6. cot theta = -8/15

determine the open t-intervals on which the curve is concave downward or concave upward. x = 5 3t2, y = 3t2 t3

Answers

The curve is concave downward for t < -1, and concave upward for t > -1

The concavity of the curve defined by the parametric equations x = 5t² and y = 3t² + t³, we need to analyze the second derivatives with respect to t.

First, we find the first derivatives:

dx/dt = 10t

dy/dt = 6t + 3t²

Next, we find the second derivatives:

d²x/dt² = 10

d²y/dt² = 6 + 6t

To determine the concavity, we examine the sign of the second derivative.

When d²y/dt² > 0, the curve is concave upward.

When d²y/dt² < 0, the curve is concave downward.

Now, let's find the values of t for which the curve changes concavity:

d²y/dt² > 0:

6 + 6t > 0

t > -1

d²y/dt² < 0:

6 + 6t < 0

t < -1

So, the curve is concave upward for t > -1, and concave downward for t < -1.

To determine the open t-intervals on which the curve is concave downward or concave upward, we need to find the interval for t where the concavity changes.

Since t < -1 is the only value for which the concavity changes, the open t-interval on which the curve is concave downward is (-∞, -1), and the open t-interval on which the curve is concave upward is (-1, ∞).

Therefore, the curve is concave downward for t < -1, and concave upward for t > -1.

To know more about concave downward click here :

https://brainly.com/question/31310143

#SPJ4

choose the correct solution to the system of linear equations. Step by Step please.​

Answers

The correct solution to the system of linear equations is x = 6, y = 10

The correct answer choice is option B.

What is the correct solution to the linear equation?

y = x + 4

y = 2x - 2

Substitute the value of y in (1) into (2)

y = 2x - 2

x + 4 = 2x - 2

combine like terms

4 + 2 = 2x - x

6 = x

Substitute x = 6 into (1)

y = x + 4

y = 6 + 4

y = 10

Ultimately, the value of x and y from the linear equation is 6 and 10 respectively.

Read more on linear equations:

https://brainly.com/question/28732353

#SPJ1

Volume of a cube (cm') = width (cm) x height (cm) x length (cm). 1.1) Using the equation above, determine the volume of a cube that measures 3 cm wide, 3 cm tall, and 3 cm long. 1.2) Let's say this cube is made out of ice and has a mass of 24.76 grams (g). What is this ice cube's density? 1.3) The density of liquid water is slightly higher than that of frozen water ice. Liquid water's density at standard pressures and temperatures is 1.00 grams per cubic centimeter (g/cm'). Given that density, what is the mass of a cube of water measuring 3 cm wide, 3 cm tall, and 3 cm long? 1.4) Compare the weight of the water you calculated in question 1.3 with the weight of the ice of the same volume given in question 1.2. Which is heavier, the liquid water or the ice? Notice that the cube of water is the same size (or volume) as the cube of ice. 1.5) You know that ice floats on water. Explain why.

Answers

1.1) The volume of the cube is 27 cubic centimeters. 1.2)the density of the ice cube is approximately 0.917 grams per cubic centimeter (g/cm³).

1.3) the mass of the water cube is 27 grams. 1.4) the weight of the water and the ice would be the same under the same conditions. 1.5)In simpler terms, ice floats on water because it is lighter (less dense) than the water, allowing it to displace an amount of water equal to its weight and float on the surface.

1.1) The volume of the cube can be calculated using the equation: Volume = width x height x length. In this case, the cube measures 3 cm wide, 3 cm tall, and 3 cm long, so the volume is:

Volume = 3 cm x 3 cm x 3 cm = 27 cm³.

Therefore, the volume of the cube is 27 cubic centimeters.

1.2) Density is defined as mass divided by volume. The mass of the ice cube is given as 24.76 grams, and we already determined the volume to be 27 cm³. Therefore, the density of the ice cube is:

Density = Mass / Volume = 24.76 g / 27 cm³ ≈ 0.917 g/cm³.

Therefore, the density of the ice cube is approximately 0.917 grams per cubic centimeter (g/cm³).

1.3) The volume of the water cube is the same as the ice cube, which is 27 cm³. Given the density of liquid water as 1.00 g/cm³, we can calculate the mass of the water cube using the equation:

Mass = Density x Volume = 1.00 g/cm³ x 27 cm³ = 27 grams.

Therefore, the mass of the water cube is 27 grams.

1.4) The weight of an object depends on both its mass and the acceleration due to gravity. Since the volume of the water cube and the ice cube is the same (27 cm³), and the mass of the water cube (27 grams) is equal to the mass of the ice cube (24.76 grams), their weights would also be equal when measured in the same gravitational field.

Therefore, the weight of the water and the ice would be the same under the same conditions.

1.5) Ice floats on water because it is less dense than liquid water. The density of ice is lower than the density of water because the water molecules in the solid ice are arranged in a specific lattice structure with open spaces. This arrangement causes ice to have a lower density compared to liquid water, where the molecules are closer together.

When ice is placed in water, the denser water molecules exert an upward buoyant force on the less dense ice, causing it to float. The buoyant force is the result of the pressure difference between the top and bottom surfaces of the submerged object.

In simpler terms, ice floats on water because it is lighter (less dense) than the water, allowing it to displace an amount of water equal to its weight and float on the surface.

Learn more about cube;

brainly.com/question/15420947

#SPJ4

Tekan-Tekan Sdn. Bhd. has order for 200 Model AS-120 calculator for delivery on day 200. The calculator consists of three parts. Components 2 and 3 form subassembly 1 . Sub-assembly 1 and component 4 form the final assembly. Following are the work centers and times of each operation. Table Q3(a) shows routine file of the operation. Assuming: - Only one machine is assigned to each operation - The factory works on 8-hour shift, 5 days a week - All parts move in one lot of 200. (a) Illustrate the backward schedule based on the information given above. (12 marks) (b) Identify when component 3 must be started to meet the delivery date. (2 marks)

Answers

Component 3 must be started on day 197 to meet the delivery date of day 200.

To illustrate the backward schedule, we need to start from the delivery date (day 200) and work our way backward, taking into account the lead times and dependencies of each operation.

(a) Backward schedule:

Operation    |  Work Center  |  Time (hours)  |  Start Day

--------------------------------------------------------

Final Assembly |   Work Center 1  |        1       |     200

Sub-assembly 1 |   Work Center 2  |        2       |     199

Component 4     |   Work Center 3  |        3       |     197

Component 2     |   Work Center 4  |        4       |     196

Component 3     |   Work Center 5  |        3       |     ????

(b) To identify when component 3 must be started to meet the delivery date, we need to consider its dependencies and lead times.

From the backward schedule, we see that component 3 is required for sub-assembly 1, which is scheduled to start on day 199. The time required for sub-assembly 1 is 2 hours, which means it should be completed by the end of day 199.

Since component 3 is needed for sub-assembly 1, we can conclude that component 3 must be started at least 2 hours before the start of sub-assembly 1. Therefore, component 3 should be started on day 199 - 2 = 197 to ensure it is completed and ready for sub-assembly 1.

Hence, component 3 must be started on day 197 to meet the delivery date of day 200.

Learn more about Scheduling here:

brainly.com/question/30012511

#SPJ4

The mapping diagram represents a relation where x represents the independent variable and y represents the
dependent variable.
x-values
-4
-2
0
3
y-values
-5
-4
-3
-2
-1
Is the relation a function? Explain.
O No, because for each input there is not exactly one output
O No, because for each output there is not exactly one input
O Yes, because for each input there is exactly one output
O Yes, because for each output there is exactly one input

Answers

Answer: Option C is correct, Yes, because for each input there is exactly one outputWhat is a function?A relation is a function if it has only One y-value for each x-value.To determine whether the relation is a function or not, we need to check whether each input in the domain (the x values) is paired with exactly one output in the range (the y values).The input value of -3 is paired with the output value of 0The input value of -1 is paired with the output value of 2The input value of 1 is paired with the output value of 0The input value of 3 is paired with the output value of 2The input value of 5 is paired with the output value of 5Since each input in the domain is paired with exactly one output in the range, the relation is a function.Therefore, the correct answer is: Yes, because for each input there is exactly one output.

Step-by-step explanation:

C is the correct answer

Simplify (3x4y3)(4x2y).

12x6y4
12x6y3
12x2y2
7x6y4

Answers

The simplified expression is 12x^6y^4.

To simplify the expression (3x^4y^3)(4x^2y), we need to multiply the coefficients and combine the variables with the same base by adding their exponents.

Multiplying the coefficients:

3 * 4 = 12

For the x variable, we add the exponents:

4 + 2 = 6

For the y variable, we add the exponents:

3 + 1 = 4

Therefore, the simplified expression is:

12x^6y^4

for such more question on simplified expression

https://brainly.com/question/4344214

#SPJ8

45 points if someone gets it right.

You randomly pull a rock from a bag of rocks. The bag has 2 blue rocks, 3 yellow rocks, and 2 black rocks.

After that, you spin a spinner that is divided equally into 9 parts are white, 3 parts are blue, 2 parts are black, and 2 parts are purple.

What is the probability of drawing a yellow rock and then the sppinter stopping at a purple section.

Answers

Answer:    3/56

Step-by-step explanation:

First bag of rocks:

2 blue

3 yellow

2 black

Total: 7 rocks

P(yellow) = 3/7      >There are 3 yellow out of 7 total

Second spinner:

9 white

3 blue

2 black

2 purple

Total: 16 colors

P(purple) = 2/16 = 1/8           >There are 2 purples out of 16 total, then

                                              reduce

Because the second probability is dependent "AND THEN" is an indicator of dependence.  multiply the 2 probabilities

P(yellow AND purple) = (3/7)(1/8)

P(yellow AND purple) = 3/56

A Web site defines a regular polygon as “a polygon with all angles the same measure.” Is this definition valid?

Answers

Answer:

A regular polygon is a sided polygon in which the sides are all the same length and are symmetrically placed about a common center

Step-by-step explanation:

Your website was partially correct, but wasn't completely reliable. Hope this helped!

Which of the following correctly expresses all values of x if lx - 2| = 1?
(A) x = -1, x = -2
(B) x = 1, x=-1
(C) x = -1, x = 0
(D) x = 1, x = 2
(E) x = 1, x = 3

Answers

Answer:

(E) x = 1, x = 3

Step-by-step explanation:

|x-2| = +- 1

x-2 = 1

x = 3

x-2 = -1

x = 1

Identity the key features of the exponential function(x) = 5* and its graph by completing each sentence:
The domain is
The range sys
The asymptole is y=
The y-intercept is

Answers

The key features of the exponential function(x) = 5^x and its graph are:The domain is all real numbers.The range is (0, ∞).The asymptote is y = 0.The y-intercept is (0,1).

The key features of the exponential function(x) = 5^x and its graph are as follows:

Domain: The domain of an exponential function is all real numbers. Thus, for the given exponential function, the domain is all real numbers.

Range: The range of the exponential function is given by the formula (0, ∞), which implies that the function takes all the positive values, but it never touches the horizontal axis. Thus, for the given exponential function, the range is (0, ∞).

Asymptote: As the exponential function (x) = 5^x grows unboundedly in the positive direction, it does not have a horizontal asymptote. Instead, it has a vertical asymptote at x = -∞, which means that the graph approaches the y-axis but never touches it. Thus, the asymptote is y = 0.

y-intercept: The y-intercept of a function is the point at which it crosses the y-axis. For the exponential function, the y-intercept occurs when x = 0. Thus, substituting x = 0 in the given exponential function, we get:y = 5^0 = 1Hence, the y-intercept is (0,1).

Know more about exponential here:

https://brainly.com/question/29287497

#SPJ11

Choose one answer and explain your choice: Suppose A and B are
disjoint events. Are A and B independent
events? i) Yes
ii) No
iii) It depends.

Answers

If A and B are disjoint events, then the probability of A or B is the sum of their individual probabilities. However, this does not necessarily mean that A and B are independent events.

If A and B are independent events, then the probability of both A and B occurring is the product of their individual probabilities. However, if A and B are disjoint, then the probability of both A and B occurring is zero. Therefore, A and B cannot be independent if they are disjoint events.Hence, the correct answer is (ii) No. A and B are disjoint events, which means that they do not have any outcomes in common. If A and B are independent events, then the occurrence of one event will not affect the occurrence of the other event. If A and B are not independent events, then the occurrence of one event will affect the occurrence of the other event.

Since A and B are disjoint events, they cannot be independent events. If A and B are independent events, then they cannot be disjoint events. Hence, the correct answer is (ii) No

To know more about Probability visit-

https://brainly.com/question/31828911

#SPJ11

Calculate the perimeter of the rectangle in terms of x^y given 3x width

Answers

Answer:

3 x X =y

Step-by-step explanation:

x=5

y=15

15+15+5+5=40

Which statements best describe the data? 1, 6, 6, 6, 8 Eight is an outlier. The data is concentrated around 6 and 1 is an outlier. The mean is 4.5 and the range is 7. The range is 6.

Answers

Step-by-step explanation:

The statements that best describe the data are:

- The data is concentrated around 6.

- The range is 6.

Explanation:

- The fact that the numbers 6 appear multiple times suggests that 6 is a mode of the data set, and that the data is concentrated around this value.

- There is no indication that 8 is an outlier, as it is not significantly farther from the other values than they are from each other.

- There is no indication that 1 is an outlier, as it is not significantly farther from the other values than they are from each other.

- The mean of the data set is (1+6+6+6+8)/5 = 5.4, which is not equal to 4.5.

- The range of the data set is the difference between the largest and smallest values: 8 - 1 = 7. However, this is not an accurate description of how spread out the data is, as most of the values are clustered around 6 and the range is being dominated by 8 which is not significantly far from 6s. A better measure of spread in this case would be the interquartile range or standard deviation.

a concrete beam of cross sectional area (16×16)m is 1.6m Long. what is the volume of the beam​

Answers

Answer: 409.6 m^3

Step-by-step explanation:

The volume of a rectangular prism is given by the formula V = l*w*h. The beam is considered a rectangular prism. We already know the area of the beam since it is specified as 16*16. This is also the l*w since area is l*w. So, V = 16*16*h. The height is given as 1.6 m. V = 16*16*1.6 = 409.6 m^3.

To calculate the volume of the concrete beam, we need to multiply its cross-sectional area by its length.

The cross-sectional area of the beam is given as (16 × 16) m² = 256 m².

The length of the beam is given as 1.6 m.

To find the volume, we multiply the cross-sectional area by the length:

Volume = Cross-sectional area × Length
= 256 m² × 1.6 m
= 409.6 m³

Therefore, the volume of the concrete beam is 409.6 cubic meters.

A $10,000 Treasury bill has 87 days until maturity and its bank discount yield is 1.32% per year. What is the bill's price? 1) $9,973.94 2) $9,960.31 3) $9,951.93 4) $9,979.68 5) $9,968.10

Answers

The bill's price is $9,968.10. The correct answer is option 5

To calculate the price of the Treasury bill, we can use the formula for bank discount yield:

BDY = (Discount / Face Value) * (360 / Days) * 100

Given:

Bank discount yield (BDY) = 1.32%

Days until maturity (Days) = 87

Face Value = $10,000

Let's rearrange the formula to solve for the discount:

Discount = (BDY / 100) * (Face Value) * (Days / 360)

Discount = (1.32 / 100) * $10,000 * (87 / 360)

Discount ≈ $31.9

The price of the Treasury bill can be calculated by subtracting the discount from the face value:

Price = Face Value - Discount

Price = $10,000 - $31.9

Price ≈ $9,968.10

Therefore, the bill's price is approximately $9,968.18.

Among the given answer choices, the correct option price is 5) $9,968.10.

To know more about treasury bill visit:

brainly.com/question/17204626

#SPJ11

Other Questions
Labor costs that are clearly associated with specific units or batches of product because the labor is used to convert raw materials into finished products called are: a.Sunk labor. b.Direct labor. c.Indirect labor. d.Finished labor. e.All of the above. 1. A basket of goods costs $3,850 in the U.S. Exact same goods basket costs 3,100 in Europe. The exchange rate is $1.26/A. What is the over/undervaluation of the USD? (percent)B. What is the over/undervaluation of the ? (percent)2. Regarding Q1, how much cheaper/more expensive is the U.S. basket than the European basket? (in percentage terms) explain the impact of covid-19 to the housing prices in china(increasing). Why is it the condition?...Require about 300-500 words.please address China's condition.downvote will receive if just copy and paste online. dont want answer for other countries or globally Create your own brand. State what product/ service you want to sell in the market and why you think this product would be purchased by the consumers. Who are your rivals and What different do you have to offer to the consumers?Now, choose 2-3 elements from the brand elements mix and state the reason why you choose them and how those elements would work for your company. (For eg: if you are choosing a brand logo, create a logo for your brand, if choosing a brand name, create a name for your brand, etc.) Discuss the three market entry strategies when the firms go Global. If the distance between two objects is 4.00 m and the distance is tripled, then what is the new distance? 3 The demand for cigarettes is quite interesting to observe. When considering the price elasticity of demand, some people consider the demand for cigarettes to be inelastic; others consider it to be elastic. And since cigarettes are expensive, some may consider cigarettes a luxury good, but others may say it an inferior good. What is your opinion on these two points? Please briefly discuss using concepts of elasticities we learn in class to support your arguments. Select the correct answer from each drop-down menu.In an ecosystem, organisms are dependent on each other for their survival. Small fish eat plankton. In the fish, chemical energy fromplankton is converted intoand used by fishes to swim. These fish are then devoured by large fishelease energy, which is then absorbed by other organisms in the ecosystem. This flow ofBacteria break down the deenergy is an example of the oxygenated energyradiant energymechanical energyResetNext The substitution effect is the effect ofA) a change in income on the quantity bought when the consumer moves to a higher indifference curve.B) a change in price on the quantity bought when the consumer hypothetically remains on the same indifference curve.C) a change in income on the quantity bought.D) a change in the best affordable point.E) a change in price on the quantity bought when the consumer moves to a higher indifference curve. The Bank of Canada's formal policy target is It's current target is to keep the annual inflation rate close to \( \% \). a. core inflation; 0 b. the money supply; 1 c. core inflation; 1 d. CPI inflation Question 16 w winiete uns assessment. [CLO-2] Explain what revenues and costs are relevant when choosing among alternatives. Give two examples Gabriel owns two firms that produce widgets. Each firm produces identical products. Firm 1s production function is given by (,K)=^0.5(K^0.5 +1), and firm 2s production function is given by (,K)=^(1/3)K^(1/3). The firms differ, however, in the amount of capital equipment each has. Firm 1 has K1 =4, whereas firm 2 has K2 =8. is the wage rate of and is the rental rate of K. = =1.(a) If Gabriel wishes to minimize short-run total costs of production, how should output be allocated between the two firms?(b) Given that output is optimally allocated between the two firms, calculate the short-run total and average cost functions for Gabriels production.(c) Calculate the long-run total and average cost functions. How should Gabriel allocate production between the two firms in the long run? You are considering purchasing a consol that promises annual payments of $4. a. If the current interest rate is 3 percent, what is the price of the consol? Instructions: Round your answer to the nearest penny (2 decimal places). The price of the consol is $ b. You are concerned that the interest rate may rise to 4 percent. Compute the percentage change in the price of the consol and the percentage change in the interest rate. Compare them. Instructions: Round your answer for dollar amounts to the nearest penny (2 decimal places ) and answers for percentages to the nearest tenth (1 decimal place) The new price of the consol would be $ The price of the consol falls by 7% and the interest rises by 7% c. Your investment horizon is one year. You purchase the consol when the interest rate is 5 percent and sell it a year later, following a rise in the interest rate to 6 percent. What is your holding period return? Instructions: Round your answer to the nearest tenth (1 decimal place) Your holding period return is % is a parallelogram. is the midpoint of . and trisect .Let = and = . Show your work on the diagram as well. 2. Graphically show the impact of rise in real GDP on the money markets under following cases. (a) The central bank target interest rates (b) The central bank targets money supply. IF H Case Incident "Data Will Set You Free "Ford CEO Alan Mullaly is known for starting meetings by saying "Data will set you free" and for trying to change Fords culture to one that is based on increased accountability, more information sharing, and hard metrics. "You cant manage a secret," he is also fond of saying. Although its not clear whether Mullalys approach will work at Ford, which is known for its self-contained fiefdoms where little information is shared, some companies have found that managing people according to hard metrics has paid off. Consider Freescale Semiconductor, a computer chip manufacturer based in Austin, Texas.Freescale has discovered that in order to have the right people at the right time to do the right job, it needs an extensive and elaborate set of metrics to manage its 24,000 employees in 30 countries. Of particular concern to Freescale is retention. "Theres no greater cost than human capital, especially in the technology industry," says Jignasha Patel, Freescales director of global talent sourcing and inclusion. "When youve got a tenured employee that decides to walk out the door, its not just one person leaving, its that persons knowledge and network and skills."To manage talent and prevent turnover, Freescale holds line managers accountable for recruiting, hiring, and retaining employees. To do that, managers need to project their talent needs into the future and reconcile those with projected availabilities. Patel provides line managers with census data that helps them make their projections, but at the end of the day, the responsibility is theirs. "What we have done is taken all of our inclusion data, all our metrics, and weve moved the accountability over to the business unit," Patel says. Patel also provides Freescale managers with benchmark data so they can compare their effectiveness with that of other units. The benchmark data include the number of people hired, turnovers, and promotionsand breakdowns by demographic categories. "Theres [a return on investment] for everything we do," says Patel.In general, what do you think are the advantages and limitations of such metrics? Based on what you have learned from Organizational Behavioral Science, how would you deal with acquisition and retention of employees you supervise if you were a manager? Sixteen years ago, the Archer Corporation borrowed $6,350,000. Since then, cumulative inflation has been 87 percent (a compound rate of approximately 4 percent per year) a. When the firm repays the original $6,350,000 loan this year, what will be the effective purchasing power of the $6,350,000? (Hint Divide the loan amount by one plus cumulative inflation) (Do not round intermediate calculations and round your answer to the nearest whole dollar.) Effective purchasing power b. To maintain the original $6,350,000 purchasing power, how much should the lender be repaid? (Hint Multiply the loan amount by one plus cumulative inflation) (Do not round intermediate calculations and round your answer to the nearest whole dollar) Loan repayment XYZ Corporation's trial balance contained the following account balances at December 31, 2021: Accumulated Depreciation--Equipment $45,000 15,000 Short-Term Investments Prepaid Insurance 3,000 Cash 33,000 ... 90,000 Inventory of Merchandise Equipment and Furniture Patent 54,000 12,000 Accounts Receivable (net) 48,000 Land Held for Future Business Site 75,000 On XYZ's December 31, 2021, balance sheet, the current assets total should be You for $4 per shore and a $58 after holding it for slightly over a year and collecting a $3,1-per share dividend. If dividend income is taxed at a 24% rate and capital gains are taxed at 21%, what is yurada hoding pentrum (Wete your answer in percentage and round it to 2 decimal places) The above article claims that HR must take a central role in creating a culture of corporate socialresponsibility. In line with this assertion:You are an HR manager at a large mining corporation. Discuss the role of the human resource (HR)department and HR practices in developing business ethics, CSR, and sustainability in yourorganisation.