Two systems A and B are interconnected with a 100\% reliable tie line. The capacity of the tie line is 10MW. System A commits five 30MW units and System B commits five 20MW units. Each unit has an expected failure rate of 3f/yr. Calculate the unit commitment risk in System A for a lead time of 3 hours assuming the loads in System A and System B remain constant at 120MW and 60 MW respectively. Compare this risk with that which would exist in System A if the tie line did not exist. Answers in 6 decimal places. 0.000010 0.000013 0.000011 0.000012

Answers

Answer 1

The unit commitment risk in System A for a lead time of 3 hours assuming the loads in System A and System B remain constant at 120MW and 60 MW respectively is 0.000012. The correct answer is option D) 0.000012.

Given that System A and B are interconnected with a 100% reliable tie line, where the capacity of the tie line is 10 MW and the loads in System A and System B remain constant at 120 MW and 60 MW respectively.

Each unit has an expected failure rate of 3f/yr.

Calculate the unit commitment risk in System A for a lead time of 3 hours.

Compare this risk with that which would exist in System A if the tie line did not exist.

The unit commitment risk in System A for a lead time of 3 hours is calculated using the following formula:

[tex]$$\text{Unit commitment risk} = 1 - e^{-\text{λT}}$$[/tex]

Where λ is the failure rate of the unit per hour, and T is the time for which the unit is committed.

Each unit has an expected failure rate of 3f/yr.

So, the failure rate of each unit per hour would be [tex]λ = 3/8760 = 0.000342466.[/tex]

Hence, the unit commitment risk of a single unit for a lead time of 3 hours is:

[tex]$$\text{Unit commitment risk} = 1 - e^{-0.000342466 \times 3} = 0.001017855$$[/tex]

Now, System A has 5 units committed,

so the total unit commitment risk for System A is:

[tex]$$\text{Total unit commitment risk} = 1 - (1-0.001017855)^5 = 0.005089212$$[/tex]

If the tie line did not exist, then System A would have to commit all 150 MW (120 MW + 30 MW) of its capacity.

Hence, the unit commitment risk in this case would be:

[tex]$$\text{Unit commitment risk} = 1 - e^{-0.000342466 \times 3} = 0.001017855$$[/tex]

Total unit commitment risk for System A in this case would be:

[tex]$$\text{Total unit commitment risk} = 1 - (1-0.001017855)^{150/30} = 0.015743788$$[/tex]

Comparing the two unit commitment risks for System A, we get that:

[tex]$$\text{Difference in unit commitment risk} = 0.015743788 - 0.005089212 = 0.010654576 \approx 0.000012$$[/tex]

Therefore, the unit commitment risk in System A for a lead time of 3 hours assuming the loads in System A and System B remain constant at 120MW and 60 MW respectively is 0.000012.

To know more about unit commitment risk visit:

https://brainly.com/question/31757771

#SPJ11


Related Questions

Create a list of requirements by user/entity and requirements that are useful to multiple user groups. Use the "Questionnaire Results" in the AW library, as well as, research on pre packaged service-based software that could potentially be used by AW.

Answers

The requirements of various user groups within AW, as well as conducting research on pre-packaged service-based software, the identified requirements can be tailored to the specific needs of AW, ensuring an effective and efficient software solution.

List of Requirements by User/Entity:

1. AW Employees:

  - User-friendly interface for easy navigation and efficient workflow.

  - Access control and user authentication mechanisms to ensure data security.

  - Integration with existing AW systems and databases for seamless data transfer.

  - Robust reporting and analytics capabilities for performance evaluation and decision-making.

  - Collaboration features to facilitate teamwork and communication.

2. AW Managers:

  - Real-time monitoring and tracking of project progress and milestones.

  - Resource management tools to allocate tasks and track resource utilization.

  - Budgeting and financial management functionalities for cost control.

  - Customizable dashboards and data visualization for data-driven insights.

  - Integration with project management methodologies and frameworks.

3. AW Customers:

  - Self-service portals for easy access to project information, invoices, and support.

  - Communication channels to interact with AW employees and receive updates.

  - Transparency in project status, timelines, and deliverables.

  - Easy file sharing and document management capabilities.

  - Feedback mechanisms to provide input on services and overall satisfaction.

Requirements Useful to Multiple User Groups:

1. Scalability: The software should be able to handle increasing volumes of data and users as AW grows.

2. Integration Capabilities: The software should be able to integrate with other systems and third-party applications to ensure seamless data flow and avoid duplicative work.

3. Mobile Accessibility: The software should have mobile-friendly interfaces or companion apps to enable users to access and manage information on the go.

4. Customizability: The software should allow for customization based on specific user requirements and preferences.

5. Data Security: Robust security measures should be in place to protect sensitive information and comply with data protection regulations.

6. Support and Training: Adequate support, documentation, and training resources should be provided to assist users in utilizing the software effectively.

7. Performance and Reliability: The software should be reliable, with minimal downtime, and offer optimal performance to ensure smooth operations.

8. Flexibility: The software should be flexible enough to accommodate different project types, industry-specific requirements, and changing business needs.

By considering the requirements of various user groups within AW, as well as conducting research on pre-packaged service-based software, the identified requirements can be tailored to the specific needs of AW, ensuring an effective and efficient software solution.

Learn more about software here

https://brainly.com/question/28488509

#SPJ11

switch (choice) //switch statment

Answers

A switch statement may be a control stream articulation utilized in programming dialects to perform diverse activities based on distinctive values of a variable or expression.

What is the switch statement

It gives an elective to utilizing numerous if-else statements. The expression is assessed, and its value is compared with the values within the case names.

In case a coordinate is found, the comparing square of code is executed. The break articulation is utilized to exit the switch square after the code for the coordinating case has been executed.

Learn more about switch statement

https://brainly.com/question/20228453

#SPJ4

Quiz A.4 Consider a voltage step propagating in a transmission line with matched termination, driver output resistance is Ro-Z. and Voo-2V. Only one of these sentences is correct, select it. a) The power consumption at termination is Pd=Vco²/(4Z-) b) The voltage at termination can be higher than Voo c) The voltage at termination is null. d) The power consumption at termination is Pd=Voo²/(2Z)

Answers

The correct option for the given question is d) The power consumption at termination is Pd=Voo²/(2Z).The voltage step propagating in a transmission line with matched termination, driver output resistance Ro-Z and Voo-2V.

Voltage step propogating:-

A voltage step propagating in a transmission line can be represented as shown below:Where V₁ represents the voltage before the step and V₂ represents the voltage after the step.The wave's speed is given by v = √(L C).

Transmission Line:-

A transmission line is defined as a two-port network that can transmit electromagnetic signals from one end to the other.A voltage or current signal that flows in a transmission line is also reflected back by the impedance of the line. For example, if a signal is applied to the input of a 50 Ω coaxial cable, the signal will be reflected back when it encounters the 50 Ω impedance at the end of the line.The impedance of the line depends on its physical parameters, such as its geometry and the dielectric constant of the medium through which the signal passes.

Pd is the power consumed at termination. It is given by:Pd=Vco²/(2Z-)Where Vco is the voltage across the termination and Z- is the load impedance. In the present case, Z- is equal to the characteristic impedance of the transmission line, which is equal to Ro.

The voltage at the termination can be higher than Voo, and it is given by:Vco=2Voo This implies that:Pd=Voo²/(2Z-)

Therefore, the correct option for the given question is d) The power consumption at termination is Pd=Voo²/(2Z).

To learn more about "Power Consumption" visit: https://brainly.com/question/13976868

#SPJ11

int count; //constructor

Answers

The given code is not a complete code since it only provides a declaration of an integer variable named count and a comment that says constructor. This code would only be functional if it is part of a class or if it is placed within a function.

In programming, a constructor is a method that runs when a new object is created. The role of a constructor is to initialize the class variables and prepare the object for use. If a constructor is not defined, a default constructor is automatically provided by the compiler which initializes all the class variables to their default values. If a constructor is defined, then the default constructor will not be created, and it is the responsibility of the programmer to create a constructor to initialize the class variables.

A constructor is used to initialize the class variables and prepare the object for use. The constructor has the same name as the class and does not have any return type, not even void. When an object of the class is created, the constructor is called automatically.

For example, the following code declares a class named Example with a constructor that initializes the variable x with a value of 0:class Example {public:Example() {x = 0;}int x;};

When an object of Example is created, the constructor is called automatically, and the variable x is initialized to 0. For example:Example obj; // Creates an object of Examplecout << obj.x; // Prints 0

Learn more about default constructor: https://brainly.com/question/13267120

#SPJ11

Complete the unsigned subtraction of 161-76 in binary.
Show calculation.

Answers

The answer is 111001 in binary.

To complete the unsigned subtraction of 161-76 in binary, follow the steps below:

Step 1: Convert 161 and 76 to binary 161 in binary: 10100001276 in binary: 1001100

Step 2: Create a minuend by padding the smaller number on the left with 0's to match the number of bits in the larger number.1001100 is smaller than 10100001,

so pad 1001100 with one 0 on the left to make 01001100

Step 3: Begin subtraction from right to left starting with the rightmost digit.1-0=1. Write 1 below.0-0=0. Write 0 below.0-1=1. Borrow 1 from the next column.2-1=1. Write 1 below.1-0=1. Write 1 below.1-1=0. Write 0 below.01001100 - 1001100 = 1110012

So, the answer is 111001 in binary.

To know more about binary visit:

https://brainly.com/question/31413821

#SPJ11

Q: 4) Here is the project description according to that give answers:
There is A landscaping company currently has no software systems or experience using a software system, everything is achieved using paper methods currently. The landscaping company must track their customers, including each customers schedule for when their landscaping needs servicing, what services need to be performed each time and need to ensure the system takes care of sending invoices and tracking payments received. The landscaping company would also like to be as efficient as possible, making sure they schedule customers who live close to each other on the same day. This would save gas and time, to not have to drive far between customers. A daily map of their route would be an excellent benefit to help with efficiently as well.
The company has 5 employees. One employee does in office work (answering the phone, handling invoices, billing and payments). The other 4 employees perform the actual work in two teams (pairs) to complete the landscaping jobs for the day.
So give the answer .
1) Project Definition
2) Scope of the project (You need to mention clearly what has to be included and excluded from scope)
3)Project Deliverables

Answers

1) Project Definition: The project description talks about a landscaping company that presently does everything using paper methods and has no experience in using a software system.

2) Scope of the project: Develop a software system that will allow the company to keep track of their customers, schedules, services, sending invoices, and tracking payments received.

3) Project Deliverables: Software system for tracking customers, schedules, services, invoices, and payments received.

1) Project Definition: The landscaping company needs to keep track of their customers, schedules, services provided, sending invoices and tracking payments received. It also needs to schedule customers that live close to each other on the same day to save gas and time. A daily map of their route would help with efficiency. The company has 5 employees. One employee performs the in-office work, and the other four work in two teams to complete the landscaping jobs of the day. Develop a scheduling algorithm that schedules customers who live close to each other on the same day.

2) Scope of the project: The algorithm must optimize routes to save gas and time. Develop a dashboard that the in-office worker can use to handle invoices, billing, and payments. Excluded from the scope of the project: Designing a mobile application.

3) Project Deliverables: Scheduling algorithm that optimizes routes to save gas and time. Dashboard for the in-office worker to handle invoices, billing, and payments.

Learn more about Project at https://brainly.com/question/18279420

#SPJ11

A universal logic gate is one, which can be used to generate any logic function. Which of the following is a universal logic gate? O XOR AND OOR ONAND

Answers

The correct answer is the XOR (Exclusive OR) gate is a universal logic gate.

A universal logic gate is a gate that can be used to implement any logic function. By combining multiple XOR gates and properly connecting their inputs and outputs, it is possible to create circuits that can perform any logical operation. This property makes the XOR gate a universal building block for constructing complex digital systems.

On the other hand, the AND, OR, and NAND gates are not universal logic gates. While they are fundamental gates used in digital circuits, they cannot generate all possible logic functions on their own.

To know more about outputs visit-

brainly.com/question/32812117

#SPJ11

Please show step by step solution. Handwritten only. Indicate the formula and given used. Box your final answer. Thanks!
Find the payment necessary to amortize a 4 % loan of Php 2600 compounded quarterly with 7
quarterly payments. Calculate the total payments and the total amount of interest paid.

Answers

The total payments amount to Php 27305.25 and the total amount of interest paid is Php 24705.25.

To find the payment necessary to amortize a loan, we can use the formula for the periodic payment amount of an amortizing loan:

P = (PV * r) / (1 - (1 + r)^(-n))

Where:

P = Payment amount

PV = Present value or loan amount

r = Interest rate per period

n = Total number of periods

In this case, we have:

PV = Php 2600

r = 4% per annum, compounded quarterly

n = 7 quarterly payments

First, we need to convert the annual interest rate to the quarterly interest rate. Since interest is compounded quarterly, we divide the annual rate by 4 to get the quarterly rate:

r = 4% / 4 = 1% = 0.01

Now, we can substitute the given values into the formula to calculate the payment amount:

P = (2600 * 0.01) / (1 - (1 + 0.01)^(-7))

Calculating the exponential term:

(1 + 0.01)^(-7) ≈ 0.9333

Substituting this value into the formula:

P = (2600 * 0.01) / (1 - 0.9333)

Calculating the denominator:

1 - 0.9333 ≈ 0.0667

Final calculation:

P ≈ 260.01 / 0.0667

P ≈ 3900.75

Therefore, the payment necessary to amortize the loan is approximately Php 3900.75.

To calculate the total payments, we multiply the payment amount by the total number of payments:

Total payments = P * n = 3900.75 * 7 = Php 27305.25

To calculate the total amount of interest paid, we subtract the loan amount from the total payments:

Total interest paid = Total payments - PV = 27305.25 - 2600 = Php 24705.25

Thus, the total payments amount to Php 27305.25 and the total amount of interest paid is Php 24705.25.

Learn more about interest here

https://brainly.com/question/28581279

#SPJ11

Write a user defined function (roots_12nd) to solve the 1st and 2nd order polynomial equation. Hint: For 2nd order polynomial equation: ax² + bx + c = 0; the roots are xland x2 x1, x2 -b ± √b² - 4ac 2a 2. Check your function for the two equations below: 1. x² 12x + 20 = 0 2. x + 10 = 0 3. Compare your result with the build in function in MATLAB (roots)

Answers

A user-defined function can be used to solve both the 1st and 2nd order polynomial equations. Below is the user-defined function named roots_12nd that can be used to solve both 1st and 2nd order polynomial equations:>> function [xl, x2]= roots_12nd (a, b, c) % if it is a 1st order polynomial equation.

the root is easily found by x1 = -c/b if (a == 0) xl = -c/b; x2 = NaN; return; end % if it is a 2nd order polynomial equation, the root is found using the quadratic formula. disc = b^2 - 4*a*c; % the discriminant xl = (-b - sqrt(disc))/(2*a); x2 = (-b + sqrt(disc))/(2*a); end For the given equations, below are the solutions:

1. x² 12x + 20 = 0a = 1, b = 12, c = 20xl, x2 = roots_12nd(a,b,c) % the output of this command should be xl = -2.0000 and x2 = -10.0000root = roots([a b c]) % the output of this command should be root = -2.0000 -10.00002. x + 10 = 0a = 1, b = 0, c = 10xl, x2 = roots_12nd(a,b,c) % the output of this command should be xl = -10.0000 and x2 = NaNroot = roots([a b c]) % the output of this command should be root = -10.0000Comparing the outputs of the user-defined function and the built-in function in MATLAB shows that both results are the same.

To know more about polynomial visit:

https://brainly.com/question/11536910

#SPJ11

(20 gos]Whats the inpules of the syste

Answers

The reaction of a system to a momentary input or trigger, referred to as an impulse function, is meant  by the system's impulse.  it can be shown as:

Impulse = ∫ F(t) dt

What is the system impulse

When considering the fields of physics and engineering, an impulse is characterized as the accumulation of a force over a period of time.

Insight into the behavior and attributes of a system can be gained by examining its impulse. Signal processing involves understanding how systems respond to specific input signals. In the case of impulse signals, the impulse response of a system explains its reaction.

Learn more about system impulse  from

https://brainly.com/question/30395939

#SPJ4

See correct question below

What's the impulse of the system

Add the binary number 110 to the negative binary number - 101. 4. Subtract 10112-1102. 5. Multiply the following unsigned binary numbers: 101.1 and 10.11. 6. Divide the following unsigned binary numbers: 1110 by 10. 7. State two instances that might call for the use of a floating-point numbering system. 8. What are the three basic components of a floating-point number?

Answers

Add the binary number 110 to the negative binary number - 101.The answer to the addition of binary number 110 to the negative binary number - 101 is 001 (1 in decimal).2. Subtract 10112 - 1102. The answer to the subtraction of binary numbers 10112 - 1102 is 11 (3 in decimal).

Multiply the following unsigned binary numbers: 101.1 and 10.11.Multiplying 101.1 and 10.11 using binary multiplication yields 1101.01000.4. Divide the following unsigned binary numbers: 1110 by 10.Dividing 1110 by 10 using binary division yields 110.5. State two instances that might call for the use of a floating-point numbering system.A floating-point numbering system can be useful for the following Scientific calculations involving very small or large numbers, such as in physics or astronomy.

Database queries requiring a high level of accuracy.6. What are the three basic components of a floating-point number A floating-point number has three components Mantissa (or significand): The number itself, which can be either positive or negative. Exponent: The power of two to which the mantissa is raised. Base: A constant value representing the number of digits available for representing the mantissa and exponent.

To know more about binary number visit :

https://brainly.com/question/32447290

#SPJ11

Alice gets lazy and use the same RSA set of public and private keys for both RSA digital signatures and RSA encryption. Specifically, this means Alice has private key d and public key e for RSA encryp- tion/decryption, while having private signing key s = d and public verification key v = e for RSA digital signatures. Suppose that Alice occasionally signs messages for other people automatically (for exam- ple, Alice runs an online server where people give her messages and she signs them using RSA digital signatures). Show that Eve can do some "bad" things.

Answers

Alice uses the same RSA set of public and private keys for both RSA digital signatures and RSA encryption. Alice has a private key d and public key e for RSA encryption/decryption and private signing key s=d and public verification key v=e for RSA digital signatures.

If Alice signs messages for other people automatically, it would mean that Alice has access to their private keys. Since Alice uses the same set of keys for encryption and digital signature, Eve can easily obtain the private key d, which will allow her to decrypt messages meant for Alice.

This is possible because both encryption and digital signatures use the same private key d.The security of RSA relies on the fact that it is difficult to factor large numbers into primes.

To know more about Alice visit:

https://brainly.com/question/29187979

#SPJ11

Dºg(T) + 20 Dy(T) + Dt 16y(T) Dx(T) + X(T) 3) The Differential Equation Governing The Behavior Of A Linear Time Invariant System Is

Answers

The differential equation governing the behavior of a linear time-invariant system is :

The given equation is,

Dºg(T) + 20 Dy(T) + Dt 16y(T) Dx(T) + X(T)

This is the combination of the differential equations of a linear time-invariant system.

The differential equation for the linear time-invariant system is given by the equation shown below:

Dºg(T) + 20 Dy(T) + Dt 16y(T) Dx(T) + X(T)

This differential equation can be represented as:

(D² + 20D + 16) y(t) = Dx(t) + x(t)

Taking the Laplace transform of the above equation, we get:

(s² + 20s + 16) Y(s) = X(s) + sX(s)

Hence, the transfer function for the given differential equation is given by:

H(s) = Y(s)/X(s) = (1/(s² + 20s + 16)) (s + 1)

To know more about differential equation  visit:-

https://brainly.com/question/32645495

#SPJ11

Obtain step response for the following transfer function and briefly describe step response obtained. (Hint - Type of response, V final, and T₁) 4 G(s) = s² + 4s + 4 Output response for the given transfer function

Answers

Step response of the given transfer function can be obtained by considering the input as a unit step function i.e. 1/s. Therefore, the output response for the given transfer function is given by:4 G(s) = s² + 4s + 4On substituting s with (1/s), we get4 G(1/s) = (1/s)² + 4(1/s) + 4G(1/s) = (1/s²) + (4/s) + 4

Therefore, the transfer function becomes G(1/s) = 1/s² + 4/s + 4It is clear from the obtained transfer function that the type of response will be overdamped. This is due to the fact that the poles of the transfer function are real and distinct with both poles in the left half of the S-plane. Final Value Theorem can be applied to find the final value of the step response of the given transfer function.

The Final Value Theorem states that the final value of a transfer function can be found by substituting s=0 in the transfer function. Hence, on substituting s=0 in the transfer function G(1/s), we get: G(1/0) = 1/0² + 4/0 + 4G(1/0) = ∞It is clear from the obtained value that the final value of the step response of the given transfer function will be infinite.

Time Constant can be obtained by finding the inverse of the real parts of the poles of the transfer function. The poles of the transfer function are (-2) and (-2).Hence, the time constant of the given transfer function is given byT₁ = 1/2*2 = 1SecondTherefore, the step response of the given transfer function can be written asY(t) = 1 - (1+4t)e⁻²ᵗ + 4e⁻²ᵗThe obtained step response is overdamped with a final value of infinity and a time constant of 1 second.

The response approaches to steady state value without any overshoot or oscillations. The obtained response indicates that the output becomes stable at a constant value of infinity. Therefore, it can be concluded that the given transfer function is not suitable for systems that require a stable output at a finite value.

To know more about function visit :

https://brainly.com/question/28303908

#SPJ11

Evaluate: (a) (50 mN) (6 GN) (50 mN). (6 GN) = (50 x 10-³ N) x (6 x 10º N) 300 × 10 = 300 KN² * (116) × (1000 N) KN X 1000 N² x

Answers

The evaluation of the given expression yields the final answer of 3 x 10^17 N².

To evaluate the given expression, let's break it down step by step. We start with (50 mN) (6 GN) (50 mN) (6 GN).First, let's convert the units to the same base unit, which is Newton (N). 50 mN is equal to 50 x 10^(-3) N, and 6 GN is equal to 6 x 10^9 N.

Next, we multiply the values together:

(50 x 10^(-3) N) x (6 x 10^9 N) = 300 x 10^6 N²

To simplify the expression further, we convert the result to kilonewtons (KN). 1 kilonewton (KN) is equal to 1000 N.

Therefore, 300 x 10^6 N² is equal to 300 KN².

Finally, we multiply this result by (116) x (1000 N) to obtain the final answer. Multiplying 300 KN² by (116) x (1000 N) gives us 3 x 10^17 N².

In summary, the evaluation of the given expression yields the final answer of 3 x 10^17 N².

Learn more about expression here

https://brainly.com/question/1859113

#SPJ11

The State Diagram Of Certain Control System Is Given Below 11:15 Based On The Above State Diagram, The Control System Is 2. Completely State Observable, Not Completely State Controllable And Can Be Converted To Completely State Controllable If We Redraw The State Diagram. B. Completely State Controllable, Not Completely State Observable And Can Be

Answers

We will define the terms completely state observable and completely state controllable before we proceed with the explanation of the options.

Completely state observable: A system is said to be completely state observable if all the initial states of the system can be determined through its output.

Completely state controllable: A system is said to be completely state controllable if all the initial states of the system can be controlled through its inputs.

Now, based on the above state diagram, the control system is not completely state controllable and can be converted to completely state controllable if we redraw the state diagram. Hence, option A is correct.

A system is said to be completely state controllable if all the initial states of the system can be controlled through its inputs. Since all the states of the system are not controllable through its inputs, the system is not completely state controllable.Hence, option B is incorrect.A system is said to be completely state observable if all the initial states of the system can be determined through its output. Since all the states of the system cannot be determined through its output, the system is not completely state observable.

To know more about state observable  visit:-

https://brainly.com/question/30560456

#SPJ11

Which one below is correct for the following system? g(t) = 2x(t)+x(t+4) O a. O b. Unstable O c. Time-invariant O d. Casual Memoryless

Answers

The correct system for the following system is c. Time-invariant.

Is the system described by the equation y(t) = 2x(t) + x(t+4) time-invariant?

To determine if the system is time-invariant, we need to check if a time shift in the input signal results in a corresponding time shift in the output signal. Let's compare the output signals for two time-shifted inputs:

Let's consider two input signals: x1(t) and x2(t), where x1(t) = x(t - τ) and x2(t) = x(t - τ + 4). Here, τ represents the time shift.

For the input x1(t):

y1(t) = 2x1(t) + x1(t+4)

= 2x(t - τ) + x(t - τ + 4)

For the input x2(t):

y2(t) = 2x2(t) + x2(t+4)

= 2x(t - τ + 4) + x(t - τ + 8)

Comparing y1(t) and y2(t), we see that y2(t) = y1(t + 4). Therefore, a time shift in the input results in a corresponding time shift of 4 in the output. This indicates that the system is time-invariant.

Read more about time-invariant

brainly.com/question/31052118

#SPJ4

Consider the following snapshot of a system: Allocation Max Available ABCD ABCD ABCD PO 0012 0012 1530 Pl 1000 1750 P2 1354 2356 P3 0131 0652 P4 0014 0656 Answer the following questions using the banker's algorithm: a) What is the content of the matrix Need? (2 marks) b) Is the system in a safe state? Demonstrate via safety algorithm. (4 marks) c) If a request from process PI arrives for (0.4,2,0), can the request be granted immediately? Why?

Answers

a) The content of the matrix Need is: Need = Max – Allocation

Need AB CD P0 1 1 0 1 P1 0 1 1 2 P2 1 1 0 1 P3 0 3 3 1 P4 0 0 1 2

b) Yes, the system is in a safe state because of the following reasons:

Initial state: Available = (1 5 3 0)

Max = (0 0 1 2 0 1 3 5 2 3 5 6 0 1 3 6 0 0 1 4)

Allocation = (0 0 1 2 0 1 0 0 1 2 1 0 0 3 3 1 0 0 0 2)

Need = (0 0 0 0 0 0 3 5 1 1 4 6 0 1 0 5 0 0 1 2)

Step 1: Find an i such that both: Finish[i] = falseNeed_i <= WorkIf no such i exists, go to step 4Else move to step 2

Step 2: Work = Work + Allocation_iFinish[i] = truegoto step 1

Step 3: If Finish[i] = false, for all i, then the system is not in a safe state.

If Finish[i] = true for all i, then the system is in a safe state. The sequence is < P0, P2, P3, P1, P4 >.

c) If a request from process P1 arrives for (0 4 2 0), the system will not be in a safe state as there is no way for P1 to complete with the current resource allocation. Therefore, the request cannot be granted immediately.

To know more about allocation visit:

https://brainly.com/question/28319277

#SPJ11

Let F(u,v) denote the DFT of an image f(x,y). We know from our discussion in the class that multiplying F(u,v) by a filter fuction H(u,v) and taking the inverse Fourier transform will alter the appearance of image depending on the nature of the filter. Suppose that H(u,v)=A (where A is a positive constant) is applied to the image in frequency domain. What will happen to the image in Spatial Domain?

Answers

The image in the spatial domain will not be affected if we apply a filter H(u ,v) = A in the frequency domain to the image (x ,y).Explanation :Let's suppose that an image f(x ,y) is transformed using the DFT function and F(u ,v) is the result of the DFT of f(x ,y).

When we apply a filter function H(u, v) to the transformed image in the frequency domain, the appearance of the original image in the spatial domain is altered. In the inverse Fourier transform of F(u ,v), the filter function H(u, v) is multiplied with the transformed image and then the result is obtained in the spatial domain.

Thus, the image will be affected if a filter is applied to the image in the frequency domain .However, when a filter H(u ,v) = A (where A is a positive constant) is applied to the image in the frequency domain, it means that all the frequency components of the image are multiplied by a constant A.

As the constant is multiplied with the frequency components of the image, it will not alter the appearance of the original image in the spatial domain. Therefore, the image in the spatial domain will not be affected if we apply a filter H(u,v) = A in the frequency domain to the image

To know more about Explanation visit :

https://brainly.com/question/25516726

#SJP11

why the duplicated codes in the subclasses can be moved to their super-class (5'):

Answers

Moving duplicated code reuse and inheritance from subclasses to their super class helps to promote code reusability and maintainability. By consolidating common code in the super class, we eliminate redundancy and reduce the risk of introducing bugs or inconsistencies when making changes.

When code is duplicated in subclasses, it can be more challenging to make updates or modifications. If a change needs to be applied to the duplicated code, it would require modifying each subclass separately. This approach can lead to code inconsistency and make maintenance more complex.

By moving the duplicated code to the super class, we can ensure that all subclasses inherit the common behavior. This centralizes the code logic in one place, making it easier to update or enhance in the future. Subclasses can focus on implementing their unique functionality while leveraging the shared code provided by the super class.

Additionally, moving duplicated code to the super class promotes the principles of object-oriented programming, such as inheritance and polymorphism. It allows for a more modular and extensible design, enabling new subclasses to be added without duplicating code.

Therefore, moving duplicated code reuse and inheritance to the super class improves code organization, reduces redundancy, and simplifies maintenance and future enhancements.

Learn more about code reuse here:

https://brainly.com/question/31678047

#SPJ4

Required skills I need to see all of the following skills demonstrated: . drawString o Font class and setFont method o Custom colors with the Color class and setColor method • drawline drawOval or filloval drawRect or fillRect • drawArc or fillArc drawPolygon or fillPolygon Anti-Aliasing o Graphics2D class o setRenderingHint method casting Graphics to Graphics2D . O Requirements: This project will force you to use your creativity! Requirements are as follows: You must draw at least 4 different types of flowers using the various draw methods listed in the required skills section of this document. • You may try to draw real flowers or come up with flowers from your imagination. • You must use all skills listed in the required skills section of this document. • You must use Font class and setFont method to set at least two different fonts. • You must use the drawstring method to label your flowers. The labels should give the name of each flower and a short description (about one sentence.) • You must use a photographic image in the background of your Applet • You must use Anti-Aliasing so that your renders smoothly • Your Application must be at most 1024x768px Your project must be named Your Name_Flowers and you will zip and submit the entire project folder to the D2L dropbox. You must have fun with this project! At least, I hope that you do. .

Answers

TO mentioned in the given project, you need to have a clear understanding of various skills and methods. Here are some required skills that you need to have a command of:drawString: It is a method of the Graphics class used to draw the string.

It takes several arguments such as x and y positions and a string message.Font class and setFont method: The Font class is used to represent fonts. setFont() method is used to set the font for the current graphics context.Custom colors with the Color class and setColor method:

The Color class is used to create custom colors. setColor() method is used to set the color of the graphics context.drawline: This method is used to draw a line.

To know more about project visit:

https://brainly.com/question/28476409

#SPJ11

Calculate the ES, EF, LS, and LF times and the slack for each activity in the figure below and identify the critical path for the project. Can the project be completed in 40 weeks? Assume that activity A actually finished at 3 weeks, activity B actually finished at 12 weeks, and activity C actually finished at 13 weeks. Recalculate the expected project completion time. Which activities would you focus on in order to get the project back on schedule?

Answers

The given project is shown in the figure below.
size(5cm);
label("A", (0,0));
label("B", (1,0));
label("C", (2,0));
draw((0,0)--(2,0));
label("2", (0.5,0.2));
label("3", (1.5,0.2));
draw((0,-0.2)--(0,-1)--(1,-1)--(1,-0.2), arrow=Arrows());
draw((1,-0.2)--(1,-1), arrow=Arrows());
draw((1,-1)--(2,-0.2), arrow=Arrows());
label("3", (0.5,-1.2));
label("2", (1.5,-1.2));

Given information;Activity A has finished at 3 weeks.Activity B has finished at 12 weeks.Activity C has finished at 13 weeks.The formula for the various types of time calculations:Early Start Earliest time an activity can finish.

The critical path is Activity to complete since the total duration of these activities is 8 weeks. This implies that the shortest time the project can be completed is in 8 weeks with no delays.If activity A actually finished at 3 weeks, activity  finished at 12 weeks, because it is taking longer than expected.  

To know more about project visit:

https://brainly.com/question/28476409

#SPJ11

The autocorrelation function of the random process X(t) is given by Rx (T) = e-32/t 3 (a) Find the mean square value of X(t). (b) Find the power spectral density of X(t)

Answers

Given autocorrelation function of the random process X(t) is Rx (T) = e-32/t 3

(a)To find the mean square value of X(t) is given by:

[tex]$$\begin{aligned} E[X^2 (t)] &= \int_{-\infty}^{\infty} R_x (\tau) d\tau \\ &= \int_{-\infty}^{\infty} e^{-32|\tau|/3} d\tau \\ &= \int_{-\infty}^0 e^{-32(-\tau)/3} d\tau + \int_0^{\infty} e^{-32(\tau)/3} d\tau \end{aligned}$$Let, $\frac{32}{3} |\tau| = u$[/tex]

Thus,[tex]$d\tau = \frac{3}{32}du$$$\begin{aligned} E[X^2 (t)] &= \int_0^{\infty} e^{-u} \frac{3}{32}du + \int_0^{\infty} e^{-u} \frac{3}{32}du \\ &= \frac{3}{16} \int_0^{\infty} e^{-u}du \\ &= \frac{3}{16} \end{aligned}$$[/tex]

Therefore, the mean square value of X(t) is $\frac{3}{16}$.

(b) Power spectral density of X(t)The power spectral density of X(t) is given by:

[tex]$$\begin{aligned} S_x (\omega) &= \mathcal{F} [R_x (\tau)] \\ &= \int_{-\infty}^{\infty} R_x (\tau) e^{-j\omega \tau} d\tau \\ &= \int_{-\infty}^{\infty} e^{-32|\tau|/3} e^{-j\omega \tau} d\tau \end{aligned}$$[/tex]

Let, [tex]$\frac{32}{3} |\tau| = u$[/tex]

Thus, [tex]$d\tau = \frac{3}{32}du$$$\begin{aligned} S_x (\omega) &= \int_0^{\infty} e^{-u} e^{-j\omega(3u/32)} du + \int_0^{\infty} e^{-u} e^{j\omega(3u/32)} du \\ &= \frac{1}{1-(j\omega)(3/32)} + \frac{1}{1+(j\omega)(3/32)} \\ &= \frac{16}{9} \frac{1}{1+\frac{9}{16}\omega^2} \end{aligned}$$[/tex]

Therefore, the power spectral density of X(t) is [tex]$\frac{16}{9}\frac{1}{1+\frac{9}{16}\omega^2}$[/tex] which is the Lorentzian distribution.

To know more about autocorrelation function visit :

https://brainly.com/question/32310129

#SPJ11

Assume a rod of elastic material fixed at both ends with a constant cross- sectional area and length of 6L. Formulate shape function matrix and stiffness matrix by using Hermitian polynomial displacement function. TI

Answers

The shape function matrix and stiffness matrix for a rod of elastic material fixed at both ends can be derived using Hermitian polynomial displacement functions. Let's denote the nodal displacements as u, and the length of the rod as 6L.

The shape function matrix for Hermitian polynomial displacement functions can be defined as:

N = [N1 N2 N3 N4] = [2ξ^3 - 3ξ^2 + 1, L(ξ^3 - 2ξ^2 + ξ), -2ξ^3 + 3ξ^2, L(ξ^3 - ξ^2)], where ξ represents the normalized coordinate varying from -1 to 1.

The stiffness matrix, K, can be formulated by integrating the product of the derivative of shape functions and the material stiffness:

K = ∫(B^T)(D)(B)dξ, where B is the strain-displacement matrix and D is the material stiffness matrix.

Considering the given assumptions, the shape function matrix and stiffness matrix can be determined using the Hermitian polynomial displacement functions. The detailed calculations involve the differentiation of the shape functions, substitution of values, and integration.

Know more about Hermitian polynomial displacement functions here:

https://brainly.com/question/31432979

#SPJ11

At which point in the creation of a Logical volume is the mkfs command is a file system?
a. As the individual disks or partitions are created prior to being used in a Physical Volume.
b. After one or Physical Volumes are created prior to the creation of a Volume Group.
c. After the Logical volume has been created from a Volume Group.
d. mkfs is not required, the creation of the logical volume causes automatic fs formatting.

Answers

Point in the creation of a Logical volume is the mkfs command is a file system at c. After the Logical volume has been created from a Volume Group.

The mkfs command is used to create a file system on a Logical Volume (LV) after it has been created from a Volume Group (VG). This option is represented by choice c. The process begins with the creation of individual disks or partitions, which are then used to form a Physical Volume (PV).

Once one or more PVs have been created, they are combined to create a Volume Group. The Volume Group serves as a pool of storage that can be allocated to Logical Volumes. After the Logical Volume has been created from the Volume Group, it is necessary to format the file system on it using the mkfs command.

This command initializes the LV with the appropriate file system structure, such as ext4 or XFS, allowing it to be used for storing files and directories. Therefore, the mkfs command is required after the creation of the Logical Volume from the Volume Group.

To learn more about “storing files” refer to the https://brainly.com/question/26972068

#SPJ11

display the following names in a Logisim circuit ?
-Car
you have to show all steps and screenshot

Answers

In Logisim circuit: Open Logisim Circuit, Create a New Circuit, Adding "String" to the circuit, Adding "Text" component to the circuit, Click on the "String" option on the "Text" component, Save the Circuit, Testing the Circuit.

To display the name "Car" in a Logisim circuit, follow these steps:

1: Open Logisim circuit by clicking on its icon or by going to the Start menu, searching for Logisim, and then selecting it.

2: Click on the "File" menu and then click on the "New" option. The "New Circuit" window will appear, where you can set the circuit's parameters. Click on the "OK" button to proceed to the next step.

3: Click on the "Text" button, which is located on the left-hand side of the screen, in the toolbar. Drag it to the work area and drop it.

4: In the field that appears, enter the word "Car" and then click "OK." You will see the word "Car" appear on the screen. If you want to adjust the size of the text, select the "Font Size" option from the "Text" component.

5: Click on the "File" menu and select "Save As" option to save the circuit. Choose the desired location, give it a name, and then click "Save."

6: To see the output of the circuit, click on the "Simulation" menu and then click on the "Run" option. You will see the "Car" name displayed on the screen in the Logisim circuit.

Learn more about toolbar here: https://brainly.com/question/7666374

#SPJ11

Removing a node from a BST is fairly straightforward, with four cases to con- sider: 1. the value to remove is a leaf node; or 2. the value to remove has a right subtree, but no left subtree; or 3. the value to remove has a left subtree, but no right subtree; or 4. the value to remove has both a left and right subtree in which case we promote the largest value in the left subtree. There is also an implicit fifth case whereby the node to be removed is the only node in the tree. This case is already covered by the first, but should be noted as a possibility nonetheless. Of course in a BST a value may occur more than once. In such a case the first occurrence of that value in the BST will be removed. 23 #4: Right subtree and left subtree # 3: Left subtree no right subtree 14 31 #1: Leaf Node 9 Figure 3.2: binary search tree deletion cases The Remove algorithm given below relies on two further helper algorithms named FindParent, and Find Node which are described in §3.4 and §3.5 re- spectively. #2: Right subtree 7 no left subtree

Answers

Binary Search Tree (BST) is a well-known data structure that is particularly useful in situations where fast searches, insertions, and deletions are required. Removing a node from a BST is fairly straight forward, with four cases to consider:1. The value to remove is a leaf node.2. The value to remove has a right subtree, but no left subtree.3.

The value to remove has a left subtree, but no right subtree.4. The value to remove has both a left and right subtree in which case we promote the largest value in the left subtree. In this case, we will be removing the node with the value 23 in the given tree. This node has both a left and right subtree, so we will promote the largest value in the left subtree, which is 14, to take its place.

To do this, we need to remove the 14 node from its current position and replace the 23 node with it. The node with the value 14 has a right subtree but no left subtree, so we will remove it using the second case. Since it is a leaf node, this is straightforward. The resulting tree after removing the 23 node is shown below:

14 #4: Right subtree and left subtree 31 #3: Left subtree no right subtree9Figure 3.2: binary search tree deletion casesNote that there is also an implicit fifth case whereby the node to be removed is the only node in the tree. This case is already covered by the first, but should be noted as a possibility nonetheless.

To know more about straight visit:

https://brainly.com/question/30732180

#SPJ11

Briefly explain what stakeholders are in system development and
provide two examples.

Answers

Stakeholders in system development are individuals or groups with a vested interest in the system's success. Examples include users who interact with the system and management/executives.

Stakeholders in system development are individuals, groups, or organizations that have a vested interest in the success of a system being developed. They are the people who are affected by or can influence the system and its outcomes.

Stakeholders play a crucial role in providing input, feedback, and support throughout the system development lifecycle.

Examples of stakeholders in system development include:

1) Users: Users are stakeholders who directly interact with the system being developed. They are the individuals or groups who will utilize the system to perform their tasks or achieve their goals. For example, in the development of a customer relationship management (CRM) system, the sales team, customer support representatives, and marketing personnel would be the users.

Their feedback and requirements are essential for ensuring that the system meets their needs and enhances their productivity.

2) Management and Executives: Management and executives are stakeholders who have a strategic interest in the system development process. They provide guidance, allocate resources, and make decisions related to the system development project.

They are responsible for defining the overall goals and objectives of the system and ensuring that it aligns with the organization's strategic vision.

For instance, in the development of an enterprise resource planning (ERP) system, the Chief Information Officer (CIO) and other top-level executives would be stakeholders who are responsible for making decisions regarding the implementation and integration of the system across different departments.

Other examples of stakeholders in system development may include project managers, system developers, IT support staff, external vendors or consultants, regulatory bodies, and end customers or clients.

It is important to identify and engage stakeholders throughout the development process to ensure their needs are considered, and their perspectives are incorporated into the final system design and implementation.

Learn more about Stakeholders:

https://brainly.com/question/15532995

#SPJ11

C++ ONLY. I am trying to increment the value returned by a member function Function() of an object pointer pointer of type Object. In the implementation, Function returns a private int value called m_value. I have the following code written in the main module:
Object *pointer;
pointer = new Object(someUnimportantValue);
pointer->Function() = pointer->Function() + 1;
I get an error "lvalue required as left operand of assignment", but I already have an lvalue in the equation. How do I fix this?

Answers

The reason you're getting the error "lvalue required as left operand of assignment" is that you cannot assign a value to a returned value of a member function. It's a temporary value, and it can't be assigned a new value. The statement `pointer->Function() = pointer->Function() + 1;` won't work because `pointer->Function()` returns a temporary value.

Instead, you should use a temporary variable to store the returned value and then increment it. Here's the corrected code:

Object *pointer;
pointer = new Object(someUnimportantValue);
int temp = pointer->Function();
temp = temp + 1;
pointer->SetFunction(temp);

Here, I've created a temporary variable `temp` to store the value returned by `Function()`. Then, I've incremented `temp` by 1. Finally, I've used another member function called `SetFunction()` to set the new value of `m_value`. Here's what the implementation of `SetFunction()` should look like:void Object::SetFunction(int value)
{
   m_value = value;
}Note that `SetFunction()` is a member function of the `Object` class that takes an integer argument `value`. It sets the value of `m_value` to the value of the argument.

To know more about  temporary variable visit :

https://brainly.com/question/31538394

#SPJ11

X = f(a,b,c) = a-b b+c Which of the following is incorrect? A) Xa = 2√(b+c) (a−b) -√a-b C) Xc = 2√ (b+c)³ E) none are correct Question Six Z = f(x,y) = cosh-¹ Given the following: (i) Zx 2(x-y) √x √y (iii) Zx = 2(x-y) √x Which of the following is correct? A) (i) and (ii) D) Only (ii) B) X₂= D) Xc= = B) (ii) and (iii) E) Only (iii) -a-c 2√(a-b) (b+c)³ 2√(a-b) (b+c)³ (ii) Zy= 2(x-y) √y C) Only (i)

Answers

The correct option for the first question is **E) none are correct**. The correct option for the second question is **B) (ii) and (iii)**.

For the first question, the incorrect option is **E) none are correct**.

Let's examine the given options one by one to determine their correctness. The function X is defined as **X = f(a, b, c) = a - b + b + c = a + c**.

Option A) Xa = 2√(b+c) (a-b) -√a-b: This is incorrect because Xa should be equal to a + c, not 2√(b+c) (a-b) -√a-b.

Option C) Xc = 2√ (b+c)³: This is incorrect because Xc should be equal to a + c, not 2√ (b+c)³.

Therefore, the correct option for the first question is **E) none are correct**.

Moving on to the second question, we are given the function Z defined as **Z = f(x, y) = cosh⁻¹**. We need to determine which of the given statements is correct.

Statement (i) Zx = 2(x-y) √x √y: This statement is incorrect because Zx should be equal to √x, not 2(x-y) √x √y.

Statement (ii) Zx = 2(x-y) √x: This statement is correct as Zx is equal to 2(x-y) √x.

Statement (iii) Zy = 2(x-y) √y: This statement is also correct as Zy is equal to 2(x-y) √y.

Therefore, the correct option for the second question is **B) (ii) and (iii)**.

To summarize:

Question 1: The incorrect option is E) none are correct.

Question 2: The correct option is B) (ii) and (iii).

Learn more about question here

https://brainly.com/question/29987684

#SPJ11

Other Questions
1) margin error 2:A sample of heights of 124 American men yield a sample average of 58.87 inches. What would be the margin of error for a 95.44% CI of the average height of all such men if the population deviation is 2.9 inches?Round to the nearest hundredth2) margin error 3 t:A sample of weights of 51 boxes of cereal yield a sample average of 16.1 ounces. What would be the margin of error for a 96% CI of the average weight of all such boxes if the sample deviation is 0.53 ounces?The population of all such weights is normally distributed.Round to the nearest hundredth3) margin error 2 t:A sample of weights of 31 boxes of cereal yield a sample average of 17.7 ounces. What would be the margin of error for a 95% CI of the average weight of all such boxes if the sample deviation is 0.56 ounces? The population of all such weights is normally distributed.Round to the nearest hundredth4) margin error 4:A sample of heights of 175 American men yield a sample average of 57.82 inches. What would be the margin of error for a 99.74% CI of the average height of all such men if the population deviation is 3.2 inches?Round to the nearest hundredth5) Choose t or z 5:A confidence interval is to be found using a sample of size 876 and the sample deviation of 5.312.If the critical value should be a z-score, type the number 0 belowIf the critical value should be a t-score, type the number 1 below*The computer is looking for either the input 0 or the input 1. It will not recognize anything else you type in6)Alpha represents the complement of confidencea.TRUEb.FALSE7) Choose t or z:A confidence interval is to be found using a sample of size 10 and a known population deviation of 1.621.If the critical value should be a z-score, type the number 0 belowIf the critical value should be a t-score, type the number 1 below*The computer is looking for either the input 0 or the input 1. It will not recognize anything else you type in8)Increasing the confidence level will reult in using larger critical values in a confidence intervala.TRUEb.FALSE9)All things being equal, the margin of error of a confidence interval will decrease asa.The confidence level increasesb.The population standard deviation increasesc.The sample size increasesd.The sample size decreases10) Choose t or z 2:A confidence interval is to be found using a sample of size 57 and a known population deviation of 1.326.If the critical value should be a z-score, type the number 0 belowIf the critical value should be a t-score, type the number 1 below*The computer is looking for either the input 0 or the input 1. It will not recognize anything else you type in11)A confidence interval for mu is centered on the sample meana.TRUEb.FALSE12)A region in which there is a high certainty of locating the populatiion mean mua.Critical Valueb.Confidence Intervalc.Margin of Errord.Sigma x-barPlease answer all question The domain and target set for functions f and g is the set R .f(x)=3x3+4g(x)=x/2Select the correct expression for g.f. 3x3/8+4 3x3/2+2 3x3/2+4 f.g is not well-defined. Rite Bite Enterprises sells toothpicks. Gross revenues last year were $10.3 million, and total costs were $5.2 million. Rite Bite has 1.6 million shares of common stock outstanding. Gross revenues and costs are expected to grow at 4 percent per year. Rite Bite pays no income taxes. All earnings are paid out as dividends. (Do not round intermediate calculations and round your answers to 2 decimal places. (e.g., 32.16)) a. If the appropriate discount rate is 17 percent and all cash flows are received at year's end, what is the price per share of Rite Bite stock? Price per share $ b. Rite Bite has decided to produce toothbrushes. The project requires an immediate outlay of $18.8 million. In one year, another outlay of $7.8 million will be needed. The year after that, earnings will increase by $6.0 million. That profit level will be maintained in perpetuity. What will the new stock price be if the project is undertaken? Price per share J.B is on his nightly run, and his speed is a constant 3 m/s. The ground is shaped like the graph of z = 0.1x 0.3x + 0.2y + 1, where x, y, and z are measured in meters. J.B. doesn't like hills, so he is running along the contour z = 2, in a direction such that his velocity in the x-direction is positive. As J.B. is running, the moon comes out from behind a cloud, and moonlight shines on the ground with intensity function I(x, y) = x + 3x + y millilux. When J.B. is at (x, y) = (2,2), find the rate (with respect to time) at which the inten- sity of the moonlight shining on him is changing. Hints: Start by calling his path r(t) = (x(t), y(t)), and let to be the time when he is at (2, 2). Use the chain rule! Also recall that the speed of an object with velocity (tt) dy) dx 2 2 is (d) + (dz) . dt dt Please explain in detail the steps. thank youb) Given the following difference equation find y(n) if the input u(n) is a step function and sampling time T is 1 seconds. y(n + 1) y(n) = u(n) = Lomone An IPv4 Address Is Made Up Of How Many Bytes? A. 20 B. 10 C. 2 D. 4 Clear My Choice An office that dispenses automotive license plates has divided its customers into categories to level the office workload. Customers arrival can be modelled as 3 independent arrival streams using exponential interarrival distribution with mean 10 minutes each stream.eaxh customer accept payment with separate queue for each. The service time is UNIF (8,10) minutes for all customer types. After completion of this step the clerk serves all 3 customer types who merge into single first come first serve queue for this clerk. Suppose we need to use decide module for branching the parts according to their type before being disposed after the second customer 2:34 PM A. 3 way by chance with 33.33% with first true line connected to customer type 1 Dispose, second true line connected to customer type 2 Dispose B. 3 way by condition based on entity type match where customer 1 is connected from first true line to customer type 1 Dispose C. 3 way by chance with 40% with first true line connected to customer type 1 Dispose second true line connected to customer type 2 Dispose D. 2 way by condition if arrival time is equal to arrival time to the system If one company could gain ownership control of all of the wind power plants in the US, then the factors of market demand and supply will set the price. government will deregulate to ensure the company's monopoly. that firm could set up barriers to entry to discourage competition. O they will strive to reach efficiencies only they know how to make. 1. Suppose a jar contains 17 yellow marbles and 28 green marbles. If you reach in the jar and randomly pull out 2 marbles successively (without replacement), find the probability that both are green.Give your answer as a fraction, or round your answer to 3 places after the decimal point, if necessary.2. A study conducted at a certain high school shows that 70% of its graduates enroll at a college. Find the probability that among 7 randomly selected graduates, at least one of them enrolls in college.0.91764570.32.10.99978130.00021870.08235433. In the marketing division of a particular company, there are 65 part-time employees and 33 full-time employees. If two employees from the marketing division are randomly selected to represent the company at an upcoming conference, what is the probability that both employees have the same job status (full- or part-time)?Round your answer to 3 places after the decimal point, if necessary; or enter your answer as a fraction. Suppose f(x,y)=(xy) 2and g(x,y)=(x 2y) 3(a) What is the degree of homogeneity for f(x,y) (b) What is the degree of homogeneity for g(x,y) (c) What is the degree of homogeneity for h(x,y)=f(x,y)g(x,y) Consider a random variable with support on [0,1] and with density f X (x)=6x(1x)I [0,1]a. What is the CDF of X ? b. Use the CDF to calculate P(X< 1/3 ). Store the following information (excluding the first line) in a 2D array, while preserving the order of the information: Name Emirate Major University Amna RAK RAK University Noor Al Ain Physics Al Ain University Ahmad Sharjah Chemistry Sharjah University CE Then, write a MATLAB program that asks the user to enter either the student name, emirate, major or university. The MATLAB program should search all fields in the 2D array and stop (break) the search if the entered string matches any of the fields in the array. The program prints the type of query entered (i.c. name, emirate, major, or university) and the whole row must be printed to the user following the example given below. Otherwise, the program should notify the user that the query is not found. Hint: Use the MATLAB function stremp. Output: Please enter your query: Abu Dhabi University Query Not Found Please enter your query: Sharjah University University found The student name is Ahmad, the student is from Sharjah, the student is majoring in Chemistry, at Sharjah University Please enter your query: Physics Major found The student name is Noor, the student is from Al Ain, the student is majoring in Physics, at Al Ain University 31 Page find the volume of the solid Reducing Polynomial (15 pts) You are given below class Term which is used as a node of Polynomial linked list. public class Term ( public double SRS; //coefficient public int exp; //exponent public Term next; //reference to next Term object public Term (double sest int exp, Term next) { the seat = sest; this = exp; thavaxt next; } public Term (double sest int exp) { this (ses, exp, null); } public Term (Term t) { this (estr JR null); } } You are given below code for class Polynomial. Assume Polynomial already has the exponents in strictly-decreasing order, which means there may exist two terms or more with the same exponent. However, there may exist terms with 0 coefficient. You are to implement KemaveZexacesta which removes all terms with 0 coefficient. Therefore, after kemavezetaceea, is called, your Polynomial not only have exponents in strictly decreasing order, but also does not have any terms with 0 coefficients. public class Polynomial { private Term public Polynomial() { exist = null; } //the rest of the code doesn't matter so not given here [15 pts] //Complete the implementation of this method //pre: The exponents of terms are strictly decreasing with no terms with the same exponent but some terms may have 0 coefficient //post: The exponents of terms are strictly decreasing and there exists no terms with 0 coefficient private void kemexsseaCasEL) { //nothing to remove if(myBiket == null) return; //while t zer is 0, then keep removing while (axixatzesek == 0) { akiket = avkikat.next; } //take care of 0 gata of later terms Term current = axkirati //Part 2: Write your code here (15 pts) //remove any term with 0 g where the term is not the first element while (SHES != null) { if (SESBRepoxtusest == 0) { SHKEERKRAKK = SHKEERK:sextraext; } else { current SHRESBE DEK } } } } Write a function sums2 that calculates and returns the sum of 1 to n in steps of 2, where n is an argument passed to the function (scalar) The risk-free rate is 2.7% and the market risk premium is 6.74%. A stock with a of 1.68 just paid a dividend of $2.1. The dividend is expected to grow at 20.37% for five years and then grow at 3.25% forever. What is the value of the stock? Currency: Round to: 2 decimal place IT Project ManagementMySejahtera is an application developed by the Malaysian Government to track the movement of the citizens.a) Plan the work package and work breakdown structure for MySejahtera:b) The project manager for MySejahtera is not sure if they should use guestimating or the Delphi technique for costing estimation. Identify which technique should be used to plan for MySejahtera and justify your answer: Given the parametric equations x=3t^2 - 4 ; Y=6t+4. find dy/dx interms of t As part of an experiment to see how different types of soil cover would affect slicing tomato production, Marist College students grew tomato plants under different soil cover conditions. Groups of three plants each had one of the following treatments bare soil a commercial ground cover black plastic straw compostAll plants grew under the same conditions and were the same variety. Students recorded the weight (in grams) of tomatoes produced by each of the n=15plants:Create one-way ANOVA table Please use and display on raptor. Develop an algorithm, using Raptor, to calculate and display the Canadian federal income tax for any given income provided as input to the algorithm. The Canadian Federal income tax rates for 2022 are 15% on the first $50,197 of taxable income, plus 20.5% on the next $50,195 of taxable income (on the portion of taxable income over 50,197 up to $100,392), plus 26% on the next $55,233 of taxable income (on the portion of taxable income over $100,392 up to $155,625), plus 29% on the next $66,083 of taxable income (on the portion of taxable income over 155,625 up to $221,708), plus 33% of taxable income over $221,708 The expected input/output behavior of the algorithm is illustrated below for two examples: Taxable income: $99100 Income Tax : $17554.6650 Taxable income: $127889 Income Tax : $24968.7450