What is the position of the project management structure vis the organization structure a a vis and governance 2

Answers

Answer 1

Project management structure is defined as the process by which a project is managed. This structure determines the direction and the operations of a project to ensure that it meets the set goals within the time frame set by the project's scope, time, budget, quality, and risk.

The organizational structure is defined as the pattern of interaction among different groups of people within an organization, including the different departments, levels of management, and communication channels. The organizational structure establishes the roles and responsibilities of individuals within the organization, as well as the hierarchy of authority. The position of the project management structure vis-à-vis the organizational structure and governance is that it is the driver of the project from the beginning to the end of the project.

The project manager is also responsible for managing the risks that are associated with the project. They ensure that the project is delivered within the budget and schedule set for it and that the quality of the deliverables meets the expectations of the stakeholders involved in the project. In conclusion, the project management structure plays a vital role in the success of the project, and its position vis-à-vis the organizational structure and governance should be clearly defined and understood by all stakeholders involved in the project.

To know more about time, budget visit:

brainly.com/question/10055921

#SPJ11


Related Questions

A catchment area having D index value of (15) mm/hr experienced the storm of the following intension: 1) 50 mm/hr for 2 hrs 2) 30 mm/hr for 1/2 hr The resulting surface runoff was (10x106) m³. Find the catchment area.

Answers

The D index value is a method of estimating the time of concentration in an area and has units of mm/hr. In this case, a catchment area has a D index value of 15 mm/ hr and has experienced a storm of two different intensities:

50 mm/hr for 2 hours and 30 mm/hr for 0.5 hours. The resulting surface runoff was 10x10^6 m³. The catchment area can be determined using the following steps:
1. Determine the rainfall depth: To calculate the rainfall depth for each of the storm intensities, multiply the intensity by the duration.


2. Determine the total rainfall depth: The total rainfall depth is the sum of the rainfall depths for each storm.
Total rainfall depth = 100 mm + 15 mm = 115 mm
3. Calculate the runoff volume: The runoff volume can be calculated using the following equation:
Runoff volume = Catchment area * Rainfall depth * (1 + 0.007 * Rainfall depth)
where the rainfall depth is in mm and the runoff volume is in m³.
To know more about concentration visit:
https://brainly.com/question/13872928

#SPJ11

The slendemess ratio of a column determines if it is short, intermediate or long column Select the correct response: I don't know True False None enough data

Answers

The slenderness ratio is a measure of how slender a column is. It is defined as the effective length of a column divided by the least radius of gyration of its cross-section.

A column with a high slenderness ratio is considered more prone to buckling. The slenderness ratio is an important aspect of column design since it determines whether the column will be classified as a short column, intermediate column, or long column. For short columns, the slenderness ratio is less than or equal to 10, while for intermediate columns, the slenderns esratio is between 10 and 30. For long columns, the slenderness ratio is greater than 30.In conclusion, the slenderness ratio of a column determines whether it is classified as a short, intermediate, or long column. It is calculated by dividing the effective length of the column by the least radius of gyration of its cross-section.

To know more about effective length   visit:

brainly.com/question/31839241

#SPJ11

The difference between the time available to do a job and the time required to do the job, is known as
a) Float
b) Constraint
c) Duration
d) Event

Answers

The difference between the time available to do a job and the time  to do the job, is known as float.What is Float?Float is defined as the of time by which a task or series of tasks can be postponed without altering the task's completion date, and it's calculated by subtracting the early start date of the task from its late start date.

The four options you've provided, a), b), c) and d), are all Project Management terms. But from the options provided, only the term "Float" is more than 100.How to calculate float?In project management, float is the amount of time that a project start date can be postponed without delaying the scheduled completion date of the project. The float may be calculated using the following formula:Float = (LS - ES) - (LF - EF)Where,ES = Early StartLS = Late StartEF = Early FinishLF = Late Finish.

To know more about job visit:

https://brainly.com/question/32282738

#SPJ11

a)Differentiated into a hierarchy of royalty, nobility, landlords and peasants
B)Present in medieval Europe
c)Marked by extreme inequality
D)Associaled with free movement across social levels
2: Quebec's Quiet Revolution:
a)Saw the government intervene to reform sectors such as health, education and social welfare
b)Was the movement to separate from Canada
c) Was a force of change that transformed Quebec society between 1850 and 1870s
d)Saw the shift in Quebec society from a radical society to a conservative one
Question 3:Govemment interventions in Quebec after the 1970s included which of the followinga)Universal health care system
b)Nationalization of all industries
c)Freeing of economic controls by the government
d)Privatization of unversile

Answers

1. In medieval Europe, social organization was characterized by extreme inequality. It was divided into royalty, nobility, landlords, and peasants, and free movement across social levels was not possible. Royalty occupied the top tier of society. The nobility, landlords, and peasants are the next levels.

The monarch of the realm was the highest-ranked individual in medieval European social hierarchy. The nobility is made up of high-ranking people who inherit their titles. Landlords are property owners who rent land or real estate to others. Peasants, on the other hand, are individuals who work on the land owned by nobility and landlords.

2. Quebec's Quiet Revolution was a period of significant social and economic change that occurred in Quebec, Canada, between 1960 and 1966. It was aimed at modernizing the province's economy and society. It was brought about by the government's intervention, which sought to reform various sectors such as health, education, and social welfare. Quebec's Quiet Revolution transformed the province into a modern, secular society.

3. Government interventions in Quebec after the 1970s included the creation of a universal healthcare system, as well as the privatization of various state-owned enterprises. The government's intervention also resulted in the freeing of economic controls and the nationalization of all industries in Quebec.

To know more about monarch visit:-

https://brainly.com/question/27006521

#SPJ11

1. a) For the initial value theorem (IVT) and the final value theorem (FVT) properties for Laplace transforms i) Explain both properties in your own words and comment on why they are advantageous for engineers. ii) Explaining all steps, show the proof for the final value theorem. b) Determine the following for the first order differential equation and initial condition shown using the Laplace transform properties. 3+ 2y = 5, where y(0) = 2 dy dt i) The following transfer function, Y(s), using the derivative property 6s + 5 Y(S) = s(3s +2) The value of the time domain function as the time approaches zero, lim y(t) using the initial value theorem property.
ii) The value of the time domšin function as the time approaches infinity, lim y(t) using the final value theorem property.

Answers

Initial value theorem (IVT):According to the initial value theorem, the value of the time-domain function at time 0 is equal to the limit of the Laplace transform of the function as s approaches infinity.

Final value theorem (FVT):According to the final value theorem, the value of the time-domain function at time infinity is equal to the limit of the Laplace transform of the function as s approaches zero. These properties are advantageous for engineers as they provide a convenient way to determine the behavior of a system at initial and final states, respectively.

This information can be used to design and optimize the system accordingly.ii) Proof for Final Value Theorem:Given a Laplace transform of a function f(t), F(s), the final value theorem states that if the function is stable and all poles of F(s) are on the left side of the s-plane, then the limit of the function as t approaches infinity is equal to the limit.  the Laplace transform as s approaches zero.

To know more about Initial visit:

https://brainly.com/question/32209767

#SPJ11

A wooden log is to be used as a foot bridge to span a gap. The log is required to support a concentrated load 0f 30 kN at midspan. Allowable shear stress is 70 MPa. What is the diameter of the log that would be needed?

Answers

The given details are: Force acting on the wooden log = 30kNThe allowable shear stress = 70 MPa Formula to be used: Shear stress (τ) = F/(π/4)d² where F is the force acting on the wooden log, d is the diameter of the wooden log.

Let us calculate the diameter of the wooden log: Diameter of the wooden log = √(4F/(πτ))Substituting the values in the above formula: Diameter of the wooden log = √(4 × 30000 N/(3.14 × 70 × 10⁶ N/m²)).

Diameter of the wooden log = √(120000/21980000)Diameter of the wooden log = √0.00547Diameter of the wooden log = 0.074m or 74mmTherefore, the diameter of the log that would be needed is 74mm.

To know more about acting visit:

https://brainly.com/question/1410250

#SPJ11

The results of two drained tri axial tests on a saturated clay are recorded as follows:
Specimen A: Chamber-confining pressure = 104 kPa Deviator stress at failure = 210 kPa
Specimen B:
Chamber-confining pressure = 170 kPa Deviator stress at failure = 324 kPa
1 Compute the angle of friction.
2 Compute the cohesion of soil.
3 If the clay specimen above is tested in a tri axial apparatus with a chamber- confining pressure of 248 kPa, compute the major principal stress at failure.

Answers

1. Computation of the angle of frictionUsing the drained tri-axial test results given below, it is required to calculate the angle of friction:Specimen A:

Chamber-confining pressure = 104 kPa Deviator stress at failure = 210 kPa Specimen B:Chamber-confining pressure = 170 kPa Deviator stress at failure = 324 kPa.

The relationship between the angle of friction and deviator stress is given by the following equation:

Computation of the cohesion of soilThe cohesion of soil is given by the following equation:$C = \sigma_1 \; sin^2 \frac{φ}{2} - \sigma_3 \; cos^2 \frac{φ}{2}$

where σ1 and σ3 are the principal stresses  For specimen A, assuming σ3 = 0, the cohesion of soil is given by:$C = \sigma_1 \; sin^2 \frac{φ}{2}$Using Mohr's circle, we can obtain σ1 as follows:

To know more about Deviator visit:

https://brainly.com/question/32343308

#SPJ11

A steam turbine, operating reversibly and adiabatically, takes in superheated steam at 2000kPa and discharges at 50kPa. (a) What is the minimum superheat required so that the exhaust contains no moisture? (b) What is the power output of the turbine if it operates under these conditions and the steam rate is 5 kg⋅s −1 ?

Answers

A) The turbine cannot prevent moisture in the exhaust through superheating.

B) The power output of the turbine is 4802.9 kW.

A) Calculation of minimum superheat required to avoid moisture in exhaust:

For the condition of no moisture in the exhaust, the quality of the steam at state 2 (x2) is 0. To determine the superheat required to prevent moisture, the process from state 1 to 2 is divided into two parts.

1. Isentropic expansion (2a) to the saturation state (2s):

During the isentropic expansion (2a), the entropy remains constant, s2a = s1. The discharge pressure is 50 kPa, and the enthalpy at this pressure is given by the steam tables as hf = 2776.3 kJ/kg and hg = 2835.8 kJ/kg. The quality at state 2a (x2a) can be calculated using the formula: X2a = (h2a - hf) / (hg - hf).

2. From state 2a to 2s:

At state 2s, the steam is dry saturated, x2s = 1. This means hf = hfg, where hfg is the latent heat of vaporization at the saturation temperature T2s. From the steam tables, hf = 2837.1 kJ/kg at T2s = 45.8°C. The heat that must be extracted during this constant-pressure heat-rejection process is given by: Q2a-2s = h2a - hf = h2a - hfg.

Since the turbine operates adiabatically, there is no heat transfer. Therefore, ΔS = S2s - S2a = S1 - S2a. And since the turbine operates reversibly, ΔS = Q / T1. By combining these equations, we get: Q = T1 (S1 - S2a). Also, Q = h1 - h2a. Substituting these equations, we can solve for h2a: h2a = h1 - T1 (S1 - S2a).

The superheat required to avoid moisture at the exhaust is given by: T2s - T2a = T2s - T1 (S1 - S2a) / Cp, where Cp is the specific heat capacity of steam at constant pressure.

B) Calculation of Power Output of Turbine:

Given the steam rate of 5 kg/s, we can calculate the power output of the turbine using the formula: Power Output = Mass Flow Rate x Specific Work done by Turbine. The specific work done by the turbine is the difference in enthalpy between the inlet and exit states, which can be expressed as: Specific work done = h1 - h2. Substituting the given values, we find: Power Output = 5 x (3390.9 - 2435.1) = 4802.9 kW.

Therefore, the power output of the turbine is 4802.9 kW.

Learn more about turbine

https://brainly.com/question/33554061

#SPJ11

A short column is designed to carry a factored load (P) 2140 kN and factored moment (M) = 690 kN.m about the strong axis. Cost studies indicate that p-0.03 % is optimum with steel arrangement in two layers parallel to the axis of bending. Find the required dimensions b and h of the column. Use f=28 MPa, fy=420 MPa.

Answers

Factored load, P = 2140 k N Factored moment, M = 690 k N. m Percent of steel, p = 0.03%Maximum Compressive stress, f = 28 M Pa.

Characteristic strength, f y = 420 M Pa Let the dimensions of the column be breadth (b) and depth (h).From the given problem, the maximum compression stress is given by the formula fc = P / A + M h / I, where fc is the compressive stress, P is the axial load acting on the column, A is the area of the column, M is the bending moment acting on the column, h is the depth of the column, and I is the moment of inertia of the column section.

or the rectangular section, the area (A) is given by the formula A = b x hand the moment of inertia (I) is given by the formula I = (b x h³) / 12.The values of P and M are factored values of the axial load and bending moment, respectively. Therefore, the nominal values of the axial load and bending moment are calculated by dividing the factored.

To know more about Factored visit:

https://brainly.com/question/24924507

#SPJ11

Q3. What is anisotrophy? How it affects your engineering design?
Q4. Deep foundation works in limestone area always create concern to the safety and cost
incurred. Discuss the issues, mitigation and correction measures.

Answers

Anisotropy is a property of a material that causes its physical properties to vary depending on the direction of measurement. It is commonly encountered in engineering materials such as wood, composites, and rocks. The property of anisotropy can have a significant impact on the design of engineering structures.

Anisotropic materials exhibit different mechanical and physical properties in different directions. it becomes challenging to predict their behavior under various loading conditions. it may be necessary to modify the design or select an alternate material to ensure that the structure will be able to withstand the loads it will encounter.

Deep foundation works in limestone areas can create safety and cost concerns due to the unique properties of the rock. Limestone is a sedimentary rock that is composed primarily of calcium carbonate. It is known for its hardness, durability, and ability to hold up well under pressure.

Another issue with deep foundation works in limestone areas is the cost. Due to the unique properties of the rock, it can be challenging and expensive to drill deep into the limestone to create the necessary foundation supports.

They must also work closely with contractors to ensure that the work is completed efficiently and within budget.

To know more about Anisotropic visit:-

https://brainly.com/question/28302216

#SPJ11

conditions that determine the pitch attitude required to maintain level flight are

Answers

The pitch attitude required for maintaining level flight is determined by factors such as lift, weight, speed, and angle of attack. Adjusting the pitch allows the pilot to balance these forces. Lift should equal weight, and the pitch needs adjustment if they are not balanced. The airspeed affects the pitch, with higher speeds requiring increased lift. Conversely, lower speeds require decreased lift. The angle of attack must also be considered to avoid stalling. Maintaining level flight involves adjusting the pitch attitude to achieve a balance between lift, weight, and speed.

In level flight, the pitch attitude required is determined by several factors, including the wing's lift, weight, and speed. The pilot can adjust the pitch to maintain level flight by changing the airspeed, angle of attack, or altitude.

The following are the conditions that determine the pitch attitude required to maintain level flight:

Lift: Lift is the force that keeps the aircraft aloft. In level flight, the lift must equal the weight of the aircraft. To maintain this balance, the aircraft's pitch attitude must be adjusted. If the lift is too low, the aircraft will descend, and if the lift is too high, the aircraft will climb.

Weight: Weight is the force that pulls the aircraft towards the ground. The weight of the aircraft must be equal to the lift in level flight. If the weight is too high, the aircraft will descend, and if it is too low, the aircraft will climb.

Speed: The airspeed of the aircraft also affects the pitch attitude required to maintain level flight. The faster the aircraft flies, the more lift is required to keep it in level flight. This means that the pitch attitude must be increased as the airspeed increases. Conversely, as the airspeed decreases, the pitch attitude must be decreased to maintain level flight.

Angle of Attack: The angle of attack is the angle between the wing and the relative wind. If the angle of attack is too high, the aircraft will stall. Therefore, the pitch attitude must be adjusted to maintain a safe angle of attack.

In conclusion, level flight is maintained by adjusting the pitch attitude of the aircraft to balance the forces of lift, weight, and speed.

Learn more about pitch attitude

https://brainly.com/question/1604278

#SPJ11

Answer the following Questions 1. A group of students in Civil engineering department were asked to design a neighbourhood for their final year project. In their first meeting one of the members suggested to use graphs and its characteristic to get an intuition about the design before proceeding to a software. The design suppose to contain five houses, one garden and mosque. The meeting ended with the following:
(a) The design will be simple. The two houses are connected with all other three houses. The garden and mosque are isolated.
(b) Two houses are surrounded by road and connected by the garden with only one road for each. The rest of the houses are pendent.
(c) The design based on one way road. It starts from garden then reaches five houses, three of
them designed to have return to the garden. The mosque is far away and located inside a big
round about.
Answer the following questions:
i. Draw a graph for the design in (a). What is the type of graph? explain.
ii. Draw a graph for the design in (b). What is the type of graph? Explain.
iii. Draw a graph for the design in (c). What is the type of graph? explain.
iv. If the five houses have four roads for each. What will be the total number of roads?
v. If the design based on one way road, the road getting in and out from each house. What will be the total number of roads?

Answers

The graph for the design in (a) is connected and simple. The type of graph is a tree because it contains a path between two vertices that are connected by exactly one path.

The graph for the design in (b) is not connected, and it is a forest graph. The type of graph is a forest because it contains many trees, where each tree is a component. The graph for the design in (c) is connected and simple. The type of graph is a path because it is a graph with vertices and edges, but there are no cycles, loops, or branches. Therefore, the graph is a linear arrangement of vertices connected by edges.

If the five houses have four roads for each, the total number of roads will be 20 because each house has four roads, so the total number of roads for the five houses is (5 x 4 = 20).(v) If the design is based on one-way road, the road getting in and out from each house, then the total number of roads will be 40 because each house has two roads.

To know more about design visit:

https://brainly.com/question/17147499

#SPJ11

rue or false. The Domain Naming System (DNS) is basically the phone book of the Internet as it stores all the IP addresses (phone numbers) and domain names (people, places, and businesses). O True False QUESTION 4 Virtual law concerns digital lawyers arguing real world cases before virtual judges in a simulated world. True False

Answers

The statement "The Domain Naming System (DNS) is basically the phone book of the Internet as it stores all the IP addresses (phone numbers) and domain names (people, places, and businesses)" is true.

On the other hand, the statement "Virtual law concerns digital lawyers arguing real-world cases before virtual judges in a simulated world" is false.

The Domain Naming System (DNS) serves as the phone book of the Internet. It is responsible for translating domain names, such as www.example.com, into IP addresses, which are unique identifiers for devices connected to the internet. DNS stores the mapping between domain names and IP addresses, allowing users to access websites by typing domain names instead of remembering complex IP addresses. Thus, the statement about DNS is true.

On the other hand, the statement about virtual law is false. Virtual law typically refers to legal issues arising from virtual environments, such as virtual reality or online platforms. It involves legal considerations related to digital transactions, online privacy, intellectual property, and cybercrime. However, the concept of digital lawyers arguing real-world cases before virtual judges in a simulated world is not a commonly practiced scenario in the legal field. While technology can play a role in facilitating legal processes, the traditional legal system primarily operates in the physical world with real judges presiding over cases.

Learn more about Domain Naming System here:

https://brainly.com/question/32768737

#SPJ11

Compare typical single beam UVNis and IR (either dispersive or Fourier transform) instruments in terms of both their respective configurations as well as differences in specific components. / Vergelyk tipiese enkelbundel UVNis en IR (óf dispersiewe of Fourier transform) instrumente in terme van beide hul onderskeie konfigurasies asook verskille in spesifieke komponente.

Answers

Single beam UVNis and IR instruments differ in their configurations and specific components. Single beam UVNis instruments use a single beam of light passing through a sample cell, while IR instruments can be  utilizing different methods for analyzing light.

Single beam UVNis (Ultraviolet-Visible-Near-Infrared) instruments and IR (Infrared) instruments are both widely used in spectroscopy for analyzing the interaction of light with matter. However, they differ in their configurations and specific components.

In a typical single beam UVNis instrument, a single beam of light passes through a sample cell containing the substance to be analyzed. The light beam is split into two paths: the sample beam that passes through the sample cell and the reference beam that bypasses the sample. The intensity of both beams is measured separately by a detector, and the ratio of their intensities is used to determine the absorption or transmission of light by the sample. This configuration allows for accurate measurement of the sample's optical properties.

On the other hand, IR instruments can be either dispersive or Fourier transform (FT) instruments. Dispersive IR instruments use a prism or a diffraction grating to disperse the infrared light into its different wavelengths. The dispersed light is then detected by a detector array, and the resulting spectrum is used for analysis.

FT-IR instruments, on the other hand, use an interferometer to measure the interference pattern produced by combining the sample and reference beams. This pattern is then mathematically transformed into a spectrum using a Fourier transformation. FT-IR instruments offer advantages such as higher spectral resolution and faster data acquisition.

In terms of specific components, single beam UVNis instruments typically consist of a light source (such as a lamp), a monochromator for selecting specific wavelengths, a sample cell, a detector, and a data analysis system. IR instruments, whether dispersive or FT, also include a source (such as a globar or a laser), an interferometer (for FT-IR instruments), a detector, and a data analysis system.

However, FT-IR instruments additionally require a beam splitter and a mirror for generating the interference pattern.

Learn more about FTIR instrument

brainly.com/question/30280289

#SPJ11

A footing whose base is 0.76m and 0.61m from the ground surface is subjected for carrying a load. Using γ=18.08 kN/m3, C = 19.15 KPa, ø = 25 deg, Nc=25.13, Nq=12.72, Nγ=8.34. Find the ultimate bearing capacity (kPa) under general shear failure

Answers

The ultimate bearing capacity (kPa) under general shear failure in the footing is given by; qult = cNc + qNq + 0.5γBNγwhere c = 19.15 KPa, Nc = 25.13, q = 0, Nq = 12.72, γ = 18.08 kN/m³ and Nγ = 8.34.

Given that the base is 0.76m and 0.61m from the ground surface. Hence the width of the footing; B = 0.76 mThe depth of the footing ;D = Bγ = 0.76 × 18.08 = 13.76 cm

Depth of foundation = D + 0.61 = 13.76 + 6.1 = 19.86 cm ≈ 20 cm The net ultimate bearing capacity of soil; qn = qult × B × D = (cNc + qNq + 0.5γBNγ) × B × D = (19.15 × 25.13 + 0 + 0.5 × 18.08 × 8.34 × 0.76 × 25.13) × 0.76 × 0.20qn = 225.13 KPa

The ultimate bearing capacity of soil is 225.13 kPa (rounded off to two decimal places).

To know more about failure visit:

https://brainly.com/question/32672005

#SPJ11

Estimate the minimum standard pipe size for hydropower generation in Question 1 if the minimum pressure required at the turbine is 40psig, Repeat question 1 with the following information: (Qn 1 info: A hydroelectric water dam with 1000000 m
3
capacity is built 50 m above sea level, 2 km away from the sea. A pump, powered by renewable energy, is used to pump water from the sea to fill up the dam at a maximum flow rate of 20 m
3
/s. When energy is required, the water from the dam will be released to the sea, flowing through a turbine at the same flow rate. Both pump and turbine have an effective height of 1 m and efficiency of 85%. Assuming frictionless flow) (i) The water dam is connected to the sea with stainless steel pipes (ii) Ignore head loss between the sea and the pump (iii) Ignore head loss between the sea and the turbine

Answers

The minimum standard pipe size for hydropower generation, considering a minimum pressure requirement of 40 psig at the turbine, is 1.5 meters (Diameter of the Pipe) for steel pipes and 1.35 meters (Diameter of the Pipe) for stainless steel pipes.

Q1: Estimate the minimum standard pipe size for hydropower generation if the minimum pressure required at the turbine is 40 psig.

Solution:

The information provided in the question is as follows:

Height of dam = 50 m

Water capacity of dam = 1000000 m^3

Distance between dam and sea = 2 km

Maximum flow rate of water = 20 m^3/s

Effective height of pump = 1 m

Efficiency of pump = 85%

Efficiency of turbine = 85%

Pressure required at the turbine = 40 psig

Pipe Material = Steel

Since the given pump has an effective height of 1m, the water level in the dam needs to be 51m to pump the water. Thus, the potential energy required to pump the water from the sea to the dam is equal to the potential energy gained by water when it flows down through the turbine. Hence, the height difference between the dam and sea is the head (pressure) generated. The height difference is 50 m – 0 m = 50 m.

The head generated = 50 m × 9.81 m/s^2 = 490.5 kPa = 71.07 psig

Total head = Head generated – Head loss

Head loss is neglected between the sea and pump and also between the sea and turbine.

Minimum pressure at the turbine = 40 psig

Thus, the pressure at the pump inlet is 40 + Head loss.

The pressure at the pump inlet must be sufficient to prevent cavitation. If the pressure at the inlet of the pump is lower than the vapor pressure of the fluid, then cavitation may occur. The vapor pressure of water at 60°C is 25.2 psig.

For pressure at inlet > vapor pressure

Head loss = Pressure at inlet - Pressure at the turbine = 40 + 25.2 - 71.07 = -5.87 psig

For pipe material steel, the friction loss at the maximum flow rate of 20 m^3/s through a 1 km long pipe can be calculated as:

Hf = 0.00002 × f × (L/D) × (V^2/2g)

Where Hf = head loss, f = friction factor, L = length of the pipe, D = diameter of the pipe, V = velocity of the fluid, and g = gravitational constant.

The above equation can be written as:

Q = (π/4) × D^2 × V

Substituting the value of V from the given flow rate and diameter of the pipe, we get:

D = 1.37 m

Let's take D = 1.5 m (Standard pipe diameter) for design purposes.

Hence, the minimum standard pipe size for hydropower generation if the minimum pressure required at the turbine is 40 psig is 1.5 meters (Diameter of the Pipe).

Q2: Repeat question 1 with the following information:

(i) The water dam is connected to the sea with stainless steel pipes

(ii) Ignore head loss between the sea and the pump

(iii) Ignore head loss between the sea and the turbine

Solution:

In this question, head loss between the sea and the pump, and also between the sea and turbine is neglected. The head generated is still 71.07 psig. The pump inlet pressure is equal to the turbine pressure, i.e., 40 psig. Therefore, the head loss will be:

Head loss = Pressure drop = 71.07 - 40 = 31.07 psig

The diameter of the pipe can be calculated in the same way as the previous question.

Q2 Answer: The minimum standard pipe

size for hydropower generation if the minimum pressure required at the turbine is 40 psig with stainless steel pipes is 1.35 meters (Diameter of the Pipe).

Learn more about hydropower generation

https://brainly.com/question/33513822

#SPJ11

The minimum amount of steel for one-way slab C with thickness h= 150 mm, f' = 28 MPa and f = 420 MPa (Grade 60) is: Select one: a. 220 2 mm/m 2 O b. 270 mm/m c. 240 2 mm/m 2 d. 290 mm/m

Answers

The correct answer is 240 2 mm/m2. The minimum amount of steel for one-way slab C with thickness h= 150 mm, f' = 28 MPa and f = 420 MPa (Grade 60) is 240 2 mm/m2.

The minimum amount of steel required for one-way slab is greater than 100. So, option (c) is correct.How to determine minimum amount of steel for a one-way slab?A minimum amount of steel is required for one-way slabs to ensure adequate structural strength.

The following is the process for calculating the minimum amount of steel required for a one-way slab:C = Cmin + Cfwhere,Cmin = 0.26(100A/Ast) (fy/f'c)^0.5Cf = 0.15(Ast/f'c)Here,Ast = area of tension reinforcement,fy = yield strength of tension reinforcement,f'c = compressive strength of concrete.

To know more about correct visit:

https://brainly.com/question/24532377

#SPJ11

Which of the followings statements is true when comparing double decining balance depreclation to straight-ine depreciation? a. Straight-line deductions will be greater than double declining balance deductions in all years of the asset's depreciable life. b. Double declining balance deductions will be less than straight-line deductions in early years of the asset's depreciable life but greater in later years. c. Double declining balance deductions will be greater than straight-line deductions in all years of the asset's depreciable life. d. Double declining balance deductions will be greater than straight-line deductions in early years of the asset's depreciable life but less in later years.

Answers

Double declining balance depreciation is an accelerated depreciation method in which an asset's book value is multiplied by a fixed depreciation rate.

The process is continued until the book value of the asset reaches zero, and it is frequently utilized to depreciate assets that lose value quickly over time. Straight-line depreciation is a method of depreciation in which the same amount of depreciation is applied every year over the life of the asset. The most significant difference between double declining balance and straight-line depreciation is that the former results in a more rapid write-off of the asset's book value.The correct answer to the given question is option (b) Double declining balance deductions will be less than straight-line deductions in early years of the asset's depreciable life but greater in later years. Double declining balance deductions will be less than straight-line deductions in the early years of the asset's depreciable life but greater in later years.

TO know more about book visit:

brainly.com/question/15113495

#SPJ11

A Contractor Has A Job Which Should Be Completed In 100 Days. At Present, He Has 80 Men On The Job And It Is Estimated That They Will Finish The Work In 130 Days. Of The 80 Men, 50 Are Each Paid ₱120.00 A Day, 25 At ₱180.00 A Day, And 5 At ₱250.00 A Day. For Each Day Beyond The Original 100 Days, A Contractor Has To Pay ₱500.00 Liquidated Damages.A) How Many
A contractor has a job which should be completed in 100 days. At present, he has 80 men on the job and it is estimated that they will finish the work in 130 days. Of the 80 men, 50 are each paid ₱120.00 a day, 25 at ₱180.00 a day, and 5 at ₱250.00 a day. For each day beyond the original 100 days, a contractor has to pay ₱500.00 liquidated damages.
a) How many more men should the contactor add so that he would complete the work on time?
b) If of the additional men, 2 are paid ₱180.00 a day, and the rest at ₱120.00 a day, would the contractor save money by employing more men and not paying the fine?

Answers

A contractor has a job that should be completed in 100 days. At present, he has 80 men on the job and it is estimated that they will finish the work in 130 days. Of the 80 men, 50 are each paid ₱120.00 a day, 25 at ₱180.00 a day, and 5 at ₱250.00 a day. For each day beyond the original 100 days, a contractor has to pay ₱500.00.

liquidated damages.(a) How many more men should the contractor add so that he would complete the work on time?In the first case, we see that the contractor already has 80 men and they are working for 130 days to complete the job. So, we can use the following formula to determine the additional number of workers required to finish the work in 100 days.

b) If of the additional men, 2 are paid ₱180.00 a day, and the rest at ₱120.00 a day, would the contractor save money by employing more men and not paying the fine Let’s assume that the contractor adds 440 workers, of which 2 are paid ₱180.00 a day and the rest are paid ₱120.00 a day.

The total cost of the new workers is, therefore, ₱9600.00 + ₱4500.00 + ₱49800.00 = ₱63,900.00.The cost of liquidated damages would be calculated as follows:  $$LD = (130-100) \cdot 500 = ₱15,000.00$$.

Therefore, the contractor would save money if he employs more men and not pays the fine. The contractor’s savings would be:$$Savings = LD - Additional cost$$$$= 15000.00 - 63900.00 $$$$= -48900.00$$

Thus, we can see that the contractor would save ₱48,900.00 by employing more men and not paying the fine.

To know more about contractor visit:

https://brainly.com/question/31457618

#SPJ11

1. Department of Transportation sometimes choose Design-Build delivery method for a project to
A. chose the best quality contractor
B. reduce the project time
C. avoid budget overrun
2. The solicitation document used for a Design-Build project is
A. request for bid
B. request for information
C. request for proposal
D. request for qualification
D. avoid the bidding process

Answers

The Department of Transportation (DOT) uses Design-Build delivery method for projects to choose the best quality contractor, reduce the project time, and avoid budget overruns. the solicitation document used for a Design-Build project is request for proposal (RFP).

Design-Build is a construction delivery method that entails hiring a single entity to manage both the design and construction of a project. Design-Build can result in faster project completion times, fewer claims and disputes, fewer change orders, and better quality. In the U.S.

The solicitation document used for a Design-Build project is the request for proposal (RFP). The RFP is a detailed, written document that defines the scope of the project, the services required, the contract terms, and conditions, and any other relevant information.

The Department of Transportation sometimes chooses the Design-Build delivery method for projects to choose the best quality contractor, reduce project time, and avoid budget overruns. The solicitation document used for a Design-Build project is the request for proposal (RFP).

To know more about solicitation visit:-

https://brainly.com/question/28180167

#SPJ11

A piple is carrying water under steady flow condition. At end point 1, the pipe diameter is 1.2 m and velocity is (48+ 30) mm/h. At other end called point 2, the pipe diameter is 1.1 m, calculate velocity in m/s at this end.

Answers

A pipe is carrying water under steady flow conditions. At end point 1, the pipe diameter is 1.2 m, and the velocity is (48+30) mm/h.  called point 2, the pipe diameter is 1.1 m.

We need to calculate the velocity in m/s at this end

[tex]Q = A1V1 = A2V2[/tex],where Q is the flow rate, A1 and A2 are the cross-sectional areas of the pipe at point 1 and point 2, respectively, and V1 and V2 are the velocities at point 1 and point 2,

Firstly, we will calculate the cross-sectional area of the pipe at point 1: Area at point 1 = [tex]π(1.2/2)²= 1.131 m²[/tex]

Now, we can calculate the flow rate at point 1:[tex]Q = A1V1(48+30) × 10⁻³ = 1.131 × V1V1 = (78/1.131) m/s = 68.89 m/s[/tex](approx)Next, we can calculate the cross-sectional area of the pipe at point 2:Area at point 2 = [tex]π(1.1/2)²= 0.95 m²[/tex]

Finally, we can use the continuity equation to find the velocity at point 2:[tex]Q = A1V1 = A2V2V2 = Q/A2= (48+30) × 10⁻³ / 0.95= 0.089 m/s[/tex]

Therefore, the velocity in m/s at point 2 is 0.089 m/s.

To know more about diameter visit:-

https://brainly.com/question/32968193

#SPJ11

during which season you will recommend to carryout
excavation for construction. also give reason

Answers

Excavation for construction is best carried out in a dry season, particularly in the summer months, depending on the location. This is because the dry season usually has less rainfall and drier soil, making it easier to excavate and construct without any complications.

The excavation process involves removing dirt, rocks, and other materials from the ground to create a foundation for construction. If the soil is too wet or the ground is soaked with water due to excessive rainfall, it can cause problems such as mudslides or erosion.

The dry season is also beneficial because it allows for better visibility and access to the site. It can be challenging to navigate through a construction site in the rainy season, as the mud and slippery surfaces make it challenging to move equipment and materials around.

The dry season can also help to reduce costs and increase efficiency as excavation can be carried out more quickly and efficiently without any weather-related disruptions. carrying out excavation for construction during the dry season is the best option due to less rainfall, drier soil, better visibility, and accessibility.

To know more about Excavation visit:-

https://brainly.com/question/27447995

#SPJ11

Questions 15 and 16 are related to the following: A construction company buys a truck for $25,000. Salvage value after useful life of 5 years is $15,000. 15. Use linear depreciation. What is depreciation value for the second year? a. $14,000 b. $1200 C. $2000 d. $8000 16. Use MACRS. What is depreciation value for the third year? a. $6,400 b. $4,800 C. $4,000 d. $3,000

Answers

15. Using linear depreciation, depreciation value for the second year can be calculated as follows: Depreciation per year = (Cost of asset - Salvage value) / Useful life Depreciation per year = ($25,000 - $15,000) / 5Depreciation per year = $2,000Depreciation value for the second year = Depreciation per year × Number of years.

Depreciation value for the second year = $2,000 × 2Depreciation value for the second year = $4,000Therefore, the correct answer is option C. $2,000.16. Using the Modified Accelerated Cost Recovery System (MACRS), depreciation value for the third year can be calculated as follows:

Depreciation rate for the third year = 1.96 × 15% = 29.4%Depreciation value for the third year = Depreciation rate × Adjusted basis Adjusted basis for the third year = Cost of asset - Depreciation for the first two years Adjusted basis for the third year = $25,000 - ($2,000 × 2)Adjusted basis for the third year = $21,000Depreciation value for the third year = 29.4% × $21,000Depreciation value for the third year = $6,174.

To know more about depreciation visit:

https://brainly.com/question/30531944

#SPJ11

Heat transfer
1) Please list the different modes (types) of heat transfer? Please provide definition, drawing and equations of each mode?

Answers

The three modes of heat transfer are conduction (transfer through direct contact), convection (transfer through fluid motion), and radiation (transfer through electromagnetic waves emitted by a hot body).

The three different modes (types) of heat transfer are as follows:Conduction: It occurs when two bodies at different temperatures come into contact with one another. The heat transfers from the hot object to the cold object via conduction. The heat flow direction is from higher temperature to lower temperature. It occurs in solids only and in metals, heat transfer occurs through the free electrons. The formula for heat conduction is given by:Q/t = kAΔT/Lwhere Q/t is the heat flow rate, k is the thermal conductivity, A is the surface area, ΔT is the temperature difference, and L is the thickness.Convection: This is the type of heat transfer that occurs due to the motion of fluids. Convection takes place in liquids and gases. Convection occurs due to density differences caused by the temperature differences. Natural convection occurs without any external force, whereas forced convection takes place due to the external force. The formula for heat convection is given by:Q/t = hA(Ts-T∞)where Q/t is the heat flow rate, h is the convection heat transfer coefficient, A is the surface area, Ts is the surface temperature, and T∞ is the fluid temperature.Radiation: It occurs due to the emission of electromagnetic waves by the body that is at a high temperature. Radiation does not require any medium to transfer heat. It occurs in a vacuum. The rate of heat transfer by radiation depends on the surface emissivity, temperature, and surface area. The formula for heat radiation is given by:Q/t = σAε(Ts^4 - T∞^4)where Q/t is the heat flow rate, σ is the Stefan-Boltzmann constant, A is the surface area, ε is the emissivity of the surface, Ts is the surface temperature, and T∞ is the fluid temperature.

Learn more about radiation here :-

https://brainly.com/question/31106159

#SPJ11

1165ft 3 /hr is a feed rate for one reformer reactor used platinum catalyst. Volume hour space velocity around 4v/hr/v, the catalyst dimeter 6ft, catalyst bulk density =60lb/ft 3 with 32API. i. What is the area of reactor, ii. Estimate both (volume and high) of catalyst in cracker? iii. Calculate the time in day to regenerate the catalyst in a reformer, if the catalyst deactivates after processing 76 bbl of feed per pound of catalyst?

Answers

The area of the reactor is approximately 291.25 ft². The volume of the catalyst is 60 ft³, with a height of 52.76 ft. The catalyst regeneration time is estimated to be around 1.68 hours or 0.07 days.

i. Area of reactor

The area of the reactor can be determined using the volumetric space velocity. The formula to calculate the area of the reactor is given by:

Area of reactor = Q / Volumetric space velocity

Where:

Q = Feed rate (ft³/hr)

Volumetric space velocity = V / Q

By substituting the given values, we can calculate the area of the reactor:

Area of reactor = (1165 ft³/hr) / (4 (ft³/hr/ft³))

Area of reactor = 291.25 ft²

ii. Catalyst volume and height

To calculate the volume of the catalyst, we use the formula:

V = πd²h/4

Where:

π = 3.1416

d = Diameter of the catalyst (6 ft)

h = Height of the catalyst

To estimate the height of the catalyst, we need to determine its bulk density in lb/in³. Using the given information:

32 API = (141.5 / bulk density) - 131.5

Bulk density = 58.128 lb/ft³

Bulk density = 58.128 / 1728 = 0.0336 lb/in³

Substituting the values, we can calculate the volume of the catalyst:

V = πd²h/4

V = π(6 ft)²h/4

V = 28.2743h ft³

Calculating the height of the catalyst:

h = V / 28.2743

h = (60 ft³) / (28.2743 × 0.0336)

h = 52.76 ft

Therefore, the volume of the catalyst is 60 ft³, and the height is 52.76 ft.

iii. Catalyst regeneration time

The time required to process 1 lb of feed can be determined as follows:

1 lb of catalyst processes 76 bbl of feed per day

(1 lb catalyst) / (76 bbl feed/day) × (42 gal/bbl) × (8.34 lb/gal) = 0.454 lb feed/lb catalyst/day

To calculate the catalyst regeneration time, we use the following formula:

(60 ft³) × (60 lb/ft³) × (0.454 lb feed/lb catalyst/day) = 1,957 lb feed/day

The time to regenerate the catalyst in a day is calculated as:

1,957 lb feed/day / 1165 ft³/hr = 1.68 hours or 0.07 days (approx).

Therefore, the catalyst regeneration time is approximately 1.68 hours or 0.07 days.

Learn more about area of the reactor

https://brainly.com/question/29123819

#SPJ11

Sustainable buildings provide many types of benefits to stakeholders and the environment. Despite so, some building developers still have some concerns over implementing sustainable designs to their new building developments. (a) Suggest reasons why some building developers still have some concerns over implementing sustainable designs to their new building developments. (b) Some city governments favor granting 'density bonus' while some others favor giving out 'tax rebates or credits' for encouraging sustainable building developments. Compare and contrast the underlying rationales of these two approaches. The government in Hong Kong has made the BEAM-Plus assessment as one of the pre-requisites for obtaining Gross Floor Area (GFA) concessions for new sustainable building developments. Comment on the appropriateness of the above government action, and outline the basic framework and operating principles of the BEAM-Plus currently adopted for assessing the sustainability of the building developments in Hong Kong

Answers

Sustainable designs often require additional upfront investments compared to conventional designs. Developers may be concerned about the initial costs of incorporating sustainable features and technologies, which can sometimes be higher.

Some developers may not fully understand the benefits and long-term cost savings associated with sustainable designs. They may be unaware of the latest sustainable technologies and practices or may have misconceptions about their effectiveness.

Developers might be hesitant to implement sustainable designs if they perceive a lack of demand or market preference for sustainable buildings. They may be concerned about the potential impact on property values or the perception of their projects by potential buyers or tenants.

Evaluation of indoor air quality, thermal comfort, lighting, acoustic performance, and occupant well-being through the use of sustainable building materials, ventilation systems, and daylighting.

Learn more about investment on:

https://brainly.com/question/10908938

#SPJ4

Describe and discuss the challenges a Spanish construction company specialising in designing and delivering sustainable energy power plants would need to consider when seeking to grow organically in Egypt. The company has no experience of operating in Egypt but has worked extensively in the United Arab Emirates. The annual turnover of the company in 2020 was €2 billion, employing 6,000 people across all their operating divisions.

Answers

If a Spanish construction company specialized in designing and delivering sustainable energy power plants wants to expand organically in Egypt, it will face various challenges that it will have to consider and handle. This company has no prior experience operating in Egypt, but it has worked significantly in the United Arab Emirates.

1. Political and economic instability: Egypt has undergone political turmoil and economic instability in recent years, with the country experiencing significant socio-economic changes. Egypt has been experiencing changes in government and economic instability for the last ten years. Before considering expansion, the Spanish construction company should look into political and economic stability and the current situation in the country.

2. Foreign laws and regulations: There are a variety of regulations and restrictions on international businesses operating in Egypt. The Spanish construction company must consider the Egyptian legal system's intricacies and the cultural variations it may experience before entering the Egyptian market.

3. Cultural Differences: Egypt's diverse culture and values must be respected by the Spanish construction company. It's critical to be familiar with Egyptian cultural norms and traditions, as well as the local language.
To know more about  worked significantly visit:

brainly.com/question/29333698

#SPJ11

2. How are igneous rocks formed?
3. What is referring texture of igneous rocks?
4. What is peridotite?
5. What are the causes of earthquake?
6. Define Bowen's reaction series
7. Distinguish between high temperature and low pressure in magma origins?
8. Define Atom?
9. What is Atomic Structure?
10. What are Isotopes?
11. What is Chemical Bonding?
12. What is a Mineral?
13. What is Crystal's habit?

Answers

2. Igneous rocks are formed when magma or lava cools and solidifies. If the cooling occurs slowly and underground, intrusive igneous rocks are formed, while extrusive igneous rocks form if the cooling occurs quickly on the Earth's surface.

3. Texture is the appearance of the igneous rock when viewed under a microscope. It depends on the rate at which the magma cooled and how long it took to solidify.
4. Peridotite is a dark, coarse-grained intrusive igneous rock that makes up the Earth's mantle. It is primarily composed of the minerals olivine and pyroxene.
5. Earthquakes are caused by the sudden release of energy in the Earth's crust. This energy is released due to the movement of tectonic plates, volcanic activity, or human activity such as mining or drilling.

6. Bowen's reaction series is a sequence of minerals that form as magma cools and solidifies. It explains the order in which minerals crystallize from a cooling magma, starting with the minerals that have the highest melting points.
7. High temperature and low pressure are magma origins that result from melting at shallow depths in the Earth's crust, typically in areas with high heat flow.
8. An atom is the basic unit of a chemical element, consisting of a nucleus of protons and neutrons, with electrons orbiting around the nucleus.

9. Atomic structure is the study of the composition and behavior of atoms. It includes the number and arrangement of subatomic particles in the nucleus and the arrangement of electrons in orbit around the nucleus.
10. Isotopes are variants of a chemical element that have the same number of protons but different numbers of neutrons in the nucleus.
11. Chemical bonding is the process by which two or more atoms are joined together to form a compound. It occurs when the outermost electrons of two atoms interact with each other.

12. A mineral is a naturally occurring inorganic solid that has a crystalline structure and a specific chemical composition.
13. Crystal habit refers to the shape and size of crystals that form in a mineral. It is influenced by the conditions in which the mineral formed, such as temperature and pressure.

To know more about volcanic visit:-

https://brainly.com/question/30437501

#SPJ11

En. Hakimie, a senior site engineer, has worked for the construction company for almost five (5) years. However, he started to feel bored due to the monotonous, repetitive type of work and started to lose enthusiasm for his job. Provide THREE (3) drawbacks for this kind of organizational structure adopted at En. Hakimie company.

Answers

En. Hakimie, a senior site engineer, has worked for the construction company for almost five years. However, he started to feel bored due to the monotonous, repetitive type of work and started to lose enthusiasm for his job. Following are the three drawbacks of this kind of organizational structure adopted at En. Hakimie's company: The first drawback of a monotonous organizational structure is that employees tend to get bored with their jobs.

Employees are given repetitive and routine tasks, which can lead to a lack of motivation and enthusiasm for their jobs. Employees feel demotivated and bored with their daily routines, which can lead to decreased productivity.The second drawback is a lack of innovation and creativity.

A monotonous organizational structure is focused on routine work, and it does not provide opportunities for employees to showcase their creativity. As a result, employees' creativity is stifled, and the company may miss out on innovative ideas that could have helped the company grow.

The third drawback is that it may lead to high turnover rates. Employees who are not satisfied with their work and who are bored with their job may leave the company.

To know more about monotonous visit:

https://brainly.com/question/29587651

#SPJ11

Determinte the required reinforcement for a beam that has a section of b=300 mm and ts) a total depth h=600 mm to resist Mu=696 KN . m. Given: f' c= 30 Nmm2 and fy =420 N/mm2.

Answers

Given data: Total depth of the beam, h = 600mmWidth of the beam, b = 300mmUltimate bending moment, Mu = 696 KN.mGrade of concrete, f’c = 30 N/mm2Grade of steel, fy = 420 N/mm2The formula to calculate the required area of steel to resist bending moment Mu for a rectangular beam is,  Ast

= (Mu * 10^6) / (0.87 * fy * (d - 0.42 * x)) Where,d = Total depth of the beam x = Depth of neutral axis = h / 2 - ((h / 2)^2 - (Mu * 10^6) / (0.87 * f'c * b * d))^0.5Substituting the given values in the above equation,  x = 0.245mAst = (696 * 10^6) / (0.87 * 420 * (0.6 - 0.42 * 0.245)) Ast = 1208.75 mm2Therefore, the required area of steel is 1208.75 mm2.

To determine the reinforcement required for a beam having a section of b = 300 mm and total depth h = 600 mm to resist Mu = 696 KN. m, the formula for calculating the required area of steel to resist bending moment Mu for a rectangular beam is used.

To know more about rectangular visit:

https://brainly.com/question/21416050

#SPJ11

Other Questions
A manager intends to order a new machine and must now decide on the number of spare parts to order along with the machine. The parts cost $408 each and have no salvage value. The manager has compiled the frequency distribution for the probable usage of spare parts:4 spare parts with frequency 0.1;5 spare parts with frequency 0.13,6 spare parts with frequency 0.16;7 spare parts with frequency 0.19; and 8 spare parts with frequency 0.42. For what range of shortage costs would stocking 6 spare parts constitute an optimal decision? a. Between 60.94and 130.4 b. Between 182.8and 391.3 . Between 146.2and 313 d. Between 121.9and 260.9 instructional opportunities for adolescents and young adults who are gifted include In the year 2013, the average SAT mathematics was 513 . Suppose that these scores are Normally distributed with a standard deviation of 80 . Find the score at the 85 th percentile. 596 606 566 576 The assignment is given based on the following objectives: 1. To expose the student on several search engines/sources for retrieval of specific articles/data through the internet or other sources 2. To encourage the student to explore and to read several research based articles on the topic given 3. To evaluate the understanding of the students through the article review writing submitted. Assignment Task Choose one of the following case studies: 1. An airport building 2. School building 3. Hospital building 4. Stadium/sports complex 5. Factory/manufacturing plant6. Or any related building Retrieve/search and read the articles which is related to "Facilities Maintenance Management" in the airport/school/hospital/stadium/factory or any related building. In addition, you are required to: 1. Prepare 10-15 pages of critical literature review, on the articles that you have read. The relevant articles should be attached and submitted (at least 5 latest papers). The use of secondary data is highly encouraged and must be properly referenced.2. Explain also the importance of maintanance mangement in the selected facilities _____ design focuses on the interaction, directly or indirectly, between the service provider(s) and the customer. Group of answer choices Lean servicescape Service process Customer benefit package Service-encounter. what are the factors that make Japan attractive for business ? in political systems, economic systems and legal systems. unadjusted trial balance of Business Solutions (reflecting its transactions for October and November of 2021) follows.Business Solutions had the following transactions and events in December 2021.December 2 Paid $965 cash to Hillside Mall for Business Solutions's share of mall advertising costs.December 3 Paid $420 cash for minor repairs to the company's computer.December 4 Received $4,050 cash from Alex's Engineering Company for the receivable from November.December 10 Paid cash to Lyn Addie for six days of work at the rate of $110 per day. December 14 Notified by Alex's Engineering Company that Business Solutions's bid of $7,200 on a proposed project has beenaccepted. Alex's paid a $2,000 cash advance to Business Solutions. December 15 Purchased $1,300 of computer supplies on credit from Harris Office Products.December 16 Sent a reminder to Gomez Company to pay the fee for services recorded on November 8.December 20 Completed a project for Liu Corporation and received $5,875 cash. December 22-26 Took the week off for the holidays.December 28 Received $3,700 cash from Gomez Company on its receivable.December 29 Reimbursed S. Rey for business automobile mileage (400 miles at $0.30 per mile). December 31 S. Rey withdrew $1,100 cash from the company for personal use.The following additional facts are collected for use in making adjusting entries prior to preparing financial statements for the company's first three months.. The December 31 inventory count of computer supplies shows $640 still available.b. Three months have expired since the 12-month insurance premium was paid in advance. c. As of December 31. Lyn Addie has not been paid for four days of work at $110 per day.d. The computer system, acquired on October 1, is expected to have a four-year life with no salvage value. e. The office equipment, acquired on October 1, is expected to have a five-year life with no salvage value.f. Three of the four months' prepaid rent have expired.Required:1. Prepare journal entries to record each of the December transactions and events for Business Solutions.2-a. Prepare adjusting entries to reflect a through f2-b. Post the journal entries to record each of the December transactions, adjusting entries to the accounts in the ledger. 3. Prepare an adjusted trial balance as of December 31, 2021. You purchase one Apple Tree Inc July 105 call contract for a premium of $8.35. You hold the option until the expiration date when Apple Tree stock sells for $134.59 per share. Calculate gain/loss that you will realize on this investment. Remember that the size of the option contract is 100. Loss should be entered with minus sign. Round the answer to two decimal places. Your Answer: Good inventory management i essere to achieve OK OF 18 loovased profit and reduced cost db All of the options Die Improved machinery performance a Mare distribution cente inced ad any cholte way Traders always earn a profit when an option expires "in-the-money." true or falsaAn option with a high strike price will usually expire in the money. true or falseFor every call option bought, there is a call option sold. true or false Let the sample space be S = {1, 2, 3, 4, 5, 6, 7, 8, 9, 10). Suppose the outcomes are equally likely. Compute the probability of the event E = {6, 8, 10). P(E)-(Type an integer or a decimal. Do not round.) A survey of 200 randomly selected high school students determined that 50 play organized sports. (a) What is the probability that a randomly selected high school student plays organized sports? (b) Interpret this probability. (a) The probability that a randomly selected high school student plays organized sports i List as many concepts from the subject as you can remember that might be relevant to the understanding this situation. Use the specific concepts as part of a series of statements that describe what is happening in an analysis of the Organisational Behaviour. Propose measures that might improve the situation. 400 Words Explain the meaning of cost behavior, and define and describe fixed and variable costsDefine and describe mixed costsDiscuss mixed costs into their fixed and variable componentsExplain the difference between absorption and variable costingDescribe the differences between job-order costing and process costing, and identify the types of firms that would use each methodCompute the predetermined overhead rate, and use the rate to assign overhead to units or services producedIdentify and set up the source documents used in job-order costingDescribe the cost flows associated with job-order costingExplain why functional (or volume)-based costing approaches may produce distorted costsExplain how an activity-based costing system works for product costingDescribe activity-based customer costing and activity-based supplier costingExplain how activity-based management can be used for cost reduction A project produces an annual net income of $11,500, $13,700, and $16,900 over the three years of its life, respectively. The initial cost of the project is $257,000. This cost is depreciated straight-line to a zero book value over three years. What is the average accounting rate of return if the required discount rate is 6.75 %? There are three classes of transportation carriers. Match the types with the definitions. Transport freight [Choose ] via all modes for the general public Do not serve the [Choose] general public only company clients Transport only [Choose] internally generated freight Two alternative ways of taxing real estate are site value taxation and taxation based on assessed value. Explain the differences between these two types of taxation. Which type of taxation will have the lower excess burden? Why? photosynthesis is a redox reaction this means that h2o is The figure below shows a piece of insulated wire formed into the shape of a figure eight. You may consider the two loops of the figure eight to be circles, where the upper loop's radius is 4.00 cm and the lower loop's radius is 7.00 cm. The wire has a uniform resistance per unit length of 7.00 o/m. The wire lies in a plane that is perpendicular to a uniform magnetic field directed into the page, the magnitude of which is increasing at a constant rate of 2.30 T/s. (a) What is the magnitude of the induced current in the wire (in A)? _____A (b) Find the direction of the induced current in the wire. (Select all that apply.) a. clockwise in the upper loop b. clockwise in the lower loop c. counterclockwise in the upper loopd. counterclockwise in the lower loop A ranger in fire tower A spots a fire at a direction of 40 degree. A ranger in fire lower B, which is 28 miles velocity east of tower A, spots the same fire at a direction of 116 degree. How far from tower A is the fire? Solve the problem. A tower is supported by a guy wire 648 ft long. If the wire makes an angle of 42 degree with respect to the ground and the distance from the point where the wire is attached to the ground and the tower is 295 ft, how tall is the tower? Round your answer to the nearest tenth. A young couple would like to add another bathroom to their starter home and anticipate in 5 years it 5 will cost $10,000. What amount invested at the end of each year at 10 percent annually will grow to $10,000 at the end of 5 years?