Explain why the probability that the critical path will be finished in 22 weeks or less is not necessarily the probability that the project will be finished in 22 weeks orless.

Answers

Answer 1

Answer:

The question is very not detailed but I assume that because the path will finish does not mean that the whole thing/project will finish.

Step-by-step explanation:


Related Questions

Can someone help me with this math homework please!

Answers

4. i believe would be D. subtract 1.1j from both sides.
5. x <_ 3
6. y=10

Answer:

Question 1: (C) Step 3

Question 2: (B) The 2nd graph from the left

Question 3: (A, B, D)

Question 4: (D) Subtract 1.1j from both sides

Question 5: (C) x <= 3

Question 6: (D) y = 10

Step-by-step explanation:

Question 1:

Step 3 is where Rahul added 1/4 to both sides. This is the only time he used the addition property of equality.

Question 2:

This questions requires you to have knowledge on how to graph lines.

g(x) = -1 is already graphed correctly on all of the answer choices, so we only have to focus on f(x) = -1/2x - 2.

The y-intercept for f(x) is -2, and only answers B & D have that intercept. However, only B has the correct slope of -1/2.

Question 3:

A is correct because they added 3/5x and x, which is still equal to the original equation.

B is correct because they multiplied all the terms to have a denominator of 30, then multiplied both sides by 30 to eliminate the fractions.

C is wrong because it's supposed to 30x, not just a regular x from the original equation.

D is correct because as you solve the equation for x, you end up adding 18x, 6x, and 30x, which is 54x. 24x + 30x in this answer choice also equals 54x.

E is wrong because they subtracted instead of adding the 6x.

Question 4:

All of the answer choices are wrong except for D because the other choices either use a wrong term (like 4j, which doesn't exist) or the wrong property of equality.

Question 5:

Use basic algebra to sovle the inequality:

2(4 + 2x) >= 5x + 5

(distribute 2 to the (4 + 2x))

8 + 4x >= 5x + 5

(subtract 5 from both sides)

3 + 4x >= 5x

(subtract 4x form both sides)

3 >= x

x <= 3

Question 6:

Use basic algebra to solve for y:

2.8y + 6 + 0.2y = 5y - 14

(subtract 6 from both sides)

2.8y + 0.2y = 5y -20

(add like terms)

3y = 5y - 20

(subtract 5y from both sides)

-2y = -20

(divide both sides by -2)

y = 10

Hope it helps (●'◡'●)

What is the slope of the line? What is the y-intercept of the line? y = -x - 6

Answers

Answer:

m = -1

y intercept = -6

Step-by-step explanation:

The given equation of the line is ,

[tex]\implies y = -x -6[/tex]

We know that the Standard equation of Slope Intercept Form of the line is,

[tex]\implies y = mx + c[/tex]

Where ,

m is slope c is y intercept .

On comparing to the Standard form of the line we get ,

[tex]\implies Slope = -1 [/tex]

[tex]\implies y - intercept= -6 [/tex]

Answer:

Slope: -1

Solution:This equation is written in slope-intercept form (y=mx+b).In this formula, "m" stands for the line's slope and "b" stands for the y-intercept of the line.Also, please notice that the slope of the line is the coefficient of x (the number next to x)If we don't have a number next to x, then the coefficient is equal to 1.If we have a minus sign next to x, then the coefficient is equal to -1.Therefore, the slope of the line is -1.Now, the y-intercept is a constant that's subtracted from/added to the slope.Therefore, the y-intercept of the line is -6.

Hope it helps.

Do comment if you have any query.

Write an equation that represents the line.
Use exact numbers.

Answers

the line passes point (0, -3) and (1, -5)

the slope = (-5+3) /(1-0) = -2/1 = -2

the y-intercept = -3

so, the equation : y = -2x -3

Can someone help with this problem

Answers

which one.

................................

Step-by-step explanation:

................

Answer:

x = 15

Step-by-step explanation:

If A parallel to B then ∠ 2 and ∠ 4 are same- side interior angles and sum to 180° , then

2x + 10 + 4x + 80 = 180 , that is

6x + 90 = 180 ( subtract 90 from both sides )

6x = 90 ( divide both sides by 6 )

x = 15

10
What are the x- and y-coordinates of point E, which
partitions the directed line segment from A to B into a
ratio of 1:2?
B(-4,9)
9
8
X E
(
mn)(x2 – xı) + x
7-
6
5
4
mm. )(x2 - y) + y
3
-7 -6 -5 4 -3 -2 -14
2 3 4 5 6 7
0 (0, 1)
0 (-1,3)
O(-2,5)
(1,0)
X
-2.
3
A(2,-3)
19

Answers

Answer:

Step-by-step explanation:

The formulas to find the x and y coordinates of E are:

[tex]x=\frac{bx_1+ax_2}{a+b}[/tex]  and  [tex]y=\frac{by_1+ay_2}{a+b}[/tex]  where x1, x2, y1, and y2 are from the coordinates of A and B, and a = 1 (from the ratio) and b = 2 (from the ratio). Filling in to find x first:

[tex]x=\frac{2(2)+1(-4)}{1+2}=\frac{4-4}{3}=0[/tex]  and now for y:

[tex]y=\frac{2(-3)+1(9)}{1+2}=\frac{-6+9}{3}=\frac{3}{3}=1[/tex]

The coordinates of E are (0, 1).

Given:

The points are A(2,-3) and B(-4,9).

The point E divides the segment AB in 1:2.

To find:

The coordinates of point E.

Solution:

Section formula: If a point divides a line segment in m:n, then the coordinates of the point is:

[tex]Point=\left(\dfrac{mx_2+nx_1}{m+n},\dfrac{my_2+ny_1}{m+n}\right)[/tex]

Using the section formula, the coordinates of point E are:

[tex]E=\left(\dfrac{1(-4)+2(2)}{1+2},\dfrac{1(9)+2(-3)}{1+2}\right)[/tex]

[tex]E=\left(\dfrac{-4+4)}{3},\dfrac{9-6}{3}\right)[/tex]

[tex]E=\left(\dfrac{0)}{3},\dfrac{3}{3}\right)[/tex]

[tex]E=\left(0,1\right)[/tex]

Therefore, the coordinates of the point E are (0,1).

Maths assignment
y^2-36

Answers

Answer:

Since both terms are perfect squares, factor using the difference of squares formula,  

a ^2 − b ^2 = ( a + b ) ( a − b )

where  

a = y

and  

b = 6  

( y + 6 ) ( y − 6 )

EXERCISE NA Amarutactures 1200 scooters in 18 days. How many scooters does mane in 1 day​

Answers

Answer:

66

Step-by-step explanation:

he uses 66 in one day

Express these numerals in the expanded form of power 10. (4) a. 5060 b.6079000 2. How many millions are there in 3 crore?(1) 3.What is the greatest number of 6 digits?(1) 4.What is the least number formed by 5 digits 4,1,8,0,7?(1) 5. Simplify: a. 18 - 7 + 9* 48/6 - 5 (1) b. 72/ 12 [ 180/4{10 +(15 - 45 /9*2)}]

Answers

Answer:

[tex]a)\ 5.06 * 10\³[/tex]

[tex]b)\ 6.079 * 10^6[/tex]

[tex]c)\ 3\ crore = 30\ million[/tex]

[tex]d)\ 999999[/tex]

[tex]e)\ 10478[/tex]

[tex]f)\ 78[/tex]

[tex]g)\ 2730[/tex]

Step-by-step explanation:

Solving (a): 5060 as a power of 10

We simply move the decimal between 5 and 6. The number of zeros to move backward is 4.

So,

[tex]5 0 6 0 = 5.06 * 10^3[/tex]

Solving (b): 6079000 as a power of 10

We simply move the decimal between 6 and 0. The number of zeros to move backward is 4.

So,

[tex]6079000 = 6.079 * 10^6[/tex]

Solving (c): 3 crore to millions

[tex]1\ crore = 10\ million[/tex]

Multiply by 3

[tex]3\ crore = 30\ million[/tex]

Solving (d): The greatest 6 digits

The greatest unit digit is 9. So, we simply write out 9 in 6 places

[tex]Greatest= 99999[/tex]

Solving (e): The least 5-digit formed from 4,1,8,0,7

To do this, we start the number from the smallest non-zero digit.

The remaining 4 digits will then be in an increasing order

So, we have:

[tex]Least = 10478[/tex]

Solving (f):

[tex]18 - 7 + 9 * \frac{48}{6} - 5[/tex]

Using BODMAS

Evaluate the division, first

[tex]18 - 7 + 9 * 8 - 5[/tex]

Then multiplication

[tex]18 - 7 + 72 - 5[/tex]

Add up the remaining digits

[tex]78[/tex]

Solving (g): This question is not clear.

I will assume the expression is:

[tex]\frac{72}{ 12}* [ \frac{180}{4}*{10 +(15 - \frac{45}{9}*2)}][/tex]

Evaluate all divisions

[tex]6* [ 45*{10 +(15 - 5*2)}][/tex]

Solve the multiplication in brackets

[tex]6* [ 45*{10 +(15 - 10)}][/tex]

Remove the inner bracket

[tex]6* [ 45*{10 +5}][/tex]

Evaluate 45 * 10

[tex]6* [ 450 +5}][/tex]

Remove the bracket

[tex]6* 455[/tex]

Multiply

[tex]2730[/tex]

Simplify the expression by combining like
terms:
2b + 7b2 - 2 + 3b - 1 + b

Answers

Answer:

[tex]7b^2+6b-3[/tex]

Step-by-step explanation:

Given:

[tex]2b+7b^2-2+3b-1+b[/tex]

Combine like terms.

[tex]7b^2+6b-3[/tex]

Hope this helps.

The coordinates of the point that is a reflection of Y(-4, -2) across the x-axis are (_,_)
The coordinates of the point that is a reflection of Y across the y-axis are (_,_) also anwser the top u know

Answers

Answer:

(-4,2)

Step-by-step explanation:

How to solve the area of a triangle

Answers

The area A of a triangle is given by the formula A=1/2*b*h where b is the base and h is the height of the triangle.

Step-by-step explanation:

The photo which is in the attachment is an example for your question.

hope this answer helps you!!

A baker's bread recipe calls for 3
cups of flour. She plans to make 2 loaves of
bread
If the baker's measuring scoop holds cup, how many scoops of
flour will she need in all?

Answers

answer: 6 cups
explanation: she has 1 cup measuring cup and has to fill it 3 times for each loaf 3*2=6

Z Is An Even Integar Greater Than 30 And Less Than Or Equal To 34.

Answers

Answer:

34 is greater than or equal to z which is greater than or equal to 30

In right triangle PQR, m∠Q = 90° and sin R=5/13
What is the value of cos R?
a) 5/13 b)5/12 c) 12/13 d) 12/5

Answers

Answer:

C

Step-by-step explanation:

Given

sinR = [tex]\frac{5}{13}[/tex] = [tex]\frac{opposite}{hypotenuse}[/tex]

This is a 5- 12- 13 triangle with legs PQ = 5, QR = 12, hypotenuse PR = 13

cosR = [tex]\frac{adjacent}{hypotenuse}[/tex] = [tex]\frac{QR}{PR}[/tex] = [tex]\frac{12}{13}[/tex]

When do you need to state a domain in your final answer?

Answers

Answer:

Not sure what you are asking.

Domain is all x values .

It can be stated in coordinates (x,y). X is the input. Y is output

It can be stated in Domain Notations such as {x | x ≥ 0}

There are 3 feet in 1 yard. This is equivalent to 12 feet in 4 yards. Which proportion can be used to represent this?
12th
$
12
Save and Exit
Next
Submit
Mark this and return

Answers

Answer:

divide 3 by the amount of feet to get to the yards

Step-by-step explanation:

For every three feet, there's always one yard

so to do this only given feet, we'll need to divide the amount of feet by 3 to represent the amount of yards

Solve the quadratic equation by factoring. Show your work and explain the steps you used to solve. 6x2 + 11x + 3 = 0

Answers

Answer:

6 x 2 = 8 + 11 = 19 x 3 = 57

Step-by-step explanation:

I NEED HELP AND NOBODY HELPING ME !!

Answers

mV + mW = mR
mVUF = 71+23=94

If A = {1, 2, 3} the number of non-empty proper subsets are ​

Answers

Answer:

The number of non empty proper subsets of a set with 3 elements is =23−2=8−2=6.

In the graph increasing, decreasing, or constant?

Answers

The graph is increasing

Answer:

Step-by-step explanation:

slope>0 so graph is increasing.

Si 4/9 de los adolencentes que confirmaron su asitencia fueron varones y 4/5 de las mujeres a pesar que confirmaron su asistencia no participaron y 24 que confirmaron su asistencia si participaron ¿cuantos adolecentes en total confirmaron su asitencia?¿Cuantos adolencentes varones confirmaron su asistencia?

Answers

Answer:

216 adolescentes confirmaron su asistencia, de los cuales 120 fueron mujeres y 96 varones.

Step-by-step explanation:

Dado que 4/9 de los adolescentes que confirmaron su asistencia fueron varones, y 4/5 de las mujeres a pesar que confirmaron su asistencia no participaron, y 24 que confirmaron su asistencia si participaron, para determinar cuántos adolescentes en total confirmaron su asistencia y cuántos adolescentes varones confirmaron su asistencia se deben realizar los siguientes cálculos:

5/9 x 1/5 = 24

5/45 = 24

1/45 = 4.8

4.8 x 45 = 216

216 / 9 x 5 = 120

216 / 9 x 4 = 96

Por lo tanto, en total 216 adolescentes confirmaron su asistencia, de los cuales 120 fueron mujeres y 96 varones.

does the point (-4, 2) lie inside or outside or on the circle x^2 + y^2 = 25?​

Answers

Step-by-step explanation:

The solution and answer are well written in the Pic above.

Given equation of the Circle is ,

[tex]\sf\implies x^2 + y^2 = 25 [/tex]

And we need to tell that whether the point (-4,2) lies inside or outside the circle. On converting the equation into Standard form and determinimg the centre of the circle as ,

[tex]\sf\implies (x-0)^2 +( y-0)^2 = 5 ^2[/tex]

Here we can say that ,

• Radius = 5 units

• Centre = (0,0)

Finding distance between the two points :-

[tex]\sf\implies Distance = \sqrt{ (0+4)^2+(2-0)^2} \\\\\sf\implies Distance = \sqrt{ 16 + 4 } \\\\\sf\implies Distance =\sqrt{20}\\\\\sf\implies\red{ Distance = 4.47 }[/tex]

Here we can see that the distance of point from centre is less than the radius.

Hence the point lies within the circle .

Given P(A) = 0.36, P(B) = 0.2 and P(ANB) = 0.122, find the value of P(AUB), rounding to the nearest thousandth, if necessary.​

Answers

Answer:

The value of P(AUB) = 0.438

Step-by-step explanation:

Given:

P(A) = 0.36

P(B) = 0.2

P(A∩B) = 0.122

Find:

The value of P(AUB)

Computation:

P(AUB) = P(A) + P(B) - P(A∩B)

The value of P(AUB) = 0.36 + 0.2 - 0.122

The value of P(AUB) = 0.56 - 0.122

The value of P(AUB) = 0.438

65. A city has a population of 25,000. The population is expected to increase by 5.5% annually for the
next decade. (See Example 5)
a. Write a function that represents the
City Population
population y after t years.
УГ
40,000
35,000
30,000
25,000
b. Graph the function from part (a). Use the 20,000
graph to estimate the population after 4
15,000
years.
10,000
5000
0
0 1 2 3 4 5 6 7 8 t
Year
Population

Answers

Answer:

The answer will be 0.45%

Step-by-step explanation:

im right

The table shows the altitudes of four different cities. What is the correct way to arrange the altitudes in decreasing order?

City Altitude (feet)
Snowvale 13
Highbridge 58
Westsilver -51
Springmoor -35
A.
58, 13, -35, -51
B.
-51, -35, 13, 58
C.
-35, -51, 13, 58
D.
58, 13, -51, -35

Answers

Answer:

Step-by-step explanation:

i think A

ANSWERA.

Hope this helps!

Find an equation for the perpendicular bisector of the line segment
whose endpoints are (9, -3) and (-5, –7).

Answers

Step-by-step explanation:

So here is my attempt. And i guess its correct

help please
h - (-2) ≥ 10​

Answers

Answer:

answer

Step-by-step explanation:

h+2 ≥ 10

h ≥ 10 - 2

h ≥ 8

Type the correct answer in each box. Use numerals instead of words. If necessary, use / for the fraction bar(s). Complete this number sentence so that it illustrates the identity property of multiplication? ____ x ____ = 57

Answers

Answer:

57 x 1 =57

Step-by-step explanation:

Please remember identity property of multiplication says

An integer * 1 = the same integer

Using this property

57 x 1 = 57

Christopher's car can drive 230 miles on a full tank of gas. He plans to drive with a full tank from Austin to Dallas, which is 195 miles. How many miles will be left once he arrives in Dallas?

Answers

Answer:

35 miles

Step-by-step explanation:

Total Miles driven at full tank = 230 miles

Miles drive at full tank from Austin to Dallas = 195 miles

How many miles will be left once he arrives in Dallas?

Number of miles remaining at full tank = Total Miles driven at full tank - Miles drive at full tank from Austin to Dallas

= 230 miles - 195 miles

= 35 miles

HELPPP SOMEONE PLEASSSSE

Answers

Answer:

c. -x -y = 5

Step-by-step explanation:

parallel means same x

Other Questions
Cmo se logra obtener un mercado externo en constante crecimiento que permite aumentar el consumo y obtener materias primas para las fbricas? Determine whether the sentences describe sedimentary rock, intrusive igneous rock, or both. When a rigid body rotates about a fixed axis, all the points in the body have the same Group of answer choices linear displacement. angular acceleration. centripetal acceleration. tangential speed. tangential acceleration. A circle is centered at the point (5,-4) and passes through the point (-3, 2). what is the equation of this circle? Solve for x. Round to the nearest tenth, if necessary. pls answer w explanation!What is the product of the complex numbers 2 + 6i and 2 - 6i? (Note: i= -1) What are the steps in order of operations Determine the volume and the surface area of the three dimension figure The demand for cigarettes is highly inelastic. This suggests that the incidence of a higher tax on cigarettes will fall primarily on can someone please help me with my math assignment??? really need the answer today. And also please don't answer this if you didn't know or for just points Which is a stretch of an exponential decay function?f(x) =4/5(5/4)f(x) = 4/5(4/5)f(x) =5/4(4/5)fx) = 5/4(5/4) Why did A. Philip Randolph plan a march on Washington in 1941?O A. To protest the war effortB. To demand the right to voteC. To support Communism in the United StatesD. To protest segregation in the defense industries If < W and < Y are supplementary, and < W = 121 , then what would < Y measure? Select one: a. 121 b. 69 c. 59 d. 13 In a second order lever system the force ratio is 2.5, the load is at the distance of 0.5m from the fulcrum find distance of effort if it losses are negligible Simplify the expression. (6)8 + (6)3 If you refuse a legal chemical test issued by a law enforcement officer, the Division of Motor Vehicles is required to: In the historic U.S. Supreme Court case of Marbury v. Madison(1803), Chief Justice John Marshall A. established judicial review for the SCOTUS B. saved the institutional integrity of the Court by avoiding the appearance of impotence C. ruled that statutory law cannot change constitutional law D. ruled an act of Congress unconstitutional for the first time E. all of the above According to you what makes a person beautiful? A tortoise moves forward 15 meters in one hour. It turns around and crawls 10 meters in thenext hour. Finally, in the third hour, it turns around again and crawls 8 more meters. Howmuch did the tortoise walk in total in 3 hours? Help me with this problem